Introduction
Transformers
16 ohms
T- 1 T- 2 T- 3
16 ohms 115/13.8 kV 230/13.8 kV 230/13.8 kV
15/20 MVA 75/84 MVA 75/84 MVA
Z=17% Z=17% Z=17%
16 ohms 16 ohms 16 ohms
In 2500 A
In 2500 A
In 2500 A
In 2500 A
In 3150 A
In 3150 A
In 3150 A
s s s s s s s
TD-1 TD-2 TD-3 TD-A TD-B
In 1250 A
In 1250 A
In 1250 A
In 1250 A
In 1250 A
In 1250 A
In 1250 A
In 1250 A
In 1250 A
In 1250 A
Isc3Ø=31.5 kA Isc3Ø=31.5 kA Isc3Ø=31.5 kA Isc3Ø=31.5 kA Isc3Ø=31.5 kA
2500 A 2500 A 2500 A 3150 A 3150 A
13.8 kV 13.8 kV 13.8 kV 13.8 kV 13.8 kV
measured
measured
measured
Slot
Slot
Slot
18 18 4 25 25
MW MW MW MW MW
LOAD LOAD LOAD LOAD LOAD
In 1200 A
In 1200 A
0.3 ohms
0.3 ohms
0.3 ohms
IS- B
IS- A
RA 1
RA 2
RA 3
measured
In 1250 A
In 1250 A
In 1250 A
In 1250 A
In 1250 A
In 1250 A
Slot
Isc3Ø=31.5 kA
2500 A
TD-BS
s s s s s s 13.8 kV
Concepts
Installed Capacity
• 50 MW @ 13.8 kV
• 25 MW de carga
115 KV
22.4 22.4 26 44
MVA MVA MVA MVA
13.8 KV
13.8 KV
M M M M M
HDR
System Architecture of Refinery
GRID 1 GRID 2 GRID 3
TG-1 TG-2 TG-271
32 MW 32 MW 115 kV 18 MW 230 kV 230 kV
16 ohms
T- 1 T- 2 T- 3
16 ohms 115/13.8 kV 230/13.8 kV 230/13.8 kV
15/20 MVA
Z=17%
16 ohms
75/84 MVA
Z=17%
16 ohms
75/84 MVA
Z=17%
Currently
16 ohms
In 2500 A
In 2500 A
In 2500 A
In 3150 A
In 3150 A
In 3150 A
s s s s s s s
TD-1 TD-2 TD-3 TD-A TD-B
In 1250 A
In 1250 A
In 1250 A
In 1250 A
In 1250 A
In 1250 A
In 1250 A
In 1250 A
In 1250 A
In 1250 A
Isc3Ø=31.5 kA Isc3Ø=31.5 kA Isc3Ø=31.5 kA Isc3Ø=31.5 kA Isc3Ø=31.5 kA
2500 A 2500 A 2500 A 3150 A 3150 A
13.8 kV 13.8 kV 13.8 kV 13.8 kV 13.8 kV
measured
measured
measured
Slot
Slot
Slot
18 18 4 25 25
MW MW MW MW MW
LOAD LOAD LOAD LOAD LOAD
In 1200 A
In 1200 A
0.3 ohms
0.3 ohms
0.3 ohms
IS- A
IS- B
RA 1
RA 2
RA 3
measured
In 1250 A
In 1250 A
In 1250 A
In 1250 A
In 1250 A
In 1250 A
Slot
Isc3Ø=31.5 kA
2500 A
TD-BS
s s s s s s 13.8 kV
TD-1 TP'S s In 2500 A In 2500 A s TD-2 s In 2500 A In 2500 A s TP'S TD-3 s In 2000 A TP'S s In 2000 A TD-A s In 3150 A TD-B s In 3150 A
TP'S TP'S
FUT-TG-3 FUT-TG-4
In 1250 A In 1250 A In 1250 A In 1250 A In 1250 A s In 1250 A s In 1250 A
TD-BS
Isc3Ø=31.5 kA
2500 A
T-SP1 T-SP2 34.5 kV
In 1250 A 34.5/0.480 kV 13.8/0.48 kV
TR-N
1 MVA 1 MVA
TR-N
TD-BA TD-BB
Challenges
• The use of IEDs devices under IEC 61850 standard should allow
more critical application, requiring time responding in
deterministic real time less than 50 ms.
• Before a power failure event must be isolated before their effect
cause serious deterioration to the electrical system and
consequently the production process of oil refinery.
• We need algorithms to decide the flow energy on the electrical
system in contingency.
IEC-61850 / Station bus / Bay Bus / Process Bus
• In refineries, is feasible to implement the station bus, bay bus (IED’s) and
Process Bus with merging units actually (Conventional Primary Equipment
with interface IEC 61850).
• A restriction to implement this project is: The integrator must have many
experience on power system and automation with IEC 61850 and
Generation system and legacy system.
• The station bus refers to monitoring and taking decision with information
system in real time.
• The process bus refers to integrate the primary electrical equipment with
automation system
Architecture of IEC 61850 Electric Power Refinery System
switch
Level 0 – Process
Intelligent Switchyard MU Brkr IED Brkr IED MU
Sensors, I/Os
Brkr IED MU
COMMUNICATIONS
• The communication for any each IED which integrate the protection, metering and
control network on system must be connected ensuring selfhealing and any failure
must not affect the functionality.
Lima, Perú