Letter No. Karapa to meet Indrapalem,Domada Road / NDB Project /


APMCRCIP / SA / SD KKD/ 2020, dt.18.04.2023
Sir,

Sub: -R&B Department – Widening and Strengthening of 14 road works in


East Godavari District taken up under Andhra Pradesh Mandal
Connectivity and Rural Connectivity Improvement Project
( APMCRCIP) with the loan assistance of New Development Bank-
Package No: EG/APMCRCIP/Proposed Construction of Protection
wall along the stretches of road adjacent to the canal for the work
Karapa to meet Indrapalem- Domada road (EGMD 164)-Deviation
proposal submitted–Approval Requested- Regarding.

Ref: - 1. G.O. Rt. No.304, T,R&B (R.I) Dept., dt.22.11.2019.


2. SE(R&B), Kakinada letter No.1105/NDB/Phase I/AEE(T)/2022
dt:01.11.2022
3. Engineer-In-Chief(R&B), Admin & NDB, Vijayawada memo No:
R&B/NDB/Deviation/EGMD 164/DEE2/AEE9/2022 dt:20.12.2022.
4. Engineer-In-Chief(R&B), Admin & NDB, Vijayawada memo No:
R&B/NDB/Deviation/EGMD 164/DEE2/AEE9/2022 dt:03.02.2023.
5.PM&SE(R&B), Kakinada memo No. 1105/NDB/PhaseI/ AEE(T)/
2022 dt:08.03.2023.
*****
Kind attention is invited to the reference 3 rd cited, wherein the Engineer-
In-Chief(R&B), Admn & NDB, Vijayawada has made certain modification to the
typical cross section submitted vide reference 2 nd cited. The Engineer- In-
Chief(R&B), Admn & NDB, Vijayawada has requested to submit the plan showing
the location of the cutoff wall with respect to centre line of the proposed road
along with deviations with the above criteria for taking necessary action.

With compliance to the above, I herewith submit the modified Typical


cross section showing the details of Protection wall from Km 5/670 to 6/590 on
Left Hand Side where canal is passing adjacent to the road along with the
deviation proposal for an amount of Rs. 33.20 lakhs.
Hence I submit the deviation proposal of the subject work for an amount
of Rs. 33.20 lakhs for favour of the necessary approval from the higher
authorities and communicate the orders at an early date to proceed with the
work.

Encl: Deviation proposal- 4 Nos