: [ POWER GENERATION CORPORATION 1
‘THERMAL POWER PROJECT MANAGEMENT BOARD 3.
PECC2 CONSULTANT
EYNTEM@D! DUYEN HAI 3 EXTENSION THERMAL POWER PLANT
PROJECT
ran Street, Ward 6, District 3, Ho Chi Minh City
Tel: 84-8-2220 0449
Fax; 84-8-2220- 0450
EVNPECC2
DOCUMENT/DRAWING TRANSMITTAL SHEET
PRorcr: | Duyen Hai3 Extension Thermal Power | TRANSMITTAL NO: | BHSET-AS SC-C-160830.963
Plant Project DATE 18 30,
SUBJECT: — | Inspection and test plan for CW pipeline
FROME Mr. Nguyen Viet Dung
Director of TPMB3
a Mr. Tomoaki Kaneko
Project Manager - SC
Ne Mr. Nguyen Hai Phu
Project Director — PECC2
ISSUED FOR SUMITOMO: O Approved Accepted as Information
CO Approved with 1 Accepted as Information with
comments comments
CO Returned for Correction] Review
Oy beter
ATTACHMENTS i C reports Drawing/Comment Sheet | C1 Specification
a ‘Agreed
o ‘Agreed with Additional Comment (comment sheet)
oO Returned for Correction (comment sheet)
O Other
DOCUMENT/DRAWING Rev. | ht TLE
NUMBER, No. |_No. Sagi
Inspection and test plan for CW
pipelin
a 7. DoJ G
SIGNATURE: Mare Tj Bich Fi SIGNATURE:
OF SENDER/DATE 301k koe OF RECEIVER/D: “Ny Thi Pl L
‘30 AUG 2016
* NOTE: PLEASE SIGN AND RETURN TO SENDER: This Transmittal sheet is made into 02 copies;
each Party shall keep Icopy, all of equal validity.
Page 1/1‘THERMAL POWER PROJECT MANAGEMENT BOARD 3
es) POWER GENERATION CORPORATION I
3 Vo Van Tan Street, Ward 6. District 3, HCM City, Vietnam
EVNTPMB3 ‘Tel: 84-8-2220 044) Fax: 84-8-22200450
To: ‘Sumitomo Corporation Tel: +81351449185
Attention; Mr. Tomoaki Kaneko Fax: +81351449290
Project Manager Address: Harumi Triton Square Office Tower Z, 21st
Floor,1-8-12 Harumi, Chuo-ku, Tokyo 104-8610,
Japan
Ce: PECC2 Tel: +848 2221 0252
Attention: Mr. Nguyen Hai Phu Fax: +848 22200204
Director of TPEC
Ref. No.: DH3E-L-A3 «SC- C- {60830-0963
Aug 302016
Duyen Hai 3 Extension Thermal Power Plant Project- 1D No: DH3 EXT-25112014
Subject: Inspection and test plan for CW pipeline
Dear Sir,
Refer your letter No DH3E-L-SC-A3-C-160819-1109 dated Aug. 19%, 2016 that we
received on 22" Aug., 2016 regarding Inspection and test plan for CW pipeline Rev. D,
we would like to respond as below:
No. | DRAWING NUMBER DRAWING/DOCUMENT TITLE Rev. | Status
1, | DHSE-UPB-C-MES-9801 | Inspection and test plan for CW pipeline D | ap
Please find our detail comment as attached comment sheet.
Finally, regarding detail design, specification documents, calcul:
jon, etc. prepared
internally by EPC contractor, please remember that the contract document always take
precedence.
‘Thank you for your kind attention and co-operation,
Yours faithfully1_—]—
Page | ofTPMB3
DUYEN HAI 3 EXTENSION THERMAL POWER PLANT PROJECT
PECC2 Ref. No: DH3E-L-C2-A3-C-160825-1056
PECC2 Inspection and test plan for CW pipeline TTPMB3 Ref. No.: HSE-(~AS-€-C-IKo ys 0K)
| System/Subject: CW pipe line/ Method statement
DRAWING/DOCUMENT NUMBER Rev. | Ree" | DRAWING/DOCUMENT TITLE
DH3E-UPB-C-MES-9801 D | Ap__ | Inspection and test plan for CW pipeline
Item | Ref. document TPMB3/PECC2 COMMENT CONTRACTOR (SC) RESPONSE
T T
Concrete sitength aremore thas ar equal 30MPa Conerete strength shall be as per approved
Construction Drawings
Noted. Concrete strength for thrust biock shall be
30Mpa.
Bituminous coating and pile head treatment were
added. Please refer to section 3 & section 10.
Noted. ITP was revised as commented. Please
refer to part A - section 10 & part B- section 4
Backfilling shall be carried out up to the sub-
grade level of roads. The compaction af sub-grade
layer shall be mentioned in a separate ITP for
Road Work.
Page | of 2HB E-L-C2-A3-C-160825-1056
‘TPMB3 DUYEN HAI 3 EXTENSION THERMAL POWER PLANT PROJECT PECC2 Ref. Ne
PECC2 Inspection and test plan for CW pipeline TPMB3 Ref. No.: Moise - 1 14-0 -IC0¥.50 - 963
Rev. B
Closed.
Rew Noted. Please refer to section 5.
| | Rev.
3) | Closed.
Page 2 of 2Sumitomo Corporation
(okyo Main Ofce) ®hojet Ofced
sun Clwn-ke Fokxo 10146229 tap bbs Cope, tan Tha ol, Dy
Tet $813.5 H.0203, Foy 481-3-51H10299Tia Vink Province 240
To: TPMB3
Attention: Mr, Nguyen Viet Dung,
Project Director
Ce: PECC2
Attention: Mr. Nguyen Hai Phu
Project Director
Ref. No.: DH3B-L-SC-A3-C-160819-1109
August 22, 2016
Duyen Hai 3 Extension Thermal Power Plant Project
Identification number: DH3 EXT-25112014
Subject: Inspection & Test Plan for CW Pipeline
Regarding the Owner’s letter Ref. No. DH3E-L- ‘A3-SC-C-160701-0582, we are pleased to
reply as per attached comment sheet and submit revised documents for your approval
Your kind and prompt approval would be highly appreciated.
'
_--, yo Yours faithfully
SUMITOMO CORPORATION
‘Tomoaki Kaneko
Project Ménager \~
> Duyen Hai 3 Extension Project
+ 7 ObsD AUGI9,2016 [DNATUAN | GV.-TAN | ¥.YAMAGUCHI[ KONUKI_ | REVISED _|
c JUN20,2016 [D.NATUAN | C\.TAN | ¥.YAMAGUCHI| KONUKI | REVISED
B MAY21,2016 [DNATUAN| CN-TAN | V.VAMAGUCHI| K.ONUKI_ | _ REVISED
; oo FOR
A MAR3L,2016 | DNATUAN] CVTAN | ¥.YAMAGUCHI] KONUKT | apr
wu Dave | mneraxeony | cuucenpay | nevawepay | aPmovepay | prsckienon
OWNER
a POWER GENERATION CORPORATION 1
nee THERMAL POWER PROJECT MANAGEMENT BOARD 3
‘OWNER’S ENGINEER
@ POWER ENGINEERING CONSULTING JOINT STOCK
Evnréce2 COMPANY 2
CONTRACTOR
Sumitomo Corporation SUMITOMO CORPORATION
SUB-CONTRACTOR
COMES scare: — Mitsui Engineering & Shipbuildi
Ref.
DUYEN HAI 3 EXTENSION THERMAL c Nie,
PROJECT:
POWER PLANT PROJECT 1 x 688M¥ AREROVED
FOR APPROVAL,
Project Document No.:
DH3E-UPB-C-MES-9801
Contractor Document No.
DH3E-EB-STC-CWP-0001