QF-SPM-05

POWER GRID COMPANY OF BANGLADESH LTD.


Weekly Under Frequency Tripping Report as on 15.04.2021 to 21.04.2021

Maximum Load at Evening Peak Hour (MW)


Sl. Name of Name of 33kV Duration of Load Load During Number of
49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Date of Tripping Tripping Time Closing Time Remarks
No. Grid Substation Feeder Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
Hasnabad 33/11kV T-8 8 15/04/2021 13.47 13.56 0:00
1
132/33 kV Sreenagar 18 15/04/2021
Pangoan 24
Postogola (IG Gate) 18
Taltala-1 20
Taltala-2 22
Ullon
2 Ullon Local-1 8
132/33 kV
Ullon Local-2 8
Goran 20
33/11 kV T-1 20
Shyampur
3 33/11 kV T-2 20
132/33 kV
33/11 kV T-3 18
Kumartuli-1 20
Narinda Kumartuli-2 14
4
132/33kV 33/11 kV TR-3 18
33/11 kV TR-4 18
5 Madanganj Haripur 14
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi
Raypura 18
Mohishasura 15
8 Munshiganj Taltala-Louhajang 28
Total 54 81 42 112 22 110 0 76 0 9 0 0

Total Load Connected to Under Frequency Scheme: 497 MW


Total Amount of Loadshedding: 0 MW
Total Number of Tripping: 5 nos.
Total Duration of Load-shed: 9 Minutes

Assistant Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
0
20
20
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 01.04.2021 to 07.04.2021

Maximum Load at Evening Peak Hour (MW)


Sl. Name of Name of 33kV Duration of Load Load During Number of
49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Date of Tripping Tripping Time Closing Time Remarks
No. Grid Substation Feeder Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16 0 No load. Standby feeder.

Lalbagh-2 18 0

33/11kV T-8 8 0

Hasnabad
1
132/33 kV

Sreenagar 18 0

Pangoan 24 0

Postogola (IG Gate) 18 0


Taltala-1 20 0
Taltala-2 22 0
Ullon
2 Ullon Local-1 8 0
132/33 kV
Ullon Local-2 8 0
Goran 20 0
33/11 kV T-1 20 0
Shyampur
3 33/11 kV T-2 20 0
132/33 kV
33/11 kV T-3 18 0
Kumartuli-1 20 0
Narinda Kumartuli-2 14 0
4
132/33kV 33/11 kV TR-3 18 0
33/11 kV TR-4 18 0
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30 0
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20 0
Narsingdi-2 (Modjal) 22 0
Chowhali-2 12 0
7 Narsingdi
Raypura 18 0
Mohishasura 15 0

8 Munshiganj Taltala-Louhajang 28 0

Total 54 81 42 112 22 110 0 76 0 0 0 0

Total Load Connected to Under Frequency Scheme: 497 MW


POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 01.04.2021 to 07.04.2021

Maximum Load at Evening Peak Hour (MW)


Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Total Amount of Loadshedding: 0 MW
Total Number of Tripping: 0 nos.
Total Duration of Load-shed: 0 Minutes

Assistant Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 08.04.2021 to 14.04.2021

Maximum Load at Evening Peak Hour (MW)


Sl. Name of Name of 33kV Duration of Load Load During Number of
49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Date of Tripping Tripping Time Closing Time Remarks
No. Grid Substation Feeder Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
Hasnabad 33/11kV T-8 8
1
132/33 kV Sreenagar 18
Pangoan 24
Postogola (IG Gate) 18
Taltala-1 20
Taltala-2 22
Ullon
2 Ullon Local-1 8
132/33 kV
Ullon Local-2 8
Goran 20
33/11 kV T-1 20
Shyampur
3 33/11 kV T-2 20
132/33 kV
33/11 kV T-3 18
Kumartuli-1 20
Narinda Kumartuli-2 14
4
132/33kV 33/11 kV TR-3 18
33/11 kV TR-4 18
5 Madanganj Haripur 14
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi
Raypura 18
Mohishasura 15
8 Munshiganj Taltala-Louhajang 28 10/04/2021 14.30 14.40 ### 20.7 1
Total 54 81 42 112 22 110 0 76 0 10 20.7 1

Total Load Connected to Under Frequency Scheme: 497 MW


Total Amount of Loadshedding: 20.7 MW
Total Number of Tripping: 1 nos.
Total Duration of Load-shed: 10 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 15.04.2021 to 21.04.2021

Maximum Load at Evening Peak Hour (MW)


Sl. Name of Name of 33kV Duration of Load Load During Number of
49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Date of Tripping Tripping Time Closing Time Remarks
No. Grid Substation Feeder Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
Hasnabad 33/11kV T-8 8 15/04/2021 13.47 13.56 9 4.5 1
1
132/33 kV Sreenagar 18 15/04/2021 13.47 13.56 9 10 1
Pangoan 24
Postogola (IG Gate) 18
Taltala-1 20
Taltala-2 22
Ullon
2 Ullon Local-1 8
132/33 kV
Ullon Local-2 8
Goran 20
33/11 kV T-1 20
Shyampur
3 33/11 kV T-2 20
132/33 kV
33/11 kV T-3 18
Kumartuli-1 20
Narinda Kumartuli-2 14
4
132/33kV 33/11 kV TR-3 18
33/11 kV TR-4 18
5 Madanganj Haripur 14
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi
Raypura 18
Mohishasura 15
15/04/2021 13.47 13.56 9 16.1
8 Munshiganj Taltala-Louhajang 28 2
16/04/2021 12.18 12.38 20 17.69
Total 54 81 42 112 22 110 0 76 0 47 48.29 4

Total Load Connected to Under Frequency Scheme: 497 MW


Total Amount of Loadshedding: 48.29 MW
Total Number of Tripping: 5 nos.
Total Duration of Load-shed: 47 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 22.04.2021 to 28.04.2021

Maximum Load at Evening Peak Hour (MW)


Sl. Name of Name of 33kV Duration of Load Load During Number of
49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Date of Tripping Tripping Time Closing Time Remarks
No. Grid Substation Feeder Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
24/04/2021 10.01 10.09 8 3 1
33/11kV T-8 8
Hasnabad 26/04/2021 13.39 13.46 7 4 1
1
132/33 kV 24/04/2021 10.01 10.09 8 6.5 1
Sreenagar 18
26/04/2021 0 Feeder was in shutdown
Pangoan 24
Postogola (IG Gate) 18
Taltala-1 20
Taltala-2 22
Ullon
2 Ullon Local-1 8
132/33 kV
Ullon Local-2 8
Goran 20
33/11 kV T-1 20
Shyampur
3 33/11 kV T-2 20
132/33 kV
33/11 kV T-3 18
Kumartuli-1 20
Narinda Kumartuli-2 14
4
132/33kV 33/11 kV TR-3 18
33/11 kV TR-4 18
5 Madanganj Haripur 14
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi
Raypura 18
Mohishasura 15
24/04/2021 10.01 10.12 11 17.8
25/04/2021 18.50 18.57 7 21.6
8 Munshiganj Taltala-Louhajang 28 3
26/04/2021 0 Feeder was in shutdown
28/04/2021 13.41 13.48 7 19.5
Total 54 81 42 112 22 110 0 76 0 48 72.4 6

Total Load Connected to Under Frequency Scheme: 497 MW


Total Amount of Loadshedding: 72.4 MW
Total Number of Tripping: 5 nos.
Total Duration of Load-shed: 48 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 29.04.2021 to 05.05.2021

Maximum Load at Evening Peak Hour (MW)


Sl. Name of Name of 33kV Duration of Load Load During Number of
49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Date of Tripping Tripping Time Closing Time Remarks
No. Grid Substation Feeder Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
Hasnabad 33/11kV T-8 8 02/05/2021 21.16 21.36 20 3.5 1
1
132/33 kV Sreenagar 18 02/05/2021 21.16 21.36 20 0.5 1
Pangoan 24
Postogola (IG Gate) 18
Taltala-1 20
Taltala-2 22
Ullon
2 Ullon Local-1 8
132/33 kV
Ullon Local-2 8
Goran 20
33/11 kV T-1 20
Shyampur
3 33/11 kV T-2 20
132/33 kV
33/11 kV T-3 18
Kumartuli-1 20
Narinda Kumartuli-2 14
4
132/33kV 33/11 kV TR-3 18
33/11 kV TR-4 18
5 Madanganj Haripur 14
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi
Raypura 18
Mohishasura 15
8 Munshiganj Taltala-Louhajang 28 02/05/2021 21.16 21.22 6 25.6 1
Total 54 81 42 112 22 110 0 76 0 46 29.6 3

Total Load Connected to Under Frequency Scheme: 497 MW


Total Amount of Loadshedding: 29.6 MW
Total Number of Tripping: 3 nos.
Total Duration of Load-shed: 46 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 06.05.2021 to 12.05.2021

Maximum Load at Evening Peak Hour (MW)


Sl. Name of Name of 33kV Duration of Load Load During Number of
49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Date of Tripping Tripping Time Closing Time Remarks
No. Grid Substation Feeder Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
Hasnabad 33/11kV T-8 8 12/05/2021 13.13 13.18 5 2 1
1
132/33 kV Sreenagar 18 12/05/2021 13.13 13.18 5 0 1
Pangoan 24
Postogola (IG Gate) 18
Taltala-1 20
Taltala-2 22
Ullon
2 Ullon Local-1 8
132/33 kV
Ullon Local-2 8
Goran 20
33/11 kV T-1 20
Shyampur
3 33/11 kV T-2 20
132/33 kV
33/11 kV T-3 18
Kumartuli-1 20
Narinda Kumartuli-2 14
4
132/33kV 33/11 kV TR-3 18
33/11 kV TR-4 18
5 Madanganj Haripur 14
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi
Raypura 18
Mohishasura 15
8 Munshiganj Taltala-Louhajang 28 12/05/2021 0 Feeder was in shutdown
Total 54 81 42 112 22 110 0 76 0 10 2 2

Total Load Connected to Under Frequency Scheme: 497 MW


Total Amount of Loadshedding: 2 MW
Total Number of Tripping: 2 nos.
Total Duration of Load-shed: 10 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 13.05.2021 to 19.05.2021

Maximum Load at Evening Peak Hour (MW)


Sl. Name of Name of 33kV Duration of Load Load During Number of
49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Date of Tripping Tripping Time Closing Time Remarks
No. Grid Substation Feeder Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
Hasnabad 33/11kV T-8 8 15/05/2021 13.01 13.25 24 2 1
1
132/33 kV Sreenagar 18 15/05/2021 13.01 13.25 24 0 1
Pangoan 24
Postogola (IG Gate) 18
Taltala-1 20
Taltala-2 22
Ullon
2 Ullon Local-1 8
132/33 kV
Ullon Local-2 8
Goran 20
33/11 kV T-1 20
Shyampur
3 33/11 kV T-2 20
132/33 kV
33/11 kV T-3 18
Kumartuli-1 20
Narinda Kumartuli-2 14
4
132/33kV 33/11 kV TR-3 18
33/11 kV TR-4 18
5 Madanganj Haripur 14
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi
Raypura 18
Mohishasura 15
8 Munshiganj Taltala-Louhajang 28 15/05/2021 0 Feeder was in shutdown
Total 54 81 42 112 22 110 0 76 0 48 2 2

Total Load Connected to Under Frequency Scheme: 497 MW


Total Amount of Loadshedding: 2 MW
Total Number of Tripping: 2 nos.
Total Duration of Load-shed: 48 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 20.05.2021 to 26.05.2021

Maximum Load at Evening Peak Hour (MW)


Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
24/05/2021 15.54 16.20 26 0
Lalbagh-1 16
24/05/2021 16.57 17.32 75 0
24/05/2021 15.54 16.20 26 0
Lalbagh-2 18
24/05/2021 16.57 17.32 75 0
20/05/2021 11.39 11.45 6 3
22/05/2021 21.29 21.49 20 3.5
23/05/2021 19.08 0
33/11kV T-8 8 24/05/2021 12.35 13.04 29 4
24/05/2021 15.54 16.20 26 4
24/05/2021 16.57 17.32 75 3.5
24/04/2021 20.17 20.45 28 4.5
Hasnabad 20/05/2021 11.39 11.45 6 1
1 7
132/33 kV
22/05/2021 21.29 21.49 20 0
23/05/2021 19.08
Sreenagar 18 24/05/2021 12.35 13.04 29 1
24/05/2021 15.54 16.20 26 1
24/05/2021 16.57 17.32 75 1
24/04/2021 20.17 20.45 28 1.5
24/04/2021 15.54 16.20 26 6
Pangoan 24
24/04/2021 16.57 17.32 75 6
24/04/2021 15.54 16.20 26 13
Postogola (IG Gate) 18
24/04/2021 16.57 17.32 75 12.5
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 1
132/33 kV Bandura 14
Nikra 8 24/05/2021 15.54 16.15 21 4.5
Dohar 14
Neemtola 8 24/05/2021 15.54 16.02 8 7.7
Sreenagar Razanagor 14
4 2
132/33kV Sreenagar-I 12
Sreenagar-II 7.5 24/05/2021 15.54 16.07 13 6.6
5 Madanganj Haripur 14 24/05/2021 15.54 16.09 15 8 1
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
24/05/2021 15.54 15.58 4 16.4
7 Narsingdi Raypura 18 2
24/05/2021 16.57 17.42 45 0
24/05/2021 15.54 16.09 15 10.3
Mohishasura 15
24/05/2021 16.57 17.58 61 0
20/05/2021 11.38 11.50 12 18.7

8 Munshiganj Taltala-Louhajang 28 5
23/05/2021 19.08 19.45 37 11.95
8 Munshiganj Taltala-Louhajang 28 24/05/2021 12.35 13.07 31 10.5 5
24/05/2021 15.54 17.44 50 12.14
24/05/2021 20.17 20.25 8 13.52
Total 54 123.5 72 147 98 0 0 0 0 1092 185.81 18

Total Load Connected to Under Frequency Scheme: 494.5 MW


Total Amount of Loadshedding: 185.81 MW
Total Number of Tripping: 18 nos.
Total Duration of Load-shed: 1092 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 27.05.2021 to 02.06.2021

Maximum Load at Evening Peak Hour (MW)


Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
28/05/2021 18.55 19.04 9 3 Did not trip at 18.48
33/11kV T-8 8
Hasnabad 29/05/2021 Did not trip at 18.52
1 28/05/2021 18.55 19.04 9 1 1 Did not trip at 18.48
132/33 kV
Sreenagar 18
29/05/2021 Did not trip at 18.52
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3
132/33 kV Bandura 14
Nikra 8
Dohar 14
Neemtola 8
Sreenagar Razanagor 14
4
132/33kV Sreenagar-I 12
Sreenagar-II 7.5
5 Madanganj Haripur 14
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi
Raypura 18
Mohishasura 15
28/05/2021 18.48 19.05 17 6.7
8 Munshiganj Taltala-Louhajang 28 1
29/05/2021 Did not trip at 18.52
Total 54 123.5 72 147 98 0 0 0 0 35 10.7 2

Total Load Connected to Under Frequency Scheme: 494.5 MW


Total Amount of Loadshedding: 10.7 MW
Total Number of Tripping: 2 nos.
Total Duration of Load-shed: 35 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 03.06.2021 to 09.06.2021

Maximum Load at Evening Peak Hour (MW)


Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
Hasnabad 33/11kV T-8 8 09/06/2021 Did not trip at 19.03
1 Sreenagar 18 09/06/2021 0 Did not trip at 19.03
132/33 kV
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Neemtola 8
Sreenagar Razanagor 14
4 0
132/33kV Sreenagar-I 12
Sreenagar-II 7.5
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18
Mohishasura 15
8 Munshiganj Taltala-Louhajang 28 09/06/2021 19.03 19.10 7 8.2 1
Total 54 123.5 72 147 98 0 0 0 0 7 8.2 1

Total Load Connected to Under Frequency Scheme: 494.5 MW


Total Amount of Loadshedding: 8.2 MW
Total Number of Tripping: 1 nos.
Total Duration of Load-shed: 7 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 10.06.2021 to 16.06.2021
Maximum Load at Evening Peak Hour (MW)
Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
10/06/2021 8.10 8.25 15 3
10/06/2021 11.38 11.42 4 4.25
33/11kV T-8 8
11/06/2021 Did not trip at 12.47
11/06/2021 Did not trip at 19.02
Hasnabad
1 10/06/2021 8.10 8.25 15 0 2
132/33 kV
10/06/2021 11.38 11.42 4 0.8
Sreenagar 18
11/06/2021 Did not trip at 12.47
11/06/2021 Did not trip at 19.02
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Atpara & Neemtola 10
10/06/2021 Did not trip at 08.10
10/06/2021 11.38 11.48 10 5
Razanagor 10
Sreenagar 11/06/2021 Did not trip at 12.47
4 1
132/33kV 11/06/2021 Did not trip at 19.02
Rarikhal 9
Sreenagar Local 8
Dogachi & Kajir Pagla 10
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18
Mohishasura 15
10/06/2021 8.10 8.20 10 4.2
10/06/2021 11.38 11.46 8 8.82
8 Munshiganj Taltala-Louhajang 28 4
11/06/2021 12.47 12.55 8 9.2
11/06/2021 19.02 19.08 6 9.45
Total 64 105 82 141 98 10 0 0 0 80 44.72 7

Total Load Connected to Under Frequency Scheme: 500 MW


Total Amount of Loadshedding: 44.72 MW
Total Number of Tripping: 7 nos.
Total Duration of Load-shed: 80 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 17.06.2021 to 23.06.2021
Maximum Load at Evening Peak Hour (MW)
Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
17/06/2021 Did not trip at 21.24
33/11kV T-8 8
18/06/2021 10.15 10.24 9 1.5
Hasnabad
1 17/06/2021 1 Did not trip at 21.24
132/33 kV Sreenagar 18
18/06/2021 10.15 10.24 9 1.5
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Atpara & Neemtola 10
17/06/2021 Did not trip at 21.24
Razanagor 10
Sreenagar 18/06/2021 10.15 10.25 10 4.5
4 1
132/33kV Rarikhal 9
Sreenagar Local 8
Dogachi & Kajir Pagla 10
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18
Mohishasura 15
17/06/2021 21.24 21.36 12 9.8
8 Munshiganj Taltala-Louhajang 28 1
18/06/2021 Feeder was in shutdown
Total 64 105 82 141 98 10 0 0 0 40 17.3 3

Total Load Connected to Under Frequency Scheme: 500 MW


Total Amount of Loadshedding: 17.3 MW
Total Number of Tripping: 3 nos.
Total Duration of Load-shed: 40 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 24.06.2021 to 30.06.2021
Maximum Load at Evening Peak Hour (MW)
Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
Hasnabad 33/11kV T-8 8 25/06/2021 19.05 19.14 9 3.5
1 Sreenagar 18 25/06/2021 19.05 19.14 9 0 1
132/33 kV
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Atpara & Neemtola 10
Razanagor 10 25/06/2021 Did not trip at 19.05
Sreenagar
4 Rarikhal 9 0
132/33kV
Sreenagar Local 8
Dogachi & Kajir Pagla 10
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18
Mohishasura 15
8 Munshiganj Taltala-Louhajang 28 25/06/2021 19.05 19.16 11 8.55 1
Total 64 105 82 141 98 10 0 0 0 29 12.05 2

Total Load Connected to Under Frequency Scheme: 500 MW


Total Amount of Loadshedding: 12.05 MW
Total Number of Tripping: 2 nos.
Total Duration of Load-shed: 29 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 01.07.2021 to 07.07.2021
Maximum Load at Evening Peak Hour (MW)
Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
04/07/2021 19.03 19.08 5 4
33/11kV T-8 8
Hasnabad 05/07/2021 Did not trip at 00.51
1 04/07/2021 19.03 19.08 5 0 1
132/33 kV
Sreenagar 18
05/07/2021 Did not trip at 00.51
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Atpara & Neemtola 10
04/06/2021 Feeder was in shutdown
Razanagor 10
Sreenagar 05/07/2021 Feeder was in shutdown
4 0
132/33kV Rarikhal 9
Sreenagar Local 8
Dogachi & Kajir Pagla 10
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18
Mohishasura 15
04/07/2021 19.03 19.23 20 8.25
8 Munshiganj Taltala-Louhajang 28 1
05/06/2021 Did not trip at 00.51
Total 64 105 82 141 98 10 0 0 0 30 12.25 2

Total Load Connected to Under Frequency Scheme: 500 MW


Total Amount of Loadshedding: 12.25 MW
Total Number of Tripping: 2 nos.
Total Duration of Load-shed: 30 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ###
6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 ### 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 08.07.2021 to 14.07.2021
Maximum Load at Evening Peak Hour (MW)
Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
09/07/2021 20.40 20.43 3 3.75
33/11kV T-8 8 DFDR tirggered on 13.14, but feeder
11/07/2021
Hasnabad did not trip
1 1
132/33 kV 09/07/2021 20.40 20.43 3 0.75
Sreenagar 18 DFDR tirggered on 13.14, but feeder
11/07/2021
did not trip
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Atpara & Neemtola 10
09/07/2021 Did not trip
Razanagor 10
Sreenagar 11/07/2021 Did not trip
4 0
132/33kV Rarikhal 9
Sreenagar Local 8
Dogachi & Kajir Pagla 10
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18
Mohishasura 15
09/07/2021 Did not trip
8 Munshiganj Taltala-Louhajang 28
11/07/2021 Did not trip
Total 64 105 82 141 98 10 0 0 0 6 4.5 1

Total Load Connected to Under Frequency Scheme: 500 MW


Total Amount of Loadshedding: 4.5 MW
Total Number of Tripping: 1 nos.
Total Duration of Load-shed: 6 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
### 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 ### 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 15.07.2021 to 21.07.2021
Maximum Load at Evening Peak Hour (MW)
Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
16/07/2021 12.08 12.20 12 4
33/11kV T-8 8
19/07/2021 17.16 17.31 15 3
Hasnabad
1 16/07/2021 12.08 12.20 12 0.75 2
132/33 kV
Sreenagar 18
19/07/2021 17.16 17.31 15 0
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Atpara & Neemtola 10
16/07/2021 12.08 12.14 6 6
Razanagor 10
Sreenagar 19/07/2021 17.16 17.22 6 6
4 2
132/33kV Rarikhal 9
Sreenagar Local 8
Dogachi & Kajir Pagla 10
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18
Mohishasura 15
16/07/2021 12.08 12.13 5 10.15
8 Munshiganj Taltala-Louhajang 28 2
19/07/2021 17.16 17.26 10 9.75
Total 64 105 82 141 98 10 0 0 0 81 39.65 6

Total Load Connected to Under Frequency Scheme: 500 MW


Total Amount of Loadshedding: 39.65 MW
Total Number of Tripping: 6 nos.
Total Duration of Load-shed: 81 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
### 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 ### 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 22.07.2021 to 28.07.2021
Maximum Load at Evening Peak Hour (MW)
Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
Hasnabad 33/11kV T-8 8
1 Sreenagar 18 0
132/33 kV
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Atpara & Neemtola 10
Razanagor 10
Sreenagar
4 Rarikhal 9
132/33kV
Sreenagar Local 8
Dogachi & Kajir Pagla 10
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18
Mohishasura 15
8 Munshiganj Taltala-Louhajang 28
Total 64 105 82 141 98 10 0 0 0 0 0 0

Total Load Connected to Under Frequency Scheme: 500 MW


Total Amount of Loadshedding: 0 MW
Total Number of Tripping: 0 nos.
Total Duration of Load-shed: 0 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 29.07.2021 to 04.08.2021
Maximum Load at Evening Peak Hour (MW)
Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16 29/07/2021 21.34 21.53 19 0
Lalbagh-2 18 Feeder was in shutdown
29/07/2021 21.09 21.53 44 2.5
Hasnabad 33/11kV T-8 8 29/07/2021 21.58 22.09 11 2.5
1 04/08/2021 19.36 20.08 32 4 4
132/33 kV
Sreenagar 3 Feeder was in shutdown
Pangoan 24 29/07/2021 21.34 21.53 19 5
Postogola (IG Gate) 18 29/07/2021 21.34 21.53 19 9
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Atpara & Neemtola 10
29/07/2021 21.09 21.24 15 7.5
29/07/2021 21.34 21.44 10 7.5
Razanagor 10
Sreenagar 29/07/2021 21.58 22.11 13 7.5
4 4
132/33kV 04/08/2021 19.36 20.05 29 8
Rarikhal 9
Sreenagar Local 8
Dogachi & Kajir Pagla 10
5 Madanganj Haripur 14 29/07/2021 21.34 21.57 23 14 1
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18 29/07/2021 21.34 21.45 11 25
Narsingdi-1 15 29/07/2021 21.34 21.46 12 5
29/07/2021 21.09 21.29 20 10.9
8 Munshiganj Taltala-Louhajang 28 2
29/07/2021 21.58 22.10 12 12
Total 49 105 82 141 98 10 0 0 0 289 120.4 11

Total Load Connected to Under Frequency Scheme: 485 MW


Total Amount of Loadshedding: 120.4 MW
Total Number of Tripping: 11 nos.
Total Duration of Load-shed: 289 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
### 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 ### 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 05.08.2021 to 11.08.2021
Maximum Load at Evening Peak Hour (MW)
Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
Hasnabad 33/11kV T-8 8 Did not trip
1 Sreenagar 3 0 Feeder was in shutdown
132/33 kV
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Atpara & Neemtola 10
Razanagor 10 Did not trip
Sreenagar
4 Rarikhal 9
132/33kV
Sreenagar Local 8
Dogachi & Kajir Pagla 10
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18
Mohishasura 15
8 Munshiganj Taltala-Louhajang 28 06/08/2021 12.38 12.47 9 9.4 1
Total 49 105 82 141 98 10 0 0 0 9 9.4 1

Total Load Connected to Under Frequency Scheme: 485 MW


Total Amount of Loadshedding: 9.4 MW
Total Number of Tripping: 1 nos.
Total Duration of Load-shed: 9 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 12.08.2021 to 18.08.2021
Maximum Load at Evening Peak Hour (MW)
Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
Hasnabad 33/11kV T-8 8 16/08/2021 15.30 15.34 4 4 Did not trip on 18/08/2021
1 Sreenagar 3 16/08/2021 15.30 15.34 4 1 1 Did not trip on 18/08/2021
132/33 kV
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Atpara & Neemtola 10
Razanagor 10 16/08/2021 15.30 15.40 10 6.5 Did not trip on 18/08/2021
Sreenagar
4 Rarikhal 9 1
132/33kV
Sreenagar Local 8
Dogachi & Kajir Pagla 10
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18
Mohishasura 15
16/08/2021 15.30 15.35 5 10.5
8 Munshiganj Taltala-Louhajang 28 18/08/2021 6.06 6.16 10 9 3
18/08/2021 6.27 6.37 10 7
Total 49 105 82 141 98 10 0 0 0 43 38 5

Total Load Connected to Under Frequency Scheme: 485 MW


Total Amount of Loadshedding: 38 MW
Total Number of Tripping: 5 nos.
Total Duration of Load-shed: 43 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
### 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 ### 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 19.08.2021 to 25.08.2021
Maximum Load at Evening Peak Hour (MW)
Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
Hasnabad 33/11kV T-8 8 Did not trip on 21/08/2021
1 Sreenagar 3 Did not trip on 21/08/2021
132/33 kV
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Atpara & Neemtola 10
Razanagor 10 Did not trip on 21/08/2021
Sreenagar
4 Rarikhal 9
132/33kV
Sreenagar Local 8
Dogachi & Kajir Pagla 10
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18
Mohishasura 15
8 Munshiganj Taltala-Louhajang 28 21/08/2021 18.40 18.45 5 8 1
Total 49 105 82 141 98 10 0 0 0 5 8 1

Total Load Connected to Under Frequency Scheme: 485 MW


Total Amount of Loadshedding: 8 MW
Total Number of Tripping: 1 nos.
Total Duration of Load-shed: 5 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 09.09.2021 to 15.09.2021
Maximum Load at Evening Peak Hour (MW)
Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
Hasnabad 33/11kV T-8 8 10/09/2021 21.24 22.36 72 4
1 Sreenagar 3 10/09/2021 21.24 21.31 7 0.75 1
132/33 kV
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Atpara & Neemtola 10
Razanagor 10 Did not trip on 10/09/2021
Sreenagar
4 Rarikhal 9 0
132/33kV
Sreenagar Local 8
Dogachi & Kajir Pagla 10
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18
Mohishasura 15
8 Munshiganj Taltala-Louhajang 28 10/09/2021 21.24 21.45 21 12.11 1
Total 49 105 82 141 98 10 0 0 0 100 16.86 2

Total Load Connected to Under Frequency Scheme: 485 MW


Total Amount of Loadshedding: 16.86 MW
Total Number of Tripping: 2 nos.
Total Duration of Load-shed: 100 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 16.09.2021 to 22.09.2021
Maximum Load at Evening Peak Hour (MW)
Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
Hasnabad 33/11kV T-8 8
1 Sreenagar 3 0
132/33 kV
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Atpara & Neemtola 10
Razanagor 10
Sreenagar
4 Rarikhal 9 0
132/33kV
Sreenagar Local 8
Dogachi & Kajir Pagla 10
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18
Mohishasura 15
8 Munshiganj Taltala-Louhajang 28 0
Total 49 105 82 141 98 10 0 0 0 0 0 0

Total Load Connected to Under Frequency Scheme: 485 MW


Total Amount of Loadshedding: 0 MW
Total Number of Tripping: 0 nos.
Total Duration of Load-shed: 0 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 23.09.2021 to 29.09.2021
Maximum Load at Evening Peak Hour (MW)
Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
Hasnabad 33/11kV T-8 8 24.09.21 18.04 18.14 10 4.5
1 Sreenagar 3 24.09.21 18.04 18.14 10 1 1
132/33 kV
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Atpara & Neemtola 10
Razanagor 10 Did not trip
Sreenagar
4 Rarikhal 9 0
132/33kV
Sreenagar Local 8
Dogachi & Kajir Pagla 10
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18
Mohishasura 15
8 Munshiganj Taltala-Louhajang 28 24.09.21 18.04 18.18 14 8 1
Total 49 105 82 141 98 10 0 0 0 34 13.5 2

Total Load Connected to Under Frequency Scheme: 485 MW


Total Amount of Loadshedding: 13.5 MW
Total Number of Tripping: 2 nos.
Total Duration of Load-shed: 34 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 30.09.2021 to 06.10.2021
Maximum Load at Evening Peak Hour (MW)
Sl. Name of Name of 33kV Date of Tripping Tripping Time Closing Time
Duration of Load Load During Number of
Remarks
No. Grid Substation Feeder 49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
Hasnabad 33/11kV T-8 8
1 Sreenagar 3 0
132/33 kV
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Atpara & Neemtola 10
Razanagor 10
Sreenagar
4 Rarikhal 9 0
132/33kV
Sreenagar Local 8
Dogachi & Kajir Pagla 10
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18
Mohishasura 15
8 Munshiganj Taltala-Louhajang 28 0
Total 49 105 82 141 98 10 0 0 0 0 0 0

Total Load Connected to Under Frequency Scheme: 485 MW


Total Amount of Loadshedding: 0 MW
Total Number of Tripping: 0 nos.
Total Duration of Load-shed: 0 Minutes

Sub-Divisional Engineer Executive Engineer


SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
QF-SPM-05
POWER GRID COMPANY OF BANGLADESH LTD.
Weekly Under Frequency Tripping Report as on 07.10.2021 to 13.10.2021
Maximum Load at Evening Peak Hour (MW)
Sl. Name of Name of 33kV Duration of Load Load During Number of
49.00 Hz 48.90 Hz 48.85 Hz 48.80 Hz 48.75 Hz 48.70 Hz 48.65 Hz 48.60 Hz 48.50 Hz Date of Tripping Tripping Time Closing Time Remarks
No. Grid Substation Feeder Shed (Min) Tripping (MW) Tripping
0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec. 0.15 sec.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lalbagh-1 16
Lalbagh-2 18
08/10/2021 17.57 18.03 13 3.5
09/10/2021 17.55 18.12 17 4.5
33/11kV T-8 8
11/10/2021 17.55 18.03 8 5
12/10/2021 17.50 18.03 13 5
Hasnabad
1 08/10/2021 17.57 18.03 13 0.75 4
132/33 kV
09/10/2021 17.55 18.10 15 0.75
Sreenagar 3
11/10/2021 17.55 18.03 8 0.75
12/10/2021 17.50 18.03 13 0.75
Pangoan 24
Postogola (IG Gate) 18
Kolatia 11
Attibazar 10
Zinzira 25
Keraniganj
2 Chargolgolia 7 0
132/33kV
Aganagar 23
Konakhola 6
BISIC 9
Nawabganj 14
Agla 12
Nawabganj Babuakhali 9
3 0
132/33 kV Bandura 14
Nikra 8
Dohar 14
Atpara & Neemtola 10
Did not trip on 08/10/21, 09/10/21 &
Razanagor 10 11/10/2021 17.55 18.05 10 7
Sreenagar 12/10/21
4 1
132/33kV Rarikhal 9
Sreenagar Local 8
Dogachi & Kajir Pagla 10
5 Madanganj Haripur 14 0
132/33kV T-1 Incoming 30
Sonargoan
6 132/33kV T-2 Incoming 30 0
132/33kV
132/33kV T-3 Incoming 20
Narsingdi-2 (Modjal) 22
Chowhali-2 12
7 Narsingdi 0
Raypura 18
Mohishasura 15
08/10/2021 17.57 18.04 7 8.76
09/10/2021 17.55 18.02 7 9
8 Munshiganj Taltala-Louhajang 28 4
11/10/2021 17.55 18.03 8 11
12/10/2021 17.50 18.04 14 9.14
Total 49 105 82 141 98 10 0 0 0 146 65.9 9

Total Load Connected to Under Frequency Scheme: 485 MW


Total Amount of Loadshedding: 65.9 MW
Total Number of Tripping: 9 nos.
Total Duration of Load-shed: 146 Minutes
Sub-Divisional Engineer Executive Engineer
SPMD, Dhaka-1, PGCB SPMD, Dhaka-1, PGCB
6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 ### 6/10/2021 6/10/2021 ### ### 6/10/2021 6/10/2021 ### 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021
6/10/2021 6/10/2021 6/10/2021 6/10/2021 6/10/2021

You might also like