QF-SPM-05

POWER GRID COMPANY OF BANGLADESH LTD.


Weekly Under Frequenoy Tripping Report as on 17.06.2021 to 23.06.2021
Name of
Name of 33k Maximum Load at Evenlng Peak Hour (MW)
Grid gpngClosinn Time Durafon of Loed Load During Number of
NO.
Feeder 49.00 Hz 48.90 H2 48.85 Hz 48 80 Hz 48.75 Hz Dale of Tripping
Substation 48.70 Hz 48.65 Hz 48.60 Hz
48.50 Hz Time Shed (Min) Trpping (MM) Tripping Remarkis
015 sec. 015 sec.
015sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 ec
Lalbagh-1 10 12 14 18
Lalbagh
3/11kV T-88 17-06-2021
Hasnabad
8 Did notIrip at21.24
132/33 k Sreenagar 18-06-2021| 10.15 10.24
18 17-06-2021 Did not trip al 21.24
18-06-2021 10.15 10.24 1.5
Pangoan
Postogola (G Gale
Kolatia
Atibazar
Keraniganj Zinzira
132/33kV Chargolgolia 0
Aganagar
Konakholaa
BISIC
Nawabgan 14
Agla
Nawabgan Babuakhali 0
132/33 KV Bandura
NIkra
Dohar
Atpara&Neemtola_ 10
Razanagor 10 17-06-2021 Did notbipat 21.24
Sreenagar 18-06-2021 10.15 10.25 10 4.5
132/33kV Rarikhal
Sreenagar Local
Dogachi&Kajir Pagla
MadanganjHaripur 4
Sonargoan132/33KV T-1 Incoming
132/33kV 132/33KV T-2Incoming
132/33KV T-3 Incoming
Narsingdi-2 (Modal)
7 Narsingdi Chowhali-2 0
Raypura
|Mohishasura
L_17-06-2021I 212421.36 9.8
8Munshigan Talilala-Lauhajang 28
18-06-2021 Feeder was in shutdown
Total 64 105 141 17.3 3
Total Load Connected to Under Frequency Scheme: 500 MW
17.3 MW
Total Amount of Loadshedding
Total Number of Tripping 3 nos
Total Duration of Load-shed: 40 Minutes
A 2406 2021 Executive
rineey 062001
Sub-Divisional Enginer
SPMD, Dhaka-1, PGCB SPMA Dhaka-éc8