Recarpeting of BT Road at Internal lanes of VAISHNAVI
Daya Sharrel,
1 1 1 Saket Colony Ph-I in Kapra Circle, Greater 33.98 1.35 METAL Completed
(9490937493)
Hyderabad Municipal Corporation. INDUSTRIES
SRI
Recarpeting of BT Road from Sainikpuri Petrol RAGHAVENDRA Daya Sharrel,
2 1 1 36.88 0.85 Completed
bunk to Nethaji Nagar in Kapra Circle, GHMC CONSTRUCTION (9490937493)
S
SRI
Recarpeting of BT Road from Vijaya High
RAGHAVENDRA Daya Sharrel,
3 1 1 School to Kapra Village in Kapra Circle, 37.11 0.85 Completed
CONSTRUCTION (9490937493)
GHMC
S
Recarpeting of BT Road in Saketh Pranam Daya Sharrel,
4 1 1 27.41 0.90 JYOTHI VLCCS Completed
Internal roads in Kapra Circle, GHMC (9490937493)
M/S
NAGARJUNA
Recarpeting of BT Road in Sainikpuri 1st Daya Sharrel,
5 1 1 20.28 0.70 HY-TECH Completed
Avenue main road in Kapra Circle, GHMC (9490937493)
CONSTRUCTION
S
BHOORATHNO
Recarpeting of BT Road in Sainikpuri 3rd & 5th M Daya Sharrel,
6 1 1 33.62 0.95 Progress
Avenue main road in Kapra Circle, GHMC CONSTRUCTION (9490937493)
CO. (P) LIMITED
BHOORATHNO
Recarpeting of BT Road in Sainikpuri Plot
M Daya Sharrel,
7 1 1 No.321 to Post office road in Kapra Circle, 29.59 0.90 Progress
CONSTRUCTION (9490937493)
GHMC
CO. (P) LIMITED
VAISHNAVI
Recarpeting of BT Road in Bhaskar rao Nagar Daya Sharrel,
8 1 1 29.64 1.13 METAL Completed
internal road in Kapra Circle, GHMC (9490937493)
INDUSTRIES
1
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
VAISHNAVI
Recarpeting of BT Road in Bhaskar Rao Nagar Daya Sharrel,
9 1 1 45.98 1.60 METAL Completed
internal road in Kapra Circle, GHMC (9490937493)
INDUSTRIES
VAISHNAVI
Recarpeting of BT Road in Eshwaripuri Colony Daya Sharrel,
10 1 1 48.83 1.50 METAL Completed
internal road in Kapra Circle, GHMC (9490937493)
INDUSTRIES
Recarpeting of BT Road in Ashok Joseph and VAISHNAVI
Daya Sharrel,
11 1 1 DLR Enclave internal road in Kapra Circle, 37.77 0.93 METAL Completed
(9490937493)
GHMC INDUSTRIES
Recarpeting of BT Road in Saibab Officers VAISHNAVI
Daya Sharrel,
12 1 1 Colony & Valvar Nagar internal road in Kapra 31.60 0.80 METAL Completed
(9490937493)
Circle, GHMC INDUSTRIES
VAISHNAVI
Recarpeting of BT Road in Saketh Colony PH- Daya Sharrel,
13 1 1 40.16 1.15 METAL Completed
II internal road in Kapra Circle, GHMC (9490937493)
INDUSTRIES
SRI
Recarpeting of BT Road in Sainikpuri 2nd RAGHAVENDRA Daya Sharrel,
14 1 1 49.50 1.10 Completed
Avenue internal roads in Kapra Circle, GHMC CONSTRUCTION (9490937493)
S
SRI
Recarpeting of BT Road in Nethaji Nagar &
RAGHAVENDRA Daya Sharrel,
15 1 1 Orla Shankaramma Colony internal roads in 46.41 1.00 Completed
CONSTRUCTION (9490937493)
Kapra Circle, GHMC
S
SRI
Recarpeting of BT Road in A.S.Rao Nagar main RAGHAVENDRA K.P.Bala Kishan,
16 2 1 28.08 1.00 Completed
road in Kapra Circle, GHMC CONSTRUCTION (9866506752)
S
Recarpeting of BT Road from Opp. Kapra
VELTECHCONST K.P.Bala Kishan,
17 2 1 Circle office to Radhika 'X' road in Kapra 23.45 0.85 Completed
RUCTIONS (9866506752)
Circle, GHMC
2
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
VAISHNAVI
Recarpeting of BT Road from Bhavani Nagar K.P.Bala Kishan,
18 2 1 30.10 1.20 METAL Completed
main road in Kapra Circle, GHMC (9866506752)
INDUSTRIES
VAISHNAVI
Recarpeting of BT Road from Bhavani Nagar K.P.Bala Kishan,
19 2 1 40.87 1.88 METAL Completed
internal road in Kapra Circle, GHMC (9866506752)
INDUSTRIES
Recarpeting of BT Road in Saketh Main road VAISHNAVI
K.P.Bala Kishan,
20 2 1 (Raja Rajeshwari Colony) in Kapra Circle, 25.42 1.00 METAL Completed
(9866506752)
GHMC INDUSTRIES
Recarpeting of BT Road in Nethaji Nagar and VAISHNAVI
K.P.Bala Kishan,
21 2 1 Srinivas Nagar internal road in Kapra Circle, 26.24 0.80 METAL Completed
(9866506752)
GHMC INDUSTRIES
Recarpeting of BT Road in Brundavan Colony VAISHNAVI
K.P.Bala Kishan,
22 2 1 and Aditya Nagar internal road in Kapra Circle, 42.03 1.45 METAL Completed
(9866506752)
GHMC INDUSTRIES
Recarpeting of BT Road in Srinivasa Nagar and
K.P.Bala Kishan,
23 2 1 Gandhi Nagar internal roads in Kapra Circle, 44.91 1.10 JYOTHI VLCCS Completed
(9866506752)
GHMC
Recarpeting of BT Road in Brundavan Colony
K.P.Bala Kishan,
24 2 1 & Prashanth Nagar internal roads in Kapra 49.50 1.00 JYOTHI VLCCS Completed
(9866506752)
Circle, GHMC
SRI
Recarpeting of BT Road from Kushaiguda
RAGHAVENDRA K.P.Bala Kishan,
25 3 1 Venkata Sai Enclave internal roads in Kapra 20.49 0.80 Completed
CONSTRUCTION (9866506752)
Circle, GHMC
S
VAISHNAVI
Recarpeting of BT Road in Nagarjuna Nagar K.P.Bala Kishan,
26 3 1 38.93 1.63 METAL Completed
internal roads in Kapra Circle, GHMC (9866506752)
INDUSTRIES
SAI RAM
Recarpeting of BT Road in E.C. Nagar internal K.P.Bala Kishan,
27 3 1 34.12 1.30 CONSTRUCTION Completed
roads in Kapra Circle, GHMC (9866506752)
S
3
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
VKA
Recarpeting of BT Road in Ambekdar Nagar K.P.Bala Kishan,
28 3 1 30.56 0.85 CONSTRUCTION Completed
internal roads in Kapra Circle, GHMC (9866506752)
S
VKA
Recarpeting of BT Road in Reddy Colony main K.P.Bala Kishan,
29 3 1 12.15 0.32 CONSTRUCTION Completed
road in Kapra Circle, GHMC (9866506752)
S
Recarpeting of BT Road from HB Colony PH- VAISHNAVI
Sai Tharun,
30 4 1 II to Venkateshwara Nagar main road in Kapra 26.84 1.42 METAL Completed
(9030713062)
Circle, GHMC INDUSTRIES
VAISHNAVI
Recarpeting of BT Road in Venkateshwara Sai Tharun,
31 4 1 31.33 2.60 METAL Completed
Nagar Internal roads in Kapra Circle, GHMC (9030713062)
INDUSTRIES
Recarpeting of BT Road in Thirumala Nagar Sai Tharun,
32 4 1 32.44 1.42 JYOTHI VLCCS Completed
Internal roads in Kapra Circle, GHMC (9030713062)
VAISHNAVI
Recarpeting of BT Road in Krishna Nagar main Sai Tharun,
33 4 1 18.58 0.52 METAL Completed
roads in Kapra Circle, GHMC (9030713062)
INDUSTRIES
VAISHNAVI
Recarpeting of BT Road in Krishna Nagar Sai Tharun,
34 4 1 15.44 0.68 METAL Completed
Internal roads in Kapra Circle, GHMC (9030713062)
INDUSTRIES
SRI
Recarpeting of BT Road in Kailasagiri temple RAGHAVENDRA Sai Tharun,
35 4 1 25.60 0.65 Completed
main roads in Kapra Circle, GHMC CONSTRUCTION (9030713062)
S
VAISHNAVI
Recarpeting of BT Road in Old Meerpet main Sai Tharun,
36 4 1 25.68 1.30 METAL Completed
road in Kapra Circle, GHMC (9030713062)
INDUSTRIES
VAISHNAVI
Recarpeting of BT Road in H.B.Colony Ph-I Sai Tharun,
37 4 1 20.94 0.73 METAL Completed
internal lanes in Kapra Circle, GHMC (9030713062)
INDUSTRIES
4
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
SRI
Recarpeting of BT Road in Indira Nagar PH-II
RAGHAVENDRA Sai Tharun,
38 4 1 & Diamond Hill area internal roads in Kapra 23.69 0.90 Completed
CONSTRUCTION (9030713062)
Circle, GHMC
S
VAISHNAVI
Recarpeting of BT Road in Ashok Nagar main K.Satya Laxmi,
39 5 1 10.26 0.57 METAL Completed
road in Kapra Circle, GHMC (9032352079)
INDUSTRIES
Recarpeting of BT Road from 1-1-2/99/B to BEKKAM Sri Baji Shaheed
40 6 2 Tarnaka Road, Street No.2, Habsiguda, Ward 13.79 0.60 CONSTRUCTION Khan, AE, Completed
No. 6, Uppal circle, GHMC S 9849906762
Recarpeting of BT Road from Auto Stand to BEKKAM Sri Baji Shaheed
41 6 2 Sairam School, Venkat Reddy, Ramanthpur 27.28 1.40 CONSTRUCTION Khan, AE, Completed
Ward No. 6, Uppal circle, GHMC S 9849906762
Recarpeting of BT Road from Electrical Sub VKA
Sri P.Damodhar
42 7 2 Station, Devender road to Prajatantra Office, 46.00 1.60 CONSTRUCTION Completed
Rao, 9966669410
Ramanthpur Ward No. 7, Uppal circle, GHMC S
Recarpeting of BT Road from Airtel Office to BEKKAM
Sri P.Damodhar
43 7 2 Krishna Chemicals, Davender Nagar 31.17 1.20 CONSTRUCTION Completed
Rao, 9966669410
Ramanthpur Ward No. 7, Uppal circle, GHMC S
Laying of B.T. road from Ramanthapur main VKA
Sri P.Damodhar
44 7 2 road, ADRM Hospital to Sholay Mutton Shop, 37.26 1.20 CONSTRUCTION Completed
Rao, 9966669410
Ramanthapur, ward No.7, Uppal Circle, GHMC S
Laying of B.T. road 3-9-47/1, ADRM Hospital K
Sri P.Damodhar
45 7 2 Road to Ward Office, Ramanthapur, ward No.7, 24.84 0.80 PARAMANAND Completed
Rao, 9966669410
Uppal Circle, GHMC A REDDY & CO
Recarpeting of BT Road from 3-7-95 to 3-16- K
Sri P.Damodhar
46 7 2 44/2/1, Indira Nagar, Ramanthpur Ward No. 7, 27.09 0.75 PARAMANAND Completed
Rao, 9966669410
Uppal circle, GHMC A REDDY & CO
Laying of B.T. Road from Veera Raja Reddy K Sri Baji Shaheed
47 6 2 Statue, 1-4-56, Street No.8, Habsiguda, ward 39.03 0.80 PARAMANAND Khan, AE, Completed
No. 6, Uppal Circle, GHMC A REDDY & CO 9849906762
5
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Laying of B.T. Road from ICICI bank to Ward Sri Baji Shaheed
VELTECHCONST
48 6 2 Office Habsiguda, ward No. 6, Uppal Circle, 48.79 1.00 Khan, AE, Completed
RUCTIONS
GHMC 9849906762
Laying of B.T. Road from Spencers to Legend Sri Baji Shaheed
VELTECHCONST
49 6 2 Apartments Habsiguda, ward No. 6, Uppal 39.03 0.80 Khan, AE, Completed
RUCTIONS
Circle, GHMC 9849906762
Laying of B.T. Road from Vignan School, East VKA Sri Baji Shaheed
50 7 2 Kalyanpuri to Justice Bhaskar Rao House, East 26.61 1.00 CONSTRUCTION Khan, AE, Completed
Kalyanpuri, Uppal Circle, GHMC S 9849906762
Laying of B.T. Road from Water Tank, Street Sri Baji Shaheed
A RAVINDER
51 6 2 No. 3 Habsiguda to '1-2-62/1, Street No. 3 26.42 1.10 Khan, AE, Completed
REDDY
Habsiguda, Uppal Circle, GHMC 9849906762
Laying of B.T. Road from Around the park, Sri Baji Shaheed
A RAVINDER
52 7 2 Kakateya Nagar to Around the park, Kakateya 15.15 0.90 Khan, AE, Completed
REDDY
Nagar, Uppal Circle, GHMC 9849906762
Laying of B.T. Road from '3-10-118, P.S. Sri Baji Shaheed
A RAVINDER
53 7 2 Colony Road to '3-12-126/2 P.S. Colony Road, 11.53 0.60 Khan, AE, Completed
REDDY
Uppal Circle, GHMC 9849906762
Laying of B.T. Road from '3-7-16/9, Mahesh
A RAVINDER Sri V.Harilal, AEE,
54 7 2 Bank Road, Gokhale Nagar to Mahesh Bank, 12.99 0.40 Completed
REDDY 9989930377
Gokhale Nagar, Uppal Circle, GHMC
Laying of B.T. Road from Ramantahapur main
Sri Baji Shaheed
road, Gokhale Nagar Road to Brundavan A RAVINDER
55 7 2 29.27 1.50 Khan, AE, Completed
Garden Gokhale Nagar Road, Uppal Circle, REDDY
9849906762
GHMC
BALAJI
Laying of B.T. Road from Ramalayam Arch to Sri P.Damodhar
CONSTRUCTION
56 6 2 Ramanthapur main road Street No.8, Habsiguda, 39.03 0.80 Rao, AE, Progress
S
ward No. 6, Uppal Circle, GHMC 9866669410
9346434840
PN
Laying of BT road from Balaji Sweet House to Sri R.Sravan
CONSTRUCTION
57 5 2 Andhra Bank, Beerappagadda, Uppal, Ward 37.26 1.20 Kumar, AEE, Progress
S
No.5-, Uppal Circle, GHMC 9000115395
9000300032
6
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
PN
Laying of BT road from Balaji Apartments Sri R.Sravan
CONSTRUCTION
58 5 2 Beerappagadda to Srinagar Colony, Uppal, 24.84 0.80 Kumar, AEE, Progress
S
Ward No.5-, Uppal Circle, GHMC 9000115395
9000300032
MERLON INFRA
Recarpeting of BT Road from KBR Function PROJECTS
Sri K.Venugopala
Hall to Grave Yard, Judges Colony in Ward PRIVATE
62 12 3A 42.90 0.50 Rao Completed
No.9, Mansoorabad of L.B.Nagar Circle-3A, LIMITED
9849908091
GHMC 9963689742
9000908811
7
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Recarpeting of BT Road from Near DCP Office
to Gotteti Functional Hall Road & Rock Town SYED ALI
Sri S.Prasad
64 11 3A Colony Main Road to Rock Town Colony near 33.40 1.00 ABBAS Progress
9704333827
Indraprastha Colony in Ward No.9, 9391322568
Mansoorabad of L.B.Nagar Circle-3A, GHMC
MERLON INFRA
Recarpeting of BT Road from High Court
PROJECTS
Colony Main Road to Bhagyalath Main Road,
PRIVATE Sri G.Sainath Goud
65 13 3A Kamala Nagar to Internal Lanes & Huda Sai 46.56 0.50 Completed
LIMITED 9000631586
Nagar to Internal Lanes in Ward No.10, Hayath
9963689742
Nagar of L.B.Nagar Circle-3A, GHMC
9000908811
BHOORATHNO
Recarpeting of BT Road from NH-65 to Yella M
Reddy Colony & NH-65 to Hayathnagar Bus CONSTRUCTION Sri G.Sainath Goud
66 13 3A 47.72 0.60 Completed
Depot in Ward No.10, Hayath Nagar of CO. (P) LIMITED 9000631586
L.B.Nagar Circle-3A, GHMC 9440623233
040-27706112
8
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
BHOORATHNO
Recarpeting of BT Road from Road No.7 to Bus
M
Stand Road, Vaidehi Nagar & P.No.135 to B-
CONSTRUCTION Sri R.Mangulal
69 15 3A 170, Sachivalaya Nagar Near Ravindra Bharathi 47.90 0.40 Completed
CO. (P) LIMITED 9701362707
Shool in Ward No.11, Vanasthalipuram of
9440623233
L.B.Nagar Circle-3A, GHMC
040-27706112
9
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Recarpeting of BT Road from Mallikarjuna
A RAVINDER
Nagar Kaman to Padmavathi Colony 'X' Roads Sri K.Venugopala
REDDY
74 12 3A & Sahara 1st Gate to Sahara Security Point in 28.37 0.23 Rao Completed
9246520560
Ward No.9, Mansoorabad of L.B.Nagar Circle- 9849908091
9246529485
3A, GHMC
A RAVINDER
Recarpeting of BT Road from Bhagyalath to
REDDY Sri G.Sainath Goud
75 13 3A Sama Nagar in Ward No.10, Hayath Nagar of 27.76 0.60 Completed
9246520560 9000631586
L.B.Nagar Circle-3A, GHMC
9246529485
A RAVINDER
Recarpeting of BT Road from Krishna Temple
REDDY Sri G.Sainath Goud
76 13 3A to Banjara Colony in Ward No.10, Hayath 30.66 1.00 Completed
9246520560 9000631586
Nagar of L.B.Nagar Circle-3A, GHMC
9246529485
Recarpeting of BT Road from Sai Baba Temple A RAVINDER
to Reliance Fresh, Prashanth Nagar in Ward REDDY Sri G.Sainath Goud
77 13 3A 31.93 0.50 Completed
No.11, Vanasthalipuram of L.B.Nagar Circle- 9246520560 9000631586
3A, GHMC 9246529485
10
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
11
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Recarpeting of BT Road from Sri NRI Jr PN
College, Chaitanya Nagar to H.No.8-7-89/34P CONSTRUCTION
Sri G.Nikhil Reddy
85 16 3A & Plot No.1, Jaya Krishna Enclave to EP 27.19 0.90 S Completed
9701365524
No.1515026259/025 in Ward No.12, 9000300032
Karmanghat of L.B.Nagar Circle-3A, GHMC 9989931292
12
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Strengthening and recarpetting of damaged BT
road from Saroornagar Old Police Station to A.RAMA Sri.A.Srinivasulu,
91 18 3B Kameshwar Rao Colony main road in Ward 23.12 0.90 KRISHANA A.EE., Completed
No.13, Champapet of L.B. Nagar Circle-3B, REDDY Cell: 8008103624
GHMC.
13
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
39-
Santos S/R to damaged BT Roads from IS Sadan to Venkata Ramana
97 4A 45.42 3.00 Completed
h CRIDA in Santoshanagar, Div-21, GHMC. Constructions
Nagar
25-
S/R to damaged BT roads beside Bawarchi
Moosa Veltech
98 4A Hotel to TV Tower Road unbder Division 28.75 1.80 Completed
rambag Constructions
No:4A, GHMC.
h
31-
S/R to damaged BT Roads from Chaderghat to Unit Constructions
99 Pather 4A 45.00 2.80 Completed
City Civil Court in Pathergatti, Div-38, GHMC. Pvt Ltd
gatti
31- S/R to damaged BT Roads from City Civil
Sri. Raghavendra
100 Pather 4A Court to Alijah Kotla in Pathergatti, Div-38, 44.42 2.80 Completed
Constructions
gatti GHMC.
24- S/R damaged BT roads in Thirumala Hills,
Veltech
101 Saidab 4A Revenue Board Colony and Various Places in 45.82 3.00 Completed
Constructions
ad Saidabad, Div-19, GHMC.
29- S/R damaged BT road from Yakutpura Railway
102 Chawn 4A Station to Jr. College Chachalguda via Chavni 41.00 2.10 Syed Ali Abbas Completed
i under Division No:4A,GHMC.
S/R damaged BT roads from A)224/2RT to
27- 234/2RT, 139/2RT to 154/SRT and bylanes in
103 Akberb 4A Saidabad Colony B)Ameen Colony and Ujale 40.90 2.10 Syed Ali Abbas Completed
agh Shah Eidgah road in Akberbagh, Div-32, Under
Division No:4A, GHMC.
14
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
15
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
43 -
Laying BT road from Bandlaguda to Ruman
Chandr
108 4B Hotel via Chandrayangutta fly over JN in the 25.00 1.10 V J Constructions Progress
ayangu
Barkas Div-24 (Phase-I)
tta
Laying BT patches on the road from R.No.11
42 -
109 4B Ismail Nagar to Vambay Mohd Nagar in the 12.00 1.30 P. N Constructions Completed
Barkas
Barkas Divn-24 (Phase-I)
Recarpetting the BT road Nooree palace
42 - Function Hall to Ghouse Nagar VAmbay Balaji
110 4B 21.25 1.10 Completed
Barkas Housing via Ismail Nagar in the Barkas Divn Constructions
(Phase-I)
Recarpetting the BT road from Peeli Dargah
42 - row to Hyderabad mission school at Unique Balaji
111 4B 21.00 1.20 Completed
Barkas Designer Tailor via salala market in the Barkas Constructions
Divn (Phase-I)
Laying of BT road with 50mm thick DBM and
36 -
25mm thick SDBC from IB petrol pump to Balaji
112 Lalitha 4B 16.05 0.80 Progress
ANURAG- Rakshapuram side of Inner ring Constructions
bagh
road Lalithabagh Div. (Phase-I )
16
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Laying of BT road with 50mm thick DBM and
40 -
25mm thick SDBC from Ghousia Masjid Edi A Rama Krishna
116 Riyasat 4B 21.95 0.40 Completed
Bazar main road upto RUB Riyasathnagar Div Reddy
hnagar
and Lalithabagh Div (Phase-I )
44 - Recarpetting of BT road from Chandrayangutta
Bekkam
117 Uppug 4B X road to Petrol pump opp Omer Hotel in 15.50 0.30 Completed
Constructions
uda Uppuguda Div (Phase-I)
44 - Recarpetting of BT road from Uppuguda
118 Uppug 4B Kandikal Gate to Arundathi Colony in 15.50 0.30 V.N.R Projects Completed
uda Uppuguda Div (Phase-I
17
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Recarpetting the BT road from Peeli Dargah
42 - row to Hyderabad mission school at Unique
123 4B 21.00 0.60 P.N Constructions Completed
Barkas Designer Tailor via salala market in the Barkas
Divn (Phase-II)
Laying of BT road with 50mm thick DBM and
36 -
25mm thick SDBC from IB petrol pump to
124 Lalitha 4B 16.05 0.80 SRR Constructions Progress
ANURAG- Rakshapuram side of Inner ring
bagh
road Lalithabagh Divn. (Phase-II)
18
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Recarpetting of BT road in the lane 18-10-
42 - 38/F/1/1 to towards Govt Primary school
131 4B 12.25 0.80 SRR Constructions Completed
Barkas Babanagar Maqbool Nagar in the Barkas Divn
(Phase-II)
43 -
Chandr Recarpetting of BT road from Chandrayangutta
132 4B 49.00 2.50 abbas Completed
ayangu flyover to Charminar (Phase-III)
tta
43 -
Chandr Recarpetting of BT road from Chandrayangutta
133 4B 50.00 1.50 abbas Completed
ayangu flyover to Charminar (Phase-IV)
tta
Recarpeting of BT roads Rythu Bazar to
46-
Madina colony (Alnoor Hotel) and Guntal nagar Shee Shakti
134 Falakn 5 19.49 0.60 Completed
Main Road to Nice Hotel Ayan Café in Enterprises
uma
Falaknuma divn Shree Shakti Enterprises
46- Recarpeting of BT roads Vattepally to in to
Bekkam
135 Falakn 5 Fatima Nagar in Falaknuma divn Bekkam 16.99 0.15 Completed
Constrcutions
uma Constructions
49-
Recarpeting of BT roads Moosabowli Junction
136 Ghansi 5 12.65 0.80 P N Constructions Completed
to City College Junction in Ghansibazar divn
bazar
46- Recarpetting of BT Road from Farooq Nagar
Artex Infra
137 Falakn 5 Bus Depo to Falaknuma Gundu in Falaknuma 15.03 0.30 Completed
Projects
uma Div
48-
Recarpetting of BT Road from Volgua Hotel to
138 Hussai 5 25.7 0.30 Shahnawzullah Completed
Moosabowli Junction in Hussainialam Div
nialam
50- Recarpetting of BT Road from Telephone
139 Begum 5 Exchange to Gowliguda X road in Begum Bazar 11.49 0.20 SSC Project Completed
Bazar Div
19
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
51-
Recarpetting of BT Road from ACP office to
140 Gosha 5 20.27 0.25 P.N Construction Completed
Joshi wadi in Goshamahal Div
mahal
48- Recarpetting of BT Road from Bahadurpura X
141 Hussai 5 road to Rama Talkies & from Khursheed Jhah 17.91 1.50 P.N Construction Progress
nialam Devdi to Murgichowk in Hussainialam Div
46- Recarpeting of BT roads Enginebowli Bus Depo
142 Falakn 5 toVattepally Temple in Falaknuma P.N 23.96 0.30 P N Constructions Completed
uma Constructions
46- Recarpeting of BT roads Chandrayanagutta Fly
143 Falakn 5 over to Zishan Hotel and Vattepally Temple in 18.62 0.40 P N Constructions Completed
uma to Nice Hotel in Falaknuma P.N Constructions
46- Recarpeting of BT roads Shama Takies to
Artex Infra
144 Falakn 5 Jahanuma Water tank in Falaknuma Artex Infra 13.56 0.15 Completed
Projects
uma Projects
Recarpeting of BT roads R.K. Medical to
54-
Mubarak Hotel in Nawab sub Kunta divn and
145 Jahanu 5 24.35 0.60 Syed Ali Abbas Completed
from Irfan Hotel to Teegalkunta Junction in
ma
Jahanuma divn Syed Ali Abbas
54-
Recarpeting of BT roads Pyaro miya Masjid to
146 Jahanu 5 13.6 0.50 Syed Ali Abbas Completed
Gowshala in Jahanuma Syed Ali Abbas
ma
54-
Recarpeting of BT roads Gowshala to in to
147 Jahanu 5 18.93 0.60 SRR Constructions Completed
Shama Talkies in Jahanuma divn No Response
ma
54-
Recarpeting of BT roads Faraz Café to Shama Artex Infra
148 Jahanu 5 26.26 0.30 Completed
Talkies in Jahanuma divn Artex Infra Projects Projects
ma
Recarpeting of BT roads Pardiwada Junction
48-
to Safi Library and Fatehdarwaza Junction to
149 Shahali 5 25.7 0.80 P N Constructions Completed
Basheer Hotel in Shahalibanda divn P.N
banda
Constructions
20
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
49- Recarpeting of BT roads Char Kaman to Qamar
Bekkam
150 Ghansi 5 Hotel via Jeevan Madical Hall Badka Jhad in 18.98 0.80 Completed
Constrcutions
bazar Ghansibazar divn No Response
49- Recarpeting of BT roads Madina Junction to
Bekkam
151 Ghansi 5 City College in Ghansibazar divn Bekkam 10.11 0.60 Completed
Constrcutions
bazar Constructions
Recarpeting of BT roads Gollakidiki X road to
53- Main road via Siddique Gulshan Dargah in and
Bekkam
152 Doodh 5 Bahadurpura X road to Vazirali Mosque (Two 13.9 1.00 Completed
Constrcutions
bowli approch roads) in Doodhbowli divn No
Response
Recarpeting of BT roads Tadbun labour Adda
55- Kalapather to Goshala junction shamsheergunj
153 Ramna 5 and Faraz café Junction to Manali 24.79 1.40 Mohd Shabazullah Completed
spura Garden(Ansari Road ) in Ramnaspura divn
Mohd Shabazullah
56- Recarpeting of BT roads Kishan Bagh Junction
154 Kishan 5 in Kishan Bagh divn to Nandimuslaiguda in 12.52 0.60 Mohd Shabazullah Completed
bagh Kishanbagh divn Mohd Shabazullah
47-
Recarpetting of BT Road from Owaisi
Nawab
155 5 community hall to Bintrif Function Hall in 14.43 0.60 SRR Constructions Completed
Sub
Nawabsab kunta Div
Kunta
Recarpetting of BT Road from Masjid Ameer
54-
Hamza to Javeed Mission School and from Super
156 Jahanu 5 17.2 0.60 Completed
Munawar General Store to Jhanda in Jahnuma Constructions
ma
Div
54-
Recarpetting of BT Road from Salam Hotel to
157 Jahanu 5 17.46 0.50 Syed Ali Abbas Completed
Masjid Aqsa in Jahanuma Div
ma
48-
Recarpetting of BT Road from Hussainialam
158 Hussai 5 15.13 0.20 Syed Ali Abbas Completed
PS to Baragally in Hussainialam Div
nialam
21
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
48-
Recarpetting of BT Road from Shahalibanda
159 Hussai 5 12.7 0.14 Syed Ali Abbas Completed
Junctio9n to Volgua Hotel in Hussainialam Div
nialam
55-
Recarpetting of BT Road from Jugnu Function
160 Ramna 5 11.95 0.10 Mohd Shabazullah Completed
hall to Main road in Ramnaspura Div
spura
55-
Recarpetting of BT Road from Tadbun Khaja
161 Ramna 5 15.96 0.30 Mohd Shabazullah Completed
Pahadi to Electrical Junction in Ramnaspura Div
spura
55-
Recarpetting of BT Road from Salheen colony
162 Ramna 5 19.52 0.50 Mohd Shabazullah Completed
bylanes in Ramnaspura Div
spura
Laying of BT patch work near Geetanjali
Bekkam
School & Railway Station at Sai Baba Bagar,
163 59 6 20.21 0.30 Constructions Completed
Old Kurnbool Road to Raghavendra Hospital at
9440222888
Pragathi Colony, W-58 in Rajendernagar Div
22
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Strengthening and Recarpeting of B.T. Road
from Piller No-179 to Dhani Appartments
Ward No. 59 ,Rajendranagar in Rajendranagar
Circle, GHMC
Change of site:
Mohd Shabazullah
166 60 6 Laying of BT road from Hanuman temple to 3- 43.98 0.60 Completed
9246337718
7-
400/102 and Bylanes at Sanjeevani hills in
Ward
No.60, Rajendranagar division in Rajendranagar
Circle-6, GHMC
Strengthening and Recarpeting of B.T. Road
from Piller No-118 to Janayapriya Appartments Mohd Shabazullah
167 60 6 47.16 0.80 Completed
Ward No. 59 ,Rajendranagar in Rajendranagar 9246337718
Circle, GHMC
Strengthening and recarpeting of BT road at
V.N.R Projects
168 61 6 Sahara Hotel to Phirangi Nala Chintalmate at 33.73 0.40 Completed
9680888727
W-60 in Rajendernagar Div
Strengthening and recarpeting of BT road from Super
169 61 6 Rambagh Police Outpost to 9 No Attapur W- 14.76 0.20 Constructions Completed
60 in Rajendernagar Div 9246888828
Strengthening and recarpeting of BT road from
Mohd Shabazullah
170 61 6 from Patel Hotel to Indra Gandhi Statue at 14.7 0.24 Completed
9246337718
Attapur W-60 in Rajendernagar
Strengthening and Recarpeting of B.T. Road
Shree Shakti
from Gateway School to Kistammagutta Road at
171 60 6 50.00 0.70 Enterprises. Completed
Budwel Ward No. 59 ,Rajendranagar in
9393532845
Rajendranagar Circle, GHMC
Laying of BT road from Grand Hotel to Sara Mohd Shabazullah
172 58 6 22.08 0.30 Completed
Medical Hall in Rajendernagar Div 9246337718
Rama Krishna
Laying of BT road from LIG 90 to Madhuban
173 59 6 23.47 0.40 Reddy Completed
colony Bus Stop in Rajendernagar Div
9849644459
23
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Laying of BT road from Pillar No.179 to Dhani
Appartments (Phase-II) and from Ganesh Nagar Mohd Shabazullah
174 60 6 48.05 0.70 Completed
main road to Bus stop in Rajendernagar Div) 9246337718
Change of site to New Friends Colony
Laying of BT road from ANGRAU Arch to Mohd Shabazullah
175 60 6 44.00 1.50 Completed
Pillar No.292in Rajendernagar Div (Phase-I) 9246337718
Laying of BT road from ANGRAU Arch to Mohd Shabazullah
176 60 6 43.97 0.60 Completed
Pillar No. 292in Rajendernagar Div (Phase-II) 9246337718
Laying of BT road from Kistamma Gutta to
Hanuman Temple in Rajendernagar Div (Phase-
I)
Change of site: Rama Krishna
177 60 6 Laying of BT road at (a) transformer to plot-46, 34.00 0.50 Reddy Completed
(b) plot-48 to 3-7-400/34 and (c) plot-46 to 9849644459
green heights Apartment in Sanjeevani Hills in
Ward No. 60, Rajendranagar division in
Rajendranagar Circle- 6, GHMC
Laying of BT road from Kistamma Gutta to
178 60 6 Hanuman Temple in Rajendernagar Div (Phase- 34.51 0.50 PN Constructions Completed
II)
Recarpeting of BT road from Reading Room to Super
179 70 7A Plot No.27 in Navodaya Colony under 4.30 0.20 Constructions Completed
Mehdipatnam. 92468888828
Laying of B.T.patches at various places
(a)cresent hill road no 2 (b) at NMDC (c)Riyan
café to RavindraBharati school(d) opp Ellora
SUPER
180 75 7A carpets(e) at P.g.college VIJAYANAGAR 49.50 1.30 Completed
CONSTRUCTION
COLONY-73(a) shantinagar
club(b)shyamraonagar©Golden café to road no
1 In Chintal Basthi-74, Ward-10
24
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
25
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Restoration and strengthening of BT road from
Hanuman temple to near Ganga Bowli outpost M/s. Artex Infra
189 64 7B 27.50 2.00 Completed
PS in Natraj Nagar main road Dattatreya Nagar, Projects
ward-13 (CZ), Div-7B, GHMC
Laying of BT road from Jamali Darwaza to MD M/s. Bekkam
190 67 7B 5.10 0.60 Completed
lines road in Golconda, ward-9 Construction
Laying of BT road near Masjid e Ahmedia, NSF
M/s. Bekkam
191 69 7B colony to Electrical transformer in Nanal Nagar, 4.95 0.40 Completed
Construction
ward-9
Laying of BT BT road from H.No.9-4-63/175/A
M/s. Bekkam
192 69 7B to junction in Nizam colony, Nanal Nagar, 8.85 0.80 Completed
Construction
ward-9
Laying of BT BT road from H.No.9-4-63/A to
M/s. Bekkam
193 69 7B Plot No.85 in Nizam colony, Nanal Nagar, 3.05 0.20 Completed
Construction
ward-9
Laying of BT road from Aman Hospital to
M/s. Bekkam
194 69 7B Borewell in Meraj Colony in Nanal Nagar, 4.20 0.30 Completed
Construction
ward-9
Laying of BT road from Rahmath dairy to end M/s. Bekkam
195 69 7B 4.60 0.30 Completed
of the road in Nanal Nagar, ward-9 Construction
Laying of BT road from 9-4-77/A/1/2 to 9-
M/s. Bekkam
196 69 7B 4-/77/S/168 in A1 Hasnath Colony in Nanal 8.90 0.50 Completed
Construction
Nagar, ward-9
Laying of BT road from 9-4-77/A/122 to 9-4-
M/s. Bekkam
197 69 7B 77/A/221 in A1 Hasnath Colony in Nanal 8.89 0.80 Completed
Construction
Nagar, ward-9
Laying of BT road from 9-4-77/A/122 to 114 in M/s. Bekkam
198 69 7B 3.90 0.20 Completed
A1 Hasnath Colony in Nanal Nagar, ward-9 Construction
Laying of BT road Plot No.114 to 116 in A1 M/s. Bekkam
199 69 7B 3.60 0.30 Completed
Hasnath Colony in Nanal Nagar, ward-9 Construction
Laying of BT road from Electrical Transformer M/s. Bekkam
200 69 7B 6.35 0.30 Completed
to culvert road ward-9 Construction
26
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Recarpeting of BT road from 13-1-1233/58/A to
13-1-1233/68/A near Ambedkar nagar colony at
201 64 7B 6.70 0.40 M/s. VNR Projects Progress
natrajnagar ,Dattatreyanagar, Ward no.13,
Division-7B, CZ, GHMC.
Laying of BT road near Dr. B.R. Ambedkar
M/s, Bekkam
202 69 7B Community Hall to Apticot High School in 2.50 0.20 Progress
Constructions
Nanal Nagar, Ward-9, Div-7B, CZ, GHMC
Strengthening and Recarpeting of damaged B.T.
P. Ganesh
203 9A Road from 1-2-142/21, Domalguda to GHMC 3.20 0.11 Completed
9989931292
Woard Office Backside, Div-9A, CZ, GHMC
Strengthening and Recarpeting of damaged B.T.
Road from Hanuman Temple, Chikkadpally to P. Ganesh
204 9A 3.80 0.17 Completed
1-1-188 near Chikkadpaly Main Road, Div-9A, 9989931292
CZ, GHMC
Strengthening and Recarpeting of damaged B.T.
P. Ganesh
205 9A Road from Govt. School , Adikmet to ZB 6.00 0.14 Completed
9989931292
Function Hall, Div-9A, CZ, GHMC
M/s. SFC
Strengthening and Recarpeting of damaged B.T. Constructions Pvt
G.Ravinder Reddy
206 96 10A Road from Yousufguda Market to Indira Nagar 16.70 0.24 Ltd, Completed
8897507716
Junction, Div-10A, CZ, GHMC Cell No.92461
53864,
M/s. VKA
Strengthening and Recarpeting of damaged B.T.
Constructions,
Road from Yousuguda basthi to Sri Nagar G.Ravinder Reddy
207 96 10A 20.60 0.60 Cell No.92465 Completed
colony via Navodaya Colony, Div-10A, CZ, 8897507716
80706,
GHMC
9848054706
27
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
M/s. VKA
Strengthening and Recarpeting of damaged B.T. Constructions,
G.Ravinder Reddy
209 99 10A Road from Srinivasa Colony to Madhura Nagar, 12.00 0.35 Cell No.92465 Completed
8897507716
Muriki nala, Div-10A, CZ, GHMC 80706,
9848054706
Sri A.Ravinder
Strengthening and Recarpeting of damaged B.T.
Reddy, G.Ravinder Reddy
210 99 10A Road from SR Nagar to Rajiv Nagar, Div-10A, 11.20 0.20 Completed
Cell 8897507716
CZ, GHMC
No.9246520560,
Sri A.Ravinder
Strengthening and Recarpeting of damaged B.T.
Reddy, G.Ravinder Reddy
211 99 10A Road from Rehamath Nagar Juntion to GTS 11.00 0.50 Completed
Cell 8897507716
Junction, Div-10A, CZ, GHMC
No.9246520560,
M/s.PN
Strengthening and Recarpeting of damaged B.T.
Constructions, G.Ravinder Reddy
212 99 10A Road from Vengal Rao Nagar to Madhura 22.20 0.54 Completed
Cell 8897507716
Nagar, Div-10A, CZ, GHMC
No.9989931292
Sri A.Ravinder
Strengthening and Recarpeting of damaged B.T.
Reddy, G.Ravinder Reddy
213 99 10A Road from Kalyan Nagar Venture I to AG 37.20 1.20 Completed
Cell 8897507716
Colony road, Div-10A, CZ, GHMC
No.9246520560,
M/s. Deccan Hitec
Strengthening and Recarpeting of damaged B.T.
Constructions G.Ravinder Reddy
214 99 10A Road from Siddharth Nagar to Vengal Rao 19.30 0.56 Completed
Cell 8897507716
Nagar, Div-10A, CZ, GHMC
No.9246520788
M/s. VKA
Strengthening and Recarpeting of damaged B.T. Constructions,
G.Ravinder Reddy
215 99 10A Road from Saradhi Studio road to Madhura 10.30 0.30 Cell No.92465 Completed
8897507716
Nagar, Div-10A, CZ, GHMC 80706,
9848054706
28
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
M/s. VKA
Strengthening and Recarpeting of damaged B.T. Constructions,
G.Ravinder Reddy
216 99 10A Road from Rajiv Nagar main road to Internal 10.30 0.30 Cell No.92465 Completed
8897507716
road, Div-10A, CZ, GHMC 80706,
9848054706
29
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Strengthening and recarpeting of damaged BT
road from Beside pension office to Sai enclave SSC PROJECTS Ashok,
224 93 10B 6.70 0.20 Completed
road no.12 Banjara Hills, Div No.10B (CZ) 9246521206 9989100137
GHMC (Item No.3)
Strengthening and recarpeting of damaged BT
PITLAMWAR
road from DS house to Plot No.176/A MLA
225 93 10B 5.36 0.18 GANESH MR Completed
colony Banajara Hills Div No.10B (CZ) GHMC
9000300032
(Item No.14)
Strengthening and recarpeting of damaged BT
PITLAMWAR
road from DS house to ACB Office Road No.12
226 93 10B 6.55 0.22 GANESH MR Completed
Banjara Hills Div No.10B (CZ) GHMC (Item
9000300032
No.15)
Strengthening and recarpeting of damaged BT
M/s Super
road from Omega hospital to Lotus Pond MLA
227 93 10B 6.51 0.25 Constructions MR Completed
colony Banjara Hills ,Div No.10B (CZ) GHMC
040 - 23316492
(Item No.12)
Strengthening and recarpeting of damaged BT
M/s Super
road from SBH to DS House and bye lanes
228 93 10B 7.44 0.25 Constructions MR Completed
MLA colony Banjara Hills Div No.10B (CZ)
040 - 23316492
GHMC (Item No.13)
Strengthening and recarpeting of damaged BT
PLR Constructions
229 92 10B road at BN Reddy colony, Banjara Hills Div 9.11 0.35 AK Completed
9866312665
No.10B (CZ) GHMC (Item No.1)
Strengthening and recarpeting of damaged BT
PLR Constructions
230 95 10B road from Plot No.52 to Ramaniya Jubilee 8.92 0.09 MR Completed
9866312665
Hills ,Div No.10B (CZ) GHMC (Item No.5)
M/s. PLR
Strengthening and Recarpeting of damaged B.T.
Constructions,
231 95 10B Road from Plot No.590 to Plot No.590D 13.88 0.28 MR Completed
Cell No.98663
Jubilee Hills, Div-10B, CZ, GHMC
12661
30
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Strengthening and recarpeting of damaged BT PITLAMWAR
232 95 10B road in Road No.22/A, Jubilee Hills Div 3.07 0.15 GANESH MR Completed
No.10B (CZ) GHMC (Item No.7) 9000300032
Strengthening and Recarpeting of damaged B.T. M/s.SSC
Road from H.No. 8-1-284/04/695, H.No. 8-1- PROJECTS.,
233 94 10B 11.57 0.21 SK Completed
284 OU Colony to Thirumala Driving school, Cell
OU Colony Shaikpet,, Div-10B, CZ, GHMC No.9246521206
Laying of BT patches from A1 hotel to 8-1-
363/340 at Aditya Nagar and from Pole No. 024 PN Constructions
234 94 10B 9.95 0.80 SK Completed
to 8-1-332/3/96 at Aziz Bagh, Shaikpet, Div 9000300032
No.10B (CZ) GHMC
Strengthening and Recarpeting of damaged B.T. M/s.SSC
Road from Bheemas Take away, in OU Colony PROJECTS.,
235 94 10B 11.89 0.11 SK Completed
Shaikpet to Kidzee play learn school OU Cell
colony, Div-10B, CZ, GHMC No.9246521206
Strengthening and recarpeting of damaged BT
road from SH motor bike point to Vinayak Bekkam
236 94 10B 7.57 0.12 SK Completed
Nagar road Div No.10B (CZ) GHMC (Item Constructions
No.21)
Recarpeting of BT road from Sri Chakra Aprt to
SFC Constructions
237 91 10B Dayanand school at Anand Nagar Colony Div 6.15 0.60 Completed
9246153864
No.10B (CZ) GHMC (Item No.6)
Recarpeting of BT road from 6-3-582/1/1 to
tender care boutique at Anand Nagar colony (ZP SFC Constructions
238 91 10B 8.00 0.50 Progress
office road) Div No.10B (CZ) GHMC (Item 9246153864
No.1)
Repair and re-carpeting of BT road from Vijetha
MOHD SHAFI & B.Kanakaiah
Super Market & Ajay function hall to Rythu
239 106 11 23.31 0.95 CO 9704345024 Completed
bazar at HUDA Trade centre in Serilingampally
9391128511
Division-11, West Zone, GHMC (Item No.1)
31
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Repair and re-carpeting of BT road from Right
MOHD SHAFI & B.Kanakaiah
side of the flyover to Rail vihar Colony main
240 106 11 39.71 1.00 CO 9704345024 Completed
road in Serilingampally Division-11, West
9391128511
Zone, GHMC (Item No.2)
Repair and re-carpeting of Internal BT roads PLR
B.Kanakaiah
near F & H park at BHEL MIG in CONSTRUCTION
241 111 11 28.84 1.60 9704345024 Completed
Serilingampally Division-11, West Zone, S
GHMC (Item No.3) 9866312661
Repair and re-carpeting of Internal BT roads PLR
B.Kanakaiah
near G & B park at BHEL MIG in CONSTRUCTION
242 111 11 27.04 1.50 9704345024 Completed
Serilingampally Division-11, West Zone, S
GHMC (Item No.4) 9866312661
Repair and re-carpeting of Internal BT roads
MOHD SHAFI & B.Kanakaiah
near D & E park at BHEL MIGin
243 111 11 25.68 1.40 CO 9704345024 Completed
Serilingampally Division-11, West Zone,
9391128511
GHMC (Item No.5)
Repair and re-carpeting of BT road from PRASOON
B.Kanakaiah
Nallagandla main road to Aparna Cyber CONSTRUCTION
244 105 11 21.83 0.30 9704345024 Progress - 80%
commune in Serilingampally Division-11, West S
Zone, GHMC 8978999333
Repair and re-carpeting of BT road from PRASOON
B.Kanakaiah
Nallagandla main road to Dimond Heights CONSTRUCTION
245 105 11 36.78 0.80 9704345024 Completed
colony in Serilingampally Division-11, West S
Zone, GHMC (Item No.7) 8978999333
BALAJI
Repair and re-carpeting of BT road from
CONSTRUCTION B.Kanakaiah
Hanuman temple to Church road at
246 105 11 15.64 0.65 S 9704345024 Completed
Nanakramguda in Serilingampally Division-11,
9391017457,
West Zone, GHMC (Item No.8)
93472326699
32
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Repair and re-carpeting of BT road from
VKA
Khajaguda main road (Prashanthi hills Arch) to B.Kanakaiah
CONSTRUCTION
247 105 11 Existing CC road in Prashanthi hills in 24.84 0.95 9704345024 Completed
S
Serilingampally Division-11, West Zone,
9246580706
GHMC (Item No.9)
BALAJI
CONSTRUCTION
Repair and re-carpeting of BT road in Papireddy
S C.Krishna
248 106 11 colony in Serilingampally Division-11, West 47.92 1.50 Completed
9391017457, 9177701929
Zone, GHMC (Item No.10)
93472326699
SFC
Repair and re-carpeting of BT road from JV
CONSTRUCTION
Hills main road to towards Gem motors road in C.Krishna
251 104 11 19.92 0.50 S PVT LTD Progress
Serilingampally Division-11, West Zone, 9177701929
9912229802,
GHMC (Item No.13) (Recall)
246153864
VENKATARAM
ANA
Repair and re-carpeting of BT road in Golden
CONSTRUCTION C.Krishna
252 104 11 Tulip colony in Serilingampally Division-11, 49.25 1.30 Completed
S 9177701929
West Zone, GHMC (Item No.14)
9347008939,
9246154767
33
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Repair and re-carpeting of BT road from PRASOON
Anjaiah nagar main road to Siddique nagar CONSTRUCTION C.Krishna
253 104 11 48.98 1.30 Progress - 20%
main road via ward office in Serilingampally S 9177701929
Division-11, West Zone, GHMC (Item No.15) 8978999333
Repair and re-carpeting of BT road from PRASOON
Anjaiah nagar main road to Siddique nagar (40 CONSTRUCTION C.Krishna
254 104 11 49.37 1.45 Progress - 20%
feet road) in Serilingampally Division-11, West S 9177701929
Zone, GHMC (Item No.16) 8978999333
Repair and re-carpeting of BT road from PRASOON
Ramkey Towers to PJR nagar in CONSTRUCTION C.Krishna
255 104 11 45.58 1.20 Completed
Serilingampally Division-11, West Zone, S 9177701929
GHMC (Item No.17) 8978999333
UNITY
Repair and re-carpeting of BT roads in Housing
CONSTRUCTION C.Krishna
256 106 11 Board colony in Serilingampally Division-11, 47.88 1.46 Completed
S PVT. LTD. 9177701929
West Zone, GHMC (Item No.18)
9248000375
VKA
Repair and re-carpeting of Old Gachibowli main
CONSTRUCTION C.Krishna
257 105 11 road in Serilingampally Division-11, West 19.35 0.55 Completed
S 9177701929
Zone, GHMC (Item No.19)
9246580706
Repair and re-carpeting of BT road from Near VKA
B.Kanakaiah
EPTRI to OI Play school at Laxmi Enclave in CONSTRUCTION
258 105 11 16.91 0.81 9704345024 Completed
Serilingampally Division-11, West Zone, S
GHMC (Item No.20) 9246580706
DVN INFRA
Repair and re-carpeting of BT road in Doctors PROJECTS B.Kanakaiah
259 105 11 colony in Serilingampally Division-11, West 22.39 0.50 PRIVATE 9704345024 Completed
Zone, GHMC (Item No.21) LIMITED
9666225025
34
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
SFC
Repair and re-carpeting of BT road from GPRA CONSTRUCTION B.Kanakaiah
260 105 11 Quarters to Rock Village in Serilingampally 17.12 0.50 S PVT LTD 9704345024 Completed
Division-11, West Zone, GHMC (Item No.22) 9912229802,
9246153864
Repair and re-carpeting of BT road from B.Kanakaiah
PARASOL INFRA
261 105 11 Gulmohar park arch to park in Serilingampally 31.54 1.00 9704345024 Completed
9866194299
Division-11, West Zone, GHMC (Item No.23)
SFC
Repair and re-carpeting of BT road from MIG
CONSTRUCTION B.Kanakaiah
flyover road to TIP TOP via Surkhi office in
262 111 11 39.08 1.05 S PVT LTD 9704345024 Completed
Serilingampally Circle-XI, WZ, GHMC (Item
9912229802,
No.1)
9246153864
SFC
Repair and re-carpeting of BT road from Old
CONSTRUCTION
Bombay main road to JV colony via Housing C.Krishna
263 104 11 48.76 1.50 S PVT LTD Completed
board in Serilingampally Circle-XI, WZ, 9177701929
9912229802,
GHMC (Item No.2)
9246153864
35
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
DVN INFRA
Repair and re-carpeting of BT road from Road
PROJECTS B.Kanakaiah
behind flyover Flyover road to MMTS road via
267 106 11 11.36 0.70 PRIVATE 9704345024 Completed
park at HUDA Trade centre to in
LIMITED
Serilingampally Circle-XI, WZ, GHMC
9666225025
36
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
DVN INFRA
Repair and re-carpeting of BT road from Pavan
PROJECTS
wood works to 5-118/B at Adarsh nagar main C.Krishna
276 106 11 11.12 0.35 PRIVATE Progress - 20%
road in Serilingampally Circle-XI, WZ, GHMC 9177701929
LIMITED
(Item No.15)
9666225025
Repair and re-carpeting of BT roads in Doyens
PARASOL INFRA C.Krishna
277 106 11 colony in Serilingampally Circle-XI, WZ, 45.58 1.30 Completed
9866194299 9177701929
GHMC (Item No.16)
Repair and re-carpeting of BT road from NCC
SAIRAMCONST
Building left side road to Raheja main road in C.Krishna
278 104 11 48.56 1.20 RUCTIONS Completed
Serilingampally Circle-XI, WZ, GHMC (Item 9177701929
9704568881
No.17)
Repair and re-carpeting of BT road from NCC
SAIRAMCONST
Building right side road to Raheja main road in C.Krishna
279 104 11 48.56 1.20 RUCTIONS Completed
Serilingampally Circle-XI, WZ, GHMC (Item 9177701929
9704568881
No.18)
Repair and re-carpeting of BT road from
Ratnadeep Super Market to Gafoor Nagar via V.S.ENGINEERIN
C.Krishna
280 104 11 Venkateswara Fine arts college in 37.76 1.00 G (P) LIMITED Completed
9177701929
Serilingampally Circle-XI, WZ, GHMC (Item 9849022521
No.19)
Repair and re-carpeting of BT road from PJR
B.Kanakaiah
Journalist colony mainroad to junction in CONSTRUCTION
281 105 11 23.30 0.50 9704345024 Completed
Serilingampally Circle-XI, WZ, GHMC (Item S
No.20) 9866312661
37
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
DVN INFRA
Repair and re-carpeting of BT road from OU
PROJECTS B.Kanakaiah
colony road to Kattela basthi at Raidurga in
282 105 11 10.50 0.25 PRIVATE 9704345024 Completed
Serilingampally Circle-XI, WZ, GHMC (Item
LIMITED
No.21)
9666225025
DVN INFRA
Repair and re-carpeting of BT road from PROJECTS B.Kanakaiah
283 105 11 Gopanpally main road to graveyard in 5.73 0.35 PRIVATE 9704345024 Progress - 10%
Serilingampally Circle-XI, WZ, GHMC LIMITED
9666225025
Repair and re-carpeting of BT road from Sathya
MOHD SHAFI &
Enclave on Gowthaminagar in W.No.114 in
284 12 46.20 1.80 CO Progress
Serilingampally, Circle-12, GHMC (Item
9391128511
No.59)
Repair and re-carpeting of BT road from
Deepthisrinagar to Dharmapuri road and Shivaji MOHD SHAFI &
285 12 nagar to RUB Lingampally in W.No.114 in 49.36 2.30 CO Completed
Serilingampally, Circle-12, GHMC (Item 9391128511
No.60)
Repair and re-carpeting of BT road from
Suraksha colony to Approach Main road, PJR VKA
Stadium to Huda Double Road (Via Electric CONSTRUCTION
286 12 49.81 2.50 Completed
Substation) and Laxminagar to Lotus School in S
W.No.114 in Serilingampally, Circle-12, 9246580706
GHMC (Item No.61)
38
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Repair and re-carpeting of BT road from at 80' VKA
feet main road to Ravindra Society in CONSTRUCTION
289 12 46.42 2.30 Progress
W.No.113 in Serilingampally, Circle-12, S
GHMC (Item No.64) 9246580706
Repair and re-carpeting of BT road from Beside VJ
DAV school internal raods in W.No.113 in CONSTRUCTION
290 12 44.79 1.50 Completed
Serilingampally, Circle-12, GHMC (Item S
No.46) 919848544870
SFC
Repair and re-carpeting of BT road from
CONSTRUCTION
Allwyn Colony Enterence to Internal Roads in
291 12 46.20 1.80 S PVT LTD Completed
W.No.113 in Serilingampally, Circle-12,
9912229802,
GHMC (Item No.47)
9246153864
39
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Recarpeting of Damaged B.T. from Annamaiah
MOHD SHAFI &
Encalve to H.No. 5008 Mac Society in D.V.S. Mallesh
297 111 13 39.50 1.05 CO Completed
Ramachandrapuram, Circle-13, West Zone of A.E.E.
9391128511
GHMC.
Recarpeting of Damaged B.T. Road on Market
Road with B.T. from Police Station to PARASOL INFRA B. Venkataramana
298 113 13 36.10 0.80 Completed
Shantinikethan School and other lanes in 9866194299 A.E.E.
Patancheru Circle-13, West Zone of GHMC.
VKA
Laying of BT roads from HIG 9 to D-Mart at
CONSTRUCTION
299 115 14A Vth Pahse in KPHB Colony In ward no 118 of 23.85 0.70 A.Rupa Devi, AEE Completed
S
GHMC Kukatpally - 14 A
9246580706
VKA
Laying of BT roads from HIG 110 to GHMC
CONSTRUCTION
300 115 14A Park at Vth Phase in KPHB colony In ward no 29.15 0.70 A.Rupa Devi, AEE Completed
S
118 of GHMC Kukatpally - 14 A
9246580706
40
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Re - Carpeting of BT road from MMR Garden
to Bhavani nagar ( High Tension Road ) and M PRAVEEN Progress (25%
304 119 14B plot no 67 to plot no 15 & 16 Balakrishna nagar 49.60 1.18 REDDY S. Raghu completed) wet
in Ward no 121 Bownpally GHMC Kukatpallyb 9666520936 mix laid
Circle 14 B
41
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Recarpeting of BT roads at HMT hills Internal V.S.ENGINEERIN
311 123 14B roads to end of roads in Ward No.124 of GHMC 20.48 0.49 G (P) LIMITED D. Ramesh Completed
Kukatpally Circle 14B 9849022521
Recarpeting of BT roads fromP.No.63 to 85 at VJ
jaya Nagar and Ravi Briyani Center to HT line CONSTRUCTION
312 124 14B 38.37 0.92 D. Ramesh Completed
at Madhavi Nagar in Ward No.124 of GHMC, S
Kukatpally Circle-14B 919848544870
MS DECCAN HI
Re-carpeting of BT Allwyn Colony Phase - I TECH
317 122 14B bus stop to Deenabandu Bridge in ward no 123 49.27 1.08 CONSTRUCTION S. Raghu Completed
of GHMC Kukatpally Circle - 14 B S
9246520788
42
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
DVN INFRA
Re-carpeting of BT plot no 862 to AVB Puram PROJECTS
318 121 14B bridge in ward no 123 of GHMC Kukatpally 18.39 0.40 PRIVATE S. Raghu Completed
Circle - 14 B LIMITED
9666225025
DVN INFRA
Layong of BT road from NH-65 to P No 2 at
PROJECTS
Ramnaresh Nagar & P.No 111/A to Masthan
319 123 14B 26.74 0.70 PRIVATE D. Ramesh Completed
Apartments at Addagutta in ward no 124 of
LIMITED
GHMC Kukatypally Circle - 14 B
9666225025
SFC
Re-carpeting of BT road from HT line at Aditya
CONSTRUCTION
Nagar to Vijetha Degree College at Addagutta
320 123 14B 49.52 1.20 S PVT LTD D. Ramesh Completed
in ward no 124 of GHMC Kukatpally Circle -
9912229802,
14 B
9246153864
Re-carpeting of BT road fromJalavayu Vihar V.S.ENGINEERIN
321 123 14B West Gate to HMT Satavahana School in ward 45.49 1.15 G (P) LIMITED D. Ramesh Completed
no 124 of GHMC Kukatpally Circle - 14 B 9849022521
Package–2: Strengthening and Recarpeting BT
road from Ushamullapudi Hospital to LOA Issued to
Chandragiri Nagar Chowrastha in Division M/s. United Road Sri K.Ramachander
322 125 15 No.125 and Surender Reddy garden Bal Reddy 36.30 1.60 Constructions, raju Completed
nagar to RSK school Bapu nagar in Division Cell Ph No.7702775297
No.131, Quthbullapur Circle-15, NZ, GHMC. No.9959882933
(By HMP)
LOA Issued to
Strengthening and Recarpeting of BT road from
M/s.Rays Project
Andhra bank ATM to Sri Sai Residency and Sri K.Ramachander
Works,
323 125 15 internal damaged lanes Balaji Layout in 49.50 1.98 raju Completed
Cell No.
Division-125, Quthbullapur Circle-15, NZ, Ph No.7702775297
9391193119 /
GHMC. (By HMP)
9666520936
43
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
LOA Issued to
Strengthening and Recarpeting of BT road from M/s.Rays Project
Sri K.Ramachander
H. No. 1-123/31 to KPHB road and Dwaraka Works,
324 125 15 45.54 1.82 raju Completed
nagar main road in Division-125, Quthbullapur Cell No.
Ph No.7702775297
Circle-15, NZ, GHMC. (By HMP) 9391193119 /
9666520936
LOA Issued to
Package–3: Strengthening and Recarpeting BT
M/s. Deccan Hi- Sri K.Ramachander
road from Suraram Village road to Sri Ram
325 129 15 49.82 1.36 Tech raju Completed
Nagar in Division No.125, Quthbullapur Circle-
Cell Ph No.7702775297
15, NZ, GHMC. (By HMP)
No.9246520788
LOA Issued to
Package–4: Strengthening and Recarpeting BT
M/s. Balaji Sri K.Ramachander
road from Sri Ram Nagar to Sri Krishna Nagar
326 129 15 49.57 1.50 Constructions, raju Progress
in Division No.125, Quthbullapur
Cell No. Ph No.7702775297
Circle -15, NZ, GHMC. (By HMP)
9346434840
LOA Issued to
Laying of BT road from Quthbullapur
M/s.Rays Project Sri. N.Bhanu
veterinary hospital to Bhola shankar nagar
Works, Prathap Naidu
327 132 15 existing road and beside E-seva venkateshwara 43.00 1.72 Completed
Cell No. Ph
Enclave Division-130, Quthbullapur Circle-15,
9391193119 / no.9701365523
NZ, GHMC. (By HMP)
9666520936
LOA Issued to
Laying of BT road in internal lanes of NCL M/s.Rays Project Sri. N.Bhanu
colony and beside Andhra Bank, Godavari Works, Prathap Naidu
328 132 15 40.00 1.60 Completed
homes in Division-130, Quthbullapur Circle-15, Cell No. Ph
NZ, GHMC. (By HMP) 9391193119 / no.9701365523
9666520936
M/s. Supriya Signs
(-) Sri K.Ramachander
Providing lane marking and catieyes in various
329 125-132 15 24.10 12.60% Less raju Progress
locations in Quthbullapur Circle,GHMC
Cell No. Ph No.7702775297
9885032945
44
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Package–3: Strengthening and Recarpeting BT
road from Seven Temples to Rukmini Junction PJR Constructions
330 16 133 45.00 0.95 Sri. V. Kondal Rao Completed
in Ward No. 133, Alwal Circle - 16, NZ, 9866312665
GHMC. (By HMP)
Package–5: Strengthening and Recarpeting BT
road from Buttonguda 'Y' Junction to PJR Constructions
331 16 133 40.00 1.60 Sri. V. Kondal Rao Completed
Turkapally in Ward No. 133, Alwal Circle - 16, 9866312665
NZ, GHMC. (By HMP)
Package-23: Strengthening and Recarpeting of
BT roads from Railway Employees Colony M/s.Nagarjuna
332 16 133 main Road to Maithri Enclave in Ward 49.00 1.05 Hytech Sri. V. Kondal Rao Completed
No.133, Alwal Circle-16, NZ, GHMC. (By 9948969896
HMP)
Package–2: Strengthening and Recarpeting BT
road from HT Line Road to Century Avenue in PJR Constructions
333 16 133 48.00 1.15 Sri. V. Kondal Rao Completed
Ward No. 133, Alwal Circle - 16, NZ, GHMC. 9866312665
(By HMP)
Package–14: Strengthening and Recarpeting BT
road from HT line road to Alwal Hills in Ward PJR Constructions
334 16 133 47.66 1.10 Sri. V. Kondal Rao Completed
No. 133, Alwal Circle - 16, NZ, GHMC. (By 9866312665
HMP)
Package–2: Strengthening and Recarpeting BT
Bhoorathnam
road from Bollarum Rly Gate to Rukmini
335 16 133 48.10 1.05 Constructions Sri. V. Kondal Rao Progress
Enclave in Ward No. 133, Alwal Circle - 16,
9440623222
NZ, GHMC. (By HMP)
Package–14: Strengthening and Recarpeting BT
Raghavendra
road Sanjeev Reddy Garden to Laxmi Enclave
336 16 133 48.30 1.05 Constructions Sri. V. Kondal Rao Completed
in Ward No. 133, Alwal Circle - 16, NZ,
9849164248
GHMC. (By HMP)
Package-1: Strengthening and Recarpeting of
BT road from Pancha Sheel junction to SN PJR Constructions
337 16 133 49.19 1.10 Sri. V. Kondal Rao Completed
Reddy Enclave in Ward No.133, Alwal Circle- 9866312665
16, NZ, GHMC. (By HMP)
45
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Package–12: Strengthening and Recarpeting BT
M.Mahender
road from HT line Road to Panchasheel Colony
338 16 133 48.00 2.30 Reddy Sri. V. Kondal Rao Completed
in Ward No. 133, Alwal Circle - 16, NZ,
9391193119
GHMC. (By HMP)
Package-II) Providing lane marking and cat eyes
339 16 133 to existing BT road from a) Railway Employees 41.64 1.80 Sri. V. Kondal Rao Completed
Colony Main Road to Maithri Enclave, etc.,
Package–12:
Raghavendra
Strengthening and Recarpeting BT road Bank of
344 16 135 42.60 0.75 Constructions Sri. B. Maheshwar Completed
Baroda Junction at R&B main road to Three
9849164248
Temples Junction in Ward No. 132, Alwal
Circle - 16, NZ, GHMC. (By HMP)
46
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Package–1: Strengthening and Recarpeting BT
road from West Venkatapuram main road
Raghavendra
chourstha (Opp Taja Super market) to Sri. B. Bhanu
345 16 134 41.50 0.75 Constructions Completed
Chittammanagar junction (Rly gate) in Ward Chander, AEE
9849164248
No. 132, Alwal Circle - 16, NZ, GHMC. (By
HMP)
Package–11:Strengthening and Recarpeting BT
road from a)Vaishnavimatha Temple Road to
M.Praveen Reddy Sri. B. Bhanu
346 16 134 MES Colony Bus Stop b) HT line road to 49.50 1.18 Completed
7396371111 Chander, AEE
Karuna Nagar in Ward No. 132 & 133, Alwal
Circle - 16, NZ, GHMC. (By HMP)
47
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Package–13: Strengthening and Recarpeting BT
VKA
road from R&B Main Raod to AWHO Colony
352 16 135 43.52 2.60 Constructions Sri. B. Maheshwar Completed
Junction in Ward No. 132, Alwal Circle - 16,
9848054706
NZ, GHMC. (By HMP)
Package–8: Strengthening and Recarpeting BT
road from Khanajiguda Petrol Pump to PLR Constructions
353 16 135 48.40 1.70 Sri. B. Maheshwar Completed
Brundavan Colony in Ward No. 132, Alwal 9866312661
Circle - 16, NZ, GHMC. (By HMP)
Package–15:
Strengthening and Recarpeting BT road from PJR Constructions
357 16 136 47.39 1.15 Sri. V. Kondal Rao Completed
Main Road to Shaili Garden & J.J.Ngar in 9866312665
Ward No. 134, Alwal Circle - 16, NZ, GHMC.
(By HMP)
Package–4: Strengthening and Recarpeting BT
VKA
road from Registration Colony to Balaji Nagar
358 16 136 49.20 0.96 Constructions Sri. V. Kondal Rao Completed
Road in Ward No. 134, Alwal Circle - 16, NZ,
9848054706
GHMC. (By HMP)
48
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Jyothi Waddera
Package–11: Strengthening and Recarpeting BT
Labour Contract
road from Kapra Border to SS Enclave in
359 16 136 48.83 1.50 Co Operative Sri. V. Kondal Rao Completed
Ward No. 134, Alwal Circle - 16, NZ, GHMC.
Society
(By HMP)
9391044194
50%
Completed
balance work
Strengthening and recarpeting of damaged BT
will be
360 142 18A Roads at various places in 142-Addagutta Corp. 49.75 1.99 Sri Ali Abbas
completed after
Divn. Div-18A, GHMC, Sec’bad.
laying of
pipeline by
HMWS&SB
M/s. P.N
Strengthening and recarpeting of damaged BT Constructions
Roads at (a) Venkatapuram Road (b) Abhinav Cell No.
361 147 18A nagar internal Roads (c) Skandagiri Road, 49.75 1.99 9908416722 / Completed
Edgah lanes in 147-Padmarao Nagar Corp. 9989931292 /
Divn. Div-18A, GHMC, Sec’bad. 9348201099.
50
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Strengthening and recarpeting of damaged BT M/s. Nagarjuna Hy
Roads from Mother Theresa statue to manohar Tech Constructions
371 150 18A theater in front of St. Marys High School in 49.80 1.99 Cell Completed
Regimental Bazar in 150-Mondamarket Corp. No.9948969896
Divn. Div-18A, GHMC, Sec’bad.
51
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Package–1: Strengthening and Recarpeting BT
143-
roads in HB Colony in Laxmi nagar, Lalapet, M/s. SSC Projects
377 Tarnak 18B 50.00 2.80 Smt. E.Lovekya Completed
Tarnaka, Division-18B, NZ, GHMC,
a
Secunderabad. (By HMP) 9246521206
53
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Package–12: Strengthening and Recarpeting
145- M/s. Sairam
damaged BT roads from H.No. 12-10-394/2 to
Seetha Constructions,
391 18B TRT Quarters, Renuka Yellamma Temple, 30.00 1.80 Sri. M. Shivanand Completed
palman Cell
Seethapalmandi, Div-18B, GHMC, Sec'bad.
di No.9704568881
(By HMP)
54
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Package–10: Strengthening and Recarpeting M/s. Merlon Infra
146- damaged BT roads from H.No. 11-3-267/23/A Projects Private
396 Boudh 18B to Raghava Garden and in internal lanes of 40.00 1.20 Limited, Sri. L. Nagender Completed
a nagar Madhura nagar, Boudha nagar, Div-18B, Cell
GHMC, Sec'bad. (By HMP) No.9963689742
Strengthening and Recarpeting of existing BT BEKKAM
397 MRD-1 Road from Barkatpura x road to King koti in the 42.40 1.62 CONSTRUCTION Completed
Major Roads Division -I,GHMC S
Strengthening and Recarpeting from Attapur MOHD
398 MRD-1 Bridge to Rethi Bowli Jn in the Major Roads 48.90 1.86 SHAHBAZULLA Completed
Division -I,GHMC H
Strengthening and Recarpeting from Gun M/s Nagarjuna Hy-
399 MRD-1 foundry to Basheerbagh Fly over in the Major 49.60 1.89 tech Completed
Roads Division -I,GHMC Construcdtions
Repairs to Footpath & Table drain from Masab
Tank to NFCL Jn. (Left Side), Road No. 1,
400 MRD-1 44.00 0.00 Sri. B. Raju Completed
Banjara Hills, Major Roads Division – I,
GHMC.
Providing Lane Markings with Thermoplastic
paint and Reflective studs, at Chaderghat D. GOVARDHAN
401 MRD-1 2.50 0.20 Completed
Signals Junction, Major Roads Division - I, YADAV
GHMC
Strengthening and Recarpeting of existing BT PN
402 MRD-1 Road from Andhra Bank to Women's College, 30.00 1.14 CONSTRUCTION Completed
Koti in the Major Roads Division -I,GHMC S
Strengthening and Recarpeting from Masab
Sairam
403 MRD-1 Tank to Vijay Nagar Colony JN in the Major 48.80 1.86 Completed
Constructions
Roads Division -I,GHMC
Strengthening and Recarpeting BT Road under
SREE SHAKTI
404 MRD-1 Jn Improvement from Rethibowli jn to RTA 47.30 3.80 Completed
ENTERPRISES
Office in LS Intermediate road Tolichowki
Strengthening and Recarpeting of existing BT VELTECH
405 MRD-1 Road from VST to Hindi Maha vidayalaya (Left 48.60 1.85 CONSTRUCTION Completed
side) in the Major Roads Division -I,GHMC S
55
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Strengthening and Recarpeting of existing BT
Road under junction improvement Rethibowli
SREE SHAKTI
406 MRD-1 Jn to RTA Office on RS of intermediate Ring 48.00 3.60 Completed
ENTERPRISES
Road of CZ under Major Roads Division
-I,GHMC
Strengthening and Recarpeting of existing BT
PN
Road from Iqbal Minar to Ravindra Bharathi
407 MRD-1 40.00 1.52 CONSTRUCTION Completed
main road in the Major Roads Division
S
-I,GHMC
Repairs to Footpath & Table drain from Masab
Tank to NFCL Jn. (Left Side), Road No. 1, M/s N. Babu Rao
408 MRD-1 48.50 0.00 Completed
Banjara Hills, Major Roads Division – I, & Co
GHMC.
Strengthening and Recarpeting of existing BT
VELTECH
Road from Tilak nagar x rd to fever hospital
409 MRD-1 48.90 1.86 CONSTRUCTION Completed
(Right side) in the Major Roads Division
S
-I,GHMC
Strengthening and Recarpeting from Liberty Jn E.VENKATA
410 MRD-1 to Ambedkar Statue and GHMC Road in the 49.10 1.87 SWAMY AND Completed
Major Roads Division -I,GHMC CO.,
Strengthening and Recarpeting from Tolichowki M/s
411 MRD-1 X Rd to Hakeempet Salar Bridge hotel in the 23.50 1.60 Venkataramana Completed
Major Roads Division -I,GHMC Constructions
Repairs and Recarpeting of existing BT Road on PJR
412 MRD-1 Vivekananda nagar main road,in Kukatpally 49.80 1.90 CONSTRUCTION Completed
circle in the Major Roads Division -I,GHMC S
Providing Lane Marking and Thermo plastic
K.
studs from Devender nagar to Bachupally R&
413 MRD-1 13.60 2.50 VENKATESHWA Completed
B main road via Kaiser nagar in the Major
RA RAO
Roads Division -I,GHMC
Constructions of covered Storm water drain
from Parvathnagar Govt. High school to Renault
414 MRD-1 Show room (Right side) for improvement of 49.50 2.30 Sri. S. Yellaiah Completed
Model Road in Major Roads Division 1 of
GHMC.
56
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Restroration of Existing Road damaged due to
laying of Electric cables by TGSPDCL from
415 MRD-1 33/11 Kv Sub Station to Olive Hospital on 8.70 0.60 R.K. Earth Movers Completed
Nanal Nagar to Langer House Road, in Major
Roads Division–I, GHMC
Strengthening and Recarpeting from Sathyam
MOHD SHAFI &
416 MRD-1 Talkis to Balkam Pet Yellamma Temple in the 49.50 1.89 Completed
CO
Major Roads Division -I,GHMC
Strengthening and Recarpeting of existing BT
VELTECH
Road from VST to Hindi Maha vidayalaya
417 MRD-1 48.60 1.85 CONSTRUCTION Completed
( Right Side) in the Major Roads Division
S
-I,GHMC
Strengthening and Recarpeting of existing BT
Road from Yousufguda Checkpost to Sriram M. PRAVEEN
418 MRD-1 48.00 1.83 Completed
Nagar X Rd. in the Major Roads Division REDDY
-I,GHMC
Repairs and Recarpeting of existing BT Road
419 MRD-1 from Road from IDPL X Road to Gandhi nagar 49.80 4.00 SRR Constructions Completed
in the Major Roads Division -I,GHMC
Strengthening and Recarpeting of existing BT
V.S.
Road from Hitech city Flyover to Hitech city
420 MRD-1 46.90 2.70 ENGINEERING Completed
railway station (Right side) in the Major Roads
(P) LTD
Division -I,GHMC
Strengthening and Recarpeting from Pillar MOHD
421 MRD-1 No.67 to Attapur Bridge in the Major Roads 49.60 1.89 SHAHBAZULLA Completed
Division -I,GHMC H
Strengthening, widening and recarpeting of BT
road at IDPL Gudenmet junction and Near NTR
422 MRD-1 Statue at Adarshnagar under Junction 20.50 2.40 SRR Constructions Completed
improvement in Major Road Division 1, West
Zone GHMC
57
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Strengthening and Recarpeting from Pillar PJR
423 MRD-1 No.30 to Pillar No.66 in the Major Roads 49.50 1.89 CONSTRUCTION Completed
Division -I,GHMC S
Strengthening and Recarpeting of existing BT
424 MRD-1 Road from Rd No.14, B.hills in the Major 47.50 1.81 SSC PROJECTS Completed
Roads Division -I,GHMC
Strengthening and Recarpeting of existing BT
VELTECH
Road from Tilak nagar x rd to fever hospital
425 MRD-1 49.80 1.90 CONSTRUCTION Completed
(Left side) in the Major Roads Division
S
-I,GHMC
Strengthening and Recarpeting from Jiyaguda MOHD
426 MRD-1 Slaughter House to Moghul ka naala in the 49.10 1.87 SHAHBAZULLA Completed
Major Roads Division -I,GHMC H
Strengthening and Recarpeting of existing BT PLR
427 MRD-1 Road in Rd.No.45 (Left Side) B'hills in the 49.60 1.89 CONSTRUCTION Completed
Major Roads Division -I,GHMC S
Strengthening and Recarpeting from V.S.
428 MRD-1 Sanathnagar Bus stop to Yerragadda JN(Left 48.90 1.86 ENGINEERING Completed
Side) in the Major Roads Division -I,GHMC (P) LTD
Strengthening and Recarpeting of existing BT
Road from Culvert over Chemical Nala (Pipe
M.MAHENDER
429 MRD-1 Line Road) to Diwan Dhaba near Jeedimatla 49.20 1.87 Completed
REDDY
Village,Qutbullapur Circle in the Major Roads
Division -I,GHMC
58
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Repairs to Footpath & Kerbing from 6No. X
M/s Sri Golden
431 MRD-1 Road to Osmania University Gate on Shivam 41.00 2.50 Completed
WLCCS Ltd
Road, Major Roads Division - I, GHMC.
Strengthening and Recarpeting of existing BT
Road from Bata Show Room to Padmalaya JN Sairam
432 MRD-1 48.40 1.84 Completed
in Road No.78J'hills in the Major Roads Constructions
Division -I,GHMC
Strengthening and Recarpeting of existing BT
VKA
Road from Jubilee Hills Check Post to Apollo
433 MRD-1 48.60 1.85 CONSTRUCTION Completed
Cross Roads in Road No.92,J'Hills in the Major
S
Roads Division -I,GHMC
59
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Repairs and providing Table drain from Katta
439 MRD-1 maisama temple to Hindi maha vidyalaya in 49.30 2.50 Sri. V. Venkatesh Completed
Major Roads Division -I,GHMC
Strengthening and Recarpeting of existing BT
440 MRD-1 Road in Rd.No.45 (Right Side) B'hills in the 49.50 1.89 PARASOL INFRA Completed
Major Roads Division -I,GHMC
Strengthening and Recarpeting from V.S.
441 MRD-1 Sanathnagar Bus stop to Yerragadda JN(Right 49.60 1.89 ENGINEERING Completed
Side) in the Major Roads Division -I,GHMC (P) LTD
Strengthening and Recarpeting of existing BT
Road from Prashasan Nagar JN to Maha Sairam
442 MRD-1 48.80 1.86 Completed
Prasthanam in Road No.78,J'hills in the Major Constructions
Roads Division -I,GHMC
Strengthening and Recarpeting from E.VENKATA
443 MRD-1 Basheerbagh Fly over to Liberty Jn in the Major 48.90 1.86 SWAMY AND Completed
Roads Division -I,GHMC CO.,
Strengthening and Recarpeting of existing BT
444 MRD-1 Road from Tappa Chaburtra to Syed Aliguda Jn. 48.00 1.83 SSC PROJECTS Completed
in the Major Roads Division -I,GHMC
Strengthening and Recarpeting of existing BT
Road on Road No.44 from Kavuri Hills & Road ARTEX INFRA
445 MRD-1 22.00 0.84 Completed
No.44 Jn. to Road No.39&44 Jn. in the Major PROJECTS
Roads Division -I,GHMC
Strengthening and Recarpeting of existing BT
BEKKAM
Road from Kachiguda x road to Tourist hotel in
446 MRD-1 49.40 1.88 CONSTRUCTION Completed
the Major Roads Division -I,GHMC in the
S
Major Roads Division -I,GHMC
Strengthening and Recarpeting from Sarover MOHD
447 MRD-1 Hotel to Dwaraka JN in the Major Roads 49.50 1.89 SHAHBAZULLA Completed
Division -I,GHMC H
60
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Strengthening and Recarpeting of existing BT
VELTECH
Road from Road No.1 & 12 Jn to Kalinga Jn
448 MRD-1 48.90 1.86 CONSTRUCTION Completed
(Right Side) (Road No.12, Banjara Hills) in the
S
Major Roads Division -I,GHMC
Strengthening and Recarpeting of existing BT
VELTECH
Road from 1&4 JN to 1& 7 JN, Road
449 MRD-1 49.60 1.89 CONSTRUCTION Completed
No.4,Banjara Hills in the Major Roads Division
S
-I,GHMC
61
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Repairs and Recarpeting of BT stretches at
various places from Kothaguda to Hafeezpet
455 MRD-1 flyover ( Left side) on Intermediate Ring Road 49.50 2.50 M/s Parasol Infra Completed
road in Major Roads Division 1 of GHMC,
Major Roads Circle.
62
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Strengthening and Recarpeting of existing BT
Road from NFCL Jn to GVK Mall Road No.1, M.MAHENDER
462 MRD-1 49.20 1.87 Completed
Banjara Hills, in the Major Roads Division REDDY
-I,GHMC
Strengthening and Recarpeting of existing BT
Road from Journalist colony main road M. PRAVEEN
463 MRD-1 47.00 1.79 Completed
Andrajyoti road in the Major Roads Division REDDY
-I,GHMC
Laying of BT Road from Devendernagar
PJR
Chowrastha to Kaisar Nagar Last Bus stop in
464 MRD-1 49.50 1.02 CONSTRUCTION Completed
Qutbullahpur Circle (Reach-3)in the Major
S
Roads Division -I,GHMC
Construction of covered Storm water drain from
Ayyappa society main road to SIET society road
465 MRD-1 49.00 2.40 Sri. S. Yellaiah Completed
for improvement of Model Road in Major
Roads Division 1 of GHMC.
Strengthening and Recarpeting of existing BT
M. PRAVEEN
466 MRD-1 Road Prashasan Nagar main road, J.Hills in the 45.00 1.71 Completed
REDDY
Major Roads Division -I,GHMC
Strengthening and Reformation of Chaderghat ARTEX INFRA
467 MRD-1 20.00 1.20 Completed
jn in the Major Roads Division -I,GHMC PROJECTS
Strengthening and Recarpeting of existing BT
Road at Road No.10C,J'hills MP & MLA Sairam
468 MRD-1 49.50 1.89 Completed
Colony ,Yousuf Guda (Reach-1) in the Major Constructions
Roads Division -I,GHMC
Forming and Strengthening of BT road under
PN
Hafeezpet RUB and Fathenagar RUB under
469 MRD-1 39.00 2.40 CONSTRUCTION Completed
Junction improvement in Major Road Division
S
1, West Zone GHMC
Strengthening and Recarpeting of existing BT
VELTECH
Road from Tilaknagar x Rd. to OU Junction
470 MRD-1 49.40 1.88 CONSTRUCTION Completed
(left side) in the Major Roads Division
S
-I,GHMC
63
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Strengthening and Recarpeting of existing BT
VKA
Road from Rajeev Circle to Green Land
471 MRD-1 49.00 1.87 CONSTRUCTION Completed
Flyover, CM Camp Office Road in the Major
S
Roads Division -I,GHMC
Strengthening and Recarpeting from Kalyan
Sairam
472 MRD-1 Nagar JN to Vengalrao Nagar JN in the Major 48.60 1.85 Completed
Constructions
Roads Division -I,GHMC
Strengthening and Recarpeting from Srinagar
473 MRD-1 49.10 1.87 PARASOL INFRA Completed
Colony park to Satyasai kalyanamadapam
Strengthening and Recarpeting of existing BT
Road from Khairtabad Jn. at Kotak Mahindra PN
474 MRD-1 bank to More Super Market via Anand Nagar 48.00 1.83 CONSTRUCTION Completed
Colony, Venkata Ramana Colony in the Major S
Roads Division -I,GHMC
64
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Providing Bulb Island, Permanent Kerbs at
479 MRD-1 JNTU Junction under Junction improvement in 6.60 0.60 Srikanth Reddy Completed
Major Roads Division 1 of GHMC
Strengthening,widening and Recarpeting of
existing BT Road from Parvath Nagar Govt
480 MRD-1 High School to Ayyappa society 100 feet 48.90 1.35 PARASOL INFRA Completed
Road(Right Side) in the Major Roads Division
-I,GHMC
Strengthening and Recarpeting of existing BT
PJR
Road from Chemical nala culvert to
481 MRD-1 49.60 1.89 CONSTRUCTION Completed
Quthbullapur junction in the Major Roads
S
Division -I,GHMC
Strengthening,widening and Recarpeting from
Sairam
482 MRD-1 Miyapur main road to HMT colony via maktha 46.80 1.78 Completed
Constructions
in the Major Roads Division -I,GHMC
Strengthening and Recarpeting from Shaik pet
483 MRD-1 Nala to Darga (Left side) in the Major Roads 48.90 1.86 V.N.R.PROJECTS Completed
Division -I,GHMC
Strengthening and Recarpeting of existing BT
BEKKAM
Road from Necklace Road Rly.Stn.to
484 MRD-1 48.90 1.86 CONSTRUCTION Completed
Somajiguda JN(Left Side) in the Major Roads
S
Division -I,GHMC
Strengthening and Recarpeting of existing BT
PN
Road from Road No.1 & 12 Jn to Kalinga Jn
485 MRD-1 49.50 1.89 CONSTRUCTION Completed
(Left Side) (Road No.12, Banjara Hills) in the
S
Major Roads Division -I,GHMC
65
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
66
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
widening and laying of existing BT Road from
UNITED ROAD
Road from Gandhi nagar (industrial café) to
495 MRD-1 49.60 1.89 CONSTRUCTION Completed
asbestos colony in the Major Roads Division
S
-I,GHMC
Strengthening and Recarpeting of existing BT
PN
Road from Rd No. 31 & 36 Jn. To MCRD at
496 MRD-1 48.90 1.86 CONSTRUCTION Completed
Rd No. 31, J.Hills in the Major Roads Division
S
-I,GHMC
Strengthening and Recarpeting of existing BT SRI
Road from Road No.1 from Masab Tank Fly RAGHAVENDRA
497 MRD-1 49.60 1.89 Completed
over to 1/12 JN Banjara Hills, in the Major CONSTRUCTION
Roads Division -I,GHMC S
Strengthening and Recarpeting from
498 MRD-1 Mehdipatnam to Asif Nagar PS in the Major 49.60 1.89 V.N.R.PROJECTS Completed
Roads Division -I,GHMC
Strengthening and Recarpeting of existing BT
VELTECH
Road from Tilaknagar x Rd. to OU Junction
499 MRD-1 48.90 1.86 CONSTRUCTION Completed
(Right side) in the Major Roads Division
S
-I,GHMC
Repairs & Restoration of BT Roads from Rajiv PLR
500 1 MRD-2 Gandhi Statue Maula Ali Road in MRD-II, 47.00 1.90 CONSTRUCTION Completed
GHMC S
Restoration and Reformation of road with BT
M/s Nagarjuna Hi-
501 1 MRD-2 from 4/0 to 3/6 Krupa Complex on Neredmet – 34.60 0.70 Completed
tech Constructions
Anandbagh road in MRD-II, GHMC
Strengthening and Recarpeting of BT Road PN
502 4 MRD-2 from Bharat gardens to Laxminagar Road in 45.60 2.00 CONSTRUCTION Completed
Circle 4 in Major road division-II,GHMC S
Repairs & Restoration of BT Roads from Inner
SHREE SHAKTI
503 6 MRD-2 ring road Between Mailardevpally to 45.10 2.10 Completed
ENTERPRISES
Udamgadda in circle – 6 of MRD-II, GHMC.
67
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Strengthening and Recarpeting of BT Road
504 6 MRD-2 from Shivarampally to Extension in Major 30.19 1.60 VNR Projects Completed
Road division-II, GHMC
Strengthening and Recarpeting of BT Road
505 6 MRD-2 from Shivarampally to Aramgarh in Major 49.05 2.10 VNR Projects Completed
Road division-II, GHMC
Strengthening and Recarpeting of BT Road PN
506 6 MRD-2 from Pillar no 178 to Sun rise home colony 42.00 1.50 CONSTRUCTION Completed
Circle 6,in Major Road division-II,GHMC S
Strengthening and Recarpeting of BT Road PN
507 6 MRD-2 from pillar no 143 to Nalandanagar in Circle 6 45.00 2.40 CONSTRUCTION Completed
in major road division-II,GHMC S
Strengthening and Recarpeting of BT Road PN
508 6 MRD-2 from Hashimabad to Aramghar on Inner Ring 41.00 1.40 CONSTRUCTION Completed
Road in Major Road Division-II, GHMC S
Strengthening and Recarpeting of BT Road
PN
from Pillar No. 215 to Rajender Nagar Circle
509 6 MRD-2 45.10 1.60 CONSTRUCTION Completed
Office road on Inner Ring Road in Major Road
S
Division-II, GHMC
Strengthening and Recarpeting of BT Road
PN
from Rajender Nagar circle office to
510 6 MRD-2 45.10 1.80 CONSTRUCTION Completed
Himayathsagar road in Major Road Division-II,
S
GHMC
Repairs & Restoration of BT Roads from Select VELTECH
511 16 MRD-2 talkies Alwal road to Ekalavya Nagar in MRD- 49.00 2.00 CONSTRUCTION Completed
II, GHMC. S
PLR
Repairs & Restoration of BT Roads from Yapral
512 16 MRD-2 49.00 3.60 CONSTRUCTION Completed
road to Indus school in MRD-II, GHMC
S
SRI
Repairs & Restoration of BT Roads from West
RAGHAVENDRA
513 16 MRD-2 Venkatapuram last bus stop PJR statue in 49.95 0.80 Completed
CONSTRUCTION
MRD-II, GHMC
S
68
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
SRI
Repairs & Restoration of BT Roads from
RAGHAVENDRA
514 16 MRD-2 Rajeev rahadari (Lothakunta X road) on Alwal 44.00 0.70 Completed
CONSTRUCTION
road PJR statue in MRD-II, GHMC
S
Strengthening and Recarpeting of BT Road
515 16 MRD-2 from Chinna Kandiguda road to Registration 48.50 2.40 SSC PROJECTS Completed
colony in Major Road division-II, GHMC
Strengthening and Recarpeting of BT Road
Krushi Infras India
516 16 MRD-2 from Mutyam reddy nagar to loyala college 39.50 1.20 Completed
Private Limited
main road in Major Road division-II, GHMC
Providing Lane Marking in Alwal Circle-16 D.Govardhan
517 16 MRD-2 45.25 7.50 Completed
North Zone , Major Road division-II GHMC Yadav
Strengthening and Recarpeting of BT Roadon UNITED ROAD
518 16 MRD-2 Mutyam reddy nagar to loyala circle-16(Reach 41.00 1.30 CONSTRUCTION Completed
2) in Major Road division-II,GHMC S
Repairs & Restoration of BT Roads from Seed PN
519 17 MRD-2 company to Safilguda railway crossing in 49.90 0.90 CONSTRUCTION Completed
MRD-II, GHMC S
Repairs & Restoration of BT Roads from PN
520 17 MRD-2 Malkajgiri PS to SP Nagar & Mirjalguda 22.00 0.60 CONSTRUCTION Completed
Anutex in MRD-II, GHMC S
Providing Lane Marking on Major Roads in
521 17 MRD-2 Circle-17 in North Zone Major Road division-II 23.00 5.60 Muses Completed
,GHMC
Restoration and Reformation of road with BT
from 4/4 to Mangalam electrical to 4/0 on M/s P N
522 17 MRD-2 41.20 0.70 Completed
Neredmet – Anandbagh road in MRD-II, Constructions
GHMC
Strengthening and Recarpeting of BT Road
SYED ALI
523 17 MRD-2 from ZTC junction to Lalapet in Major Roads 49.00 1.60 Completed
ABBAS
Division – II, GHMC
69
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
SRI
Repairs & Restoration of BT Roads from Clock RAGHAVENDRA
524 18A MRD-2 18.00 0.70 Completed
Tower Paradise in MRD-II, GHMC CONSTRUCTION
S
M/S.NAGARJUN
Repairs & Restoration of BT Roads from Hari
A HY-TECH
525 18A MRD-2 Hala Kala Bhavan Karbala Maidan Viceroy 49.30 1.40 Completed
CONSTRUCTION
Hotel in MRD-II, GHMC
S
Strengthening and Recarpeting of BT Road
526 18A MRD-2 from Shenoy nursing home to tukaram gate in 48.50 1.20 SSC PROJECTS Completed
Major Road division-II, GHMC
Strengthening and Recarpeting of BT Road
M. PRAVEEN
527 18A MRD-2 from Clock tower to Chandralok complex road 45.95 1.40 Completed
REDDY
in Major Roads Division – II, GHMC
Strengthening and Recarpeting of BT Road
M. PRAVEEN
528 18A MRD-2 from Hari Hara Kala Bhavan to Mahindra show 45.95 1.40 Completed
REDDY
room road in Major Roads Division – II, GHMC
Strengthening and Recarpeting of BT Road VKA
529 18A MRD-2 from Mahankali temple to MG Road in Major 14.00 1.00 CONSTRUCTION Completed
Road division-II,GHMC S
Strengthening and Recarpeting of BT Road
M. PRAVEEN
530 18A MRD-2 from RUB Right side via Rail nilayam Rest 45.50 1.90 Completed
REDDY
House in Major Road division-II,GHMC
Repairs & Restoration of BT Roads from
PN
Musheerabad X road Padmarao Nagar &
531 18B MRD-2 19.95 1.50 CONSTRUCTION Completed
Sunshine Hospital to R.P Road in MRD-II,
S
GHMC
M/S.NAGARJUN
Repairs & Restoration of BT Roads from
A HY-TECH
532 18B MRD-2 Chilkalguda road Jamai Osmania in MRD-II, 47.50 1.20 Completed
CONSTRUCTION
GHMC
S
70
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Repairs to the Existing damaged BT Road from
M/s VKA
533 18B MRD-2 A1 Tea stall to Suprabhat Hotel at Habsiguda 9.00 0.70 Completed
Constructions
Junction,in Major Roads Division-II, GHMC
Strengthening and Recarpeting of BT Road
SYED ALI
534 18B MRD-2 from Lalapet to Tarnaka Junction in Major 44.75 1.80 Completed
ABBAS
Roads Division – II, GHMC
Strengthening and Recarpeting of BT Road
SYED ALI
535 18B MRD-2 from Lalapet to Maulali flyover in Major Roads 45.65 1.60 Completed
ABBAS
Division – II, GHMC
Repairs & Restoration of BT Roads from Omni VELTECH
536 3A MRD-2 Hospital, Kothapet, Mandal Parishad School in 49.98 1.80 CONSTRUCTION Completed
MRD-II, GHMC S
Repairs & Restoration of BT Roads from
Chaitanyapuri X roads to Venky Food court via VELTECH
537 3A MRD-2 Jain Mandir, Andhra Bank to Genious Grammer 49.90 1.75 CONSTRUCTION Completed
School, Presidency High School to Satya Nagar S
Bus Stop in MRD-II, GHMC
Repairs & Restoration of BT Roads from E.VENKATA
538 3A MRD-2 Gayatrinagar X road to Karmanghat X road, in 36.00 1.20 SWAMY AND Completed
MRD-II, GHMC CO.,
Repairs & Restoration of BT Roads from LB PN
539 3A MRD-2 Nagar ring road to Owaisi Hospital junction on 42.00 2.80 CONSTRUCTION Completed
Inner Ring Road in MRD-II, GHMC S
Repairs & Restoration of BT Roads from Sagar
K.ARAVIND
540 3A MRD-2 X road to Sagar Housing complex (GHMC 24.00 1.80 Completed
REDDY
limits) Chainage 11/4 in MRD-II, GHMC
Strengthening and Recarpeting of BT Road
from GSI Training Institute to Rajiv Saha A.RAMA
541 3A MRD-2 Bhavan Apartments on Mansoorabad X Roads 45.15 1.00 KRISHNA Completed
to Anand Nagar X Roads Road in Major Road REDDY
division-II, GHMC
71
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Strengthening and Recarpeting of BT Road
from Rajiv Saha Bhavan Apartments to Anand A.RAMA
542 3A MRD-2 Nagar X Roads on Mansoorabad X Roads to 45.15 1.00 KRISHNA Completed
Anand Nagar X Roads Road in Major Road REDDY
division-II, GHMC
Strengthening and Recarpeting of BT Road
from DVM Degree College to Axis Bank ATM Veltech
543 3A MRD-2 29.00 1.05 Completed
on Siris Road in Major Road division-II, Constructions
GHMC
Strengthening and Recarpeting of BT Road
E. Venkata Swamy
544 3A MRD-2 from Abhinand Grand to ICICI Bank ATM on 30.00 1.05 Completed
& Co
Siris Road in Major Road division-II, GHMC
Strengthening and Recarpeting of BT Road M/S.NAGARJUN
from Lifeline Bakery to Sri Gurudev Academy A HY-TECH
545 3A MRD-2 18.00 1.20 Completed
on Kuntloor Road in Major Road division-II, CONSTRUCTION
GHMC S
Strengthening and Recarpeting of BT Road PN
546 3A MRD-2 from Chainage 2/6 to 3/6 Left Side on Inner 45.76 3.20 CONSTRUCTION Completed
Ring Road in Major Roads Division-II, GHMC S
Strengthening and Recarpeting of BT Road PN
547 3A MRD-2 from Chainage 2/6 to 3/6 Right Side on Inner 45.94 3.25 CONSTRUCTION Completed
Ring Road in Major Roads Division-II, GHMC S
Strengthening and Recarpeting of BT Road PN
548 3A MRD-2 from Chainage 3/6 to 4/6 Left Side on Inner 45.87 3.10 CONSTRUCTION Completed
Ring Road in Major Roads Division-II, GHMC S
Strengthening and Recarpeting of BT Road PN
549 3A MRD-2 from Chainage 3/6 to 4/6 Right Side on Inner 45.65 3.15 CONSTRUCTION Completed
Ring Road in Major Roads Division-II, GHMC S
Strengthening and Recarpeting of BT Road
550 3A MRD-2 from Chainage 7/0 to 8/0 Left Side on Inner 45.65 3.30 SSC PROJECTS Completed
Ring Road in Major Roads Division-II, GHMC
72
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Strengthening and Recarpeting of BT Road
551 3A MRD-2 from Chainage 7/0 to 8/0 Right Side on Inner 45.70 3.10 SSC PROJECTS Completed
Ring Road in Major Roads Division-II, GHMC
Strengthening and Recarpeting of BT Road
552 3A MRD-2 from Chainage 8/0 to 9/0 Left Side on Inner 45.75 3.20 SSC PROJECTS Completed
Ring Road in Major Roads Division-II, GHMC
Strengthening and Recarpeting of BT Road PN
553 3A MRD-2 from Chainage 8/0 to 9/0 Right Side on Inner 45.80 3.15 CONSTRUCTION Completed
Ring Road in Major Roads Division-II, GHMC S
Strengthening and Recarpeting of BT Road PN
554 3A MRD-2 from Chainage 9/0 to 10/0 Left Side on Inner 45.60 3.20 CONSTRUCTION Completed
Ring Road in Major Roads Division-II, GHMC S
Strengthening and Recarpeting of BT Road PN
555 3A MRD-2 from Chainage 9/0 to 10/0 Right Side on Inner 45.85 3.10 CONSTRUCTION Completed
Ring Road in Major Roads Division-II, GHMC S
Strengthening and Recarpeting of BT Road PN
556 3A MRD-2 from Chainage 4/8 to 5/6 on Nagarjuna Sagar 44.20 3.60 CONSTRUCTION Completed
Road in Major Roads Division-II, GHMC S
Strengthening and Recarpeting of BT Road PN
557 3A MRD-2 from Chainage 6/2 to 7/4 on Nagarjuna Sagar 45.90 3.60 CONSTRUCTION Completed
Road in Major Roads Division-II, GHMC S
Strengthening and Recarpeting of BT Road
PN
from Indira Priyadarshini park to Mosque on
558 3A MRD-2 40.20 2.40 CONSTRUCTION Completed
Saroor Nagar Tank Bund Road in Circle-3A
S
Major Roads Division-II, GHMC
Repairs & Restoration of BT Roads from
Eswar Reddy &
559 3B MRD-2 Singareni colony X roads to Nagarjuna Sagar X 39.63 2.20 Completed
Sons
road in circle – 3B of MRD-II, GHMC.
Strengthening and Recarpeting of BT Road PN
560 3B MRD-2 from Chainage 10/0 to 11/0 Left Side on Inner 45.55 3.30 CONSTRUCTION Completed
Ring Road in Major Roads Division-II, GHMC S
73
Name of the Name of the Present Status
Sl. Ward Amount of Lane Responsible Officer
Div Name of the Work Agency / Contact of work in
No. No. estimate Km
No. detail
AE / AEE
Strengthening and Recarpeting of BT Road PN
561 3B MRD-2 from Chainage 10/0 to 11/0 Right Side on Inner 45.50 3.20 CONSTRUCTION Completed
Ring Road in Major Roads Division-II, GHMC S
Strengthening and Recarpeting of BT Road PN
562 3B MRD-2 from Chainage 2/8 to 3/6 on Nagarjuna Sagar 41.98 3.35 CONSTRUCTION Completed
Road in Major Roads Division-II, GHMC S
Strengthening and Recarpeting of BT Road PN
563 3B MRD-2 from Chainage 3/6 to 4/2 on Nagarjuna Sagar 45.20 3.60 CONSTRUCTION Completed
Road in Major Roads Division-II, GHMC S
Strengthening and Recarpeting of BT Road
SYED ALI
564 4A MRD-2 from Nalgonda X road to I.S. Sadan Circle 4A 45.05 1.80 Completed
ABBAS
in Major Road division-II, GHMC
Strengthening and Recarpeting of BT Road PN
565 4A MRD-2 from I.S. Sadan to Owaisi Hospital Circle 4A in 41.00 1.60 CONSTRUCTION Completed
Major Road division-II, GHMC S
Strengthening and Recarpeting of BT Road PN
566 4A MRD-2 from Chainage 11/8 to 13/5 on Inner Ring Road 45.30 1.75 CONSTRUCTION Completed
in Major Road Division-II, GHMC. S
Providing Lane Marking on Major Roads from
Chanchalguda to Chandrayangutta & Other
567 4B MRD-2 49.00 8.00 M.A.Aleem Imran Completed
Link Roads in South Zone Major Road division-
II, GHMC
Strengthening and Recarpeting of BT Road PN
568 4B MRD-2 from Chainage 13/5 to 15/0 on Inner Ring Road 45.35 2.10 CONSTRUCTION Completed
in Major Road Division-II, GHMC S
Providing Lane marking in various places in
569 MRD-2 southzone in Circle 4,5,6 South Zone Major 35.00 7.20 Muses Completed
Road division-II, GHMC
74
0 DAYS ACTION PLAN LIST
B T ROAD WORKS
Remarks
10
75
Remarks
76
Remarks
77
Remarks
78
Remarks
79
Remarks
80
Remarks
81
Remarks
82
Remarks
83
Remarks
84
Remarks
85
Remarks
86
Remarks
87
Remarks
88
Remarks
89
Remarks
90
Remarks
91
Remarks
92
Remarks
93
Remarks
94
Remarks
95
Remarks
96
Remarks
97
Remarks
98
Remarks
99
Remarks
100
Remarks
101
Remarks
102
Remarks
103
Remarks
104
Remarks
105
Remarks
106
Remarks
Cleaning completed
Work will be completed
by 1st week of June 2016
107
Remarks
108
Remarks
109
Remarks
Cleaning completed
Work will be completed
by 1st week of June 2016
110
Remarks
13.05.2016
111
Remarks
13.05.2016
112
Remarks
113
Remarks
--
114
Remarks
115
Remarks
116
Remarks
117
Remarks
118
Remarks
119
Remarks
120
Remarks
121
Remarks
122
Remarks
123
Remarks
124
Remarks
125
Remarks
126
Remarks
127
Remarks
128
Remarks
129
Remarks
130
Remarks
131
Remarks
132
Remarks
133
Remarks
134
Remarks
135
Remarks
136
Remarks
137
Remarks
138
Remarks
139
Remarks
140
Remarks
141
Remarks
142
Remarks
143
Remarks
144
Remarks
145
Remarks
146
Remarks
147
Remarks
148