Weekly Under Frequenoy Tripping Report as on 17.06.2021 to 23.06.2021 Name of Name of 33k Maximum Load at Evenlng Peak Hour (MW) Grid gpngClosinn Time Durafon of Loed Load During Number of NO. Feeder 49.00 Hz 48.90 H2 48.85 Hz 48 80 Hz 48.75 Hz Dale of Tripping Substation 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Time Shed (Min) Trpping (MM) Tripping Remarkis 015 sec. 015 sec. 015sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 ec Lalbagh-1 10 12 14 18 Lalbagh 3/11kV T-88 17-06-2021 Hasnabad 8 Did notIrip at21.24 132/33 k Sreenagar 18-06-2021| 10.15 10.24 18 17-06-2021 Did not trip al 21.24 18-06-2021 10.15 10.24 1.5 Pangoan Postogola (G Gale Kolatia Atibazar Keraniganj Zinzira 132/33kV Chargolgolia 0 Aganagar Konakholaa BISIC Nawabgan 14 Agla Nawabgan Babuakhali 0 132/33 KV Bandura NIkra Dohar Atpara&Neemtola_ 10 Razanagor 10 17-06-2021 Did notbipat 21.24 Sreenagar 18-06-2021 10.15 10.25 10 4.5 132/33kV Rarikhal Sreenagar Local Dogachi&Kajir Pagla MadanganjHaripur 4 Sonargoan132/33KV T-1 Incoming 132/33kV 132/33KV T-2Incoming 132/33KV T-3 Incoming Narsingdi-2 (Modal) 7 Narsingdi Chowhali-2 0 Raypura |Mohishasura L_17-06-2021I 212421.36 9.8 8Munshigan Talilala-Lauhajang 28 18-06-2021 Feeder was in shutdown Total 64 105 141 17.3 3 Total Load Connected to Under Frequency Scheme: 500 MW 17.3 MW Total Amount of Loadshedding Total Number of Tripping 3 nos Total Duration of Load-shed: 40 Minutes A 2406 2021 Executive rineey 062001 Sub-Divisional Enginer SPMD, Dhaka-1, PGCB SPMA Dhaka-éc8