Gas turbine start-up requires a complicated sequence of events that
numerous systems need to be in a synchronized situation before start-up, because
they are most likely will be interacting with each other at different times. Before start- up checks and precautions is a critical phase for the operation of the gas turbine in order to ensure any deficiency and defects have been addressed and also adequate safety measures are in place. Take note also that, one must follow the manufacturer’s guidelines about the gas turbine engine in order to have the right operation intended for that machine. Gas turbine requires multi-step start-up process, different checklist and parameters should be met in order to ensure the safety and the success of the operation. These parameters are the ones’ that eliminate any hazardous situation that might during the operation of the gas turbine engine. Before starting-up of gas turbine engine, ensure that it is ready to be operated. The engineer or the operator must thoroughly follow the precautionary checklist given in the gas turbine manufacturer’s guide. Before starting the gas turbine, one must visually inspect the gas turbine itself. Check the gas turbine inlet section for any obstruction of foreign materials. Inspect the fuel oil and lube oil that will be used for the system if it is free from any contamination. It is also important to check the tank level of lube oil and fuel oil system to ensure that they are on sufficient level for the operation. Check the lube oil cooling system if it is in good operating condition in order to return oil at the right temperature during periods of high ambient conditions in gas turbine. Furthermore, before aligning the fuel and lube oil system for the gas turbine operation, inspection of the filters and strainers in the system is a must, clean or replace them if necessary. Locating also for any leakages in this system should be done and correcting any deficiencies in these systems is necessary in order to ensure the integrity of these systems for the operation. Moreover, ensure that the all drains in intake and exhaust ducts are clear. Checking the status of starting system must be done to make sure that necessary amount of energy intended for the start-up is sufficient enough to run the gas turbine. The starting system of gas turbine utilized either compressed air or hydraulic fluid as starting media, energy stored in the generators are also used to initially start the gas turbine. Once all the starting system parameters have been met, it should now be aligned for the gas turbine start-up. Also, inspection of the electrical connections should be done to know if these connections are loosed or in tight manner. It should also be check to know the condition of its insulation and immediately replace them if required. Lastly, once all the necessary and important parameters have been checked, we must double check the fuel oil, lube oil, and starting systems are aligned for the operation of the gas turbine.