You are on page 1of 15

CONTRACTS SETTLED IN C & M WING FROM 01.09.2020 To 30.09.

2020

S No Name of work/Contract No. Date of Date of Date of Name of bidders Name of the sucessful
Inviting opening the award of participated in the tender contractor & Contract
Tenders Tender contract & their quoted value Value

1 Outsourcing of Operation and 18.02.2020 10.03.2020 04.09.2020 Two bids received M/s.Ravi associates,
Maintenance of (4MLD HT 3 Shift) 1.G.S.Naidu Chennai
Tondiarpet D SPS, (3 MLD LT-3 constructions, Rs.1,53,93,619.50
shifts) RK Nagar South SPS and Chennai after negotiation
(7.5 MLD LT-3 Shifts) Kadumpadi Rs.1,67,60,800.00
amman koil street SPS in Area- IV for 2.M/s.Ravi
three years on performance based associates,Chennai
contract Rs.1,65,34,500.00
CNT/SEW/MWB/3237/ 2019-20
2 Outsourcing of Operation and 18.02.2020 10.03.2020 04.09.2020 Two bids received M/s.Annai Abirami
Maintenance of (7MLD HT-3 shifts) 1.M/s.Annai Abirami Enterprises,
RK Nagar North SPS in Area- IV for Enterprises,Chennai Chennai
three years on performance based Rs.66,24,020.00 Rs.61,37,154.53
contract 2.M/s.M.S.Construc- after negotiation
CNT/SEW/MWB/3238/ 2019-20 tion,Chennai
Rs.68,14,185.00
3 Outsourcing of Operation and 18.02.2020 10.03.2020 04.09.2020 Two bids received M/s.V.Chinnaduari&
Maintenance of (36MLD HT- Relay 3 1.M/s.V.Chinnaduari& Co.Chennai
shift) Tondiarpet „F‟ New Relay SPS, Co.Chennai Rs.1,59,30,404.01
(3MLD LT-3 shifts) Thendral Nagar Rs.1,69,74,325.00 after negotiation
SPS and (3MLD LT-3 Shifts) 2.M/s.Ravi
Poongavanam Nagar SPS in Area- associates,Chennai
IV for three years on performance Rs.1,71,76,900.00
based contract
CNT/SEW/MWB/3239/ 2019-20
4 Outsourcing of Operation and 18.02.2020 10.03.2020 04.09.2020 Two bids received M/s.N.Nedunchezhiyan,C
Maintenance of (8MLD HT-3 shifts) 1.M/s.Chinnammal hennai
Tondiarpet A SPS, (2 MLD LT-2 shift) Enterprises Trichy Rs.1,56,78,910.80
RR Nagar SPS, (1MLD LT-2 Shift) Rs.1,65,89,615.00 after negotiation
Bharathi Nagar SPS in Area IV and 2.M/s.N.Nedunchezhiyan,
(0.5MLD LT-2 Shift) Chettithotam Chennai
SPS in Area V SPS for three years Rs.1,65,56,400.00
on performance based contract
CNT/SEW/MWB/3240/ 2019-20

5 Outsourcing of Operation and 18.02.2020 10.03.2020 04.09.2020 Two bids received M/s.Ravi associates,
Maintenance for (5 MLD HT3 Shift) 1.G.S.Naidu Chennai
CB Road SPS , (3.5 MLD LT3 Shift) constructions, Rs.1,53,91,966.05
TV Nagar SPS and (3MLD LT-3Shift) Chennai after negotiation
Kamarajar salai in Area- IV for three Rs.1,67,60,800.00
years on performance based contract 2.M/s.Ravi
CNT/SEW/MWB/3241/ 2019-20 associates,Chennai
Rs.1,65,34,500.00
6 Outsourcing of Operation and 18.02.2020 10.03.2020 04.09.2020 Two bids received. M/s.Vee Pee
Maintenance for (13 MLD HT-3 shifts) 1.M/s.Ravi Constructions chennai
KKD SPS, (2.5 MLD LT-3 Shifts) associates,ChennaiRs.1, Rs.1,53,96,116.10
Nehru Nagar SPS and (2 MLD LT- 67,90,000.00 after negotiation
3Shifts) KB4 SPS in Area- IV for 2.M/s.Vee Pee
three years on performance based Constructions chennai
contract Rs.1,65,71,000.00
CNT/SEW/MWB/3242/ 2019-20
7 Outsourcing of Operation and 18.02.2020 10.03.2020 04.09.2020 Two bids received M/s.ESSAR
Maintenance of (3.5 MLD HT3 shift) 1.M/s.ESSAR Constructions,
Muthamizh Nagar SPS in Area- IV Constructions,Chennai Chennai
for three years on performance based Rs.66,52,125.00 Rs.61,36,585.31
contract 2.G.S.Naidu after negotiation
CNT/SEW/MWB/3243/ 2019-20 constructions,
Chennai
Rs.67,21,475.00
CONTRACTS SETTLED IN C & M WING FROM 01.09.2020 To 30.09.2020

S No Name of work/Contract No. Date of Date of Date of Name of bidders Name of the sucessful
Inviting opening the award of participated in the tender contractor & Contract
Tenders Tender contract & their quoted value Value

8 Outsourcing of Operation and 18.02.2020 10.03.2020 04.09.2020 Two bids received M/s.Chinnammal
Maintenance of (4MLD HT-3 Shift) 1.M/s.Chinnammal Enterprises Trichy
Tondiarpet E SPS, (6.5 MLD LT-3 Enterprises Trichy Rs.1,53,75,763.69
shifts) Kasimedu SPS and (3MLD LT- Rs.1,62,53,450.00 after negotiation
3 Shifts) DBK Street SPS in Area- IV 2.M/s.N.Nedunchezhiyan,
for three years on performance based Chennai
contract Rs.1,62,68,780.00
CNT/SEW/MWB/3244/ 2019-20
9 Outsourcing the Operation and 25.02.2020 19.03.2020 04.09.2020 Two bids received M/s.V.Chinnadurai&Co.C
Maintenance of Sewage Pumping 1.M/s.Chinnammal hennai
Stations on the following locations for Enterprises,Chennai Rs.1,74,41,246.68
three years on Performance based Rs.1,89,54,450.00 after negotiation
contract at Royapuram , Tondiarpet 2.M/s.V.Chinnadurai&Co.
„B‟, & Tondiarpet „C‟ Area- V Chennai
CNT/SEW/MWB/3326/ 2019-20 Rs.1,88,24,875.00

10 Outsourcing the Operation and 25.02.2020 19.03.2020 04.09.2020 Two bids received M/s.Sri Selvaganapathy
Maintenance of Sewage Pumping 1.Th.R.Radhakrishnan, Engineers
Stations on the following locations for Chennai Rs.92,51,136.70
three years on Performance based Rs.1,05,52,150.00 after negotiation
contract at Ezhil Nagar, Kannagi 2.M/s.Sri Selvaganapathy
Nagar Area- XV Engineers
CNT/SEW/MWB/3332/ 2019-20 Rs.1,00,22,900.00

11 Outsourcing of Operation and 18.02.2020 19.03.2020 04.09.2020 Two bids received. M/s.D.Kumar &Sons
Maintenance of Sewage Pumping 1.M/s.D.Kumar &Sons Rs.2,14,54,564.51
Stations for three years on Rs.2,37,75,005.00 after negotiation
performance based contract 2.Th.E.Saravanan
atGreams Road,South Rs.2,41,03,870.00
Mylapore,Karneeswarar Pakoda 3.M/s,Calcutta Tube
Street,Independence Day Park & Company- Non
Kumarappa in Area-IX responsive
CNT/SEW/MWB/3252/ 2019-20
12 Outsourcing the Operation and 25.02.2020 17.03.2020 04.09.2020 Two bids received M/s.Sapthagiri Engineers
Maintenance of water distribution 1.M/s.Build Tech and Constructions,
station and Head works. of the Engineers,Chennai Chennai Rs.71,36,421.60
following locations for three years Rs.79,20,500.00 after negotiation
MRC Nagar (Mylapore & Nandanam) 2.M/s.Sapthagiri
WDS Area XIII Engineers and
CNT/WSS/MWB/3295/ 2019-20 Constructions, Chennai
Rs.77,23,400.00
13 Outsourcing of the Operating staff for 25.02.2020 19.03.2020 04.09.2020 Two bids received M/s.Chinnammal
the operation and maintenance of 1.M/s.Chinnammal Enterprises
various sections of pump houses at Enterprises Rs.2,81,37,648.00
Regional Office-I for a period of 24 Rs.3,05,84,400.00 after negotiation
months- 2.M/s.Eco Protection
CNT/WSS/MWB/3231/ 2019-20 Engineers Pvt.Ltd.
Rs.3,09,20,400.00
CONTRACTS SETTLED IN C & M WING FROM 01.09.2020 To 30.09.2020

S No Name of work/Contract No. Date of Date of Date of Name of bidders Name of the sucessful
Inviting opening the award of participated in the tender contractor & Contract
Tenders Tender contract & their quoted value Value

14 Outsourcing the Operation and 24.02.2020 18.03.2020 04.09.2020 Two bids received M/s.Vedas Infratech,
Maintenance of Sewage Pumping 1.M/s.D.Kumar &Sons Consultant,Pvt.Ltd,
Stations on the following locations for Chennai Chennai
three years on Performance based Rs.1,23,86,275.00 Rs.1,09,90,518.65
contract at AGS Colony SPS, after negotiation
Drowpathy Amman Koil street 2.M/s.Vedas Infratech,
SPS&Ravanan Nagar SPS Area- XIV Consultant,Pvt.Ltd,
CNT/SEW/MWB/3301/ 2019-20 Chennai
Rs.1,21.77,860.00

15 Outsourcing of Operation and 18.02.2020 11.03.2020 04.09.2020 Two bids received M/s.V.Subbiah,
Maintenance of Sewage Pumping 1.M/s.V.Chinnaduari& Chennai
Stations for three years on Co.Chennai. Rs.63,67,607.50
performance based contract at Rs.68,93,390.00 after negotiation
Giriappa Road and Puliyarpuram in M/s.V.Subbiah, Chennai
Area-IX CNT/SEW/MWB/3254/2019- Rs.68,83,900.00
20
16 Outsourcing of Operation and 18.02.2020 11.03.2020 04.09.2020 Two bids received Th.V.Subbiah,
Maintenance of Headworks for three 1.M/s.V.Chinnaduari& Chennai Rs.71,36,991.00
years on performance based Co.Chennai. after negotiation
contract at Southern Headworks in Rs.77,96,400.00
Area IX CNT/WSS/MWB/3263/ 2019- 2.Th.V.Subbiah,
20 Chennai
Rs.77,74,500.00
17 Outsourcing of Operation and 18.02.2020 11.03.2020 04.09.2020 Two bids received M/s.C.S.Constructions,
Maintenance of WDS for three years 1.M/s.C.S. Chennai Rs.71,36,757.40
on performance based contract at Constructions,Chennai after negotiation
KK Nagar New WDS in Area X Rs.77,38,000.00
CNT/WSS/MWB/3264/ 2019-20 2.M/s.Home Makers
Private Ltd,Chennai
Rs.79,02,250.00
18 Outsourcing the Operation and 18.02.2020 12.03.2020 04.09.2020 Two bids received M/s.Jeyakumar
Maintenance of Sewage Pumping 1.M/s.Jeyakumar Engineering Contractor
Stations on the following locations for Engineering Contractor Rs.63,61,293.00
three years on Performance based Rs.67,89,000.00 after negotiation
contract at Dimmasamydarga & 2.M/s.Vee Pee
Sivanada Nagar in Area VI Constructions
CNT/SEW/MWB/3273/ 2019-20 Rs.72,27,000.00

19 Outsourcing the Operation and 25.02.2020 17.03.2020 04.09.2020 Two bids received M/s.M.S.Construction,
Maintenance of Sewage Pumping 1.M/s.Annai Abirami Chennai
Stations on the following locations for Rs.70,08,000.00 Rs.63,60,723.60
three years on Performance based Enterprises,Chennai after negotiation
contract at Ayothikuppam and Ram 2.M/s.M.S.Construction,C
Nagar Area- IX hennai Rs.68,83,900.00
CNT/SEW/MWB/3285/ 2019-20

20 Outsourcing the Operation and 25.02.2020 17.03.2020 04.09.2020 Two bids received Th.R.Seethapathi,
Maintenance of Sewage Pumping 1.Th.P.N.Desikan Chennai
Stations on the following locations for Rs.74,09,500.00 Rs.66,81,361.50
three years on Performance based 2.Th.R.Seethapathi, after negotiation
contract at T.Nagar Area- X Chennai
CNT/SEW/MWB/3286/ 2019-20 Rs.72,27,000.00
CONTRACTS SETTLED IN C & M WING FROM 01.09.2020 To 30.09.2020

S No Name of work/Contract No. Date of Date of Date of Name of bidders Name of the sucessful
Inviting opening the award of participated in the tender contractor & Contract
Tenders Tender contract & their quoted value Value

21 Outsourcing the Operation and 25.02.2020 19.03.2020 04.09.2020 Single bid received M/s.MV power
Maintenance of Sewage Pumping 1.M/s.MV power consultants & Engineers
Stations on the following locations for consultants & Engineers Pvt.Ltd,
three years on Performance based Pvt.Ltd, Chennai.
contract at Vinayakapuram , Chennai Rs.95,53,108.50
Singaravelan Nagar, Veerakutty SPS Rs.1,06,76,250.00 after negotiation
Area- IV
CNT/SEW/MWB/3328/ 2019-20

22 CRRT -Phase 1- Package 35- 03.12.2019 28.01.2020 04.09.2020 Single bid received M/s.VVV
Enlargement of existing 400mm dia M/s.VVV Constructions,Pvt.Ltd,
CI Pumping main to 600mm CI Constructions,Pvt.Ltd, Chennai
pumping main from Saidapet „A‟ to Chennai. Rs.23,57,77,851.23
junction of Govindan Street and Rs.25,90,68,070.86 after negotiation
enlargement of existing 525mm dia
CI pumping main to 800mm dia CI
pumping main from Saidapet „B‟ SPS
to Nesapakkam STP.Tender No.
CNT/SEW/NCB/CRRT/ PHASE
I/069/2019-20

23 Outsourcing the Operation and 25.02.2020 17.03.2020 04.09.2020 Two bids received Th.R.Radhakrishnan,
Maintenance of water distribution 1.Th.R.Radhakrishnan, Chennai.
station and Head works. of the Rs.1,81,44,880.00 Rs.1,67,96,715.42
following locations for three years 2.M/s.Sri Selvaganapathy after negotiation
Thillai Ganga Nagar, Nehru Engineers,
Nedunchalai, B.V Nagar and Kannan Rs.1,91,26,000.00
Colony.WDS Area XII
CNT/WSS/MWB/3293/2019-20

24 Package I – Balance works under 31.12.2019 23.01.2020 04.09.2020 Single bid received M/s.VVV
providing comprehensive sewerage M/s.VVV Constructions,Pvt.Ltd,
scheme to Pallikaranai with collection Constructions,Pvt.Ltd, Chennai
system, pumping station, pumping Chennai. Rs.24,30,95,545.64
main, allied electrical works and Rs.25,69,17,718.92 after negotiation
trenchless technology for road and
canal crossing works (Zone 1 to 4)
CNT/SEW/NCB/JNNURM/164A/
2019-20

25 Providing Concrete Roads, Security 02.06.2020 28.07.2020 04.09.2020 Two bids received M/s.Chinnammal
room, Solar lighting, Rain Water 1.M/s.Chinnammal Enterprises,Trichy.
Harvesting strucuture and Enterprises,Trichy, Rs.93,73,902.83
Landscaping at Thervoykandigai Rs.1,01,82,228.89 after negotiation
Pump House – 2.M/s.C.S. Constructions,
CNT/WSS/TNIPP/3222B/2020-21 Rs.1,03,69,796.27

26 Outsourcing the Operation and 25.02.2020 18.03.2020 07.09.2020 Two bids received M/s.Classic Engineering
Maintenance of Sewage Pumping 1.M/s.Classic Enterprises,
Stations on the following locations for Engineering Enterprises, Coimbatore
three years on Performance based Coimbatore Rs.92,48,136.21
contract at Neithal Nagar, Jai Hind Rs.99,97,985.10 after negotiation
NagarArea I 2.Th.E.Saravanan,
CNT/SEW/MWB/3311/ 2019-20 Chennai.
Rs.1,07,09,990.60.00
CONTRACTS SETTLED IN C & M WING FROM 01.09.2020 To 30.09.2020

S No Name of work/Contract No. Date of Date of Date of Name of bidders Name of the sucessful
Inviting opening the award of participated in the tender contractor & Contract
Tenders Tender contract & their quoted value Value

27 Outsourcing of operation and 18.02.2020 10.03.2020 08.09.2020 Two bids received M/s.P.Nagadevan
maintenance of the (LT2 Shift 1.G.S.Naidu &Co.Chennai
0.80MLD) East cemetery road constructions, Rs.1,73,44,456.17
pumping station, (LT2 Shift 0.70MLD) Chennai after negotiation
Bojaraja nagar, (LT2 Shift 0.50MLD) Rs.1,87,35,450.00
muthamizh nagar , (LT2 Shift 2.M/s.P.Nagadevan
0.80MLD) stanley sewage pumping &Co.Chennai
stations and (LT 3 shift 2.0MLD) at Rs.1,83,85,050.00
Malaiyappan street Sewage pumping
station in Area V for 3 years on
performance based contract.
CNT/SEW/MWB/3245/ 2019-20

28 outsourcing of operation and 18.02.2020 10.03.2020 08.09.2020 Two bids received M/s.P.Nagadevan
maintenance of (LT2 Shift 0.35MLD) 1.M/s.P.Nagadevan &Co.Chennai
Navalar nagar pumping station, (LT2 &Co.Chennai Rs.1,73,42,617.66
Shift 0.6MLD) Sathyavanimuthu Rs.1,83,85,050.00 after negotiation
nagar, (LT2 Shift 0.2 MLD) 2.M/s.Ravi
Meenambal sivraj nagar, (LT2 Shift associates,Chennai
0.7MLD) Kathpada sewage pumping Rs.1,87,35,450.00
stations and (LT3 Shift 2MLD ) at
Border thottam Sewage pumping
station in Area V for 3 years on
performance based contract.
CNT/SEW/MWB/3246/ 2019-20

29 Operation and Maintenance of 18.02.2020 10.03.2020 08.09.2020 Two bids received M/s.P.Nagadevan
Mogappair (23 MLD HT-3 shift) Relay 1.M/s.Pon Nagu &Co. &Co.Chennai
Sewage Pumping station in Area-VII Rs.1,23,11,450.00 Rs.1,13,05,263.52
and Periyar Salai (2.0 MLD LT-3) 2.M/s.P.Nagadevan after negotiation
Sewage Pumping station in Area-VIII &Co.Chennai
for a period of 3 years on Rs.1,19,74,646.25
performance based contract.
CNT/SEW/MWB/3247/ 2019-20

30 Operation and Maintenance of Anna 18.02.2020 10.03.2020 08.09.2020 Two bids received M/s.Kalaichandran
Nagar 'B' ( 18 MLD HT 3 1.M/s.Kalaichandran &Co,Chennai
relay),Thiruvalluvar Nagar( 1.0 MLD &Co,Chennai Rs.1,59,11,171.25
LT 3 shift), Sastri Nagar (0.9 MLD Rs.2,01,66,250.00 after negotiation
LT3 shift)sewage pumping station in 2.M/s.Sri Venkteswra
Area VIII for 3 years on Performance industries,Chennai
based contract Rs.2,14,25,500.00
CNT/SEW/MWB/3250/ 2019-20
31 Out sourcing of Operation and 18.02.2020 10.03.2020 08.09.2020 Two bids received. M/s.VE Tech
Maintenance of (14.0MLDHT3 shift) 1.M/s.Ravi Infrastructures,&
Greams Road , (10.00MLD HT3 associates,Chennai Projects,Chennai
shifts) South Mylapore, (1.30MLD Rs.2,14,62,000.00 Rs.1,94,87,373.36
LT3 shift)Karneeswarar Pakoda 2.M/s.VE Tech after negotiation
Street , (2.50MLD LT 2 Infrastructures,&
shift)Independence Day park and Projects,Chennai
(0.5MLD Road side) Kumarappa Rs.2,08,48,800.00
Sewage Pumping Station in Area-IX
for 3 years on performance based
contract”
CNT/SEW/MWB/3251/ 2019-20
CONTRACTS SETTLED IN C & M WING FROM 01.09.2020 To 30.09.2020

S No Name of work/Contract No. Date of Date of Date of Name of bidders Name of the sucessful
Inviting opening the award of participated in the tender contractor & Contract
Tenders Tender contract & their quoted value Value

32 Outsourcing of Operation and 18.02.2020 11.03.2020 08.09.2020 Two bids received Th.E.Venkatesan,
Maintenance of West Arumbakkam 1.Th.D.Kumar Chennai
(5.5 MLD, HT/3 Shifts) Sewage &sons,chennai Rs.1,56,91,711.88
Pumping Station, Gothamedu (0.5 Rs.1,76,93,987.18 after negotiation
MLD, LT/2 Shifts) sewage pumping 2.Th.E.Venkatesan,
station, Gandhi Nagar (2.0 MLD, LT/2 Chennai
Shifts) sewage pumping station and Rs.1,73,85,011.74
Kulasekarapuram (1.0 MLD, LT/2
Shifts) sewage pumping station for
Three years on performance based
contract.
CNT/SEW/MWB/3258/ 2019-20

33 Outsourcing of Operation and 18.02.2020 11.03.2020 08.09.2020 Two bids received Th.E.Saravanan, Chennai
Maintenance of Saidapet “A” (2.50 1.Th.D.Kumar Rs.1,38,82,792.86 after
MLD, LT/3 shifts) Sewage Pumping &sons,chennai negotiation
Station, Jaffarkhanpet (4.0 MLD, LT/3 Rs.1,56,38,384.85
shifts) Sewage Pumping Station in 2.Th.E.Saravanan,
Area - X and Kannan Colony (2.0 Chennai
MLD, LT/3 shifts) Sewage Pumping Rs.1,53,91,122.90
Station in Area - XII for Three years
on performance based
contract.CNT/SEW/MWB/3259/ 2019-
20

34 Outsourcing of Operation and 18.02.2020 11.03.2020 08.09.2020 Two bids received. M/s.Vee Pee
Maintenance of Saidapet “A” (2.50 1.M/s.Ravi Constructions chennai
MLD, LT/3 shifts) Sewage Pumping associates,Chennai Rs.1,38,82,388.10
Station, Jaffarkhanpet (4.0 MLD, LT/3 Rs.1,52,20,500.00 after negotiation
shifts) Sewage Pumping Station in 2.M/s.Vee Pee
Area - X and Kannan Colony (2.0 Constructions chennai
MLD, LT/3 shifts) Sewage Pumping Rs.1,50,01,500.00
Station in Area - XII for Three years
on performance based contract.
CNT/SEW/MWB/3261/ 2019-20

35 Outsourcing of Operation and 18.02.2020 11.03.2020 08.09.2020 Two bids received M/s.G.S.Naidu
Maintenance of Saligramam (11.0 1.M/s.G.S.Naidu constructions,
MLD, HT/3 Shifts) Sewage Pumping constructions, Chennai after negotiation
Station, Virugambakkam (5.5 MLD, Chennai Rs.1,39,49,942.30
LT/3 Shifts) sewage pumping station Rs.1,50,74,500.00 after negotiation
and Sarathy Nagar (1.5 MLD, LT/2 2.M/s.Ravi
Shifts) sewage pumping station for associates,Chennai
Three years on performance based Rs.1,53,66,500.00
contract.in Area X
CNT/SEW/MWB/3262/ 2019-20

36 Outsourcing of operation and 18.02.2020 11.03.2020 08.09.2020 Two bids received M/s.Home Makers Private
Maintenance of (52.00 MLD / HT 1.M/s.Home Makers Ltd,Chennai
Relay) Adyar, (2.60 MLD / LT3 shift) Private Ltd,Chennai Rs.1,59,37,506.00
Dr. Seethapathy Nagar and (2.00 Rs.1,70,82,000.00 after negotiation
MLD / LT3 shift) Thanthai Periyar 2.M/s.Mohan Power
Nagar Sewage Pumping Station for Infrastructions(P),Ltd.
three years in Area XIII on Rs.1,71,71,425.00
performance based contrac
CNT/WSS/MWB/3265/ 2019-20
CONTRACTS SETTLED IN C & M WING FROM 01.09.2020 To 30.09.2020

S No Name of work/Contract No. Date of Date of Date of Name of bidders Name of the sucessful
Inviting opening the award of participated in the tender contractor & Contract
Tenders Tender contract & their quoted value Value

37 Outsourcing the Operation and 18.02.2020 11.03.2020 08.09.2020 Two bids received. M/s.VE Tech
Maintenance of (9.00MLD/LT 3 shift) 1.M/s.Ravi Infrastructures,&
AGS Colony, (2.10MLD/LT 3 shift) associates,Chennai Projects,Chennai
BV Nagar and (1.00MLD/LT 3 shift) Rs.1,52,20,500.00 Rs.1,38,79,387.80
Pallipattu sewage pumping stations 2.M/s.VE Tech afte negotiation
in Area XIII” on performance based Infrastructures,&
contract CNT/WSS/MWB/3266/ 2019- Projects,Chennai
20 Rs.1,50,01,500.00

38 Outsourcing the Operation and 18.02.2020 11.03.2020 08.09.2020 Two bids received Th.D.Kumar
Maintenance of (7.50MLD/HT 3 shift) 1.Th.D.Kumar &Sons,Chennai
Gandhi Nagar, (2.80MLD/HT 3 shift) &sons,chennai Rs.1,69,06,521.37
Saidapet - D and (3.20MLD/LT 3 Rs.1,87,37,139.95 afte negotiation
shift) Taramani sewage pumping 2.Th.E.Saravanan,
stations in Area - XIII” for Three years Chennai
on performance based Rs.1,90,68,647.55
contractCNT/WSS/MWB/3267/ 2019-
20

39 Outsourcing the Operation and 18.02.2020 11.03.2020 08.09.2020 Two bids received Th.D.Kumar
Maintenance of (3.10MLD/HT 3 shift) 1.Th.D.Kumar &Sons,chennai
Guindy, (0.70MLD/LT 2 shift) SKP &sons,chennai Rs.1,25,09,505.57
Puram and (1.00MLD/LT2 shift) Rs.1,38,60,948.00 afte negotiation
Foreshore Estate sewage pumping 2.Th.E.Saravanan,
stations in Area - XIII” for Three years Chennai
on performance based Rs.1,40,84,773.30
contract.CNT/WSS/MWB/3268/ 2019-
20

40 Outsourcing the Operation and 18.02.2020 12.03.2020 08.09.2020 Two bids received Th..N.Nedunchezhiyan,C
Maintenance of (10.00MLD/HT 3 1.M/s.Chinnammal hennai
shift) Indira Nagar, (1.00MLD/LT 3 Enterprises Trichy Rs.1,53,82.669.50
shift) PTC Colony and (1.10MLD/LT 3 Rs.1,6370.250.00 afte negotiation
shift) Kalachetra Colony sewage 2.Th.N.NedunchezhiyanC
pumping stations in Area - XIII” for hennai
Three years on performance based Rs.1,62,60.750.00
contract.
CNT/SEW/MWB/3269/2019-20
41 Outsourcing the Operation and 18.02.2020 12.03.2020 08.09.2020 Two bids received M/s.Build Tech
Maintenance of (25.00MLD/HT 1.M/s.Build Tech Engineers,
Relay) LIC Colony, (3.20MLD/HT 3 Engineers,Chennai Chennai
shift) Kotturpuram and (0.80MLD/LT Rs.2,06,67,117.60 Rs.1,59,96,349.02
2 shift) Bhiramin Street sewage 2.M/s.Shanthi after negotiation
pumping stations in Area - XIII” for Enterprises,Chennai
Three years on performance based Rs.2,10,99,171.75
contract.
CNT/SEW/MWB/3270/ 2019-20
42 Outsourcing the Operation and 18.02.2020 12.03.2020 08.09.2020 Two bids received M/s.P.Nagadevan
Maintenance of (13.00MLD/HT 3 1.M/s.P.Nagadevan &Co. &Co.Chennai
shift) Thiruvanmiyur and Rs.1,16,30,725.00 Rs.1,07,64,235.98
(1.60MLD/LT 3 shift) Sidco Main 2.M/s..Pon Nagu &Co, after negotiation
sewage pumping stations in Area Chennai.
XIII” for Three years on performance Non-responsive
based contract.
CNT/SEW/MWB/3271/ 2019-20
CONTRACTS SETTLED IN C & M WING FROM 01.09.2020 To 30.09.2020

S No Name of work/Contract No. Date of Date of Date of Name of bidders Name of the sucessful
Inviting opening the award of participated in the tender contractor & Contract
Tenders Tender contract & their quoted value Value

43 Outsourcing of Operation and 18.02.2020 12.03.2020 08.09.2020 Two bids received M/s.Chinnammal
Maintenance of (12.25MLD/HT 3 1.M/s.Chinnammal Enterprises Trichy
shift) Velachery, (2.75MLD/LT 3 shift) Enterprises Trichy Rs.1,39,46,336.09
Orandiamman Koil Street and Rs.1,47,11,325.00 after negotiation
(0.35MLD/LT 2 shift) Govindasamy 2.Th.N.Nedunchezhiya,C
Nagar sewage pumping stations hennai
sewage pumping stations in Area - Rs.1,47,69,725.00
XIII” for Three years on performance
based
contract.CNT/SEW/MWB/3272/ 2019-
20

44 Out sourcing of Operation and 18.02.2020 12.03.2020 08.09.2020 Two bids received Th.N.Nedunchezhiyan,
Maintenance of (2.0 MLD LT 1.Th.N.NedunchezhiyanC Chennai
3shift)Jawahar Nagar, (4.0 MLD LT hennai Rs.1,38,65,985.00
3shift)Periyar Nagar and (6.0 MLD Rs.1,46,73,000.00 after negotiation
LT 3shift) Kennedy Square sewage 2.M/s.Ravi
pumping stations in Area VI for three Associates,Chennai
years on performance based Rs.1,47,33,225.00
contract.
CNT/SEW/MWB/3274/ 2019-20
45 Out sourcing of Operation and 18.02.2020 12.03.2020 08.09.2020 Two bids received Th.P.N.Desikan.,
Maintenance of (5.0 MLD LT 3shift) 1.Th.P.N.Desikan Chennai
Ekangipuram, (2.0 MLD LT 3shift) Rs.1,50,09,165.00 Rs.1,38,68,468.46
Venkatesapuram and (4.0 MLD LT 2.M/s.Sree Venkateswara after negotiation
3shift) Sembium sewage pumping Industries,Chennai
stations in Area VI for three years on Rs.1,59,25,877.10
performance based contract.
CNT/SEW/MWB/3275/ 2019-20

46 Out sourcing of Operation and 18.02.2020 12.03.2020 08.09.2020 Two bids received M/s.Devs Engineering
Maintenance of (5.0MLD HT3 Shift) 1.M/s.Devs Engineering Technologies,Chennai
Nammawarpet, (2.0MLD LT3 Technologies,Chennai Rs.1,39,42,969.92
Shift)KP Park in Area-VI and Rs.1,54,66,411.45 after negotiation
(2.0MLD LT2 Shift)Reserve Bank in 2.M/s.Raju Engineering
Area-V Sewage Pumping Stations for Enterpries,chennai Rs.
Three years on performance contract. 1,57,35,993.15
CNT/SEW/MWB/3276/ 2019-20

47 “Operation and Maintenance of 18.02.2020 12.03.2020 08.09.2020 Two bids received M/s.N.R.& Co., Chennai
Kilpauk(7 MLD HT 3shift) ,North 1.M/s.Kalaichandran Rs.1,39,43,876.00
Jaganatha Nagar(1.0 MLD LT 3 &Co,Chennai after negotiation
shifts) and P.P Garden (0.7 MLD LT Rs.1,61,69,500.00
2 shift) Sewage Pumping station for 2.M/s.N.R.& Co.,
3 years in Area VIIIon Performance Chennai
based contract” Rs.1,54,76,000.00
CNT/SEW/MWB/3277/ 2019-20
48 Outsourcing of Operation and 25.02.2020 17.03.2020 08.09.2020 Two bids received M/s.Sri Vignesh
Maintenance (3.0 MLD LT3 shift) SBI 1.Th.N.Nedunchezhian,C Associates,
colony WDS, (1.30 MLD LT3 shift) hennai Chennai
Nethaji street WDS and (1.0 MLD Rs.1,33,86,375.00 Rs.1,25,86,153.11
LT3 shift) Nandambakkam WDS in 2.M/s.Sri Vignesh after negotiation
Area-XII" for Three years on Associates,Chennai
performance based contract.. Rs.1,33,04,250.00
CNT/WSS/MWB/3287/ 2019-20
CONTRACTS SETTLED IN C & M WING FROM 01.09.2020 To 30.09.2020

S No Name of work/Contract No. Date of Date of Date of Name of bidders Name of the sucessful
Inviting opening the award of participated in the tender contractor & Contract
Tenders Tender contract & their quoted value Value

49 Outsourcing of Operation and 25.02.2020 17.03.2020 08.09.2020 Two bids received M/s.Mohan Power
Maintenance (10 MLD HT3 Shift) 1.M/s.Home Makers Infrastructure,Pvt.Ltd
Thiru Nagar, (3 MLD LT3 Shift) Private Ltd. Rs.1,53,74,465.39
Meenakshi Nagar and (5 MLD LT3 Rs.1,67,24,300.00 after negotiation
Shift) Ramakrishna Nagar sewage 2.M/s.Mohan Power
pumping station in Area XI” for three Infrastructure,Pvt.Ltd
years on performance based Rs.1,64,34,490.00
contract.
CNT/SEW/MWB/3292/ 2019-20
50 Outsourcing of operation and 25.02.2020 17.03.2020 08.09.2020 Two bids received M/s.V.Chinnadurai&Co
Maintenance of (1.00 MLD / LT3 1.M/s.V.Chinnadurai& Rs.1,38,68,886.75
shift) 512 HIG LT/3 shifts, (3.10 MLD Co, after negotiation
/ LT3 shift) Thiruvalluvar Nagar and Rs.1,50,01,500.00
(2.50 MLD / LT3 shift) Velachery 2.M/s.VE Tech
Lakshmi Nagar sewage pumping Infrastructures &
stations for three years in Area XIII Projects,Chennai
on performance based Rs.1,53,30,000.00
contract.CNT/SEW/MWB/3296/ 2019-
20

51 Outsourcing of operation and 25.02.2020 17.03.2020 08.09.2020 Two bids received M/s.SRM Enterprises,
Maintenance of ( 1 MLD LT2 shift) 1.Th.E.Saravanan, Chennai
Usha nagar HW, ( 1 MLD LT2 shift) Chennai Rs.1,16,02,135.28
Balaji Nagar HW and ( 1 MLD LT2 Rs.1,30,27,580.00 after negotiation
shift) Anna Salai HW, ( 1 MLD LT2 2.M/s.SRM
shift) MG Nagar in Area XIV for three Enterprises,Chennai
years on performance based Rs.1,28,12,960.00
contract. CNT/WSS/MWB/3300/
2019-20
52 Outsourcing of Operation and 25.02.2020 18.03.2020 08.09.2020 Two bids received M/s.Ravi Associates,
Maintenance of(10.9MLD HT/3 1.M/s.Pon Nagu Chennai
Shifts/day) Subramaniam pond , &Co.Rs.1,83,96,000.00 Rs.1,69,04,610.00
(7.10MLD HT/3 Shifts/day) Basin 2.M/s.Ravi after negotiation
road Sewage and (0.9MLD LT/3- Associates,Chennai
Shift/day) Annaisivagami Nagar Rs.1,81,77,000.00
Sewage pumping station in Area-I”
for 3 years on performance based
contract.
CNT/SEW/MWB/3314/ 2019-20

53 Outsourcing the Operation and 25.02.2020 17.03.2020 09.09.2020 Two bids received M/s.Vee Pee
Maintenance of (4.50MLD/HT 3 shift) 1.M/s.V.Chinnadurai&Co, Constructions,
Ekkattuthangal, (7.50MLD/LT 3 shift) Rs.1,54,76,000.00 Chennai
Murugu Nagar and (0.60MLD/LT 2 2.M/s.Vee Pee Rs.1,39,42,405.05
shift) Sidco Lift sewage pumping Constructions,Chennai after negotiation
stations in Area - XIII” for Three years Rs.1,50,74,500.00
on performance based contract
CNT/SEW/MWB/3297/ 2019-20
CONTRACTS SETTLED IN C & M WING FROM 01.09.2020 To 30.09.2020

S No Name of work/Contract No. Date of Date of Date of Name of bidders Name of the sucessful
Inviting opening the award of participated in the tender contractor & Contract
Tenders Tender contract & their quoted value Value

54 Outsourcing of Operation and 24.02.2020 18.03.2020 09.09.2020 Single bid received M/s.PNP
Maintenance of (3 MLD LT 3 shift) M/s.PNP Constructions,
Thangal Karai, (1.25 ML LT 3 shift) Constructions, Chennai
Madhanakuppam and (4 MLD LT 3 Chennai Rs.1,52,34,990.50
shift) Bank Colony and (0.5MLD Rs.1,64,70,260.00 after negotiation
Road side) Puthagaram sewage
pumping station in Area-III for 3 years
on performance based contract
CNT/SEW/MWB/3303/ 2019-20

55 Outsourcing of Operation and 24.02.2020 18.03.2020 09.09.2020 Single bid received M/s.PNP
Maintenance of (0.98 MLD LT3 shift) M/s.PNP Constructions,
Thanikachalam Nagar, (1MLD LT3 Constructions, Chennai
shift)Chandraprabhu Colony & Chennai Rs.1,38,64,837.44
(0.94MLD LT3 shift) Ramachandra Rs.1,49,97,120.00 after negotiation
Nagar Sewage Pumping Station in
Area III for 3 years on performance
based
contractCNT/SEW/MWB/3304/ 2019-
20
56 Outsourcing of Operation and 24.02.2020 18.03.2020 09.09.2020 Two bids received M/s.Kalaichandran
Maintenance of (1.60MLD LT3 1. M/s.Kalaichandran &Co,Chennai
shift)sewage Pumping station at &Co,Chennai Rs.1,38,74,334.37
Mathur MMDA in Area-II, (0.98MLD Rs.1,50,56,250.00 after negotiation
LT3 shift) Metha Nagar & (0.78MLD 2. M/s.Sree
LT3 shift) Muthumariamman koil Venkateswara Industries
street sewage Pumping station for 3 Rs.1,54,39.500.00
years in Area-III on performance
based contract
CNT/SEW/MWB/3305/ 2019-20

57 Outsourcing of Operation and 24.02.2020 18.03.2020 09.09.2020 Two bids received M/s.S.Chandrasekaran &
Maintenance of (80 MLD, HT/3 Shifts 1.M/s. Home Makers Co., Chennai
Relay) Nesapakkam sewage Pvt., Ltd, Chennai Rs.66,89,122.68
pumping station for Three years on Rs.79,57,730.00 after negotiation
performance based contract. 2.M/s.S.Chandrasekaran
CNT/SEW/MWB/3307/ 2019-20 & Co., Chennai
Rs.72,35,395.00
58 Outsourcing of Operation and 25.02.2020 18.03.2020 09.09.2020 Two bids received Th.R.Radhakrishnan
Maintenance of (5MLD HT/3-Shifts) 1.Th.R.Radhakrishnan Rs.1,48,57,211.85
Kamalamal Nagar, (3MLD LT/3- Rs.1,61,42,125.00 after negotiation
Shifts) Thalan Kuppam, (0.5MLD/ 2.M/s.Sri Selvaganapathy
Road Side) Nehru nagar, (1MLD/ Engineers
Road Side) Anna Nagar and Rs.1,69,04,975.00
(0.5MLD/ Road Side ) Periyakuppam
Sewage Pumping stations in Area-I”
for 3 years on performance based
contract" CNT/SEW/MWB/3312/
2019-20
CONTRACTS SETTLED IN C & M WING FROM 01.09.2020 To 30.09.2020

S No Name of work/Contract No. Date of Date of Date of Name of bidders Name of the sucessful
Inviting opening the award of participated in the tender contractor & Contract
Tenders Tender contract & their quoted value Value

59 outsourcing of operation and 25.02.2020 17.03.2020 11.09.2020 Two bids received Th.G.Shrirangarayan,
maintenance of Korattur (old & new) 1.M/s.Abi Chennai
HT / Relay &Elango Nagar ( LT 3 Associates,Chennai Rs.1,44,95,473.12
Shift) sewage pumping stations in Rs.1,65,16,250.00 after negotiation
Area-VII &Osangulam ( LT 2 Shift) 2.Th.G.Shrirangarayan,C
sewage pumping station in Area-VIlI hennai
for a period of three years on Rs.1,57,13,250.00
performance based contract.
CNT/SEW/MWB/3290/ 2019-20

60 Outsourcing of Operation and 25.02.2020 17.03.2020 11.09.2020 Two bids received M/s.Chinnammal
Maintenance of (4 1.M/s.Chinnammal Enterprises,Chennai
MLD LT3 Shift) Nolambur Phase – I, Enterprises,Chennai Rs.1,38,73,321.50
(4 MLD LT3 Shift) Ganga Nagar and Rs.1,46,73,000.00 after negotiation
(2 MLD LT3 Shift) CMDA Colony 2.M/s.Sattva Engineering
sewage pumping station in Area XI” Constructions,Pvt.Ltd
for three years on performance based Rs.1,47,11,325.00
contract.
CNT/SEW/MWB/3291/ 2019-20

61 Operation and Maintenance (16 MLD 25.02.2020 17.03.2020 15.09.2020 Two bids received Th.G.Ravikumar,
HT 3 shift) Nilamangainagar Sewage 1.Th.G.Ravikumar, Chennai Rs.61,36,542.42
Pumping station in Area-XII" for Chennai after negotiation
Three years on performance based Rs.66,48,475.00
contract. 2.M/s.SP Constructions,
CNT/SEW/MWB/3288/ 2019-20 Chennai Rs.70,08,000.00

62 Outsourcing the Operation and 25.02.2020 17.03.2020 15.09.2020 Two bids received M/s.D.Kumar &Sons.
Maintenance of (2.00MLD/LT 3 shift) 1.M/s.D.Kumar &Sons. Rs.1,38,80,563.83
Periyar Nagar, (2.65MLD/LT 3 shift) Rs.1,53,71,610.00 after negotiation
Velachery Sector - V and 2.Th.E.Saravanan,
(4.00MLD/LT 3 shift) Saidapet - C Chennai
sewage pumping stations in Area - Rs.1,56,44,265.00
XIII” for Three years on performance
based contract.
CNT/SEW/MWB/3298/ 2019-20
63 Outsourcing of Operation and 24.02.2020 18.03.2020 15.09.2020 Single bid received M/s.PNP
Maintenance of (4.5 MLD HT 3 Shift M/s.PNP Constructions,
Relay) Kadappa Road sewage Constructions, Chennai
pumping station & (1MLD LT2 Shift) Chennai Rs.95,81,340.52
Thanikachalam Nagar WDS in Area - Rs.1,03,47,020.00 after negotiation
III for three years on performance
based
contractCNT/SEW/WSS/MWB/
3302/2019-20
64 Outsourcing of Operation and 25.02.2020 18.03.2020 15.09.2020 Two bids received Th.P.N.Desikan
Maintenance of (0.5MLD LT- 3 1.Th.P.N.Desikan, Rs.84,27,565.30
shifts)Kathivakkam and (0.5MLD Rs.89,65,495.00 after negotiation
LT- 3 shifts)Thalankuppam Head 2.M/s.Ve Tech
works in Area-I” for 3 years on Infrastructure & Projects.
performance based contract Rs.92,08,220.00
CNT/WSS/MWB/3315/ 2019-20
CONTRACTS SETTLED IN C & M WING FROM 01.09.2020 To 30.09.2020

S No Name of work/Contract No. Date of Date of Date of Name of bidders Name of the sucessful
Inviting opening the award of participated in the tender contractor & Contract
Tenders Tender contract & their quoted value Value

65 Outsourcing of Operation and 18.02.2020 11.03.2020 16.09.2020 Two bids received M/s.N.Nedunchezhiyan,C
Maintenance of CIT Nagar (3.0 MLD, 1.Th.N.NedunchezhiyanC hennai
HT/3 Shifts) Sewage Pumping hennai Rs.1,84,10,864.62
station, Kodambakkam “B” (7.0 MLD, Rs.1,96,55,250.00 afte negotiation
HT/3 Shifts) Sewage Pumping station 2.M/s.Ravi
and Saidapet “B” (10.5 MLD, HT/3 associates,Chennai
Shifts) sewage Pumping station for Rs.1,98,19,500.00
Three years on performance based
contract.CNT/SEW/MWB/3257/ 2019-
20

66 Annual Maintenance Contract for Sun 03.03.2020 09.06.2020 16.09.2020 Single bid received M/s.Inspirisys Solutions
Servers,Computers,Thin M/s.Inspirisys Solution Limited,Chennai
Clients,Printers and UPS for 2 years. Limited,Chennai Rs.1,86,53,381.00
CNT/WSS/MWB/3334/ 2019-20 Rs.1,94,54,424.00 after negotiation

67 Operation and Maintenance of East 18.02.2020 12.03.2020 16.09.2020 Two bids received M/s.S.P.constructions,
Arumbakkam(18 MLD HT 3 1.Th.G.Shrirangarayan,C Chennai
shift),PadmanabanNagar(2.5 MLD LT hennai Rs.1,07,57,280.00
3 shift ) Sewage Pumping station for Rs.1,22,52,685.00 after negotiation
3 years in Area VIII on Performance 2.M/s.S.P.Constructions
based contract” Chennai
CNT/SEW/MWB/3278/ 2019-20 Rs.1,16,80,000.00

68 Operation and Maintenance of Anna 18.02.2020 12.03.2020 16.09.2020 Two bids received M/s.D.Sebastian & Co.
Nagar „A‟ (2.5 MLD HT 3 shift) 1.M/s.Ravi Rs.1,69,05,347.30
,Shenoy Nagar (4.5 MLD HT 3 shift) associates,Chennai after negotiation
and Chetpet(2.5 MLD LT 3 shift Rs.1,81,77,000.00
)Sewage Pumping station for 3 years 2.M/s.D.Sebastian
in Area VIII on performance based &Co.Rs.1,79,65,300.00
contract ” CNT/SEW/MWB/3279
/2019-20
69 Operation and Maintenance of 18.02.2020 12.03.2020 16.09.2020 Two bids received M/s.Abi
Villivakkam Phase I (3.5 MLD LT 3 1.M/s.Abi AssociatesChennai
shifts) ,Villivakkam Phase II (3.5 MLD associates,Chennai Rs.1,70,55,225.43
LT 3 shifts ) Villivakkam Sector „B‟ Rs.1,81,14,950.00 after negotiation
(4.5 MLD LT 3 shifts) and 2.Th.G.Shrirangarayan,C
Bharathipuram(0.7 MLD LT 2 shift hennai
)Sewage Pumping station in Area VIII Rs.1,89,41,675.00
for 3 yearson performance based
contract”
CNT/SEW/MWB/3280/ 2019-20
70 Out sourcing of Operation and 18.02.2020 12.03.2020 16.09.2020 Two bids received M/s.Shanthi
Maintenance of (1.90MLD LT-3 Shift) 1.M/s.Build Tch Enterprises,Chennai
Killijocium Nagar , (0.9MLD LT- 2 Engineers,Chennai Rs.1,41,70,420.55
shifts) Perimattupalayam ,(0.92MLD Rs.1,82,37,225.00 after negotiation
LT- 2 shifts) Sadayankuppam pattai 2.M/s.Shanthi
and (0.90MLD LT- 2 shifts) Enterprises,Chennai
K.R.Ramasamy Nagar Sewage Rs.1,77,46,300.00
Puping stations in Area-I” for 3 years
on performance based contract
CNT/SEW/MWB/3282/ 2019-20
CONTRACTS SETTLED IN C & M WING FROM 01.09.2020 To 30.09.2020

S No Name of work/Contract No. Date of Date of Date of Name of bidders Name of the sucessful
Inviting opening the award of participated in the tender contractor & Contract
Tenders Tender contract & their quoted value Value

71 “Out sourcing of Operation and 18.02.2020 12.03.2020 16.09.2020 Two bids received M/s.G.S.Naidu
Maintenance of (1.80MLD LT- 3 1.G.S.Naidu constructions,
shifts/day) West Mada , (1.60MLD constructions, Chennai
LT- 3 shifts/day)South Mada sewage Chennai. Rs.1,38,80,887.95
pumping stations in Area-I Rs.1,50,01,500.00 after negotiation
and(1.40MLD LT- 3 shifts/day) Manali 2.M/s.Ravi
New Town Sewage Pumping station associates,Chennai
in Area- II” for 3 years on Rs.1,52,20,500.00
performance based contract
CNT/SEW/MWB/3283/ 2019-20

72 Outsourcing of Operation and 25.02.2020 19.03.2020 16.09.2020 Two bids received Th.Harichandra Raju,
Maintenance of (0.5MLD LT- 2 shifts) 1.Th.Harichandra Raju, Rs.57,82,819.83
Theradi and (0.3MLD LT- 2 shifts) Rs.61,53,900.00 after negotiation
Theyagarayapuram Head Works in 2.M/s.M.S.Construction,C
Area-I” for 3 years on performance hennai Rs.62,41,500.00
based Contract.
CNT/WSS/MWB/3327/ 2019-20
73 “Out sourcing of Operation and 18.02.2020 11.03.2020 17.09.2020 Two bids received M/s.Ravi associates,
Maintenance of (2.0MLD LT2 shift) 1.Th.N.NedunchezhiyanC Chennai
Mandavelipakkam and(0.50MLD LT2 hennai Rs.63,67,936.00 after
shift) Pallakumaniyamsewage Rs.69,86,100.00 negotiation
pumping stations in Area-IX for 3 2.M/s.Ravi
years on performance based associates,Chennai
contractCNT/SEW/MWB/3256/ 2019- Rs.68,62,000.00
20

74 Outsourcing of Operation and 18.02.2020 12.03.2020 17.09.2020 Two bids received M/s C&T Constructions,
Maintenance of (60 MLD HT3 shifts 1.M/s C&T Chennai
Relay) Erukkenchery SPS in Area- Constructions,Chennai.R Rs.66,84,537.00
IV for three years on performance s.71,72,250.00 after negotiation
based contract 2.M/s.Vee Pee
CNT/SEW/MWB/3284/ 2019-20 Contructions,Chennai.
Rs.76,65,000.00
75 Outsourcing of Operation and 24.02.2020 18.03.2020 17.09.2020 Two bids received M/s.Raju Engineering
Maintenance of (2.75MLD LT3 shift) 1.M/s.Devs Engineering Enterprises,Chennai
Padmavathy Nagar Sewage Pumping Technologies, Rs.78,01,006.66
station in Area-III for three years on Chennai after negotiation
performance based Rs. 88,07,815.00
contractCNT/SEW/MWB/3306/ 2019- 2. M/s.Raju Engineering
20 Enterprises,Chennai
Rs.86,58.165.00
CONTRACTS SETTLED IN C & M WING FROM 01.09.2020 To 30.09.2020

S No Name of work/Contract No. Date of Date of Date of Name of bidders Name of the sucessful
Inviting opening the award of participated in the tender contractor & Contract
Tenders Tender contract & their quoted value Value

76 Outsourcing the Operation and 25.02.2020 19.03.2020 17.09.2020 Three bids received M/s. Mohan Power
Maintenance of Imayam Colony 1.M/s. Mohan Power Infrastructure Pvt. Ltd.,
(ANWE-I) (5.0 MLD LT3 Shift)S. M. Infrastructure Pvt. Ltd., Chennai
Narayana Nagar(ANWE-II) (4.0 MLD Tirunelveli Rs.1,70,60,199.28
LT3 Shift), BharathiSalai (3.0 MLD Rs.1,80,72,245.00 afte negotiation
LT3 Shift) and Reddipalayam (1.50 2.M/s.Ve Tech
MLD LT2 Shift) Sewage Pumping Infrastructure and
Stations for three years on Projects, Chennai
Performance based contract at Area- Rs.1,85,91,275.00
VII CNT/SEW/MWB/3322/ 2019-20 3. M/s. Calcutta Tube
Company, Calcutta - Non
responsive
77 Operation and Maintenance of 18.02.2020 19.03.2020 18.09.2020 Two bids received M/s.Subbu Foundr and
Dr.AmbedkarNagar (0.35 MLD LT 2 1.M/s.Sri Selvaganapathy engineering works
shift) and R.V Nagar(0.5 MLD LT 2 Engineers Rs.63,68,371.66
shifts) Sewage Pumping station in Rs.70,66,400.00 after negotiation
Area VIII for 3 years on performance 2.M/s.Subbu Foundr and
based contract” I engineering works
CNT/SEW/MWB/3248/ 2019-20 Rs.68,79,520.00

78 Operation and Maintenance of 18.02.2020 10.03.2020 18.09.2020 Two bids received M/s.Sri Rajeswari
Gandhi Nagar (0.5 MLD LT 2 shift) 1.M/s.N.R& Co.Chennai Construction,Chennai
and N.S.K Nagar (1.5 MLDLT 2 shift) Rs.72,27,000.00 Rs.63,64,367,40
Sewage Pumping station in Area VIII 2.M/s.Sri Rajeswari after negotiation
for 3 years on Performance based Construction,Chennai
contract” Rs.69,06,630.00
CNT/SEW/MWB/3249/ 2019-20
79 Outsourcing of Operation and 18.02.2020 11.03.2020 18.09.2020 Two bids received M/s.VE Tech
Maintenance of Bharathidasan 1.M/s.Everbright Infrastructures & Projects
Colony (1.0 MLD, LT/2 Shifts) Engineering Company Rs.95,47,786.80
sewage pumping station, Sathya Rs.1,07,31,000.00
Murthy Block (1.50 MLD, LT/2 Shifts) 2.M/s.VE Tech
sewage pumping station and Thiru Infrastructures & Projects
Nagar (2.0 MLD, LT/2 shifts) sewage Rs.1,02,93,000.00
pumping station for Three years on
performance based contract
CNT/SEW/MWB/3260/ 2019-20

80 Outsourcing of operation and 25.02.2020 17.03.2020 18.09.2020 Two bids received M/s.Abi Associates,
Maintenance of (60 MLD HT relay 3 1.M/s.Abi chennai Rs.66,91,545.00
shift) LB Road in Area XIV for three Associates,chennai after negotiation
years on performance based Rs.68,98,500.00
contract.CNT/SEW/MWB/3299/ 2019- 2.M/s.Kalaichandran
20 &Co,Chennai
Rs.70,35,375.00
81 Outsourcing the Operation and 25.02.2020 19.03.2020 18.09.2020 Two bids received M/s. Thirumalai
Maintenance of (5.0 MLD 1.M/s. Subbu Foundry Enterprises, Chennai
HT/3Shifts/day) Sewage Pumping and Engineering Works, Rs.61,38,260.62
Stations in Perumbakkam TNSCB Chennai after negotiation
Tenement for three years on Rs.67,39,725.00
Performance based contract at Area- 2.M/s. Thirumalai
XV CNT/SEW/MWB/3323/ 2019-20 Enterprises, Chennai.
Rs.65,07,220.00
CONTRACTS SETTLED IN C & M WING FROM 01.09.2020 To 30.09.2020

S No Name of work/Contract No. Date of Date of Date of Name of bidders Name of the sucessful
Inviting opening the award of participated in the tender contractor & Contract
Tenders Tender contract & their quoted value Value

82 Operation and Maintenance of 25.02.2020 19.03.2020 18.09.2020 Two bids received M/s.C.S. Constructions,
Kelambakkam WDS (10 MLD HT3 1.M/s.C.S. Constructions, Chennai
shift sewage pumping station Chennai Rs.71,34,702.45
meeting all the statutory Rs.77,63,550.00 after negotiation
requirements for 3 years. 2.M/s.Home Makers
CNT/WSS/MWB/3324/ 2019-20 Private Limited, Chennai
Rs.78,84,000.00

83 Phase-I - Package-12 - Replacement 18.02.2020 10.03.2020 23.09.2020 Two bids received M/s.Chinnammal
of 450 mm dia sewage Pumping 1.M/s.Chinnammal Enterprises Trichy
Main with 500 mm dia CI pumping Enterprises Trichy. Rs.1,90,51,190.20
main from Imayam Colony Sewage Rs.2,07,64,240.00 after negotiation
Pumping station to 6th Avenue Road 2.Th.V.Subbiah,
Junction of 13th main road in Area Chennai.
VIII. CNT/SEW/CRRT/ Rs.2,08,60,089.60
PHASE-I/050A/2019-20

84 CRRT – Phase I – Package 39 – Re- 18.02.2020 10.03.2020 23.09.2020 Single Bid received Th.V.Subbiah,Chennai.
routing of sewer main at Moorthy 1.Th.V.Subbiah, Rs.1,88,73,727.15
Nagar, MTH Road,Bajanai Koil Street Chennai. after negotiation
in Depot-95, Area VIII - Rs.2,18,69,904.00
CNT/SEW/CRRT/ 073A /2019-20

85 CRRT-Phase-I-Packag-44 21.07.2020 08.09.2020 30.09.2020 Two bids received M/s.Sri Rajeswari


Enlargement of gravity sewer main at 1.M/s.N.R.&Co. Chennai. Constructions,
Padi Pudhu Nagar Main Street in Rs.18,58,996.58 Rs.2,90,11,451.70
Dn.90, Area-VII – 2.M/s.Sri Rajeswari after negotiation.
Cont.No.CNT/SEW/CRRT/ Constructions,
PHASEI/078A/2020-21 Rs.3,04,42,236.83