You are on page 1of 20

Slope stability analysis

Input data
Project
Date 25/07/202
: 1
5

Settings
USA - Safety factor (6)
Stability analysis
Earthquake analysis : Standard
Verification methodology Safety factors
: (ASD)
10

Safety factors
Permanent design situation
Safety factor : SFs = 1.50 [–]
Interface
Coordinates of interface points [ft]
No. Interface location
x z x z x z
1 -273.37 -5.19 -273.06 -4.99 -261.80 2.15
-247.50 3.50 -111.07 6.43 -63.32 10.14
-22.41 25.05 -2.52 32.05 22.36 40.82
71.85 59.82 103.09 71.81 120.31 71.97
166.46 97.41 211.84 122.44 243.09 128.38
260.92 136.86 298.82 151.54

2 -273.37 -9.87 -244.71 -3.97 -165.13 -1.08


-83.45 0.99 -54.91 4.76 -10.63 19.66
25.49 31.96 58.83 43.32 66.18 45.81
116.82 62.06 167.72 82.38 215.12 97.44
215.70 97.63 266.75 124.78 298.82 134.20

3 -273.37 -16.71 -243.67 -11.65 -218.15 -9.09


-173.72 -8.27 -125.17 -5.80 -53.12 -3.01
-26.57 4.36 22.59 22.20 49.96 32.05
104.27 51.98 138.19 62.51 177.21 79.83
191.97 84.67 228.83 97.33 229.02 97.41
282.84 121.77 298.82 126.19

4 -273.37 -26.60 -225.36 -19.82 -154.93 -18.08


-82.08 -13.71 -37.88 -7.16 6.20 2.30
41.07 15.81 95.52 33.76 143.37 53.83
160.29 62.81 200.75 78.85 239.91 89.79
259.58 97.40 298.82 112.57

5 166.46 97.41 215.12 97.44

1
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Coordinates of interface points [ft]
No. Interface location
x z x z x z
6 215.12 97.44 229.02 97.41

7 229.02 97.41 259.58 97.40

8 259.58 97.40 298.82 97.41

9 -273.37 -44.28 -272.43 -44.20 -161.75 -34.79


-35.08 -27.83 32.48 -11.41 140.47 26.12
179.31 48.83 224.75 67.93 269.52 83.73
298.82 92.07

10 58.83 43.32 71.85 59.82

11 49.96 32.05 58.83 43.32

12 -2.52 32.05 25.49 31.96

2
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Coordinates of interface points [ft]
No. Interface location
x z x z x z
13 25.49 31.96 49.96 32.05

Soil parameters - effective stress state


ef cef 
No. Name Pattern
[°] [psf] [pcf]

1 Timbunan 20.00 118.0 99.0

2 1_Lanau Kelempungan 15.00 593.8 103.3

3 2. Pasir Kelanauan 21.00 552.9 99.0

4 3. Lanau Kelempungan 24.67 409.5 107.3

5 4. Batu Bara 45.00 0.0 115.6

6 5 45.00 409.5 115.6

5 Soil parameters - uplift


sat s n
No. Name Pattern
[pcf] [pcf] [–]

1 Timbunan 111.8

2 1_Lanau Kelempungan 116.1

3 2. Pasir Kelanauan 111.8

4 3. Lanau Kelempungan 120.1

3
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
sat s n
No. Name Pattern
[pcf] [pcf] [–]

5 4. Batu Bara 120.1

6 5 128.5

Soil parameters
Timbunan
Unit weight :  = 99.0 p
c
f
Stress-state : effective
Angle of internal friction : e = 20.00 °
f
Cohesion of soil : ce = 118.0 p
f s
f
Saturated unit weight : s = 111.8 p
at c
f
 
1_Lanau Kelempungan
Unit weight :  = 103.3 p
c
f
Stress-state : effective
Angle of internal friction : e = 15.00 °
f
Cohesion of soil : ce = 593.8 p
f s
f
Saturated unit weight : s = 116.1 p
at c
f
5  
2. Pasir Kelanauan
Unit weight :  = 99.0 p
c
f
Stress-state : effective
Angle of internal friction : e = 21.00 °
f
Cohesion of soil : ce = 552.9 p
f s
f
Saturated unit weight : s = 111.8 p
at c
f
 
3. Lanau Kelempungan

4
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Unit weight :  = 107.3 p
c
f
Stress-state : effective
Angle of internal friction : e = 24.67 °
f
Cohesion of soil : ce = 409.5 p
f s
f
Saturated unit weight : s = 120.1 p
at c
f
 
4. Batu Bara
Unit weight :  = 115.6 p
c
f
Stress-state : effective
Angle of internal friction : e = 45.00 °
f
Cohesion of soil : ce = 0.0 p
f s
f
Saturated unit weight : s = 120.1 p
at c
f
 
5
Unit weight :  = 115.6 p
c
f
Stress-state : effective
Angle of internal friction : e = 45.00 °
f
Cohesion of soil : ce = 409.5 p
f s
f
Saturated unit weight : s = 128.5 p
at c
f
 
5
Assigning and surfaces
Coordinates of surface points [ft] Assigned
No. Surface position
x z x z soil
1 215.12 97.44 215.70 97.63
1_Lanau Kelempungan
266.75 124.78 298.82 134.20
298.82 151.54 260.92 136.86
243.09 128.38 211.84 122.44
166.46 97.41

2 229.02 97.41 282.84 121.77


2. Pasir Kelanauan
298.82 126.19 298.82 134.20
266.75 124.78 215.70 97.63
215.12 97.44

5
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Coordinates of surface points [ft] Assigned
No. Surface position
x z x z soil
3 259.58 97.40 298.82 112.57
2. Pasir Kelanauan
298.82 126.19 282.84 121.77
229.02 97.41

4 298.82 97.41 298.82 112.57


3. Lanau Kelempungan
259.58 97.40

5 58.83 43.32 66.18 45.81


1_Lanau Kelempungan
116.82 62.06 167.72 82.38
215.12 97.44 166.46 97.41
120.31 71.97 103.09 71.81
71.85 59.82

6 49.96 32.05 104.27 51.98


2. Pasir Kelanauan
138.19 62.51 177.21 79.83
191.97 84.67 228.83 97.33
229.02 97.41 215.12 97.44
167.72 82.38 116.82 62.06
66.18 45.81 58.83 43.32

7 25.49 31.96 58.83 43.32


1_Lanau Kelempungan
71.85 59.82 22.36 40.82
-2.52 32.05

8 49.96 32.05 58.83 43.32


2. Pasir Kelanauan
25.49 31.96

9 -2.52 32.05 -22.41 25.05


1_Lanau Kelempungan
-63.32 10.14 -111.07 6.43
-247.50 3.50 -261.80 2.15
-273.06 -4.99 -273.37 -5.19
-273.37 -9.87 -244.71 -3.97
-165.13 -1.08 -83.45 0.99
-54.91 4.76 -10.63 19.66
25.49 31.96

10 25.49 31.96 -10.63 19.66


2. Pasir Kelanauan
-54.91 4.76 -83.45 0.99
-165.13 -1.08 -244.71 -3.97
-273.37 -9.87 -273.37 -16.71
-243.67 -11.65 -218.15 -9.09
-173.72 -8.27 -125.17 -5.80
-53.12 -3.01 -26.57 4.36

6
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Coordinates of surface points [ft] Assigned
No. Surface position
x z x z soil
22.59 22.20 49.96 32.05

11 229.02 97.41 228.83 97.33


2. Pasir Kelanauan
191.97 84.67 177.21 79.83
138.19 62.51 104.27 51.98
49.96 32.05 22.59 22.20
-26.57 4.36 -53.12 -3.01
-125.17 -5.80 -173.72 -8.27
-218.15 -9.09 -243.67 -11.65
-273.37 -16.71 -273.37 -26.60
-225.36 -19.82 -154.93 -18.08
-82.08 -13.71 -37.88 -7.16
6.20 2.30 41.07 15.81
95.52 33.76 143.37 53.83
160.29 62.81 200.75 78.85
239.91 89.79 259.58 97.40

12 -272.43 -44.20 -161.75 -34.79


3. Lanau Kelempungan
-35.08 -27.83 32.48 -11.41
140.47 26.12 179.31 48.83
224.75 67.93 269.52 83.73
298.82 92.07 298.82 97.41
259.58 97.40 239.91 89.79
200.75 78.85 160.29 62.81
143.37 53.83 95.52 33.76
41.07 15.81 6.20 2.30
-37.88 -7.16 -82.08 -13.71
-154.93 -18.08 -225.36 -19.82
-273.37 -26.60 -273.37 -44.28

13 269.52 83.73 224.75 67.93


4. Batu Bara
179.31 48.83 140.47 26.12
32.48 -11.41 -35.08 -27.83
-161.75 -34.79 -272.43 -44.20
-273.37 -44.28 -273.37 -59.28
298.82 -59.28 298.82 92.07

Water
Water type No
: water
5 Tensile crack
Tensile crack not
inputted.
Earthquake
Earthquake not
included.
10

Settings of the stage of construction


Design situation permane
: nt

7
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Results (Stage of construction 1)
Analysis 1 (stage 1)
Circular slip surface
Slip surface parameters
x= -2.93 [ft] 1 = -9.08 [°]
Center : Angles :
z= 388.84 [ft] 2 = 51.73 [°]
Radius : R= 383.52 [ft]
The slip surface after optimization.
5

Slope stability verification (Bishop)


Sum of active forces : Fa 459869.1 lbf/ft
=
Sum of passive forces Fp 768801.0 lbf/ft
: =
Sliding moment : Ma 176369006. lbfft/
= 3 ft
Resisting moment : Mp 294850575. lbfft/
= 1 ft
Factor of safety = 1.67 > 1.50
Slope stability ACCEPTABLE
 
10 Input data (Stage of construction 2)
Earth cut
Coordinates of cut points [ft]
No. Cut location
x z x z x z
1 166.46 97.41 298.82 97.41

15
Assigning and surfaces
Coordinates of surface points [ft] Assigned
No. Surface position
x z x z soil
1 259.61 97.41 229.02 97.41
1_Lanau Kelempungan
259.58 97.40

2 259.58 97.40 298.82 97.41


3. Lanau Kelempungan
259.61 97.41

3 58.83 43.32 66.18 45.81


1_Lanau Kelempungan
116.82 62.06 167.72 82.38
215.03 97.41 166.46 97.41
120.31 71.97 103.09 71.81
71.85 59.82

8
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Coordinates of surface points [ft] Assigned
No. Surface position
x z x z soil
4 49.96 32.05 104.27 51.98
2. Pasir Kelanauan
138.19 62.51 177.21 79.83
191.97 84.67 228.83 97.33
229.02 97.41 215.03 97.41
167.72 82.38 116.82 62.06
66.18 45.81 58.83 43.32

5 25.49 31.96 58.83 43.32


1_Lanau Kelempungan
71.85 59.82 22.36 40.82
-2.52 32.05

6 49.96 32.05 58.83 43.32


2. Pasir Kelanauan
25.49 31.96

7 -2.52 32.05 -22.41 25.05


1_Lanau Kelempungan
-63.32 10.14 -111.07 6.43
-247.50 3.50 -261.80 2.15
-273.06 -4.99 -273.37 -5.19
-273.37 -9.87 -244.71 -3.97
-165.13 -1.08 -83.45 0.99
-54.91 4.76 -10.63 19.66
25.49 31.96

8 25.49 31.96 -10.63 19.66


2. Pasir Kelanauan
-54.91 4.76 -83.45 0.99
-165.13 -1.08 -244.71 -3.97
-273.37 -9.87 -273.37 -16.71
-243.67 -11.65 -218.15 -9.09
-173.72 -8.27 -125.17 -5.80
-53.12 -3.01 -26.57 4.36
22.59 22.20 49.96 32.05

9 -225.36 -19.82 -154.93 -18.08


2. Pasir Kelanauan
-82.08 -13.71 -37.88 -7.16
6.20 2.30 41.07 15.81
95.52 33.76 143.37 53.83
160.29 62.81 200.75 78.85
239.91 89.79 259.58 97.40
229.02 97.41 228.83 97.33
191.97 84.67 177.21 79.83
138.19 62.51 104.27 51.98
49.96 32.05 22.59 22.20
-26.57 4.36 -53.12 -3.01
-125.17 -5.80 -173.72 -8.27
-218.15 -9.09 -243.67 -11.65
-273.37 -16.71 -273.37 -26.60

9
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Coordinates of surface points [ft] Assigned
No. Surface position
x z x z soil
10 -272.43 -44.20 -161.75 -34.79
3. Lanau Kelempungan
-35.08 -27.83 32.48 -11.41
140.47 26.12 179.31 48.83
224.75 67.93 269.52 83.73
298.82 92.07 298.82 97.41
259.58 97.40 239.91 89.79
200.75 78.85 160.29 62.81
143.37 53.83 95.52 33.76
41.07 15.81 6.20 2.30
-37.88 -7.16 -82.08 -13.71
-154.93 -18.08 -225.36 -19.82
-273.37 -26.60 -273.37 -44.28

11 269.52 83.73 224.75 67.93


4. Batu Bara
179.31 48.83 140.47 26.12
32.48 -11.41 -35.08 -27.83
-161.75 -34.79 -272.43 -44.20
-273.37 -44.28 -273.37 -59.28
298.82 -59.28 298.82 92.07

Water
Water type No
: water
5 Tensile crack
Tensile crack not
inputted.
Earthquake
Earthquake not
included.
10

Settings of the stage of construction


Design situation permane
: nt
Results (Stage of construction 2)
15 Analysis 1 (stage 2)
Circular slip surface
Slip surface parameters
x= -5.89 [ft] 1 = -13.11 [°]
Center : Angles :
z= 264.51 [ft] 2 = 50.25 [°]
Radius : R= 261.33 [ft]
The slip surface after optimization.
Slope stability verification (Bishop)
Sum of active forces : Fa 245982.8 lbf/ft
=
Sum of passive forces Fp 485063.9 lbf/ft
: =
Sliding moment : Ma 64282675.4 lbfft/
= ft

10
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Resisting moment : Mp 126761741. lbfft/
= 1 ft
20 Factor of safety = 1.97 > 1.50
Slope stability ACCEPTABLE
 
Input data (Stage of construction 3)
Earth cut
Coordinates of cut points [ft]
No. Cut location
x z x z x z
1 -2.52 32.05 49.96 32.05 71.85 59.82

5 Assigning and surfaces


Coordinates of surface points [ft] Assigned
No. Surface position
x z x z soil
1 259.61 97.41 229.02 97.41
1_Lanau Kelempungan
259.58 97.40

2 259.58 97.40 298.82 97.41


1_Lanau Kelempungan
259.61 97.41

3 58.85 43.33 66.18 45.81


1_Lanau Kelempungan
116.82 62.06 167.72 82.38
215.03 97.41 166.46 97.41
120.31 71.97 103.09 71.81
71.85 59.82

4 49.96 32.05 104.27 51.98


2. Pasir Kelanauan
138.19 62.51 177.21 79.83
191.97 84.67 228.83 97.33
229.02 97.41 215.03 97.41
167.72 82.38 116.82 62.06
66.18 45.81 58.85 43.33

5 25.75 32.05 -2.52 32.05


1_Lanau Kelempungan
25.49 31.96

6 25.49 31.96 49.96 32.05


2. Pasir Kelanauan
25.75 32.05

11
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Coordinates of surface points [ft] Assigned
No. Surface position
x z x z soil
7 -244.71 -3.97 -165.13 -1.08
1_Lanau Kelempungan
-83.45 0.99 -54.91 4.76
-10.63 19.66 25.49 31.96
-2.52 32.05 -22.41 25.05
-63.32 10.14 -111.07 6.43
-247.50 3.50 -261.80 2.15
-273.06 -4.99 -273.37 -5.19
-273.37 -9.87

8 -10.63 19.66 -54.91 4.76


2. Pasir Kelanauan
-83.45 0.99 -165.13 -1.08
-244.71 -3.97 -273.37 -9.87
-273.37 -16.71 -243.67 -11.65
-218.15 -9.09 -173.72 -8.27
-125.17 -5.80 -53.12 -3.01
-26.57 4.36 22.59 22.20
49.96 32.05 25.49 31.96

9 -225.36 -19.82 -154.93 -18.08


2. Pasir Kelanauan
-82.08 -13.71 -37.88 -7.16
6.20 2.30 41.07 15.81
95.52 33.76 143.37 53.83
160.29 62.81 200.75 78.85
239.91 89.79 259.58 97.40
229.02 97.41 228.83 97.33
191.97 84.67 177.21 79.83
138.19 62.51 104.27 51.98
49.96 32.05 22.59 22.20
-26.57 4.36 -53.12 -3.01
-125.17 -5.80 -173.72 -8.27
-218.15 -9.09 -243.67 -11.65
-273.37 -16.71 -273.37 -26.60

10 -272.43 -44.20 -161.75 -34.79


3. Lanau Kelempungan
-35.08 -27.83 32.48 -11.41
140.47 26.12 179.31 48.83
224.75 67.93 269.52 83.73
298.82 92.07 298.82 97.41
259.58 97.40 239.91 89.79
200.75 78.85 160.29 62.81
143.37 53.83 95.52 33.76
41.07 15.81 6.20 2.30
-37.88 -7.16 -82.08 -13.71
-154.93 -18.08 -225.36 -19.82
-273.37 -26.60 -273.37 -44.28

11 269.52 83.73 224.75 67.93


4. Batu Bara
179.31 48.83 140.47 26.12
32.48 -11.41 -35.08 -27.83
-161.75 -34.79 -272.43 -44.20
-273.37 -44.28 -273.37 -59.28
298.82 -59.28 298.82 92.07

12
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Water
Water type No
: water
Tensile crack
5

Tensile crack not


inputted.
Earthquake
Earthquake not
included.
10 Settings of the stage of construction
Design situation permane
: nt
Results (Stage of construction 3)
Analysis 1 (stage 3)
15 Circular slip surface
Slip surface parameters
x= -1.43 [ft] 1 = -13.31 [°]
Center : Angles :
z= 269.83 [ft] 2 = 49.71 [°]
Radius : R= 266.66 [ft]
The slip surface after optimization.
Slope stability verification (Bishop)
Sum of active forces : Fa 248469.5 lbf/ft
=
Sum of passive forces Fp 480130.1 lbf/ft
: =
Sliding moment : Ma 66256887.3 lbfft/
= ft
Resisting moment : Mp 128031479. lbfft/
= 4 ft
Factor of safety = 1.93 > 1.50
20 Slope stability ACCEPTABLE
 
Input data (Stage of construction 4)
Embankment interface
Coordinates of interface points [ft]
No. Interface location
x z x z x z
1 -2.52 32.05 23.15 64.61 31.35 64.61
84.33 64.61

2 31.35 64.61 31.53 64.85 55.95 97.41


155.49 97.43 298.82 97.46

25

13
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Assigning and surfaces
Coordinates of surface points [ft] Assigned
No. Surface position
x z x z soil
1 259.61 97.41 229.02 97.41
1_Lanau Kelempungan
259.58 97.40

2 259.58 97.40 298.82 97.41


1_Lanau Kelempungan
259.61 97.41

3 84.33 64.61 103.09 71.81


Timbunan
120.31 71.97 166.46 97.41
215.03 97.41 229.02 97.41
259.61 97.41 298.82 97.41
298.82 97.46 155.49 97.43
55.95 97.41 31.53 64.85
31.35 64.61

4 58.85 43.33 66.18 45.81


1_Lanau Kelempungan
116.82 62.06 167.72 82.38
215.03 97.41 166.46 97.41
120.31 71.97 103.09 71.81
84.33 64.61 71.85 59.82

5 49.96 32.05 104.27 51.98


2. Pasir Kelanauan
138.19 62.51 177.21 79.83
191.97 84.67 228.83 97.33
229.02 97.41 215.03 97.41
167.72 82.38 116.82 62.06
66.18 45.81 58.85 43.33

6 25.75 32.05 49.96 32.05


Timbunan
58.85 43.33 71.85 59.82
84.33 64.61 31.35 64.61
23.15 64.61 -2.52 32.05

7 25.75 32.05 -2.52 32.05


1_Lanau Kelempungan
25.49 31.96

8 25.49 31.96 49.96 32.05


2. Pasir Kelanauan
25.75 32.05

14
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Coordinates of surface points [ft] Assigned
No. Surface position
x z x z soil
9 -244.71 -3.97 -165.13 -1.08
1_Lanau Kelempungan
-83.45 0.99 -54.91 4.76
-10.63 19.66 25.49 31.96
-2.52 32.05 -22.41 25.05
-63.32 10.14 -111.07 6.43
-247.50 3.50 -261.80 2.15
-273.06 -4.99 -273.37 -5.19
-273.37 -9.87

10 -10.63 19.66 -54.91 4.76


2. Pasir Kelanauan
-83.45 0.99 -165.13 -1.08
-244.71 -3.97 -273.37 -9.87
-273.37 -16.71 -243.67 -11.65
-218.15 -9.09 -173.72 -8.27
-125.17 -5.80 -53.12 -3.01
-26.57 4.36 22.59 22.20
49.96 32.05 25.49 31.96

11 -225.36 -19.82 -154.93 -18.08


2. Pasir Kelanauan
-82.08 -13.71 -37.88 -7.16
6.20 2.30 41.07 15.81
95.52 33.76 143.37 53.83
160.29 62.81 200.75 78.85
239.91 89.79 259.58 97.40
229.02 97.41 228.83 97.33
191.97 84.67 177.21 79.83
138.19 62.51 104.27 51.98
49.96 32.05 22.59 22.20
-26.57 4.36 -53.12 -3.01
-125.17 -5.80 -173.72 -8.27
-218.15 -9.09 -243.67 -11.65
-273.37 -16.71 -273.37 -26.60

12 -272.43 -44.20 -161.75 -34.79


3. Lanau Kelempungan
-35.08 -27.83 32.48 -11.41
140.47 26.12 179.31 48.83
224.75 67.93 269.52 83.73
298.82 92.07 298.82 97.41
259.58 97.40 239.91 89.79
200.75 78.85 160.29 62.81
143.37 53.83 95.52 33.76
41.07 15.81 6.20 2.30
-37.88 -7.16 -82.08 -13.71
-154.93 -18.08 -225.36 -19.82
-273.37 -26.60 -273.37 -44.28

13 269.52 83.73 224.75 67.93


4. Batu Bara
179.31 48.83 140.47 26.12
32.48 -11.41 -35.08 -27.83
-161.75 -34.79 -272.43 -44.20
-273.37 -44.28 -273.37 -59.28
298.82 -59.28 298.82 92.07

15
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Water
Water type No
: water
Tensile crack
5

Tensile crack not


inputted.
Earthquake
Earthquake not
included.
10 Settings of the stage of construction
Design situation permane
: nt
Results (Stage of construction 4)
Analysis 1 (stage 4)
15 Circular slip surface
Slip surface parameters
x= -46.55 [ft] 1 = 20.39 [°]
Center : Angles :
z= 150.57 [ft] 2 = 65.13 [°]
Radius : R= 126.42 [ft]
The slip surface after optimization.
Slope stability verification (Bishop)
Sum of active forces : Fa 64123.1 lbf/ft
=
Sum of passive forces Fp 39268.3 lbf/ft
: =
Sliding moment : Ma 8106436. lbfft/
= 3 ft
Resisting moment : Mp 4964297. lbfft/
= 0 ft
Factor of safety = 0.61 < 1.50
20 Slope stability NOT ACCEPTABLE
 
Input data (Stage of construction 5)
Assigning and surfaces
Coordinates of surface points [ft] Assigned
No. Surface position
x z x z soil
1 259.61 97.41 229.02 97.41
1_Lanau Kelempungan
259.58 97.40

2 259.58 97.40 298.82 97.41


1_Lanau Kelempungan
259.61 97.41

16
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Coordinates of surface points [ft] Assigned
No. Surface position
x z x z soil
3 84.33 64.61 103.09 71.81
Timbunan
120.31 71.97 166.46 97.41
215.03 97.41 229.02 97.41
259.61 97.41 298.82 97.41
298.82 97.46 155.49 97.43
55.95 97.41 31.53 64.85
31.35 64.61

4 58.85 43.33 66.18 45.81


1_Lanau Kelempungan
116.82 62.06 167.72 82.38
215.03 97.41 166.46 97.41
120.31 71.97 103.09 71.81
84.33 64.61 71.85 59.82

5 49.96 32.05 104.27 51.98


2. Pasir Kelanauan
138.19 62.51 177.21 79.83
191.97 84.67 228.83 97.33
229.02 97.41 215.03 97.41
167.72 82.38 116.82 62.06
66.18 45.81 58.85 43.33

6 25.75 32.05 49.96 32.05


Timbunan
58.85 43.33 71.85 59.82
84.33 64.61 31.35 64.61
23.15 64.61 -2.52 32.05

7 25.75 32.05 -2.52 32.05


1_Lanau Kelempungan
25.49 31.96

8 25.49 31.96 49.96 32.05


2. Pasir Kelanauan
25.75 32.05

9 -244.71 -3.97 -165.13 -1.08


1_Lanau Kelempungan
-83.45 0.99 -54.91 4.76
-10.63 19.66 25.49 31.96
-2.52 32.05 -22.41 25.05
-63.32 10.14 -111.07 6.43
-247.50 3.50 -261.80 2.15
-273.06 -4.99 -273.37 -5.19
-273.37 -9.87

10 -10.63 19.66 -54.91 4.76


2. Pasir Kelanauan
-83.45 0.99 -165.13 -1.08
-244.71 -3.97 -273.37 -9.87
-273.37 -16.71 -243.67 -11.65
-218.15 -9.09 -173.72 -8.27
-125.17 -5.80 -53.12 -3.01
-26.57 4.36 22.59 22.20

17
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Coordinates of surface points [ft] Assigned
No. Surface position
x z x z soil
49.96 32.05 25.49 31.96

11 -225.36 -19.82 -154.93 -18.08


2. Pasir Kelanauan
-82.08 -13.71 -37.88 -7.16
6.20 2.30 41.07 15.81
95.52 33.76 143.37 53.83
160.29 62.81 200.75 78.85
239.91 89.79 259.58 97.40
229.02 97.41 228.83 97.33
191.97 84.67 177.21 79.83
138.19 62.51 104.27 51.98
49.96 32.05 22.59 22.20
-26.57 4.36 -53.12 -3.01
-125.17 -5.80 -173.72 -8.27
-218.15 -9.09 -243.67 -11.65
-273.37 -16.71 -273.37 -26.60

12 -272.43 -44.20 -161.75 -34.79


3. Lanau Kelempungan
-35.08 -27.83 32.48 -11.41
140.47 26.12 179.31 48.83
224.75 67.93 269.52 83.73
298.82 92.07 298.82 97.41
259.58 97.40 239.91 89.79
200.75 78.85 160.29 62.81
143.37 53.83 95.52 33.76
41.07 15.81 6.20 2.30
-37.88 -7.16 -82.08 -13.71
-154.93 -18.08 -225.36 -19.82
-273.37 -26.60 -273.37 -44.28

13 269.52 83.73 224.75 67.93


4. Batu Bara
179.31 48.83 140.47 26.12
32.48 -11.41 -35.08 -27.83
-161.75 -34.79 -272.43 -44.20
-273.37 -44.28 -273.37 -59.28
298.82 -59.28 298.82 92.07

Reinforcements
Reinforc
Point to the left Point to the right Length Strength Pull out resist. End of
No. ement
new x [ft] z [ft] x [ft] z [ft] L [ft] Rt [lbf/ft] reinf.
Tp = 116534.8
1 Yes -1.22 33.69 51.25 33.69 52.47 116534.8 Fixed
lbf/ft2
Tp = 116534.8
2 Yes 0.07 35.33 52.54 35.33 52.47 116534.8 Fixed
lbf/ft2
Tp = 116534.8
3 Yes 1.36 36.97 53.84 36.97 52.48 116534.8 Fixed
lbf/ft2
Tp = 116534.8
4 Yes 2.65 38.61 55.13 38.61 52.48 116534.8 Fixed
lbf/ft2
Tp = 116534.8
5 Yes 3.95 40.25 56.42 40.25 52.47 116534.8 Fixed
lbf/ft2
Tp = 116534.8
6 Yes 5.24 41.89 57.72 41.89 52.48 116534.8 Fixed
lbf/ft2

18
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Reinforc
Point to the left Point to the right Length Strength Pull out resist. End of
No. ement
new x [ft] z [ft] x [ft] z [ft] L [ft] Rt [lbf/ft] reinf.
Tp = 116534.8
7 Yes 6.53 43.53 59.01 43.53 52.48 116534.8 Fixed
lbf/ft2
Tp = 116534.8
8 Yes 7.83 45.17 60.30 45.17 52.47 116534.8 Fixed
lbf/ft2
Tp = 116534.8
9 Yes 9.12 46.81 61.60 46.81 52.48 116534.8 Fixed
lbf/ft2
Tp = 116534.8
10 Yes 10.41 48.45 62.89 48.45 52.48 116534.8 Fixed
lbf/ft2
Tp = 116534.8
11 Yes 11.70 50.09 64.18 50.09 52.48 116534.8 Fixed
lbf/ft2
Tp = 116534.8
12 Yes 13.00 51.73 65.47 51.73 52.47 116534.8 Fixed
lbf/ft2
Tp = 116534.8
13 Yes 14.29 53.37 66.77 53.37 52.48 116534.8 Fixed
lbf/ft2
Tp = 116534.8
14 Yes 15.58 55.01 68.06 55.01 52.48 116534.8 Fixed
lbf/ft2
Tp = 116534.8
15 Yes 16.88 56.65 69.35 56.65 52.47 116534.8 Fixed
lbf/ft2
Tp = 116534.8
16 Yes 18.17 58.29 70.65 58.29 52.48 116534.8 Fixed
lbf/ft2
Tp = 116534.8
17 Yes 19.46 59.93 71.85 59.82 52.39 116534.8 Fixed
lbf/ft2
Tp = 116534.8
18 Yes 20.76 61.57 73.23 61.57 52.47 116534.8 Fixed
lbf/ft2
Tp = 116534.8
19 Yes 22.05 63.21 74.53 63.21 52.48 116534.8 Fixed
lbf/ft2
Tp = 116534.8
20 Yes 31.53 64.85 84.01 64.85 52.48 116534.8 Fixed
lbf/ft2
Tp = 116534.8
21 Yes 32.76 66.49 85.24 66.49 52.48 116534.8 Fixed
lbf/ft2
Tp = 116534.8
22 Yes 33.99 68.13 86.47 68.13 52.48 116534.8 Fixed
lbf/ft2
Tp = 116534.8
23 Yes 35.22 69.77 87.70 69.77 52.48 116534.8 Fixed
lbf/ft2
Tp = 116534.8
24 Yes 36.45 71.41 88.93 71.41 52.48 116534.8 Fixed
lbf/ft2
Tp = 116534.8
25 Yes 37.68 73.05 90.16 73.05 52.48 116534.8 Fixed
lbf/ft2
Tp = 116534.8
26 Yes 38.91 74.69 124.19 74.69 85.28 116534.8 Fixed
lbf/ft2
Tp = 116534.8
27 Yes 40.14 76.33 125.42 76.33 85.28 116534.8 Fixed
lbf/ft2
Tp = 116534.8
28 Yes 41.37 77.97 126.65 77.97 85.28 116534.8 Fixed
lbf/ft2
Tp = 116534.8
29 Yes 42.60 79.61 131.16 79.61 88.56 116534.8 Fixed
lbf/ft2
Tp = 116534.8
30 Yes 43.83 81.25 132.39 81.25 88.56 116534.8 Fixed
lbf/ft2
Tp = 116534.8
31 Yes 45.06 82.89 133.62 82.89 88.56 116534.8 Fixed
lbf/ft2
Tp = 116534.8
32 Yes 46.29 84.53 141.41 84.53 95.12 116534.8 Fixed
lbf/ft2

19
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Reinforc
Point to the left Point to the right Length Strength Pull out resist. End of
No. ement
new x [ft] z [ft] x [ft] z [ft] L [ft] Rt [lbf/ft] reinf.
Tp = 116534.8
33 Yes 47.52 86.17 142.64 86.17 95.12 116534.8 Fixed
lbf/ft2
Tp = 116534.8
34 Yes 48.75 87.81 143.87 87.81 95.12 116534.8 Fixed
lbf/ft2
Tp = 116534.8
35 Yes 49.98 89.45 145.10 89.45 95.12 116534.8 Fixed
lbf/ft2
Tp = 116534.8
36 Yes 51.21 91.09 150.00 91.09 98.79 116534.8 Fixed
lbf/ft2
Tp = 116534.8
37 Yes 52.44 92.73 157.00 92.73 104.56 116534.8 Fixed
lbf/ft2
Tp = 116534.8
38 Yes 53.67 94.37 170.00 94.37 116.33 116534.8 Fixed
lbf/ft2
Tp = 116534.8
39 Yes 54.90 96.01 173.00 96.01 118.10 116534.8 Fixed
lbf/ft2
Water
Water type No
: water
5 Tensile crack
Tensile crack not
inputted.
Earthquake
Earthquake not
included.
10

Settings of the stage of construction


Design situation permane
: nt
Results (Stage of construction 5)
15 Analysis 1 (stage 5)
Circular slip surface
Slip surface parameters
x= -33.03 [ft] 1 = -3.51 [°]
Center : Angles :
z= 313.86 [ft] 2 = 43.81 [°]
Radius : R= 299.93 [ft]
The slip surface after optimization.
Reinforcement forces
20

Slope stability verification (Bishop)


Sum of active forces : Fa = 272105.0 lbf/ft
Sum of passive forces Fp = 423281.4 lbf/ft
:
Sliding moment : Ma = 81612453.7 lbfft/f
t
Resisting moment : Mp = 126954782.3 lbfft/f
t
Factor of safety = 1.54 > 1.50
Slope stability ACCEPTABLE
25  

20
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]