You are on page 1of 5

PARTLIST RTG

Project : RTG CRANE PELINDO III


No. Kontrak : PLG 9.17.204
Owner : PELINDO III

weight total
No Description Drawing weight (kg) Dwg/ Dimension PN Material BQ Qty indeks (%) Status
(Kg)

1 Hoisting Gear 4
1.1 Rope Drum Sheet 105-0000 1.830,00 1 2 8 14640 1,861%
1.2 Bearing block Drum complete 110-0000 163,00 2 2 8 1304 0,166%
1.2.1 pass plate 110-0001 7,10 60x85x220 1 S355J2+N 2 16 113,6 0,014%
1.2.2 locking cover 110-0002 4,30 30x290x290 2 S235JR+AR 2 16 68,8 0,009%
1.2.3 spacer bush d 120x33 110-0003 1,10 40x150x15 3 S235JR+AR 1 8 8,8 0,001%
1.3 Bearing block gear 120-0000 229,0 3 2 8 1832 0,233%
1.3.1 pass plate 110-0001 7,1 60x85x220 1 S355J2+N 2 16 113,6 0,014%
1.3.2 Locing Cover 120-0001 8,9 30x400x400 2 S235JR+AR 2 16 142,4 0,018%
1.3.3 spacer bush d 200x109 120-0002 5,6 R244,5x28x115 3 S235JR+AR 1 8 44,8 0,006%
1.4 Cam 125-0000 1,44 4 2 8 11,52 0,001%
1.5 Limit switch drum side 130-0000 26,0 5 2 8 208 0,026%
1.5.1 latern 130-1000 7,4 1 1 8 59,2 0,008%
1.5.2 Guard 130-2000 2,8 2 1 8 22,4 0,003%
1.5.3 cover 251 135-0001 1,3 15x230x230 3 S235JR+AR 1 8 10,4 0,001%
1.6 Limit switch gearbox side 135-0000 27,0 6 2 8 216 0,027%
1.6.1 Latern 135-1000 7,5 1 1 8 60 0,008%
1.6.2 Guard 135-2000 3,2 2 1 8 25,6 0,003%
1.6.3 Cover 135-0001 1,6 15x260x260 3 S235JR+AR 1 8 12,8 0,002%
1.7 Pressure device 140-0000 730,0 7 2 8 5840 0,742%
1.7.1 Compresion Rod 140-1000 0,6 1 6 48 29,76 0,004%
1.7.2 Lever Long 140-1500 20,60 2 1 8 164,8 0,021%
1.7.3 Lever short 140-2000 18,2 3 2 16 291,2 0,037%
1.7.4 Presure roller long 140-2500 47,1 4 1 8 376,8 0,048%
1.7.5 Presure roller short 140-3000 38,8 5 2 16 620,8 0,079%
1.7.6 Support I 140-3500 16,7 6 3 24 400,8 0,051%
1.7.7 Support II 140-4000 15,8 7 3 24 379,2 0,048%
1.7.8 Axle holder 140-0001 0,11 4x16x65 8 S235JR+AR 6 48 5,28 0,001%
1.7.9 Axle long 140-0002 7,9 RD45x990 9 S355J2+N 1 8 63,2 0,008%
1.7.10 Axle short 140-0003 5,9 Rd45x751 10 S355J2+N 2 16 94,4 0,012%
1.7.11 Presure piece 140-0004 0,3 Rd60x40 11 42CrMo4+QT 6 48 16,32 0,002%
1.7.12 Threaded Plate 140-0005 7,9 20x160x320 12 S355J2+N 6 48 379,2 0,048%
1.8 Torque Support 150-0000 21,1 8 2 8 168,8 0,021%
1.8.1 Pair of flaps 150-1000 15,1 1 1 16 241,6 0,031%
1.8.2 Bolt d.50 150-0001 2,4 Rd70x160 2 42CrMo4+QT 1 16 38,4 0,005%
1.8.3 End disk d.70 150-0002 0,2 d70x16 3 S235JR+AR 1 16 3,2 0,000%
1.8.4 Axle Holder 0,15 30 x 6 4 St 1 8 1,2 0,000%
1.9 Rope clamp 40 100-0001 0,48 30x40x60 9 S355J2+N 16 64 30,72 0,004%
1.10 Rope Clamp 60 100-0002 1,45 40x60x90 10 S355J2+N 16 64 92,8 0,012%
1.11 End disk d.100 100-0003 0,70 12x100x100 11 S235JR+AR 2 8 5,6 0,001%
1.12 Pararel keys 45x25x440 100-0004 3,80 50x580 12 E360GC 16 64 243,2 0,031%
1.13 Stop Plate 40x 50 100-0005 0,20 15x40x50 13 S235JR+AR 16 64 12,8 0,002%
1.14 Stop Plate 60x70 100-0006 0,58 20x60x70 14 S235JR+AR 16 64 37,12 0,005%
2 Gantry Traveling Gear 1 4 0 0,000%
2.1 Gantry traveling gear Left 200-0500 7.769,1 1 2 8 62152,8 7,899%
2.1.1 Main rod 200-0001 152,40 Rd170x1000 1 42CrMo4+QT 1 8 1219,2 0,155%
2.1.2 conecting tie rod 200-1000 37,3 2 1 8 298,4 0,038%
2.1.2.1 Spacer Tube 200-1006 19,5 1 1 8 156 0,020%
2.1.2.2 End pieces 200-1007 12,7 2 1 8 101,6 0,013%
2.1.2.3 Bolt d.50 200-1001 1,7 50x106 3 42CrMo4+QT 2 16 27,2 0,003%
2.1.2.4 Axle holder 200-1002 0,1 16x20x80 4 S235JR+AR 2 16 1,04 0,000%
2.1.2.5 Nut M45 Right hand 200-1003 0,3 M45x3 5 S355J2+N 2 16 5,12 0,001%
2.1.2.6 Nut M45 Left Hand 200-1004 0,3 M45x3 6 S355J2+N 2 16 5,12 0,001%
2.1.2.7 Washer M50 200-1005 0,1 18x70x70 7 S235JR+AR 2 16 1,04 0,000%
2.1.3 Balancer left hand 200-2500 1.378,0 3 1 8 11024 1,401%
2.1.4 Stering Drive Left Hand 200-3500 332,0 4 1 8 2656 0,338%
2.1.4.1 bolt 1 stering drive 200-3500 4,9 Rd 80 x 175 2 42CrMo4+QT 1 8 39,2 0,005%
2.1.4.2 bolt 2 stering drive 200-3501 6,1 Rd 80 x 215 3 42CrMo4+QT 1 8 48,8 0,006%
2.1.5 Wheel set Driven Left Hand 200-4500 3.581,0 5 1 8 28648 3,641%
2.1.6.1 Support Gear left 200-4501 385,10 1 1 8 3080,8 0,392%
2.1.6.2 Wheel Hub Driven 200-4002 137,2 Rd500x260 2 42CrMo4+QT 1 8 1097,6 0,139%
2.1.6.3 Cover Bearing 200-5004 6,8 50x295x295 4 S235JR+AR 1 8 54,4 0,007%
2.1.6.4 king Pin 200-5005 393,5 Bl50x295x295 5 42CrMo4+QT 1 8 3148 0,400%
2.1.6.5 End Disk king Pin 200-5006 30,2 Rd250x1375 6 S355J2+N 1 8 241,6 0,031%
2.1.6.6 Upper Distance Ring 200-5007 7,0 35x320x320 7 S355J2+N 1 8 56 0,007%
2.1.6.7 Intermediate Ring 200-5008 8,4 Bl35x320x320 8 S355JRH 1 8 67,2 0,009%
2.1.6.8 Lower Distance Ring' 200-5009 7,4 Ro D323.9xt45x45 9 S355J2+N 1 8 59,2 0,008%
2.1.6.9 Distance Tube 200-5010 40,0 Bl 40x310x310 10 S355JRH 1 8 320 0,041%
2.1.6.10 Wheel Bolt 200-5001 0,4 Rd 35 x 110 11 34CrNiMo6+QT 24 96 33,6 0,004%
2.1.6.11 Motor Console Left Hand 200-4504 40,2 16 St 1 8 321,6 0,041%
2.1.6.12 blind bearing 200-4003 10,8 S335J2+N 38 S355J2+N 1 8 86,4 0,011%
2.1.6.13 distance Bushing Gear 200-4005 0,5 S335J2+N 43 S355J2+N 1 8 4 0,001%
2.1.6 Wheel Set Non Driven left hand 200-5500 2.062,0 6 1 8 16496 2,096%
2.1.6.1 Wheel Support left 200-5501 1 1 8 0 0,000%
2.1.6.2 Wheel Hub non Driven 200-5002 Rd500x260 2 42CrMo4+QT 1 8 0 0,000%
2.1.6.3 Wheel Axle 200-5003 180,2 Rd200x980 3 42CrMo4+QT 1 8 1441,6 0,183%
2.1.6.4 Cover Bearing 200-5004 6,8 Bl50x295x295 4 S235JR+AR 1 8 54,4 0,007%
2.1.6.5 King Pin 200-5005 393,5 Rd250x1375 5 42CrMo4+QT 1 8 3148 0,400%
PARTLIST RTG

Project : RTG CRANE PELINDO III


No. Kontrak : PLG 9.17.204
Owner : PELINDO III

weight total
No Description Drawing weight (kg) Dwg/ Dimension PN Material BQ Qty indeks (%) Status
(Kg)

2.1.6.6 End Disk king Pin 200-5006 30,2 70x39x5x395 6 S355J2+N 1 8 241,6 0,031%
2.1.6.7 Upper Distance Ring 200-5007 7,0 Bl35x320x320 7 S355J2+N 1 8 56 0,007%
2.1.6.8 Intermediate Ring 200-5008 8,4 Ro D323.9xt45x45 8 S355JRH 1 8 67,2 0,009%
2.1.6.9 Lower Distance Ring' 200-5009 7,4 Bl 40x310x310 9 S355J2+N 1 8 59,2 0,008%
2.1.6.10 Distance Tube 200-5010 40,0 Ro D267xt14,2x500 10 S355JRH 1 8 320 0,041%
2.1.6.11 Wheel Bolt 200-5011 0,4 Rd 35x110 11 34CrNiMo6+QT 24 96 33,6 0,004%
2.1.7 Axle Holder 0,9 15x60x190 7 S335j2+N 4 32 28,8 0,004%
2.1.8 Fender inside 200-0002 102,6 10 1 8 820,8 0,104%
2.1.9 fender Outside 200-0003 114,8 11 1 8 918,4 0,117%
2.2 Gantry traveling gear right 200-0250 7.619,1 2 2 8 60952,8 7,746%
2.2.1 Main rod 200-0001 152,40 Rd170x1000 1 42CrMo4+QT 1 8 1219,2 0,155%
2.2.2 conecting tie rod 200-1000 37,3 2 1 8 298,4 0,038%
2.2.2.1 Spacer Tube 200-1006 19,5 1 1 8 156 0,020%
2.2.2.2 End pieces 200-1007 12,7 2 1 8 101,6 0,013%
2.2.2.3 Bolt d.50 200-1001 1,7 50x106 3 42CrMo4+QT 2 16 27,2 0,003%
2.2.2.4 Axle holder 200-1002 0,1 16x20x80 4 S235JR+AR 2 16 1,04 0,000%
2.2.2.5 Nut M45 Right hand 200-1003 0,3 M45x3 5 S355J2+N 2 16 5,12 0,001%
2.2.2.6 Nut M45 Left Hand 200-1004 0,3 M45x3 6 S355J2+N 2 16 5,12 0,001%
2.2.2.7 Washer M50 200-1005 0,1 18x70x70 7 S235JR+AR 2 16 1,04 0,000%
2.2.3 Balancer right hand 200-2000 1.378,0 3 1 8 11024 1,401%
2.2.4 Stering Drive Right Hand 200-3000 332,0 4 1 8 2656 0,338%
2.2.4.1 bolt 1 stering drive 200-3000 4,9 Rd 80x175 2 42CrMo4+QT 1 8 39,2 0,005%
2.2.4.2 bolt 2 stering drive 200-3000 6,1 Rd 80x215 3 42CrMo4+QT 1 8 48,8 0,006%
2.2.5 Wheel set Driven Right Hand 200-4000 3.581,0 5 1 8 28648 3,641%
2.2.5.1 Support Gear Right 200-4501 385,10 1 1 8 3080,8 0,392%
2.2.5.2 Wheel Hub Driven 200-4002 137,2 Rd500x260 2 42CrMo4+QT 1 8 1097,6 0,139%
2.2.5.3 Cover Bearing 200-5004 6,8 50x295x295 4 S235JR+AR 1 8 54,4 0,007%
2.2.5.4 king Pin 200-5005 393,5 Bl50x295x295 5 42CrMo4+QT 1 8 3148 0,400%
2.2.5.5 End Disk king Pin 200-5006 30,2 Rd250x1375 6 S355J2+N 1 8 241,6 0,031%
2.2.5.6 Upper Distance Ring 200-5007 7,0 35x320x320 7 S355J2+N 1 8 56 0,007%
2.2.5.7 Intermediate Ring 200-5008 8,4 Bl35x320x320 8 S355JRH 1 8 67,2 0,009%
2.2.5.8 Lower Distance Ring' 200-5009 7,4 Ro D323.9xt45x45 9 S355J2+N 1 8 59,2 0,008%
2.2.5.9 Distance Tube 200-5010 40,0 Bl 40x310x310 10 S355JRH 1 8 320 0,041%
2.2.5.10 Wheel Bolt 200-5001 0,4 Rd 35 x 110 11 34CrNiMo6+QT 24 96 33,6 0,004%
2.2.5.11 Motor Console Right Hand 200-4504 40,2 16 St 1 8 321,6 0,041%
2.2.5.12 blind bearing 200-4003 10,8 S335J2+N 38 S355J2+N 1 8 86,4 0,011%
2.2.5.13 distance Bushing Gear 200-4005 0,5 S335J2+N 43 S355J2+N 1 8 4 0,001%
2.2.6 Wheel Set Non Driven Right hand 200-5500 2.062,0 6 1 8 16496 2,096%
2.2.6.1 Wheel Support Right 200-5501 1 1 8 0 0,000%
2.2.6.2 Wheel Hub non Driven 200-5002 Rd500x260 2 42CrMo4+QT 1 8 0 0,000%
2.2.6.3 Wheel Axle 200-5003 180,2 Rd200x980 3 42CrMo4+QT 1 8 1441,6 0,183%
2.2.6.4 Cover Bearing 200-5004 6,8 Bl50x295x295 4 S235JR+AR 1 8 54,4 0,007%
2.2.6.5 King Pin 200-5005 393,5 Rd250x1375 5 42CrMo4+QT 1 8 3148 0,400%
2.2.6.6 End Disk king Pin 200-5006 30,2 70x39x5x395 6 S355J2+N 1 8 241,6 0,031%
2.2.6.7 Upper Distance Ring 200-5007 7,0 Bl35x320x320 7 S355J2+N 1 8 56 0,007%
2.2.6.8 Intermediate Ring 200-5008 8,4 Ro D323.9xt45x45 8 S355JRH 1 8 67,2 0,009%
2.2.6.9 Lower Distance Ring' 200-5009 7,4 Bl 40x310x310 9 S355J2+N 1 8 59,2 0,008%
2.2.6.10 Distance Tube 200-5010 40,0 Ro D267xt14,2x500 10 S355JRH 1 8 320 0,041%
2.2.6.11 Wheel Bolt 200-5011 0,4 Rd 35x110 11 34CrNiMo6+QT 24 96 33,6 0,004%
2.2.7 Axle Holder 0,9 15x60x190 7 S335j2+N 4 32 28,8 0,004%
2.2.8 Fender inside 200-0002 102,6 10 1 8 820,8 0,104%
2.2.9 fender Outside 200-0003 114,8 11 1 8 918,4 0,117%
3 Auxilary winch 300-0000 627,0 1 2 8 5016 0,637%
3.1 Auxilary winch left 300-1000 69,5 2 1 8 556 0,071%
3.1.1 Rope drum Left 300-1000 69,5 1 1 8 556 0,071%
3.1.2 end disk 300-0001 0,9 Bl10x135x135 2 S235JR+AR 1 8 7,2 0,001%
3.1.3 pass plate I 300-0002 13,2 Bl50x110x350 3 S355J2+N 1 8 105,6 0,013%
3.1.4 pass plate II 300-0003 3,2 Bl50x75x130 4 S355J2+N 2 16 51,2 0,007%
3.1.5 gearing foot I 300-0004 21,6 Bl35x235x350 5 S355J2+N 1 8 172,8 0,022%
3.1.6 gearing foot II 300-0005 17,2 Bl35x130x506 6 S355J2+N 1 8 137,6 0,017%
3.1.7 stop plate 300-0006 0,2 Bl15x35x42 7 S235JR+AR 4 32 4,8 0,001%
3.1.8 rope clamp 100-0001 0,5 Bl30x40x60 8 S355J2+N 4 32 15,36 0,002%
3.2 Auxilary winch right 350-0000 627,0 2 1 8 5016 0,637%
3.2.1 Rope drum Left 350-1007 69,50 Bl10x135x135 2 S235JR+AR 1 8 556 0,071%
3.2.2 End disk 350-1001 0,9 Bl50x110x350 3 S355J2+N 1 8 7,2 0,001%
3.2.3 Pass Plate I 350-1002 13,20 Bl50x75x130 4 S355J2+N 2 16 211,2 0,027%
3.2.4 Pass Plate II 350-1003 3,2 Bl35x235x350 5 S355J2+N 1 8 25,6 0,003%
3.2.5 Gearing Foot I 350-1004 21,7 Bl35x130x506 6 S355J2+N 1 8 173,6 0,022%
3.2.6 Gearing Foot II 350-1005 17,2 Bl15x35x42 7 S235JR+AR 4 32 550,4 0,070%
3.2.7 Stop Plate 35 x r42 350-1006 0,2 Bl30x40x60 8 S355J2+N 4 32 4,8 0,001%
4 Trolley Arrangement 1 4 0 0,000%
4.1 Troley Travel Gear 410-0000 1 1 4 0 0,000%
4.1.1 support 410-1000 9,6 1 4 16 152,8 0,019%
4.1.2 wheel complete 410-2000 188,4 2 4 16 3014,4 0,383%
4.1.2.1 Shaft 410-0001 46,4 Rd160x647 1 42CrMo4+QT 1 16 742,4 0,094%
4.1.2.2 Wheel 410-0002 142,0 Rd550x160 2 42CrMo4+QT 1 16 2272 0,289%
4.1.3 flange bearing 410-0003 26,5 Bl110x360x360 3 S355J2+N 8 32 848 0,108%
PARTLIST RTG

Project : RTG CRANE PELINDO III


No. Kontrak : PLG 9.17.204
Owner : PELINDO III

weight total
No Description Drawing weight (kg) Dwg/ Dimension PN Material BQ Qty indeks (%) Status
(Kg)

4.1.4 cover closed 410-0004 2,8 Bl15x225x225 4 S235JR+AR 4 16 44,8 0,006%


4.1.5 cover open 410-0005 2,1 Bl25x225x225 5 S235JR+AR 4 16 33,6 0,004%
4.1.6 washer 410-0006 1,7 Bl25x200x200 6 S235JR+AR 8 32 54,4 0,007%
4.1.7 end disk 410-0007 0,4 Bl10x85x85 7 S235JR+AR 4 16 5,76 0,001%
4.1.8 thread plate 410-0008 6,2 Bl20x170x235 8 S355J2+N 4 16 99,2 0,013%
4.1.9 Bolzen Ø25x148 410-0009 0,5 Rd30x155 9 42CrMo4+QT 4 16 8 0,001%
4.2 Trolley Frame Steel Structure 420-0000 2 1 4 0 0,000%
4.2.1 main girder 1 420-4000-A 3.486,0 1 1 4 13944 1,772%
4.2.2 main girder 2 420-5000 2.985,0 2 1 4 11940 1,517%
4.2.3 top beam 1 420-6000 519,0 3 1 4 2076 0,264%
4.2.3.1 bolt locking 420-6001 14,50 23 1 4 58 0,007%
4.2.4 top beam 2 420-7000 476,0 4 1 4 1904 0,242%
4.2.5 crossbeam 420-2000 157,0 5 2 8 1256 0,160%
4.2.6 auxiliaray beam 420-1000 67,0 6 2 8 536 0,068%
4.2.7 beam for cable strain relief 420-3000 27,0 7 1 4 108 0,014%
4.2.8 buffer extension F 420-9400 38,0 15 1 4 152 0,019%
4.2.9 buffer extension G 420-9400 47,0 16 1 4 188 0,024%
4.2.10 buffer extension H 420-9400 24,0 17 1 4 96 0,012%
4.2.11 drum cover 1 420-8000 240,00 21 1 4 960 0,122%
4.2.12 drum cover 2 420-9000 230,00 22 1 4 920 0,117%
4.2.13 holder switch cabinet 420-9200 17,00 23 1 4 68 0,009%
4.2.14 driver ennergy chain 420-9100 178,00 24 1 4 712 0,090%
4.2.15 machining trolley frame 420-9300 0,00 25 1 4 0 0,000%
4.3 Access Trolley 430-0000 3 1 4 0 0,000%
4.3.1 Support Landing 1 430-0001 82,4 1 4 329,48 0,042%
4.3.2 Landing 1 HR-L 430-0002 82,4 1 4 329,48 0,042%
4.3.3 Landing 1 HR-R 430-0003 82,4 1 4 329,48 0,042%
4.3.4 support Landing 2 430-0004 82,4 1 4 329,48 0,042%
4.3.5 Landing 2 Hr-L 430-0005 82,4 1 4 329,48 0,042%
4.3.6 Landing 2HR-R 430-0006 82,4 1 4 329,48 0,042%
4.3.7 Support Landing 3 430-0007 82,4 1 4 329,48 0,042%
4.3.8 Landing 3 HR-L 430-0008 82,4 1 4 329,48 0,042%
4.3.9 Landing 3 HR-R 430-0009 82,4 1 4 329,48 0,042%
4.3.10 Support Landing 4 430-0010 82,4 1 4 329,48 0,042%
4.3.11 Landing 4 HR-L 430-0011 82,4 1 4 329,48 0,042%
4.3.12 Landing 4 HR-R 430-0012 82,4 1 4 329,48 0,042%
4.3.13 Support 5 430-0013 82,4 1 4 329,48 0,042%
4.3.14 Landing 5 HR-R 430-0014 82,4 1 4 329,48 0,042%
4.3.15 Support 6 430-0015 82,4 1 4 329,48 0,042%
4.3.16 Landing 6 HR-L 430-0016 82,4 1 4 329,48 0,042%
4.3.17 Landing 6 HR-R 430-0017 82,4 1 4 329,48 0,042%
4.3.18 Support 7 430-0018 82,4 1 4 329,48 0,042%
4.3.19 Landing 7 HR-R 430-0019 82,4 1 4 329,48 0,042%
4.3.20 Landing 7HR-L 430-0020 82,4 1 4 329,48 0,042%
4.3.21 Ladder 1 430-0021 82,4 1 4 329,48 0,042%
4.3.22 Ladder2 430-0022 82,4 1 4 329,48 0,042%
4.3.23 Landing 1 Rope Fixed 430-0023 82,4 1 4 329,48 0,042%
4.3.24 Landing 2 Rope Fixed 430-0024 82,4 1 4 329,48 0,042%
4.3.25 Landing 3 Rope Fixed 430-0025 82,4 1 4 329,48 0,042%
4.3.26 Landing 4 Rope Fixed 430-0026 82,4 1 4 329,48 0,042%
4.3.27 Cover 1 430-0027 82,4 1 4 329,48 0,042%
4.3.28 Cover 2 430-0028 82,4 1 4 329,48 0,042%
4.3.29 Cover 3 430-0029 82,4 1 4 329,48 0,042%
4.3.30 Cover 4 430-0030 82,4 1 4 329,48 0,042%
4.3.31 Cover 5 430-0031 82,4 1 4 329,48 0,042%
4.3.32 Door 430-0032 82,4 1 4 329,48 0,042%
4.4 Cabin Suspenion 440-0000 4 1 4 0 0,000%
4.5 Trolley Drive/ Guide Roller 450-0000 11,4 5 2 8 91,04 0,012%
4.5.1 box 450-1000 143,0 1 1 8 1144 0,145%
4.5.2 eccentric axle 450-0001 18,2 Rd100x445 2 42CrMo4+QT 2 16 291,2 0,037%
4.5.3 hub 450-0002 1,0 Rd110x58 3 42CrMo4+QT 2 16 16 0,002%
4.5.4 end disk 450-0003 0,29 Bl10x75x75 4 S235JR+AR 2 16 4,64 0,001%
4.5.5 guiding roller 450-0004 10,2 Rd220x93 5 42CrMo4+QT 2 16 163,2 0,021%
4.5.6 washer 450-0005 0,5 Rd80x20 6 S235JR+AR 2 16 8 0,001%
4.5.7 axle holder 450-0006 0,47 Bl10x40x160 7 S235JR+AR 2 16 7,52 0,001%
4.6 Rope Fix Point 460-0000 6 4 32 0 0,000%
4.6.1 frame 460-1000 50,0 1 1 16 800 0,102%
4.6.2 holder 460-2000 3,45 2 2 32 110,4 0,014%
4.6.3 anti-twist spindle 460-3000 2,85 3 1 16 45,6 0,006%
4.6.4 transition piece 460-0001 27,1 Rd200x330 4 42CrMo4+QT 1 16 433,6 0,055%
4.6.5 bolt 460-0002 1,5 Rd70x115 5 42CrMo4+QT 1 16 24 0,003%
4.6.6 spindle 460-0003 9,3 Rd60x600 6 42CrMo4+QT 1 16 148,8 0,019%
4.6.7 traverse 460-0004 15,7 Bl100x170x230 7 42CrMo4+QT 1 16 251,2 0,032%
4.6.8 anti-rotation nut 460-0005 0,2 15x30x65 8 S355J2+N 1 16 3,2 0,000%
4.6.9 bearing bush outside 460-0006 1,0 Rd110x40 9 S355J2+N 1 32 32 0,004%
4.6.10 bearing bush inside 460-0007 1,3 Rd110x50 10 S355J2+N 2 32 41,6 0,005%
5 Steel Structure 600-0000 1 4 0 0,000%
PARTLIST RTG

Project : RTG CRANE PELINDO III


No. Kontrak : PLG 9.17.204
Owner : PELINDO III

weight total
No Description Drawing weight (kg) Dwg/ Dimension PN Material BQ Qty indeks (%) Status
(Kg)

5.1 Leg A 610-1000 7.744 2 1 4 30976 3,937%


5.2 Leg B 610-2000 7.740 3 1 4 30960 3,935%
5.3 Leg C 610-3000 7.740 4 1 4 30960 3,935%
5.4 Leg D 610-4000 7.744 5 1 4 30976 3,937%
5.5 Joints of legs 615-0000 64 6 1 4 256 0,033%
5.6 Bridge girder 1 620-1000 13.125 7 1 4 52500 6,672%
5.7 Bridge girder 2 620-2000 13.097 8 1 4 52388 6,658%
5.8 Rail on bridge girder 625-1000 3.011 9 1 4 12044 1,531%
5.9 Gantry sill beam A-B 630-1000 6.246 10 1 4 24984 3,175%
5.10 Gantry sill beam C-D 630-2000 6.351 11 1 4 25404 3,229%
5.11 Gantry diagonal 1 640-1000 235 12 4 16 3760 0,478%
5.12 Gantry diagonal 2 640-2000 713 13 2 8 5704 0,725%
5.13 Walkway bridge girder 650-1000 14 1 4 0 0,000%
5.13.1 Railing 1 Support 650-1000 146 1 s235JR+AR 1 4 584 0,074%
5.13.2 Railing 1 HR-R 650-1000 146 1 s235JR+AR 1 4 584 0,074%
5.13.3 Raiiling 2 Support 650-1000 146 2 s235JR+AR 1 4 584 0,074%
5.13.4 Raiing 2 HR-R 650-1000 146 2 s235JR+AR 1 4 584 0,074%
5.13.5 Railing 3 Support 650-1000 146 3 s235JR+AR 1 4 584 0,074%
5.13.6 Railing 3 Hr-R 650-1000 146 3 s235JR+AR 1 4 584 0,074%
5.13.7 Railing 4 Support 650-1000 146 4 s235JR+AR 1 4 584 0,074%
5.13.8 Railing 4 HR-R 650-1000 146 4 s235JR+AR 1 4 584 0,074%
5.13.9 Railing 5 Support 650-1000 146 4 s235JR+AR 1 4 584 0,074%
5.13.10 Railing 5 HR-R 650-1000 146 5 s235JR+AR 1 4 584 0,074%
5.13.11 railing 6 Support 650-1000 146 5 s235JR+AR 1 4 584 0,074%
5.13.12 Railing 6 HR-R 650-1000 146 6 s235JR+AR 1 4 584 0,074%
5.13.13 Railing 7 Support 650-1000 146 6 s235JR+AR 1 4 584 0,074%
5.13.14 Railing 7 HR-R 650-1000 146 6 s235JR+AR 1 4 584 0,074%
5.13.15 Railing 8 Support 650-1000 146 7 s235JR+AR 1 4 584 0,074%
5.13.16 Railing 8 HR-R 650-1000 146 7 s235JR+AR 1 4 584 0,074%
5.13.17 Railing 9 Support 650-1000 146 8 s235JR+AR 1 4 584 0,074%
5.13.18 Railing 9 HR-R 650-1000 146 8 s235JR+AR 1 4 584 0,074%
5.14 Stairs and landings at leg 660-0000 4.104 15 s235JR+AR 1 4 16416 2,086%
5.14.1 Stairs 1 Frame L 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.2 Stairs 1 Frame R 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.3 Stairs 1 HR-L 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.4 Stairs 1 HR-R 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.5 Plat Form Stairs 1 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.6 Stairs 2 Frame L 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.7 Stairs 2 Frame R 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.8 Stairs 2 HR-L 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.9 Stairs 2 HR-R 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.10 Stairs 3 Frame L 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.11 Stairs 3 Frame R 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.12 Stairs 3 HR-L 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.13 Stairs 3 HR-R 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.14 Stairs 4 Frame L 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.15 Stairs 4 Frame R 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.16 Stairs 4 HR-L 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.17 Stairs 4 HR-R 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.18 Stairs 5 Frame L 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.19 Stairs 5 Frame R 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.20 Stairs 5 HR-L 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.21 Stairs 5 HR-R 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.22 Stairs 6 Frame L 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.23 Stairs 6 Frame R 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.24 Stairs 6 HR-L 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.25 Stairs 6 HR-R 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.26 Stairs 7 Frame L 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.27 Stairs 7 Frame R 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.28 Stairs 7 HR-L 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.29 Stairs 7 HR-R 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.30 PF 1 Support 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.31 PF 1 Hr-A 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.32 PF 1 HR-B 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.33 PF 2 Support 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.34 PF 2 HR-A 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.35 PF 2 HR-B 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.36 PF 3 Support 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.37 PF 3 Hr-A 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.38 PF 3 HR-B 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.39 PF 4 Support 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.40 PF 4 Hr-A 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.41 PF 4 HR-B 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.42 PF 5 Support 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.43 PF 5 Hr-A 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.44 PF 6 Support 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.45 PF 6 Hr-A 660-0000 77 s235JR+AR 1 4 308 0,039%
PARTLIST RTG

Project : RTG CRANE PELINDO III


No. Kontrak : PLG 9.17.204
Owner : PELINDO III

weight total
No Description Drawing weight (kg) Dwg/ Dimension PN Material BQ Qty indeks (%) Status
(Kg)

5.14.46 PF 6 Hr-B 660-0000 77 s235JR+AR 1 4 308 0,039%


5.14.47 PF 6 Hr-C 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.48 PF 6 Hr-D 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.49 PF 6 Hr-E 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.50 PF 7 Support 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.51 PF 7 Hr-A 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.52 PF 7 Hr-B 660-0000 77 s235JR+AR 1 4 308 0,039%
5.14.53 Console Support 660-0000 77 s235JR+AR 1 4 308 0,039%
6 Rope System 800-0000 1 4 0 0,000%
6.1 Head Block 810-0000 3448,0 1 1 4 13792 1,753%
6.1.1 Frame 810-1000 2.612 1 1 4 10448 1,328%
6.1.2 Cable basket 810-2000 197 2 1 4 788 0,100%
6.1.2.1 Distance washer 1 810-8000 1,60 17 8 32 51,2 0,007%
6.1.2.2 Distance Washer 2 810-9000 0,46 18 8 32 14,72 0,002%
6.1.3 Bolt 810-3000 12,4 8 4 16 198,4 0,025%
6.1.4 Axle 1 810-4000 23,20 9 4 16 371,2 0,047%
6.1.5 Axle 2 810-5000 12,0 10 4 16 192 0,024%
6.1.6 Axle holder 1 810-6000 0,7 11 16 64 47,36 0,006%
6.1.7 Axle holder 2 810-7000 0,4 12 8 32 11,84 0,002%
7Ellectrical Part att 1 4 0 0,000%
7.1 cable ways gantry traveling 900-1000 273,00 1 1 4 1092 0,139%
7.2 Cable Ways Trolley 900-2000 73,00 2 1 4 292 0,037%
7.3 Cable Ways Gantry Travel Gear 900-3000 56,40 3 1 4 225,6 0,029%
7.4 Support for diesel engine 920-0000 5.133,90 4 1 4 20535,6 2,610%
7.4.1 Exhausting Pipe 920-1000 631,20 1 1 4 2524,8 0,321%
7.5 Supports for limit switches 930-0000 281,60 5 1 4 1126,4 0,143%
7.5.1 Encoder auxiliary winch right 930-1000 43,10 1 2 8 344,8 0,044%
7.5.1.1 protection box right 930-1001 39,00 1 1 8 312 0,040%
7.5.1.2 threaded piece 930-1002 0,90 Rd45x170 2 S355J2+N 1 8 7,2 0,001%
7.5.2 Encoder auxiliary winch right 930-2000 49,10 2 2 8 392,8 0,050%
7.5.2.1 protection box left 930-2001 39,00 1 1 8 312 0,040%
7.5.2.2 threaded piece 930-1002 0,90 Rd45x170 2 S355J2+N 1 8 7,2 0,001%
7.5.3 Supports for limit switches hoisting gear 930-3000 41,70 3 1 4 166,8 0,021%
7.5.4 final circuit for drive trolley 930-4000 16,27 4 1 4 65,08 0,008%
7.5.4.1 bracket pre limit-switch 930-4100 1,26 1 1 4 5,04 0,001%
7.5.4.2 switching point 930-4150 0,44 2 2 8 3,52 0,000%
7.5.4.3 holder operation limit switch 930-4200 3,30 3 1 4 13,2 0,002%
7.5.4.4 bracket safety limit switch 930-4250 2,20 4 1 4 8,8 0,001%
7.5.4.5 switching ruler left for operation limt switch 930-4300 1,44 5 1 4 5,76 0,001%
7.5.4.6 switching ruler right for operation limt switch 930-4350 1,44 6 1 4 5,76 0,001%
7.5.4.7 switching ruler left for safety limit switch 930-4400 1,12 7 1 4 4,48 0,001%
7.5.4.8 switching ruler right for safety limit switch 930-4450 1,12 8 1 4 4,48 0,001%
7.5.4.9 intermediate plate 930-4001 0,69 9 1 4 2,76 0,000%
7.5.5 Encoder steering crane wheels 930-5000 9,80 5 4 16 156,8 0,020%
7.5.5.1 Limit switch console 930-5001 6,50 1 1 16 104 0,013%
7.5.5.2 Cover 930-5002 1,30 Pl.15x230x230 2 235JR+AR 1 16 20,8 0,003%
7.5.5.3 Shaft 930-5003 0,70 Rd.50x120 3 235JR+AR 1 16 11,2 0,001%
7.6 Support energy chain 940-0000 1.120,00 6 1 4 4480 0,569%
7.7 Spot lights 950-1000 431,00 7 1 4 1724 0,219%
7.8 Ligthing 950-2000 55,10 8 1 4 220,4 0,028%
7.5 Supports for limit switches 930-0000 281,60 5 1 4 1126,4 0,143%
7.6 Support energy chain 940-0000 1.120,00 6 1 4 4480 0,569%
7.7 Spot lights 950-1000 431,00 7 1 4 1724 0,219%
7.8 Ligthing 950-2000 55,10 8 1 4 220,4 0,028%
7.9 Bracket sounder strobe 960-1000 18,00 9 1 4 72 0,009%
7.10 Bracket camera 970-1000 29,10 10 1 4 116,4 0,015%
7.11 Bracket telefon 980-1000 13,40 11 1 4 53,6 0,007%
7.12 Bracket switchbox 990-1000 196,20 12 1 4 784,8 0,100%
Total Berat Fabrikasi 786861,84
Total Progres Fabrikasi

You might also like