DAILY WORK MANAGEMENT

By : Magnifico Training and Consultancy Services

Magnifying Performance Through Innovative Mentoring 1


NGK and HGK
Leaders

Day to day business Work on strategic goals


Daily Management Policy deployment
Nichijo Kanri Hoshin Kanri

Magnifying Performance Through Innovative Mentoring 2


HOSHIN KANRI
• Japanese term for strategic planning
• HO – Direction
• SHIN – Shining needle used in compass
• Hoshin means process towards goal
• KAN – Control or channeling the process
• RI – Cognitive working process
• Kanri means management
• Hoshin Kanri means management planning and
control process towards the achievement of
organization’s goal

Magnifying Performance Through Innovative Mentoring 3


NICHIJO KANRI
• Nichijo – Daily / Day to day work
• KANRI – Management
• Nichijo Kanri means Planning or Management
of daily work
• Daily Work Management

Magnifying Performance Through Innovative Mentoring 4


Different words with Kanri

Magnifying Performance Through Innovative Mentoring 5


HGK & NGK
• The purpose of daily Management is to
sustain the improvements or ensuring the
routine works done as per the standards
already established and keep improving;
• whereas Policy deployment focuses on Break-
through improvements or strategic objectives.

Magnifying Performance Through Innovative Mentoring 6


What is DWM / Nichijo Kanri?
• Daily Work Management is the system that
provides the ability to manage departments,
functions, and processes, wherein processes are
defined, standardized, controlled, and improved
by the process owners

• Daily management (or DM) is a continuous


process that ensures the work is done in the right
way and in the right time, in order to achieve
business GOALS

Magnifying Performance Through Innovative Mentoring 7


What is DWM?
• DWM is the most important aspect of
sustaining a Kaizen/Lean culture.
• For e.g. If you go to the gym
• Work on various methodologies, of course you
are able to lose weight.
• But what would you do to maintain this
weight lost? What happens after you have lost
weight?
• DWM talks about standardization

Magnifying Performance Through Innovative Mentoring 8


What is DWM?
• So it’s a system or a model or a tool/technique by
which standards for running the day-to-day business
are developed, maintained, controlled and improved
on ongoing basis.
• And this helps you maintain the lean culture on the
shop floor, it helps you maintain standardization on
the shop floor, it helps you define standard work for
everybody, and this way you are not only able to
sustain the improvement but keep it up on the
continual improvement journey.

Magnifying Performance Through Innovative Mentoring 9


Need of DWM
PROBLEM

ACTIONS

The team takes time to


recover the performance

Performance has dropped


• The results are checked in the end of shift , Day, Week or month
• Significant delay to correct variation

Magnifying Performance Through Innovative Mentoring 10


Need of DWM
PROBLEM

ACTIONS

Performance recovered in less time

Performance is continuously monitored and in control


• The results are continually followed
• No delay to correct variations

Magnifying Performance Through Innovative Mentoring 11


DWM
• If we do not strengthen the basics, we are probably
going to back slide.

• The organization can deteriorate due to any of these


3 powers
Magnifying Performance Through Innovative Mentoring 12
Reason for deterioration

The result of above three powers can make organization weak.

Magnifying Performance Through Innovative Mentoring 13


Sustenance
• Organization should respond to the above given 3
powers/problems so that it can help the organization
from becoming weak.
• What is most important is to Sustain whatever
improvements or changes are done.

Magnifying Performance Through Innovative Mentoring 14


Sustain Management
• If we do not sustain whatever improvements are done or
whatever our current state is – we are bound to slide back
from our current state.
• Therefore it is very important to focus on DWM in order to
achieve our future state or maintain our current state.

Magnifying Performance Through Innovative Mentoring 15


PDCA Cycle
Did it not Work ?
Think about what may be changed
Turn PDCA
Identify the Problem
Did it Work ?
Find out where and why
Standardize the process
begins
Share the knowledge
Plan improvements
Problem Solved
Create action plan
Search for next problem

Analyze if every thing


was carried out as Improve People
planned and if the Execute the action plan
expected results did
come true

Magnifying Performance Through Innovative Mentoring 16


SDCA Cycle
ESTABLISH STANDARD by
using the best known
practices in place that Implement Standards
meet the internal and Execute the process
external customer need Make the product
Collect data for charting
and analysis

If CHECK shows the STANDARD


that was implemented in DO is an Study the actual results
improvement, Then the process Compare against the
become the new standard going expected results to
forward ascertain and differences

Magnifying Performance Through Innovative Mentoring 17


PDCA & SDCA
PERFORMANCE

P D
A C
Wheel of Improvement

TIME

Magnifying Performance Through Innovative Mentoring 18


PDCA & SDCA

Stable Process

S D P byD
Sustenance
PERFORMANCE

Standardization
A C A C
P D
Wheel of Sustenance
A C
Wheel of Improvement

TIME

Magnifying Performance Through Innovative Mentoring 19


NGK & HGK

Nichijo Kanri
Hoshin Kanri with no
S Hoshin Kanri
with no
Nichijo Kanri

Magnifying Performance Through Innovative Mentoring 20


4 Element of Nichijo Kanri

Gemba
Kaizen
Workshop

4M Leaders
Stand Visual Daily
Standard Do Check Standard Act
ardize Control Accountability
Works

Magnifying Performance Through Innovative Mentoring 21


4 Element of NGK

Focus on Process
Process Produce Results

Stabilization

Magnifying Performance Through Innovative Mentoring 22


How to do NGK?
Step -1 – Establish Ownership
 Define Functions( Purpose of Existence)
• Primary
• Secondary
• Tertiary
Organization Structure( WHO ?)
 Establish Responsibility and Authority
• Responsibility defines what to do (What?)
• Authority defines degree of power to make decision
 Establish Accountability
Magnifying Performance Through Innovative Mentoring 23
How to do NGK?
Step -2 -Process and Measurement
• Define Processes
• Business Process Flow
• Procedures
• Standard Work Instructions
• Measurement of Accountability(Managing point)

• Key Checkpoint of process Control ( Monitoring Point)


Magnifying Performance Through Innovative Mentoring 24
How to do NGK?
Step -3 –Gap Analysis
• Identify The Gap

Known Causes Unknown Causes

• Perform Root cause • Understand the facts


Analysis • Data Analysis
• Generate Solution • Perform RCA
• Generate Solution
• Select Best Solution
• Select Best Solution
• Standardize the process
• Standardize the process
• Monitor the results
• Monitor the results
• Deploy Horizontally
• Deploy Horizontally

Magnifying Performance Through Innovative Mentoring 25


Small Company / Area

Magnifying Performance Through Innovative Mentoring 26


Bigger Company / Area

Magnifying Performance Through Innovative Mentoring 27


Who should do DWM?
• Mandatory for all Level ( Including CEO)
• Habit formation by all level of people
• Different format for different level
• Different frequency for different level
• Different value at different level
• Different time allotment

Magnifying Performance Through Innovative Mentoring 28


How DWM Works
• Aligning everyone’s individual job to the strategy
• Indicators deployment and visual management
• Eliminating chronic problems
• The daily meeting and teamwork
• The role of leadership: new attitudes and
behaviors
• Problems should be exposed and solved
• Help Chain

Magnifying Performance Through Innovative Mentoring 29


Benefits of DWM
• Provides data on where you are (actual)
compared to where you want to go (planned)
• Assists with meeting customer demand
• Improves process quality
• Reduces process variation
• Ensures effective problem-solving
• Help standardize the way organizations manage
their facilities
• Ensures sustainability for improvement efforts

Magnifying Performance Through Innovative Mentoring 30


Conclusion
• Nichijo Kanri (Daily Management) is the
System that provides the ability to manage
department, functions, processes wherein
processes are defined, standardized,
controlled & improved by process owners.

• It prevents Deterioration by making control


and improvement in the norm.

Magnifying Performance Through Innovative Mentoring 31


THANKS

From : Magnifico Training and Consulting

Magnifying Performance Through Innovative Mentoring 32