S. State Name of the Company /Concessionaire Date of Date of Confirmation / Date of Date of Sanction Amount Date of Date of Remarks
No. /Contractor receipt of Validation of the BG Amount Submission of the Amount by Sanctione Signing of Release of
Application by NHAI of Bank NHAI d (Rs. in Escrow Amount to
in Format 'A' Guarantee crore) Account the Escrow
from the by the Agreement Account
Contractor Contractor by the
Contractor
1 2 3 4 5 6 7 8 9 10
1 Gujarat IRB Ahmedabad Vadodara Super Express 08.12.2016 15.12.2016 08.12.2016 15.12.2016 21.17 15.12.2016 19.12.2016 Consequent upon Judgement dated
Tollway Private Limited /Six laning of 06.02.2017 of Hon'ble High Court of
Ahmedabad to Vadodara section of NH 8 Delhi in favor of NHAI by set aside the
from Km. 6.400 to Km. 108.700 (length AT award dated 08.01.2016,
102.300) in the State of Gujarat and Concessionaire has deposited Rs. 21.80
improvement of Ahmedabad Vadodara Cr. through RTGS in Canara bank.
Expressway from Km. 0.000 to 93.302 in
the State of Gujarat (Length – 93.302 Km.)
under NHDP Phase V on Design Build
Finance Operate Transfer (DBFOT) Toll
basis
2 Goa IRB GOA Tollway Private Limited /Design, 08.12.2016 15.12.2016 08.12.2016 15.12.2016 248.50 15.12.2016 16.12.2016
Engineering, Finance, Construction,
Operation and Maintenance of Four laning
of Goa/Karnataka border to Panaji‐Goa
Section of NH‐4A from Km. 84+000 to Km.
153+070 in the State of Goa under NHDP
Phase III on Build, Operate and Transfer
(BOT) Toll basis
5 Uttar Oriental Structure Engineers Pvt Ltd. KMC 14.12.2016 Letter No. Arbitration/UP/ABP‐ 23.08.2017 09.10.2017 29.30 08.09.2017 10.10.2017 Letter No. Arbitration /UP/ABP‐2&3/
Pradesh /Request from Oriental Structural 2&3/2010/92655 dated 2010/103820 dated 02/08/2017 issued
Engineers Pvt Ltd – KMC Constructions Ltd 20.12.2016 issued to to Contractor
(JV) Allahabad Bypass Project (Package Contractor
ABP‐3), (Award date: 07.11.2011)
28 Maharashtra JOG – SHIRKE (JV) /Four Laning of SH‐54 12.12.2016 Letter No. BG in F/o 31.01.2017 24.79 19.01.2017 01.02.2017 BG Confirmation in the name of
from 6.400 Km to 14.55 Km and NHAI/Legal&Arbitration / National National Highways Authority of India on
Construction of Four lane Major Bridge Revival/2016/92689 dated Highways 30.01.2017. Amended BG Confirmation
across Panvel Creek (Belapur‐ 20.12.2016 issued to Authority in the name of Mumbai JNPT Port Road
GawanPhata) in Maharashtra State Contractor of India on Company Limited on 09.03.2017
Package‐II. 19.01.2017
& BG in F/o
of Mumbai
JNPT Port
Road
Company
Limited on
23.02.2017
29 West Bengal Hindustan Construction Company Ltd. 14.12.2016 Letter No. NHAI/12014/FQ Case Closed Claim amount stands deposited with
/Widening 4/6 Lanes and Strengthening of /2003/ SC/Tech/CGM the Supreme Court. Contractor not
existing Two Lane Carriageway of NH‐6 in /186/92685 dated 20.12.2016 eligible for 75% Payment against
the State of West Bengal from Kolaghat to issued to Contractor Arbitral Award. Letter No.
Kharagpur (from km 72 to km 136) NHAI/12014/FQ /2003/ SC/Tech/CGM
Contract Package WB‐II) Claim No. 3,4&5. /186/105752 dated 12.09.2017 issued
to Contractor
30 West Bengal Hindustan Construction Company Ltd. 14.12.2016 Letter No. NHAI/12014 Case Closed Claim amount stands deposited with
/Widening 4/6 Lanes and Strengthening of /FQ/2003/SC/ the Supreme Court. Contractor not
existing Two Lane Carriageway of NH‐6 in Tech/CGM/186/92675 dated eligible for 75% Payment against
the State of West Bengal from Kolaghat to 20.12.2016 issued to Arbitral Award. Letter No.
Kharagpur (from 72 km to km 136) Contractor NHAI/12014/FQ /2003/ SC/Tech/CGM
(Contract Package WB‐II) claim‐II /186/105755 dated 12.09.2017 issued
to Contractor
31 West Bengal Hindustan Construction Company Ltd. 14.12.2016 Letter No. NHAI/12014/ Case Closed Proposal withdrawn by HCC vide Letter
/Widening 4/6 Lanes and Strengthening of FQ/2003/SC/ No. HCC/CONT/ARB/WBII/PA/288
existing Two Lane Carriageway of NH‐6 in Tech/CGM/186/92656 dated dated 09.02.2017
the State of West Bengal from Kolaghat to 20.12.2016 issued to
Kharagpur (from 72 km to km 136) Concessioniare
(Contract Package WB‐II) Claim‐III
32 West Bengal Hindustan Construction Company Ltd. 14.12.2016 Letter No. NHAI/12014/ Case Closed NHAI PIU Kolkata relaesed the amount
/Widening 4/6 Lanes and Strengthening of FQ/2003/SC/ of Rs. 70,21,297/‐ on 13.02.2013.
existing Two Lane Carriageway of NH‐6 in Tech/CGM/186/92654 dated Nothing is admissible to HCC against
the State of West Bengal from Kolaghat to 20.12.2016 issued to the AT award. Letter No.
Kharagpur (from 72 km to km 136) Contractor NHAI/12014/FQ /2003/SC/Tech/CGM
(Contract Package WB‐II) Claim No. 2 /186/105750 issued to Contractor.
36 Uttar Hindustan Construction Company Ltd. 14.12.2016 Letter No. NHAI/40020/2/‐III/ 24.02.2017 21.03.2017 50.22 14.03.2017 21.03.2017 Letter No. NHAI/40020/2/C‐III/ Tech‐
Pradesh /Lucknow‐Muzaffarpur National Highway Tech‐III/WB‐4/DRB/92658 III/WB‐4/DRB/95581 dated 23.02.2017
Project‐ 4 Laning from km 135+000 to km dated 20.12.2016 issued to issued to Contractor
164+000 of Ayodhya‐Gorakhpursection of Contractor
NH‐28 in Uttar Pradesh, India Contract
package : LMNHP‐EWII‐WB‐4 (Award Date
30.05.2015)
42 Uttar Hindustan Construction Company Ltd. 14.12.2016 Letter No. 20.02.2017 09.03.2017 10.38 01.03.2017 16.03.2017 Letter No. NHAI/Tech/LMNHP/WB‐
Pradesh /Lucknow‐Muzaffarpur National Highway NHAI/Tech/LMNHP/WB‐ 1/2016/95580 dated 23.02.2017 issued
Project‐ 4 Laning from km 9+000 to km 1/2016/92665 dated to Contractor
45+000 of Lucknow‐Ayodhya section of 20.12.2016 issued to
NH‐28 in Uttar Pradesh, India Contract Contractor
package :LMNHP‐EWII‐WB‐1 (Award Date
28.05.2014)
56 Odisha Gammon India Ltd. /Widening to 4/6 lanes 01.03.2017 Letter No. 20.12.2017 01.01.2018 53.49 22.12.2017 03.01.2018 Letter
and Strength4ening of existing 2‐lane NHAI/12013/6/2005/Tech/CK‐ No.NHAI/11011/19/RO/Od/1118/2017/
carriageway (Bridge, Flyovers & ROB) of II/314 dated 19.01.2017 issued 100168 dated 22.05.2017 issued to
NH‐5 in the State of Orissa from km. to contractor Contractor
61.000 to km. 199.141 (Chandikole to
Blaeswar) Contract Package No. OR‐V