Professional Documents
Culture Documents
Pembentangan Dari Syarikat Mengenai Peralatan: Getz Healthcare
Pembentangan Dari Syarikat Mengenai Peralatan: Getz Healthcare
Getz Healthcare
Mengenai Peralatan
Modular Operating Room [OR]
United Kingdom
Kazakhstan
Tajikistan
USA Japan
China
Afghanistan S. Korea
Pakistan
UAE
India Myanmar Taiwan
Laos
Hong Kong
Thailand
Cambodia Vietnam Philippines
Nigeria
Sri Lanka
Malaysia
Kenya Singapore
Australia
Getz Offices
New Zealand
2015 Financial Highlights
Performance Materials,
25% Industrial Products and
Telecommunication Services
Healthcare and
Life Sciences 51%
Hospitality
4% Management and
Building Solutions
- Product Training
- Refresher Training
- Workshops
PROJECT DIVISION
D esign Consultancy
DESIGN CAPABILITIES
PROJECT DIVISION
1. Medical Equipment Planning & Procurement
5. Construction Planning
Monitoring
A&E
Labour Wards
Neonatal
Cardiology Imaging
building infrastructures that enable flexibility
OUR SOLUTION
Modular
Hygienic Operating Rooms [OR]
Integrated
OUR COMMITMENT
Experts estimate that 70–80% of all infections are transmitted via the
hands – Hand Unhygienic.
FACTS - INFECTION
HAI has also caused a huge strain on the country’s healthcare system.
Sanitized Silver products are not based on nanotechnology and do not contain silver nanoparticles .
INFECTION CONTROL
99.84% effectiveness
HEALING ENVIRONMENT
By understanding the principals, design for health care environments has begun
to include aesthetic enhancements in an attempt to reduce stress and anxiety
Modular system successfully integrating light, space, colour, shape, texture and
artwork — as well as sounds and sensations — they create space that manifests
a harmony of mind, body and spirit.
While also improving staff morale and efficiency, bright, cheerful surroundings
can help reduce medical errors and hospital-acquired infections.
HEALING ENVIRONMENT
COST
Provides intuitive wireless control for medical equipment and devices within
operating theatre using the touch panel.
MONITOR & MEDIA INTEGRATION
FEATURES
FAST INSTALLATION
Modular construction means your project will be completed quicker because
many of the building elements are delivered to site pre-fabricated.
This can reduce build times by as much as 50 per cent compared to conventional
methods.
Delivering clinical services faster.
HYGIENE REASONS
HEALING ENVIROMENTS
FAST INSTALATION
Window
- Constant Window
- Double Window
- Tilting – Sending & Receiving Window
- Tilting – Single Window Clip – In
Wall Panels - Ventilation – Guillotine Window
Ceiling Panels
PATIENTS
• Better Post Operation recovery
• Minimal hospitalization days
HOSPITAL
• Lower Infection Rate [HAI & SSI]
• Reduction of overall cost
• Minimal Downtime of OR