You are on page 1of 17

M AJ OR P R OJE C TS

Project Document
Department: Doc Number: 16-00036-UO-01-3.11-PLA -2
FORT HILLS COGENERATION
TR Number: 08577-00-YTC-SNS -TRC-007

Subject: ENVIRONMENTAL MONITORING AND


Revision: 2
MEASUREMENT PLAN

1 PURPOSE........................................................................................................................................ 3

2 APPLICATION SCOPE .................................................................................................................. 3

3 RESPONSABILITY ........................................................................................................................ 3

4 GENERAL....................................................................................................................................... 4
4.1 DEFINITIONS .......................................................................................................................... 4
4.2 DESCRIPTION......................................................................................................................... 5

5 METHODOLOGY........................................................................................................................... 5
5.1 ENVIRONMENTAL MONITORING AND MEASUREMENT ................................................... 6
5.2 VERIFICATION ........................................................................................................................ 6
5.3 ENVIRONMENTAL RECORDS............................................................................................... 7

6 FILING............................................................................................................................................ 8

7 TEMPLATES .................................................................................................................................. 8

8 REFERENCES ................................................................................................................................ 8
8.1 APPLICABLE LEGISLATION .................................................................................................. 8
8.2 APPLICABLE PROJECT’S LICENSES AND AUTHORIZATIONS ........................................ 8
8.3 PROJECT’S DOCUMENTATION ............................................................................................ 9
8.4 PARTNERSHIP’S DOCUMENTATION ................................................................................... 9

9 ATTACHMENTS ............................................................................................................................ 9

ATTACHMENT 1: CONTROL OF ENVIRONMENTAL MANAGEMENT SYSTEM’S ACTIVITIES


....................................................................................................................................................... 10

ATTACHMENT 2: ENVIRONMENTAL RECORDS .......................................................................... 16

03-00108-CO-2.4.5-FOR-7 Rev 1
Page 2 of 17
M AJ OR P R OJE C TS

Project Document
Department: Doc Number: 16-00036-UO-01-3.11-PLA -2
FORT HILLS COGENERATION
TR Number: 08577-00-YTC-SNS -TRC-007

Subject: ENVIRONMENTAL MONITORING AND


Revision: 2
MEASUREMENT PLAN

1 PURPOSE
The purpose of this document is to provide a guideline for the performance of environmental
monitoring and measurement activities during the construction phase of Fort Hills Cogeneration
Plant.
The main objectives are:
 The prevention and minimization of negative environmental impacts,
 Ensure the fulfilment with applicable legal requirements, and,
 Follow-up the specific mitigation and control measures indicated in Project’s standards and
documentation.

2 APPLICATION SCOPE
This PLAN will apply to the personnel of Contractor and Subcontractors involved in the construction
phase of Fort Hills Cogeneration Plant.

3 RESPONSABILITY
In general terms, PARTNERSHIP, Project Management, CONTRACTOR Management and
SUBCONTRACTOR Management is accountable for EMP performance within their Area of
responsibility and must make every reasonable and practicable effort to comply with the applicable
requirements of the Fort Hills Project EH&S Plan, this document and all applicable Environmental
and OH&S Acts, Regulations and Codes.
Responsible Functions

Site Manager  Ensure that this plan is applied during all works on site.
 Provide the necessary resources to carry out the required activities.

 Ensure any documents affected by requirements of this plan are kept on


site by HSE Department.
 Update this plan as required and keep all relevant personnel informed
about this plan and its contents.
Site HSE  Oversee the implementation of environmental protection measures.
Manager  Liaise with Subcontractor’s HSE representative to ensure that resources
and measures to comply with the requirements of this plan are available
and applied as required.
 Ensure all personnel are aware of this plan and the pertinent information
contained within.

03-00108-CO-2.4.5-FOR-7 Rev 1
Page 3 of 17
M AJ OR P R OJE C TS

Project Document
Department: Doc Number: 16-00036-UO-01-3.11-PLA -2
FORT HILLS COGENERATION
TR Number: 08577-00-YTC-SNS -TRC-007

Subject: ENVIRONMENTAL MONITORING AND


Revision: 2
MEASUREMENT PLAN

Responsible Functions
 Verify, control and execute the environmental monitoring and
measurement activities related in this plan.

 Comply with the requirements included in this plan.


 Provide resources necessary to execute environmental measures as
Subcontractor’s
required to remain in compliance with this plan.
Site Manager
 Submit the necessary documents regarding environmental monitoring
and measurement.

Subcontractor’s  Ensure the compliance with the guidelines included in this plan.
HSE  Comply with all activities regarding data control and data monitoring that
Representative(s) may apply.

All Personnel  Comply with the requirements included in this plan.

4 GENERAL

4.1 DEFINITIONS

ENVIRONMENTAL element of the organization’s activities, products or services that can


ASPECT interact with the environment. A significant environmental aspect is an
environmental aspect that has or can have significant environmental
impact.
ENVIRONMENTAL process to predict environmental impacts, hazards or accidents before
ASSESSMENT they are carried out.
ENVIRONMENTAL any change to the environment (surrounding in which an organization
IMPACT operates, including air, water, land, natural resources, flora, fauna, humans
and their interrelation), whether adverse or beneficial, wholly or partially
resulting from an organization´s environmental aspects during routine
operations.
ENVIRONMENTAL state or combination of events which has the potential to threaten the
HAZARDS surrounding natural environment and adversely affect people's health.
ENVIRONMENTAL an unexpected occurrence, failure or loss, with the potential for harming
ACCIDENT the ecosystem, natural resources, human health or equipment.

03-00108-CO-2.4.5-FOR-7 Rev 1
Page 4 of 17
M AJ OR P R OJE C TS

Project Document
Department: Doc Number: 16-00036-UO-01-3.11-PLA -2
FORT HILLS COGENERATION
TR Number: 08577-00-YTC-SNS -TRC-007

Subject: ENVIRONMENTAL MONITORING AND


Revision: 2
MEASUREMENT PLAN

MITIGATION action developed with the aim of reducing the severity of the damage
MEASURE against human, environment and equipment caused by and environmental
impact, accident or hazards.
MONITORING process of checking, observing and measuring events, processes or
physical, chemical, biological and environmental phenomena in order to be
analyzed and/or another mean of measurement. The ultimate goal of the
process is to foresee and measure potential harmful effects on the
environmental as a result of human activities.

ABBREVIATIONS
AER: Alberta Energy Regulator.
AESRD: Alberta Environment and Sustainable Resource Development.
CEPA: Canadian Environmental Protection Act.
EPEA: Environmental Protection and Enhancement Act.
MSDS: Material Safety Data Sheet.
TDG: Transportation of Dangerous Goods.
WHMIS: The Workplace Hazardous Materials Information System.

4.2 DESCRIPTION
Environmental inspections, monitoring and measurement activities constitute the main tools to
ensure that environmental management is fully accomplished during the construction phase.
Environmental performance must be assessed as per project expectations and requirements
established in the “Environmental Management Plan” (08577-00-YTC-SNS-TRC-032). Therefore,
all environmental procedures involved in Site Environmental Management System are part of this
document.
The assessment and understanding of environmental data collected during monitoring and
measurement processes will give an early indication for the environmental control measures or
practices needed to achieve acceptable standards.

5 METHODOLOGY
Methodology to define Environmental Monitoring and Measurement Plan followed Partnership
recommendation covered by:
 PHE-GT-0015 Environmental Control Plan.
 PHE-GF-0019 Environmental Inspection Checklist_(137022528)

03-00108-CO-2.4.5-FOR-7 Rev 1
Page 5 of 17
M AJ OR P R OJE C TS

Project Document
Department: Doc Number: 16-00036-UO-01-3.11-PLA -2
FORT HILLS COGENERATION
TR Number: 08577-00-YTC-SNS -TRC-007

Subject: ENVIRONMENTAL MONITORING AND


Revision: 2
MEASUREMENT PLAN

5.1 ENVIRONMENTAL MONITORING AND MEASUREMENT


Environmental aspects with the potential to be affected by construction activities shall be studied and
monitored during the project. Control is undertaken through the following actions:
 Environmental inspections at worksite,
 Environmental records,
 HSE monthly reports,
 HSE audits.
Contractor and its Subcontractors shall monitor the effectiveness of their works affecting the
environment and take corrective and / or preventive actions, if necessary. This includes the control
of quantitative aspects associated to the environmental parameters:
 Control areas,
 Specific resources needed,
 Limits to accomplish,
 Measurement conditions.
Site HSE Manager shall organize measurement activities taking into account: operational control
and environmental legal and other relevant requirements. Contractor and Subcontractors shall also
comply with any additional monitoring requirements specified by the Regulatory Authority.
During the execution of the construction phase of the project, monitoring activities might be adjusted
in order to adapt monitoring requirements with current Project situation. Environmental measurement
activities will be specified according to site requirements.

5.2 VERIFICATION
Verification of environmental monitoring and measurement activities will be undertaken through the
following activities:

Control frequency
Eventually

Annually

Activities
Monthly
Weekly

Environmental Inspections (08577-00-YTC-SNS-TRC-008


X X
HSE Procedure: HSE Inspections)
Environmental Records
X X X
(detailed in Attachment 2 “Environmental records”)

Environmental Monthly Reports (template 8577-FE-015-B) X X

03-00108-CO-2.4.5-FOR-7 Rev 1
Page 6 of 17
M AJ OR P R OJE C TS

Project Document
Department: Doc Number: 16-00036-UO-01-3.11-PLA -2
FORT HILLS COGENERATION
TR Number: 08577-00-YTC-SNS -TRC-007

Subject: ENVIRONMENTAL MONITORING AND


Revision: 2
MEASUREMENT PLAN

Control frequency

Eventually

Annually
Activities

Monthly
Weekly
Corrective and preventive actions
(According to procedure “08577-00-YTC-SNS-TRC-018 Non-
X X
conformities on site. Control of corrective and preventive
actions”)
Improvement areas (8577-FE-015-B Environmental Monthly
X X X
Reports)
Environmental legal and other requirements accomplishment
(according to procedure “08577-00-YTC-SNS-TRC-010
X X
Identification, updating and verification of environmental legal
requirements”)
HSE Site audits (according to “08577-00-YDT-DND-TRE-019
X X
HSE Plan”)
These activities are specified in Attachment 1 “Control of Environmental Management System’s
activities”.

5.3 ENVIRONMENTAL RECORDS


The main objective of the environmental records prepared on site is to register information regarding
the control of environmental issues related to the Site Environmental Management System. The
following requirements shall be followed as minimum:
 Site HSE Manager and Subcontractors Site HSE Representative(s) shall create and maintain
updated all records.
 Records shall be kept on site till the end of the Project, unless any legal requirement specifies a
different timing.
 Those records shall be legible, identifiable and traceable to the activity involved. They must be
filed and maintained so that they are protected against any damage, deterioration or loss.
Attachment 2 “Environmental Records” shows the minimum records expected to be produced and
managed during construction phase and is aligned with contents covered y PHE-GF-0019
Environmental Inspection Checklist_(137022528).
If any new requirement is identified during the execution of the construction phase which involve any
monitoring or measurement activity, new records will be established and maintained.

03-00108-CO-2.4.5-FOR-7 Rev 1
Page 7 of 17
M AJ OR P R OJE C TS

Project Document
Department: Doc Number: 16-00036-UO-01-3.11-PLA -2
FORT HILLS COGENERATION
TR Number: 08577-00-YTC-SNS -TRC-007

Subject: ENVIRONMENTAL MONITORING AND


Revision: 2
MEASUREMENT PLAN

6 FILING
Contractor Site HSE Manager is responsible for maintaining and keeping until the end all
documentation associated with the monitoring and measurement plan until the end of the project.

7 TEMPLATES
 8577-FE-002-B Environmental Legal Requirements Sheet.
 8577-FO-002-B Environmental Inspection Template.
 8577-FE-003-B Consumption Control Sheet.
 8577-FE-004-B Hazardous Waste Disposal Log.
 8577-FE-005-B Non-Hazardous Waste Disposal Log.
 8577-FE-006-B Monthly Waste Management.
 8577-FE-007-B HSE Non-Conformities Sheet.
 8577-FE-015-B Environmental Monthly Report

8 REFERENCES

8.1 APPLICABLE LEGISLATION


 Alberta Environmental Protection and Enhancement Act (EPEA) 276/2003, as amended.
 Alberta Occupational Health and Safety Act, 2009.
 Canadian Environmental Protection Act (CEPA).
 Workplace Hazardous Material Information System (WHMIS) Regulation.
 Alberta Waste Control Regulation, AR192/96, 1996.
 Transportation of Dangerous Goods Act, 1992, as amended.
 Transportation of Dangerous Goods Regulations, as amended.
 Directive 055 Storage Requirements for the Upstream Petroleum Industry (2001).
 Guidelines for Secondary Containment for Aboveground Storage Tanks, Alberta Environment,
1997.

8.2 APPLICABLE PROJECT’S LICENSES AND AUTHORIZATIONS


 EPEA Approval number 151469-00-05 Amending Approval. Alberta Energy Regulator.
 EPEA Approval number 151469-00-00 Approval. Alberta Energy Regulator.
 EPEA Approval number 151469-01-00 Approval. Alberta Energy Regulator

03-00108-CO-2.4.5-FOR-7 Rev 1
Page 8 of 17
M AJ OR P R OJE C TS

Project Document
Department: Doc Number: 16-00036-UO-01-3.11-PLA -2
FORT HILLS COGENERATION
TR Number: 08577-00-YTC-SNS -TRC-007

Subject: ENVIRONMENTAL MONITORING AND


Revision: 2
MEASUREMENT PLAN

8.3 PROJECT’S DOCUMENTATION


 08577-00-YDT-DND-TRE-019 EH&S Management Plan.
 08577-00-YTC-SNS-TRC-002 Emergency response plan during construction.
 08577-00-YTC-SNS-TRC-004 Environmental Management Plan.
 08577-00-YTC-SNS-TRC-010 Environmental Procedure: Identification, updating and
verification of environmental legal requirements.
 08577-00-YTC-SNS-TRC-012 Waste Management Procedure.
 08577-00-YTC-SNS-TRC-017 Environmental Procedure: Protection and conservation of soil
and vegetation Procedure.
 08577-00-YTC-SNS-TRC-018 Non conformities on site. Control of corrective and preventive
actions.
 08577-00-YTC-SNS-TRC-039 Work Area Specific Water Management Plan for Fort Hills Site.

8.4 PARTNERSHIP’S DOCUMENTATION


 PHE-GT-0015 Environmental Control Plan.
 PHE-GF-0019 Environmental Inspection Checklist_(137022528)
 03-00108-CO-3.11.2.2-STD-1 Fort Hills Release Management Standard

9 ATTACHMENTS
 Attachment 1: Control of Environmental Management System’s Activities.
 Attachment 2: Environmental Records.

03-00108-CO-2.4.5-FOR-7 Rev 1
Page 9 of 17
M AJ OR P R OJE C TS

Project Document
Department: Doc Number: 16-00036-UO-01-3.11-PLA -2
FORT HILLS COGENERATION
TR Number: 08577-00-YTC-SNS -TRC-007

Subject: ENVIRONMENTAL MONITORING AND MEASUREMENT PLAN Revision: 2

ATTACHMENT 1: CONTROL OF ENVIRONMENTAL MANAGEMENT SYSTEM’S ACTIVITIES


Type of control /
Area Environmental Aspect Project activities / items Record (s)
monitoring
Consumption  Water consumption.  Site construction activities.  Monthly check of  Consumption Control
 Fuel consumption.  Site Temporary Facilities consumption rates. Sheet.
 Power consumption. and Offices  Comparison with data
from the previous year to
 Paper consumption.
detect inconsistencies or
improvement areas to
reduce consumption.

Atmospheric  Direct emissions due to  Transportation.  Weekly environmental  Weekly environmental


emissions combustion: carbon  Construction equipment. inspections. inspections.
dioxide (CO2), oxides of  Periodical watering of
 Commissioning activities.
nitrogen (NOx), carbon the affected areas.
monoxide (CO), volatile
 Proper maintenance,
organic compounds
inspections and repair of
(VOCs) and sulphur
vehicles, equipment and
dioxide (SO2).
machinery.
 Diffuse emissions: flying  Construction and  Compliance with
dust (particulate assembly activities (earth construction speed
matters). works and truck traffic). limits.
 Covering trucks that
transport dusty
materials.

03-00108-CO-2.4.5-FOR-7 Rev 1
Page 10 of 17
M AJ OR P R OJE C TS

Project Document
Department: Doc Number: 16-00036-UO-01-3.11-PLA -2
FORT HILLS COGENERATION
TR Number: 08577-00-YTC-SNS -TRC-007

Subject: ENVIRONMENTAL MONITORING AND MEASUREMENT PLAN Revision: 2

Type of control /
Area Environmental Aspect Project activities / items Record (s)
monitoring
 Proper maintenance of
vehicles, equipment and
machinery.
 Control of dusting levels
to the lowest practicable
level through the use of
best construction
practices, such as road
and surface dewatering.
Noise  Environmental noise due  Use of construction  Maintenance and Weekly environmental
to general construction vehicles, machinery and inspections program for inspections
and commissioning equipment. vehicles, machinery and
activities.  Transport of materials. equipment.
 General site traffic.  Noise suppression
devices in machinery
 Flushing and blowing of
and equipment, if
pipework, valves and
needed.
equipment.
 Limitation of high noise
construction activities
during sensitive hours
(e.g. night).

03-00108-CO-2.4.5-FOR-7 Rev 1
Page 11 of 17
M AJ OR P R OJE C TS

Project Document
Department: Doc Number: 16-00036-UO-01-3.11-PLA -2
FORT HILLS COGENERATION
TR Number: 08577-00-YTC-SNS -TRC-007

Subject: ENVIRONMENTAL MONITORING AND MEASUREMENT PLAN Revision: 2

Type of control /
Area Environmental Aspect Project activities / items Record (s)
monitoring
Groundwater  Water quality.  Groundwater from  Weekly environmental  Weekly environmental
/ Surface dewatering operations. inspections. inspections
water  Storm water and snow  Spill kits at strategic  Water sampling reports
melt water runoff. locations. (if any)
 Hydrotest water.  Prevention and
 Equipment wash water. immediate response
according to
“Emergency Response
Plan during
Construction” (08577-
00-YTC-SNS-TRC-002)
in case of spills and / or
leaks.
 In case of hazardous
material spills,
CONTRACTOR and
PARTNERSHIP shall
be immediately notified
(product & estimated
volume) and according
to 03-00108-CO-
3.11.2.2-STD-1 Fort
Hills Release
Management Standard.
 If any water is to be
withdrawn or
discharged to site,
03-00108-CO-2.4.5-FOR-7 Rev 1
Page 12 of 17
M AJ OR P R OJE C TS

Project Document
Department: Doc Number: 16-00036-UO-01-3.11-PLA -2
FORT HILLS COGENERATION
TR Number: 08577-00-YTC-SNS -TRC-007

Subject: ENVIRONMENTAL MONITORING AND MEASUREMENT PLAN Revision: 2

Type of control /
Area Environmental Aspect Project activities / items Record (s)
monitoring
water diversion form
available at the site
permit office shall be
used following Work
Area Specific Water
Management Plan for
Fort Hills Site (08577-
00-YTC-SNS-TRC-
039).
Hazardous  Management of  Temporary site facilities.  Weekly environmental  Weekly environmental
Materials hazardous materials inspections. inspections
Management during general site  Selection of hazardous  MSDS
works. materials with the  Inventory of hazardous
lowest risk associated. substances on site.
 MSDS information and
requirements of TDG
legislation to be fulfilled.
 Control that only
approved substances to
be brought onto site.
Soil and  Quality of soil and  Waste and hazardous  Weekly environmental  Weekly environmental
vegetation vegetation. materials storage and inspections according to inspections
handling. “Protection and
 Spills and accidental conservation of soil and
releases. vegetation Procedure”

03-00108-CO-2.4.5-FOR-7 Rev 1
Page 13 of 17
M AJ OR P R OJE C TS

Project Document
Department: Doc Number: 16-00036-UO-01-3.11-PLA -2
FORT HILLS COGENERATION
TR Number: 08577-00-YTC-SNS -TRC-007

Subject: ENVIRONMENTAL MONITORING AND MEASUREMENT PLAN Revision: 2

Type of control /
Area Environmental Aspect Project activities / items Record (s)
monitoring
(08577-00-YTC-SNS-
TRC-017).
 In case of spills and / or
leaks, prevention and
immediate response
according to
“Emergency Response
Plan during
Construction” (08577-
00-YTC-SNS-TRC-
002).
Waste  Non – hazardous waste  General work within units.  Weekly environmental  Weekly environmental
– Domestic waste. inspections. inspections.
 Recyclable and un-  Monthly waste
recyclable rubbish management record.
separated.  Non-hazardous waste
 Clean-up and disposal log.
housekeeping within  Waste disposal records.
units.

03-00108-CO-2.4.5-FOR-7 Rev 1
Page 14 of 17
M AJ OR P R OJE C TS

Project Document
Department: Doc Number: 16-00036-UO-01-3.11-PLA -2
FORT HILLS COGENERATION
TR Number: 08577-00-YTC-SNS -TRC-007

Subject: ENVIRONMENTAL MONITORING AND MEASUREMENT PLAN Revision: 2

Type of control /
Area Environmental Aspect Project activities / items Record (s)
monitoring
 Hazardous waste  General work within units  Weekly environmental  Weekly environmental
(Scrap metal, batteries, (maintenance of inspections. inspections.
spent oil and machinery, use of  Preferably disposed at  Monthly waste
lubricants). vehicles, etc.). controlled waste management record.
disposal.  Hazardous waste
 Clean-up and disposal log.
housekeeping within  Waste disposal records.
units
 Use of containers
clearly labeled and
coded.
 Containers for
combustible, flammable
or toxic waste
constructed of metal
and equipped with
covers.
 Waste Management
Control will be followed
according to 08577-00-
YTC-SNS-TRC-012
Waste Management
Procedure.

03-00108-CO-2.4.5-FOR-7 Rev 1
Page 15 of 17
M AJ OR P R OJE C TS

Project Document
Department: Doc Number: 16-00036-UO-01-3.11-PLA -2
FORT HILLS COGENERATION
TR Number: 08577-00-YTC-SNS -TRC-007

Subject: ENVIRONMENTAL MONITORING AND MEASUREMENT PLAN Revision: 2

ATTACHMENT 2: ENVIRONMENTAL RECORDS

Environmental Area Record Template Referenced Procedure

HSE Non Conformities Sheets 8577-FE-007-B NON-CONFORMITIES ON SITE. CONTROL OF


Non Conformities CORRECTIVE AND PREVENTIVE ACTIONS
HSE Non Conformities List 8577-FE-008-B (08577-00-YTC-S NS-TRC-018)

Incident Investigation Reports 8577-FO-025-B HSE INCIDENT INVESTIGATION &


Environmental Incidents REPORTING PROCEDURE (08577-00-YTC-
Lessons Learned Reports 8577-FO-026-B SNS-TRC-009)

Hazardous Materials Inventory No specific template


Hazardous Substances HAZARDOUS MATERIALS MANAGEMENT
Management PLAN (08577-00-YTC-SNS -TRC-008)
MDSDs To be supplied by Vendors

Hazardous Waste Disposal Log 8577-FE-004-B


Non Hazardous Waste Disposal WASTE MANAGEMENT PROCEDURE (08577-
Waste Management 8577-FE-005-B
Log 00-YTC-SNS-TRC-012)

Monthly Waste Management 8577-FE-006-B


Environmental Legal IDENTIFICA TION, UPDATING AND
8577-FE-002-B
Requirements Sheets VERIFICATION OF ENVIRONMENTAL LEGAL
Legal Requirements
Environmental Legal REQUIREMENTS (08577-00-YTC-SNS-TRC-
No specific template 010)
Requirements Register
CONSUMPTION CONTROL (08577-00-YTC-
Consumption Control Consumption Control Sheet 8577-FE-003-B
SNS-TRC-019)
ENVIRONMENTAL MANAGEMENT PLAN
Environmental Audits Audit Program No specific template (08577-00-YTC-S NS-TRC-004)

03-00108-CO-2.4.5-FOR-7 Rev 1
Page 16 of 17
M AJ OR P R OJE C TS

Project Document
Department: Doc Number: 16-00036-UO-01-3.11-PLA -2
FORT HILLS COGENERATION
TR Number: 08577-00-YTC-SNS -TRC-007

Subject: ENVIRONMENTAL MONITORING AND MEASUREMENT PLAN Revision: 2

Environmental Area Record Template Referenced Procedure

Audit Reports No specific template


HSE PROCEDURE: TRAINING (08577-00-Y TC-
Environmental Training Records No specific template SNS-TRC-032)
HSE PROCEDURE: HSE INSPECTIONS
Weekly Environmental Inspections 8577-FO-002-B
(08577-00-YTC-S NS-TRC-008)
03-00108-CO-2.4.5-FOR-
General Minutes of meetings
76_R1
ENVIRONMENTAL MANAGEMENT PLAN
Communications No specific template (08577-00-YTC-S NS-TRC-004)

Environmental Monthly Reports 8577-FE-015-B


ENVIRONMENTAL PROCEDURE: EQUIPMENT
V/M/E Certifications and To be supplied by MAINTENANCE. CONTROL OF NOISE LEVELS
Equipment
Maintenance Manuals Subcontractors ON SITE ACTIVITIES
(08577-00-YTC-S NS-TRC-015)

03-00108-CO-2.4.5-FOR-7 Rev 1
Page 17 of 17