You are on page 1of 14
VIETSOVPETRO RESEARCH AND ENGINEERING INSTITUTE VIETSOVPETRO FOR OIL AND GAS = PROJECT NAME, SUB- PROJECT NAME = EXTENSION OF GAS COMPRESSION CAPACITY AT BLOCK 09-1 INSTALL TRAIN A ON MKS FOR ALL SUB-PROJECTS DOCUMENT TITLE. : SPECIFICATION FOR SPECIALTY ITEMS. DOCUMENT No. + MKS-112-TS-TP1-SP-03 PHASE © DETAILED DESIGN CONTROLLED I 4 | (lite | JL | Az | tah | pl ev.) vescrerion | oare | preparen | cxecKen | CHEF |, ENG. | PRO. “CAPACITY AT BLOCK 004 oe No | MKS-12-78-7P.5°-09 J ‘TABLE OF CONTENTS 4.0 GENERAL 4 12 Defnion of Tens 4 1.3 Abbreviations 5 20 APPLICABLE CODES, STANDARDS AND REGULATIONS, 5 24 Complance wih Specfeaton 6 22 Regulations 5 23° Quality Assurance 5 24 Confiets and Onder of Precedence 6 25 Reference Project Documents 6 28 Codes and Stands 6 27 Health, Seley and Envionmertl Regulstons 7 28 Unite Language 7 29° SteCondtons 7 30 SCOPE 8 3.1 Scope of work 8 32 Scope supply e 4.0 DESIGN AND MANUFACTURING REQUIREMENTS ° 41 Design Lite ° 42. Design Requirements ° 43° Manutactuing Requtorrens 0 44 Surlace Preparation ae Painting 0 50 MATERIALS REQUIREMENTS 10 51 Material Requrerents 0 52 carton See! 0 53 Austaniic Stainless Steal " 54 — Mota Certficates " 6.0 INSPECTION AND TESTING REQUIREMENTS 2 81 Testing 2 62 _Inspecton and Test Pan (TP) Requirements 2 7.0 DOCUMENTATION 2 EXTENSIONOF GASCOWPRESSION Toc no | uKS-112TS-TF¥S°-05 Documents Required Wi Bs 2 Document Review and Approval 2 PACKING AND SHIPPING 2 9.0 SPARE PARTS AND SPECIAL TOOLS 13 40.0 WARRANTY AND PERFORMANCE GUARANTEE. 13 44.0 APPENDIX “ Vendor Document Requirement List EXTENSION OF GAS COMPRESSION | poco] MKS 1278-704 so] INSTALL THANWA ON MIS wane 3 A rare | seconcanonrorsecouttyires [page [aw te 10 GENERAL 441 Introduction “The gas compcession platerm MKS was bul in 1996, Is looted net the ol prosucbon platform [MP4 at White Tiger Oi Feld of tie Block 08-1, approximately 148 kn South-East of Ving Tau Cty, ‘fshore ofthe Soialit Republe of Vnam, The MKS and MGPA plats are canected via Inking bridge, Thore aro 04 high pressure ges compression modules (84100, S200, BMS00, BIO} ‘operating on the MKS plore wth 318 MSCIMD each In oder to Ineease gas compression capacity at Hock O21 Vetsopeto is developing the projet “tension of gas compression capacty at Heck O01, Insal Tain A on MKS". Projet seope of work inches Instalaton a new nigh pressure gas compression rosie Tran A wit capacty 1.7 MMSCMD onthe MKS piatorm; = Mesication of suture, process nd uty systems on the MKS and MSPS platforms to ‘supper instalation and operation of the Tain A. Before intaaton of Tran A onthe MKS platform, ta existing gas compression modules (@R200 ‘snd BiH) shal bereaved. Romoving of tose two exising gas compression medkles sna in scope fhe project "Extension of gas compression capacity at block 0-1 Intl Train Aon MS" Petre 1 ~ Lacallon of MKS pao st White Tiger Ot Fete 4.2 Definition of Terms ‘The folowing ters a8 used inthis epecteaton,aesuns SION OF GAG COMPRES oe.No | NKS-HZ-TS-TPL-SP9 INSTALL TRAN AON MS saw company VIETSOVPETRO JOINT VENTURE, as the grolsct developer end ultimate onne ofthe cy, VENDOR The company on which the order or the contact fr supply of te goeds onsen places 1.3 Abbreviations ‘The following sbtreviatons are usa nthe document asi American National Standards Inte a ‘American Petroleum itis ASME ‘American Society of Mechanical Engineers ast ‘American Socey of Testing and Matera bn Nominal Dameter FAT Factory Acceptance Test Hazor Hazard and Operabany Review He High Pressuw om Insalaten and Operation Manval aor Maxirur Alowabe Operating Pressure eR Matera! Purchase Requisition NACE atonal Aesocistion of Certeson Engineers oD. Outside Diameter Pao Piping and instrument Diagn Po Purchase Order st ‘Sytem Itematons! urs Speci Minimum Tense Strength suv Spectiec Minimum Yield Strength SPR Spare Parts Interchangoailly Records 2.0 APPLICABLE CODES, STANDARDS AND REGULATIONS 24 Compliance with Specification Data Shoes, ferences and relat documents included inthe MPR ar an integral par of hie fluent and as such shal be used conpnction wth the Speciation 22 Regulations Al caipmant shall comply withthe relovan Vietnamese and international recommendations. The VENDOR shail determne whet equipment requves pe approval by the loca Vineness {Author and sll prove type approved equipment where necessary. 29 Quality Assurance ‘The design, terial, and workmanship employed hceughout the cours of the project sal be ot high lly and based on the princes of 180 9001 o equivalent staneaes. The VENDOR is EXTENSION OF GAS COMPRESSION | osc o | axeaiaTeaPr-sras SAE | srecmcariowrorspecusryirens [page oor 24 25 required to operate on ISO 8001 or equivalent qualty assurance systom, which shall be ‘Subjects fo eontriuous mentoring bythe COMPANY, Confets and Order of Precedence In case of conf, the roguatons, codes, standards ang other documents referenced shal be pple in he fetouing pny arse Vielamese Goverment Lagi Project Speccafons, Datasheet Inausty Standards VENDOR Codes and Working Standards In ease of conic or dstrepancies between any requirements ofthe above codes and standards and thes technical specticaons, the more stingent shal apply ‘Al equipment supplied shall meet te conact-speces requtements andthe manufactures pubis epecfeatons. In ine event of cone. the more stngent shal govetn unless mull Safeedotheruse,by ine COMPANY ang the VENDOR. Reference Project Documents ‘The folowing project documents ae related to is speifcaton MKS-112-75-1P1-5P-01 Piping Mater Cass Specfeston Mis-112-78-1P1-9°-02 ‘Specteaton for Morus! Valves MKS-112.GEN-AZ7-SP-01 Technica! Speciation fe Painting MKS-112-GEN-AZT-SCH-OF Basic Pain Schedules ‘Codes and Standards “The latest edtons, as ofthe ens oF purchase order date, ofthe follwing code, standards, ‘spectiions and reguatons (as far as they are aopeabe) sre consdored part of ths ‘Specifeaton and are to be used by tte VENDOR i ther designs. Whore In-House’ VENDOR. ‘Standards have been developed or are based on recagrizes Natona Internationa o Indust Standard, those may be afered co an allsnatne, eject Yo review and approval by the COUPANY. ASHE B16 Pipe Flanges and Flanged Fitings (NPS % though NPS 24) ASHE B91 Process Ping ASHE ESE Gas Transmission and Distbuton Piping Systens ASHE E1624 Valves, Flanged Treadod and Welding End ASMEBPVC Section V Non Destuetve Testing [ASME BPVC Section IK Welding and Brazing Qualification asTu ‘American Society for Testing and Matra SEN 12674 Fame Arete. Porfomance requrements, est methods and EXTENSION OF GAS COMPRESSION Joo no | mes-uzrervarae ‘ral Yon AO a 5 Ribrene GaN | secowmcariowroRsPecatTy MENS | page ro 180 18802008, Fame Aeir,Pertmancequrents tes mets and nts foros en so 17252 Metal at Valves for Peleur, Petoctorical and led pavates s0180 ‘Specaon or Ppt Vales oy Vite nsec and esting aeiRe 621 aie for ress Reevig and depressing syste nore 178 Rocemvené Pace or Flee Pe norspee 173 ‘Speco or unbonded fee pps Pt spec 17 ‘Specfaton ox toned exible pipe ASME Sect Vi oer and resi Vase! Code Aws00200 Corner Kem Desoson a7 29 saa aaa ‘Couptng Hates, QuickDisconnec,Cam-Locking Type General Speciation fr. mLc-2rse7 tary Speiteation Coupling Halves, Quick-Disconnect, Camockng Type cr “Tne VENDOR shal be responsible for ensuring tal the goods and services supplied meet a sppleabo national and intrnatonalcodesreguatens onthe hea, eel and environmental requrements Unit & Languag ‘Alluns stl be expressed in Si (or ease ofthe users) unless chorea note, th, Safety and Environmental Regulations Alu pressure given inthis standard are gauge pressure, unless ofvervie stated. ‘The VENDOR shal submit all dcimentation an correspondence in the Engish anguage. Temperate Externe High Temperature | 4000090 treme Low Temperture ‘80Deg0 ‘Average Annual Temperature | 2710096 Maximum: 40 009 6 inimum 18 095.6 [Seawater Tempers 2412634506 Design Ambien Temperature Relative Humisty EXTENSION OF GAS COMPRESSION Toc no | wguizerresnan Rev No ° ‘Average Relatve Homily [985% ~ 100%, Design Reatve Humiaiy [6510 99% 1 Sols Raciaton| ‘TA. calor (verage oun por nen) 3:14 Wind Spees Main {6 ms ( se gust (Nont-Eas) Design Wind Speed 48.5 is (Nort) 30 SCOPE 34 Seope of work ‘hie epeceaton wn te appendices define the tunctonel requirements fer supply of Special Ping (SP) tome used for easton and operat forthe projets. ‘The VENDOR shal sunt tecneal deals ofthe SP lems, which meets al of most of he requrementsdetaled heron. Aspects of he requirement, which cant ba mot, shal be ented Sed varances expiaines ‘The SP tems shall be designed, manufactured and tested In accordance with the recuements a the enquiy document, aking due aocourt of te proservaton and vanspor requirement 32 Scope of supply ‘VENDOR shall be response for the supply of Special Pping lems (SP ems) a5 tsa in “APPENDIX A for ealition and person forthe project The VENDORS scope of sup for each tem shall indude but not be Ime to the folowing Design, manufacture end supply of SP tems 9 pristine. Inspection and tasting, ‘Al special tosis required fr operaton, removal, maininance and instalaton purposes. A Complete Isto be sued wth he bi Commissioning, pr-comissioning and itil operaton (tar) spares, 2 years operaton Spares list of recommends operating (insurance) spare. SPR Forme shal be somplted sna submits wih te Bi, [Ate dentitid cetcaesincusing but not its to mates an desig verfeaton ‘Completed inspection, QA and tetng requirements 2s defined inthe speciation along wit at supporting documentation, = Process and mochavical performance guarantee for each em tod + Surface preparation and pant. ees | srecircaniow oR sPEciLTY TEMS [Page oan 40 a4 42 + Packing, preseriston and suitable preparation ofthe packages fr anspor + _Prouslon for tansportation from te fabrcaoniessembly locaton tothe point of deve = Document in accordance wih the VENDOR Data Requirement Ist. ‘any oer services at may be agred at ime of erer placement VENDOR may quote atlemate arangereots and specication they are equal oor exceed the generat requremonis of hs speceaon, These alemates shal be clearly hghighted in VENDOR'S ld or COMPANY evauston and aprova VENDOR hall submit fl ectnicalcetls of his SP tem design which meets te requenents deta herein. Aspects of fe requrerens ich connate tet shell be Wentied and tbe \avianes explained Inthe cate, VENOOR suply hose connection and Nleible hove by diferent manufactures, VENDOR shal be responsible for ensuring that the goods are stabi ‘th together By Iter conminment. Completed lnspecien, ONGC. and tesing requlrements 2 delned In the ‘Speaeaten along wth sl supporting documenta, ‘The SP lems stall be designed, manulacured, tested. and supplied in acordance with he ragurements in the enguly document, king! due. atccunt of presevator and anspor ‘eaulement DESIGN AND MANUFACTURING REQUIREMENTS The VENDOR shall provide al rlevatinfrmaton in relton to the cesign Ite end overall tetas The iformton ene be baved on previous experience with proven desis, wich favo operated in hoi for saveral years “The design if of equprnent shal be 25 years. Design Requirements [ASP lems referenced in his specfcaton shal be design tis governing codes and standards ‘3s Indeated in secbon 20. ro specie design standards indicates in he relevart dala shoes, ‘loca SP tom shal then be decighed and manufactured fe manufacture proven pracboes and Standard qudeines, “These SP its shal be of proven desig ha have operate in the ld of elma envtonmerta onions for sovral yeas wih only panned outages for maintarancelrelacement of normal ‘wearing ype of components “The VENDOR shall be sponsible fr ensuring that al components ncusing those that have not eon manufectured by them meet tis Spodieaion and ae compute wih each oer ard the process medum nal espacs, ‘All mater shal te conformed to ASME, ASTM, AP OS standards and the flevant data ‘heats. Design and ‘sbricston shal be conorme to ASME BaT-3"Procese Piping” and APL RP “ME “Recommended Practoe lor Desigh and Irstalaten of Ofshere Prosucon Pao Ping Systeme". Only latest eons of sandards menfoned herein shal be used uness noted heres INSTALLTRAIN AON WKS =r 7 A eerie | srecoricanow ror SPELT TENS [Page tow 1 43 44 50 64 82 [All mataale and thelr dimensions, tlrances, chemical composton, physical prarios, het {teatment nyrotest and other testing and markings shal be corform tos codes and standards ‘spociodin be regulon. Deviatons), fay, shal be clearly highightod ith ef, Manufacturing Requirements ‘The VENDOR shal submit an Inspecton and Tes Pian (ITP) or approval rir to manufac ‘The VENDOR shal also submit inspacton and Test Procedure, schedule and recording forms for aperval The approval shall be obtained prior te commencement of nspectons and ests ‘Surface Proparation and Palnting ‘Surface preparation and painting of al extomal carbon stool srtaces shall bein accordance with Project Speciation in sacton 25, VENDOR rraypropots hs pang and coating system ft is proven tht can sufably protect the supped fame agains! the slferous mare enorment However, tisis subject1o COMPANY aprova, Painting damaged curing transit and construction shal be prepared by the VENDOR, The ‘VENDOR shal provide sffelent quantity of coating wit the appropiate clr for hs purpose. MATERIALS REQUIREMENTS atrial Requirements Al materials nal be new and isersabe against thelr cetfcaton {Al components shall be cutbl or nstalatin in a salferus topical marine environment and or ‘desig feo 25 years, ‘Al matte shal be in ovordance with the celevent ASTM stander or equivalent approves by ‘he COMPANY. Packing materials containing asbestos shal nat be use, Bar stock atrial shall not be used forthe fabeation of vale, including modula valves, [Al carton sel and aloy materials under insulation shall be painted in accrdance wih the ‘wolct specication, Carbon Steet atari for SP toms sal be as pr atached dala shoes. Whar interface is raqured benwean pais ofthe SP lems and COMPANY's piping these parts shal be of simiar materials as the tng piping. These sha! apply to al types of jon but-wed, Ranged. ect Inthe event tht fissimiar matrle metace Gok! not be avoded Yor fange typ Jats, VENDOR shal supply Inslation Sets togeer wh the relevant Specal Piping tems to prevent galvane coreson, Insulation ete cha const of he olowinge Gasket (Raises faced, Ring Jit, ec, depending on mating ange) scan Steve thats Tube' type Gasket eainer Sealing = nesting wash see 53 54 -NGION OF GAS COMPRESSION Tope no] MKS-t12.TSTPH-CP.98 INSTALLTRANA ON MS Taney a 7 specricanio ror sPecaLryiTeMs [Page to = Lesking washer Inthe event that materi that are nominated inthe specication or reference documents could ot be met the VENDOR may afer alates. Alternatives shal be sear ndeated ithe i, Song wth any cost adjustments and technical dia supporting the. ater, Atematve ‘materte chal be subject to COMPANY’s approval ‘The carbon Equivalent for carton sel intended for welding shal net exceed 1.43% based on the formu Mi , (Cr+ Mo+¥) , (W1+Cu) ce=c+: i+) 5 5 ‘The carbon content ofthe plate mstorial shal not excsed 0.23%; the carbon contnt ofthe forgings shall not exceed 0.25%, lasiomoric materia for rng seas shall resist explosive decompression and shal be suitable for exposure ana temperature The seal shall be abe fo wihstané witout leakage an eral ‘ecuum of0 028 pl 2 mb) Austenitic Staniess Stoo! The used of austentc sanzss steel Hed to a maximum temperature of 60°C ove Yo Chleide Stess Corson Cracking tendency. Extemal panting is requred if temperature ‘xoeeds the maximum requrement, Al atone taness ste shal be grade 316/62 [Al austen staniess stool stall be supped in 2 salsion annealed condition, No welding or ‘working ofthe atonal i permed afer fis reatment [All welds mace to stainless steel components shal te ficled and passivated. Radiography or ‘Stematve NDT shal be conducted o ensure aon tatr of 1.0 Al tread joins shal be est wit a suitable ent-galing compoune, ‘ny hycrostat testing of austenitic tinissstel sal be conductea wih fesh water contanng les then 30,949 (30 ppm by mass) chores in accordance wit» API Spec 6D, ard any open nds sealed att dying to ensure no moisture ngress. ‘98316 and $S516L materal shall have minimum 2.59% Mo to improve the materars clode ses crfsin cracking (CSCC) ana pling resistance ‘4 intcgranlarcorosion tt to ASTM A252 Praches E and Micro testa at 400K 0 ensure no (fan boundary cafbides or precpstes shall be conducted on each heat or lot of austntic ‘Sainiess steal, inluding weld metal ana Heat Acted Zone (Haz) where apples. Postve Materia identeaon (Pk) shal be cae out for al austni tiles tel materials atrial Corticates “The manulactrer shall provide carifcaton to very thatthe mater of constucton meet the requrement of te tea specications, Material test cerifcses including physical properties, chemical composition, heat treatment and Impact et report shat also be fished forte matoals supped. Matera! test ceca cha boas por EN 10204 Type 2.1 or equivalent. EXTERSIONOE GAS COMPRESSION [bon no | _wS¥T2TETPLSAOD INSTALL TRAN AGN KS mee TASES | srcoimcamonrorsrecaury nes [Page eat 60 INSPECTION AND TESTING REQUIREMENTS 64 Testing 1 SPs salon ase © ae racy tn and ks cles he epatie ‘i oss ale for by tis speceaton shall be made Inthe Manufacturers plant or at an {pproved subconract’s plant porto shipment and tthe Manufactures expos 1.2 Inspection and Test Plan (IT) Requirements Upon arin of contacto VENDOR by ner a Pctare Ore Nb: Later of _Eeaptance bythe COMPANY, n acordance wis he VENDOR Documentation Reaureare 79° DOCUMENTATION TA Documents Required With Bis “Thefotowing document shal bo nes wih he Bs = Completed datasheets = Drainglsocument (Sesincalelaons cetales drawings ct) Techni Spcteation~ nara desrpton of he exupment fred = Quay Pan + Manutzcting,Testng and Delvery Seredste Comment Devitions/ Exceptions Recommended eperaing nd commissioning spars = Listot Reternoes ‘erative proposals ay) 7.2. Document Review and Approval ‘The VENOOR shal auply ote COMPANY a decunetaton ncldng stati apervas and Tegitabons necessary to vty at fe opment supped Fas Boon moncocured. snd {Sireted in ssordnce wt hi spoxenon and fe cada and rgJatone orported Ne by reference. VENDOR shal suply atleast those documents sted the VENDOR Data Reauieronts st per APPENDIX Review of the ocumenaton bythe COMPANY doesnot eee the VENDOR of resporibity for enving complance of he upment wih te Necessary code and gusta 8.0 PACKING AND SHIPPING tome with multiple components shall be installed to te manimum ertert possible por to shigment eres Pat consist of various smal pats shall be disantes, packed end ship lose 1S port of delivery. These parts shall be tagged for easo of Wentfcaton. Each tm shall be carfuly packed in export quay packing and secured for anspor in such a manner hat ts pretectod fom al dust, climate canons, vbraer, movement and shock which hay occur dung osding, Vencporulcadng. The VENDOR is only permited to ship equipment and materials to ste upon success ompition snd acceptance of te FAT. Shipping sal nue, at ast, te fotwng + Packing an rating fr international shipment = insurance to te, {Custos and ence fomaies and duty charges at both source and destin pos. + Transportation fom enty fort to se win Vietnam, = Temporary in-ounty storage, roqied + Bepedting delivery ste ‘SPARE PARTS AND SPECIAL TOOLS VENDOR shall provide recormended til commnisionng and startup ps wo (2) years of ‘operation spare pars Et wih tomized pices submited togaer wi is quotation Recommends pares shal ake into aocount elated factor of ping ms reiabity and cots rar, \VENDOR shal his quotation, clude a tof recommend spacial tools wih tami poe ‘sppleabl,requted forthe mainimance of the equipment ‘Al spare par and Special Tools fumishes by VENDOR shal be wrapped and paced preserve ems as new condton under normal sorage, Tre same pats shall be prope tagged oy ‘ismise sel tage and coded eo that ilar entcston ae to ther iterced aage wil be ‘aoltates All tems supple shallbe packages separatey and Geary marked ae” Spare Toot" ‘2 sipped wth equipment in aosorcance wih neon om COMPANY. Packing st eh be ftrshad compote andi tal so that parts can be handed without uncratn, i dsted WARRANTY AND PERFORMANCE GUARANTEE VENDOR shail provide a process and mechanic! gueantes. Gusranse period shall be 2s Stal in the commercial documentaton scoompanirg tbe requston. Compliance by the ‘VENDOR wih te provision of this epecteaton doesnot follows thom of he responsi of furnshing equipment whim the bounde of he relevant standards, suted to mest ie epecfad Serice conatlons. "The VENDOR shall guafatee that the requed quay of mater, {aotcaton and perfomance tthe spoctid operating coraltons willbe mot Unies otherwise agreed, al SP ters shale guararieed as tows [ASP lems ena perform easactory under te spectiog operating conditions dead onthe ata shots, nd shall be ifr he tances purpote. [Al workmanship shel te guaranteed tree of detecis and in accordance with the best Indust standards and practies, ‘The VENDOR shall guarantee all $P items to be in fall complance wit the speciteabon, locusing al attachments anisted specication, codes and standards CRT aon use ag) See" eres | srcaincaniowrorseeciary ens | age rae ‘The VENDOR shal guerantes the mechanical and etuctul Integy, workmanship and Se ‘matale of construction used. 41.0 APPENDIX ‘VENDOR DOCUMENT REQUIREMENT LIST No. eseription “| Bata sheets: Comic daashosts os defined inthe funcional specication 2 | Prectes design calovaton, Mechanical Design Caleuatons (Caution shee). VENDOR have to responsi ‘or suply al caleulstion sheet correspond To each fl which salle ofe/ supplied by VENDOR. J GA Drawing inaudng cutine drnensioe, size ard ype of companions, weight ard COG, pat et il of moteralelmaterl of consicton, design data ot 4 _| Cross section drawings & pats ist shop deals / assembly ‘5 __| Preservation, packing and shipping 6 _| Spare Paris and itrchangeabity 7_|epecton snd Test len 8 | Gualty Fan 2 | Paining Procedure 0 _| Testing prosedure (but no lied T04_| NOES Test Procedures 102 | Weng and welding repair procedure 1033 | Funconal Test Procedure 704 _| Performance test procedure 11 _ | Records, reports and carats (ut no ited 1:1 _[ Cleaningtushng record "112_| Cenioste of compliance 13_| Rysostate test record “ria _| Prev test record “HS _| Fanatonal test report “118 _| Perorance test report “117 _| Eaulpment hazardous area cericatee “118 _| Perormanee guaranise 719 | Welder quafcaton records

You might also like