KEY INFORMATION
Supplier Name: Assessment Date: Assessor:
Supplier Address: Supplier Telephone:
Supplier Contact & Title: Supplier Web Site:
Supplier email: Type: Full Service: Build to Print:
Primary Commodity: Blueprint: Not Provided: Provided:
Supported Program: Part/s being considered:
Liability Insurance Certificate Y __ N __ Copy Received ___ No new business awarded by Linamar without liability insurance
SUPPLIER BACKGROUND
Assessment Item Guidelines - At a minimum use the following to evaluate each
Score
Points
Item #
assessment item
Linamar Supplier Quality Manual: Has the supplier downloaded a copy from Linamar.com? Supplier can
1 3.0 demonstrate download & accepts Linamar QM as written - 3, Printed copy - 2,
Not printed or downloaded but able to find it - 1, None of the above - 0.
2 Major Customers/Processes Used: Primary Customer Base Commercial -0, Automotive & Commercial -1, Extensive
Automotive -2, OEMs -3
List Major Customers, how long have they supplied to their majors? List
significant Manufacturing Processes.
List Sub-Contracted Processes (i.e. Heat Treat, Plating, Painting, Deburr, etc.).
Has the supplier reviewed CQI audits from Sub-Contractors? - 1
Manufacturing Strategies Offered - Continuous Production (Dedicated Tools &
4.0 Equipment, Fixed Assets)
Large Batch Production (Dedicated Tools, Dedicated Equipment None/Little, Not
Program Specific)
Small Batch (Tools & Equipment both Dedicated and Non-Dedicated)
Service Parts
What are the most recent major customer performance ratings? Any examples
8.0 of customer recognition for performance? If a current Linamar supplier list
recent scorecard ratings, if not green. Is there any current customer
performance or warranty data available for review? - 2
550931165.xls Page 1
LINAMAR POTENTIAL SUPPLIER ASSESSMENT
PPAP/Automotive Industry Familiarity/Process Has the supplier done PPAPs/Safe Launch/Run @ Rates for OEMs, or other
4 Control automotive customers? Are PPAP samples retained? - 2
When the supplier develops control plans for new products do they use a cross-
functional team? Who is responsible to drive the process and validate that it
works? Are operator training records maintained and posted at work stations.
Is Error Proofing included from the beginning of all new projects? - 2
Do they have access to all the latest industry reference documents from AIAG
and VDA etc. If exposed to OEMs are they connected through the OEM supplier
portals? - 1
Does the supplier's quality plan contain all the required elements? Including, a
Control Plan that specifically references high risk items from the PFMEA, a
Measurement System strategy that describes the type, frequency, number,
13.0 gauge and pass fail criteria for all KPCs, PTCs and QSIs identified on the part or
process? Is the supplier in compliance with their own plan? - 2
Does the supplier have capability data to back up their strategy to control high
risk elements. Does this include Measurement System Analysis data that
supports their selection of gauging, frequency and number of checks and verifies
proper operator gauge usage. - 2
How does the supplier's quality plan deal with Pass Through Characteristics
(PTCs)? Are they recognized? Listed in the control plan and PFMEA? - 2
Does the supplier conduct annual layouts of material shipped to Linamar. - 1
5 Contract Feasibility Review: Is there a process in place to conduct a cross-functional feasibility review to
confirm the ability of the supplier to conform with all print specifications and
2.0 program requirements including timing and capacity. Signed off by functional
leaders? - 2
6 Organizational Structure/Size: Total manufacturing space, break out by area, Production, Maintenance, Office,
Storage, Shipping Dock, Tool Room, Receiving, etc.
Describe operating plan, days/week, days/year, shifts/day, hours/shift, numbers
of employees by shift including management.
Does supplier have a clearly defined quality system? Is it in writing? Is this
system supported by management? (sign off), Is it comprehensive enough to
6.0 support automotive operations? - 2
Are all management positions filled? Are responsible personnel defined for
APQP teams? Organizational & RASIC Charts - 2
Has a system for self-assessment been established by the supplier? (internal
audit) Are recent internal audits available for review? Are they supported by
action plans? - 2
7 Delivery Performance: How does the supplier track premium freight incidents? What is their historical
on time delivery percentage? - 2
How is the plant scheduled? Who is responsible? How much inventory is
maintained? Who receives and acknowledges customer releases? - 1
5.0 Who is responsible for resolving delivery problems? Are delivery records
maintained? Have there been any recent delays or shortages? Explain? - 1
Is maintenance coordinated with materials management to assure that
customers are not disrupted? Clearly communicate Linamar's requirements
regarding RMAs and late shipments. - 1
8 Financial Stability: Is the supplier publically traded or privately held? What are the annual sales? Is
the company a parent or subsidiary? How many years in business in total, how
many in the present location? Other locations? Where is executive
management located? Annual sales? Is sufficient working capital available to
2.0 support the new programs? Is there adequate cash flow? - 1
Has the supplier completed the Linamar Financial Assessment, and has it been
sent to purchasing? - 1
550931165.xls Page 2
LINAMAR POTENTIAL SUPPLIER ASSESSMENT
QUALITY REQUIREMENTS
9 IATF-16949 certified: If YES for IATF-16949, review most recent third party audit. If NO, establish
or ISO 9001 certified: intentions of supplier to become certified to IATF 16949 or ISO 9001, have
ISO 14001 certified: supplier provide a timeline for certification. ISO 9000/IATF-16949 (depending on
Certificate # - audit results) 1
Plan to reach ISO 9001/IATF-16949: (Must have documentation showing
2.0 contract with registrar in place), 1
No Intention or Plan - (0).
Is supplier certified ISO 14001 compliant Y/N (0 if no)
Who maintains tooling, the supplier or a third party? What is outsourced vs. in-
6.0 house? Are tools properly maintained, stored and identified? This includes post
production reports, part/shot counts by tool & refurb/replacement schedules - 2
Is the supplier familiar with the Linamar Tool Audit Procedure (XR-29-C03-01-
01)? Are obsolete and service tools properly labeled? -2
Gauge Control /Strategy: Is the measurement strategy appropriate for the component being produced
11 including EOL, variable, go/no-go, templates, and boundary samples? - 2
Are operators trained in the proper use and application of gauges for features
they control? - 2
Are gauge studies available for review ? Is calibration traceable to recognized
standards ? - 1
Quality Resources (Equipment & Personnel): List the key quality personnel resident at the facility. Is there adequate quality
12 support for all shifts and weekend or holiday operations. Have all operators
received adequate training (Training Progress Chart) - 2
What are the monthly PPM values over the last 12 months. - 1
Material Identification/Inspection Routings: Is all material on the shop floor identified? Is it traceable?, to what level?, how
14 long are traceability records maintained? Is it properly stored to prevent
damage from handling, traffic, and weather? - 2
550931165.xls Page 3
LINAMAR POTENTIAL SUPPLIER ASSESSMENT
15 Internal/External Corrective Action Procedures: How is initial containment established? Who is responsible? Who is responsible
to inform the customer, when is the customer informed? - 2
Who is responsible for problem solving? Once containment has been
established, what is the process utilized to determine Root Cause and Corrective
Actions? - 2
16 New Product Launch: Who reviews feasibility of new potential product launches? Are all KPCs, PTCs
and CSIs identified and linked to the process control plan? - 2
Who is responsible to Track/Drive new product launches? Who oversees the
team? Is there a formal process and tracking method? Show example. - 2
8.0 Who monitors Supplier Program/Timing/Issues materials, Re-arrangement
equipment and especially tooling? - 2
Who from the manufacturing location is responsible for customer
awareness/notification of any program developments including timing, quality,
cost, etc.? - 2
Engineering Change Procedures: Who manages Engineering Changes? Does the supplier have a system for
17 tracking engineering changes? Who approves changes (same team that
approved the original design)? - 2
Control of Supply Base: Who is responsible for purchased parts and raw material? Is traceability
18 required for incoming materials? Who is accountable for Supplier Quality? - 2
Does the supplier sub-contract manufacturing processes? (Heat treat, plating,
5.0 painting, etc.). Who is responsible to oversee sub-contractors? - 1
Does the supplier have an approved sub-contractor list? - 1
ENGINEERING CAPABILITIES
To be completed for "Full Service" Suppliers only
19 Design Capabilities: Number of dedicated Design Engineers? Employees or Contractors? - 2
What design software is utilized? List names and versions. How many seats? - 2
Supplier to list and describe previous successful designs and current design
customers. - 2
10.0 .
Does the supplier conduct Research and Development? Describe resources
devoted to R & D. Describe control and extent of Intellectual Property. - 2
Does the supplier have any Strategic Partnerships in place, either in the form of
alliances or investment, for the purpose of Research and Development of
process or products - 2
550931165.xls Page 4
LINAMAR POTENTIAL SUPPLIER ASSESSMENT
20 Engineering Staff and Services: Supplier to list number of engineers on staff, broken down by services provided
(product engineering, test and validation, reliability, warranty, etc.), location,
employment status (employee or contractor). - 4
10.0
Supplier to describe program launch support strategy. Including dedicated
resources and facilities. - 3
Supplier to provide Engineering Organizational Chart with RASIC. - 3
21 Facilities: What laboratory facilities does the supplier have? Where are they located? Are
they accredited? (When and by Who?). - 3
Describe testing facilities, can supplier conduct validation testing, test to failure,
10.0 climatic tests, static tests. All season and environmental. Vehicle level? System
level? Component level? - 4
SCORING SUMMARY
Supplier Manufacturing Capability Total 100 Possible Points
Acceptable 80-100% 0 Points Scored Corrective Action Required: Y / N *
Needs Development 65-79% 0% Rating% Due Date:
Unacceptable 0-64% Status Re-audit Required: Y / N
Re-audit Date:
Supplier Engineering Capability Ra Total 30 Possible Points
Acceptable 80-100% 0 Points Scored
Needs Development 65-79% 0% Rating% *Corrective Action Required for all Scores 64-79%, or any
Unacceptable 0-64% Status individual element with a score less than 60%
550931165.xls Page 5
Contact Information
Date: Survey Conducted By:
Supplier Name: Address:
Tel/Fax Number: Country:
Contacts: Supplier Web Site:
Plant Manager/Director: Tel#/Email:
Quality Manager: Tel#/Email:
Engineering Manager: Tel#/Email:
Facility Information
Total Employees:
Management________ Technical________
Production_______
Machining________Maintenance_______ Die Shop________
Powder Equipment
How is blending controlled?
What type of compacting equipment is utilized (hydraulic or
mechanical) floating or non-floating bed - tonnage
Sintering Furnace type Continuous / batch
What is max density you can produce?
Powder Types
List powder types used:
Heat Treatment
In House heat treatment? yes / no
CQI9 updated in last 12 months? yes / no
Process Control
how is metal mix received / controlled?
how is density measured throughout the part?
does supplier conduct first off inspections?
how is tonnage controlled at compaction?
how is density controlled at compaction?
If using hot forming process how many thermocouples are in
each die half?
Are the thermocouples tied to a closed loop system for temp
monitoring? (Poke-yoke)
Pattern Shop
Ability to design / make / repair tooling:
Yes_____No______
Notes:__________________
Secondary Operations
What secondary operations are available at supplier?
Notes: ____________
Product Development
Ability to design a part from engineering performance
requirements: Yes____No_____
Confidential Information - ©This document is copyright by Linamar Corporation and no person shall reproduce,
retransmit, copy or use, in whole or in part, this document without the express written permission of Linamar
Corporation.
Contact Information
Date: Survey Conducted By:
Supplier Name: Address:
Tel/Fax Number: Country:
Contacts: Supplier Web Site:
Plant Manager/Director: Tel#/Email:
Quality Manager: Tel#/Email:
Engineering Manager Tel#/Email:
Facility Information
Parent Company: Main Ownership:
Technical
Partner(s):________________________________________
________________________________________________ Forging Capacity/Utilization %______
________________________________________________ Forrging Capacity %______
________ Forging Capacity in out
years : Y1_______Y2______ Y3________ Y4________
Main products: Part Name/Production%_______________ Machining: Milling_________ Turning___________
Part Name/production%_________ Drilling_________ CNC____________
Part Name/production%_____________ Heat treatment_________
Broaching______________
Total Employees:________ Management______ Existing total Floor Space (ft2/m2)_______________
Technical_____ Production_______ Floor space in out years__________
Maintenance______ Tooling Shop_____ Forging
Shop______ HT_______
Customers ( List%) : Customers ( List%) :
Process Control
Use of specific plans, inspection and process parameters to Forging / HT control/ monitoring process
control every part: Yes_____No_____ a) Central monitoring system_____
Use of Standard Operating instructions for every b) At each individual cell_______
operation: Yes____No____ Manufacturer ________________
Use of Statistical Control (SPC) to control manufacturing
process: Yes_____No______
Additional Equipment
Product Development
Use of CAD software for tool design: Yes____ No____ Die Tooling designed internally: Yes_____No_____
Please list system_________________________ Use of If not by whom____________________________
CAD,CAM: Yes____No_____Please list Ability to develop a new part from engineering
systems:______________________________ performance requirements: Yes____No_____
Ability to create tooling from Math data files:
Yes___No______ Ability to transfer CAD data directly to
tooling machines: Yes____No_____
Quality Systems
Certification: ISO-9001_________Date___________ If Not, what is planned date(please
IATF-16949_____Date________CQI-9______ describe)______________________________________
Preventive/Predictive maintenance
Preventive maintenance for the main equipment ( DCM's Preventive maintenance is based on :
furnaces, trim presses, extractors,etc ) and tooling is a ) manufacturer recommendation
performed by : _______________ b) production
a ) Internal qualified resources_______ requirements _________________ c)
b ) outside contractors_________ scheduling______________
c ) both a and b ___________ d) Other_____________
What type of predictive maintenance is performed:
a) Thermography_________
b) Ultrasonic__________
c) Vibration analysis_________
Training
Forging / HT operator training:
In house_______ By ________________________
Frequency :______
Outside- specify :______________
Operating Plan
Hours per shift_____________ Shifts per day___________ Days per week____________ Days per Year__________
Confidential Information - ©This document is copyright by Linamar Corporation and no person shall reproduce,
retransmit, copy or use, in whole or in part, this document without the express written permission of Linamar
Corporation.
Contact Information
Date: Survey Conducted By:
Supplier Name: Address:
Tel/Fax Number: Country:
Contacts: Supplier Web Site:
Plant Manager/Director: Tel#/Email:
Quality Manager: Tel#/Email:
Plant Manager/Director Tel#/Email:
Facility Information
Parent Company: Primary Ownership:
Foundry Capacity/Utilization%______ Die Cast%______
Technical Partner: SPM%______ Lost Foam%______
Main products: Part Name/Production%_______________
Part Name/production%_________ Machining: Milling_________ Turning___________
Part Name/production%_____________ Drilling_________ CNC____________
Safety:
Recordable Rate_________________
Lost Work day Total Floor Space (ft2/m2)_______________
rate_______________
Customers ( List%) : Customers ( List%) :
Molding facility
Type: Vertical # Sand: Molds/hr Green sand:
Quantity, Manufacture, Size:_______X_______X________
Number of Vertical Lines:____________ # Molds/hr resin sand:
Mold Size:_______X_______X________
Size:_______________________________
Type Horizontal:
Quantity, Manufacture
Number of Horizontal Lines:___________
Mold
Size:________________________________
Core making facility
# of Cold Box: Capacity________Cores/hr_________ # of Shell Box: Capacity________Cores/hr_________
Manufacture _________ Manufacture _________
# Hot Box: # Pep Set Box:
Capacity_________Cores/hr_________ Capacity_________Cores/hr_________
Manufacturer_________ Manufacturer_________
Heat Treatment
Type of heat treat processes available: Ability to control temperature:
Annealing_______T4_______T5______T6________ +/-2 C_____+/-5 _____ +/- 10 C______+/-20 C______
Type of Furnace: Ability to control temperature of quench:
Batch_______Quantity_______ Size____________ +/-2 C_____+/-5 _____ +/- 10 C______+/-
Continuous:_______Quantity________Size____________ 20 C______
Type of temperature Control:
Run Chart __________Automatic__________
CQI-9 available and up to date: ________________
Process Control
Use of specific plans, inspection and process parameters If Yes: What Parameters: Iron Temperature_____
to control every part: Yes_____No_____ Chemistry_____ Mechanical Properties_____ Pouring
Use of Standard Operating instructions for every Time__________ Other Parameters_____
operation: Yes____No____ Green Sand Controls:
Use of Statistical Control (SPC) to control manufacturing Permeability___________ Compatibility__________
process: Yes_____No______ Methane Blue___________ LOI____________
Sieve analysis____________
Does the muller have a closed loop system for
compatibility:______________
Is shake out temp monitored:_______________
Hot pull capability:_____________
Non destructive testing Capability: Availability of fully programmable CMM for tooling and
Fluorescent particle_____X-ray____X-ray Multiple production: Yes_____No_______
Views_____ Real Time____ Eddy Current_________
Magna Flux______ Resonance Frequency__________
Ultrasonic Testing________
Pattern Shop
Ability to repair tooling, Die pins and bushings: Use of Electrical Discharge machining (EDM)
Yes_____No______ Yes____No_____
Ability to make own tooling including gating: Ability to Transfer tooling data from computers to
Yes_____No______ manufacturing machines: Yes_____No______
Additional Equipment
Degassing Manual or Automatic _______ Manual Type & Impregnation equipment___________ Shot
Number ______ Automatic degassing Blasting__________Shot peening_________
stations__________ Automatic unloading from Painting_________
Die________ Automatic trim presses________ Air-Decay Others________________________________________
leak testing_______ Borescoping_____________ _
Microstructure analysis__________________
Spectrometer________________
Auto grinding cells______________
Product Development
Use of Solidification software for tool design: Yes____ Gating System designed internally: Yes_____No_____ If
No____ Please list system_________________________ not by whom____________________________
Use of CAD,CAM: Yes____No_____Please list Ability to develop a new part from engineering
systems:______________________________ performance requirements: Yes____No_____What is
Ability to create tooling from Math data files: the most complex part your plant
Yes___No______ Ability to transfer Cad data directly to produces:__________________Material___________
tooling machines: Yes____No_____ Process____________#cavities/mold_______
Laser Scanning_______________ #Cores/cavity________
Printed Cores________________
FEA_________________________
Quality Systems
Certification: ISO-9001_________Date___________ If Not, what is planned date(please
ISO TS- describe)______________________________________
16949_____Date________,PSA________Date_____
Operating Plan
Hours per shift_____________ Shifts per day___________ Days per week____________ Days per Year__________
Confidential Information - ©This document is copyright by Linamar Corporation and no person shall reproduce,
retransmit, copy or use, in whole or in part, this document without the express written permission of Linamar
Corporation.
TECHNICAL MANUFACTURING SURVEY- PERMANENT MOLDING AND LOW PRESSURE DIE CASTING
Contact Information
Date: Survey Conducted By:
Supplier Name: Address:
Tel/Fax Number: Country:
Contacts: Supplier Web Site:
Plant Manager/Director: Tel#/Email:
Quality Manager: Tel#/Email:
Engineering Manager Tel#/Email:
Facility Information
Parent Company: Main Ownership:
Technical Foundry Capacity/Utilization %________
Partner(s):________________________________________ Low pressure %______ SPM %
________________________________________________ ________
________________________________________________ Foundry Capacity in out years : Y1_______Y2______
________ Y3________ Y4________ Casting capacity in out years:
Y1_________Y2_________Y3________Y4__________
Main products: Part Name/Production%_______________
Part Name/production%_________ Machining: Milling_________ Turning___________
Part Name/production%_____________ Drilling_________ CNC____________
Heat treatment_________
Total Employees:________ Management______ Existing total Floor Space (ft2/m2)_______________
Technical_____ Production_______ Floor space in out years__________
Maintenance______ Tooling Shop_____ Casting
Shop______ Core Shop____
Customers ( List%) : Customers ( List%) :
Delivery /transfer molten metal from foundry to holding Delivery molten metal from holding furnace to casting
furnace ________ machine
Manual__________Forklift _______ Manual__________
Monorail Automated ladle______
track_______________ Others ______ Launder_______ Others ______
Alloys Available
319_____333____354_____356_______357 _____ Other Inoculant/grain refiner used__________
_____/______/_____/____ Inoculation process___________
Molding facility
# Casting Machines: 3000Tons_____2500Tons______ # SPM : Automated Tables ( tilt pour )______
2000Tons______ 1800Tons______ 1600Tons______ # of stations per table _______
1000Tons_____800Tons______750Tons_______ Automated Single Station
500Tons______ Other______ machines ______ Manual Station
Manufacturer Machines________ # of machines
(s)________________________________ Low pressure die casting_____
___________________ Pouring process:
Tilting sleeve Yes_____ No____
By Gravity Yes_____ No____
Using filters :Yes______ No______
Tooling Shop
Ability to repair tooling : Tracking the tool life: Yes_____ No ____
a)Patterns: main repairs Yes _____No___ Cleaning the cooling waterline: Yes____ No____
Die pins Yes_____No___ Equipment use for cleaning the cooling lines
Bushings Yes____No ______ Others_______ Specify _______________________
Use of Electronic Discharge Machining Yes___
No___ Ability to transfer tooling data from computers
b)Core box Yes_______No____ to manufacturing machines: Yes_____ No_____
Ability to make own tooling Yes______
No_____ Pattern including gating Yes____ No
___ Core box Yes_____ No____
Sand cores
# of Cold Box machines______ Capacity ______ # of Shell Box machines_______Capacity_________
Manufacturer______________________ Manufacturer___________________
# of Hot Box machines _____
Capacity_______ Manufacturer ________________
Process Control
Use of specific plans, inspection and process parameters to Casting control/ monitoring process
control every part: Yes_____No_____ a) Central monitoring system_____
Use of Standard Operating instructions for every b) At each individual DCM_______
operation: Yes____No____ Manufacturer ________________
Use of Statistical Control (SPC) to control manufacturing c) Portable unit _______
process: Yes_____No______ Manufacturer______________
What Parameters: Aluminum Temperature_____ Die
Temperature______Die close pressure/Clamping
force_____ Shot pressure______ Shot velocity_____
Mechanical Properties _________Cycle time______
Chemistry______Specific Gravity_____ Sand cores
properties_____ Other _________
Additional Equipment
Oil heaters________ Jet cooling ___________ Automatic Impregnation equipment___________
unloading from Die________ Automatic trim Shot Blasting__________Shot peening_________
presses________ Air-Decay leak testing_______ Engraving Painting_________
equipment for Casting traceability______ Vacuum/Venturi Others________________________________________
aspiration system_______ _
Product Development
Use of Solidification software for tool design: Yes____ Gating System designed internally: Yes_____No_____
No____ Please list system_________________________ If not by whom____________________________
Use of CAD,CAM: Yes____No_____Please list Ability to develop a new part from engineering
systems:______________________________ performance requirements: Yes____No_____What is
Ability to create tooling from Math data files: the most complex part your plant
Yes___No______ Ability to transfer CAD data directly to produces:__________________Material___________
tooling machines: Yes____No_____ # of cavities_______ # Slides/Cores_______
Quality Systems
Certification: ISO 9001_________Date___________ If Not, what is planned date(please
IATF-16949_____Date______________Date_____ describe)______________________________________
Existing Production Casting Machine
Part Name: ______________________________ Cycle time ________
Requirement per year:_____________________ Machine Uptime__________
Cavities:____________________
Internal Scrap%__________ External Scrap
%___________
Training
Foundry operator training/Apprentice training: Tool maker training/apprentice training:
In house_______ By In house_______ By
________________________ Frequency :______ ________________________ Frequency
Outside- :______
specify :______________ Outside- specify :______________
Foundry process training/Apprentice training Maintenance training/Apprentice
__________ In house_____ training _____ In
By _____________ house_____ By _____________
Outside- Specify __________ Outside- Specify __________
Operating Plan
Hours per shift_____________ Shifts per day___________ Days per week____________ Days per Year__________
Confidential Information - ©This document is copyright by Linamar Corporation and no person shall reproduce,
retransmit, copy or use, in whole or in part, this document without the express written permission of Linamar
Corporation.
Contact Information
Date: Survey Conducted By:
Supplier Name: Address:
Tel/Fax Number: Country:
Contacts: Supplier Web Site:
Plant Manager/Director: Tel#/Email:
Quality Manager: Tel#/Email:
Engineering Manager Tel#/Email:
Facility Information
Parent Company: Main Ownership:
Technical Foundry Capacity/Utilization %______
Partner(s):________________________________________ Die Cast Capacity %______
________________________________________________ Foundry Capacity in out
________________________________________________ years : Y1_______Y2______ Y3________ Y4________
________ Die Cast capacity in out years:
Y1_________Y2_________Y3________Y4__________
Main products: Part Name/Production%_______________
Part Name/production%_________ Machining: Milling_________ Turning___________
Part Name/production%_____________ Drilling_________ CNC____________
Heat treatment_________
Total Employees:________ Management______ Existing total Floor Space (ft2/m2)_______________
Technical_____ Production_______ Floor space in out years__________
Maintenance______ Tooling Shop_____ Die Cast
Shop______
Customers ( List%) : Customers ( List%) :
Non destructive testing Capability: Availability of fully programmable CMM for tooling and
Fluorescent particle_____X-ray____X-ray Multiple production: Yes_____No_______
Views_____ Real Time____ Eddy Current_________
Magna Flux______
Destructive testing capability :
CNC for In Process Check for casting defects ____
Tooling Shop
Ability to repair tooling, Die pins and bushings: Use of Electrical Discharge machining (EDM)
Yes_____No______ Yes____No_____
Ability to make own tooling including gating: Ability to Transfer tooling data from computers to
Yes_____No______ manufacturing machines: Yes_____No______
Additional Equipment
Oil heaters________ Jet cooling ___________ Automatic Impregnation equipment___________
unloading from Die________ Automatic trim Shot Blasting__________Shot peening_________
presses________ Air-Decay leak testing_______ Engraving Painting_________
equipment for Casting traceability Others________________________________________
__
Product Development
Use of Solidification software for tool design: Yes____ Gating System designed internally: Yes_____No_____
No____ Please list system_________________________ If not by whom____________________________
Use of CAD,CAM: Yes____No_____Please list Ability to develop a new part from engineering
systems:______________________________ performance requirements: Yes____No_____What is
Ability to create tooling from Math data files: the most complex part your plant
Yes___No______ Ability to transfer CAD data directly to produces:__________________Material___________
tooling machines: Yes____No_____ # of cavities_______ # Slides/Cores_______
Quality Systems
Certification: ISO-9001_________Date___________ If Not, what is planned date(please
IATF-16949_____Date________ describe)______________________________________
Existing Production Die Casting Machine
Part Name: ______________________________ Shots/day________Shots/hr_________
Requirement per year:_____________________ Machine Uptime__________
Cavities:____________________
Internal Scrap%__________ External Scrap
%___________
Preventive/Predictive maintenance
Preventive maintenance for the main equipment ( DCM's Preventive maintenance is based on :
furnaces, trim presses, extractors,etc ) and tooling is a ) manufacturer recommendation
performed by : _______________ b) production
a ) Internal qualified resources_______ requirements _________________ c)
b ) outside contractors_________ scheduling______________
c ) both a and b ___________ d) Other_____________
What type of predictive maintenance is performed:
a) Thermography_________
b) Ultrasonic__________
c) Vibration analysis_________
Training
Die casting /foundry operator training: Tool maker training:
In house_______ By In house_______ By ________________________
________________________ Frequency :______ Frequency :______
Outside- Outside- specify :______________
specify :______________ Maintenance training
Die casting process training __________ __________ In
In house_____ By _____________ house_____ By _____________
Outside- Specify __________ Outside- Specify __________
Is there an apprenticeship program_______________
Operating Plan
Hours per shift_____________ Shifts per day___________ Days per week____________ Days per Year__________
Confidential Information - ©This document is copyright by Linamar Corporation and no person shall reproduce,
retransmit, copy or use, in whole or in part, this document without the express written permission of Linamar
Corporation.
Contact Information
Date: Survey Conducted By:
Supplier Name: Address:
Tel/Fax Number: Country:
Contacts: Supplier Web Site:
Plant Manager/Director: Tel#/Email:
Quality Manager: Tel#/Email:
Engineering Manager: Tel#/Email:
Facility Information
What is overall capacity in out years? Main product(s) with percentage of production:
Y1 _______Y2_______Y3_______Y4_______ Radial ball bearings__________________
Thrust ball bearings__________________
Radial roller bearings________________
Thrust roller bearings________________
Linear motion bearings_______________
Journal bearings_____________________
Other (specify type)__________________
Customers (List%) :
Heat Treatment
In House heat treatment? yes / no
CQI9 updated in last 12 months? yes / no
Is there a metallurgical lab on-site? yes / no
Is lab A2LA accredited? yes / no
Is there a Metallurgist on-site? yes / no
Process Control
Metal processing in-house (bonding, super finishing, etc.)?
Coating technologies offered?
Testing capabilities bearing/bushing components (NVH,
metallurgical, contamination, etc.)?
Secondary Operations
What secondary operations are available at supplier?
Notes: ____________
Product Development
Ability to design a part from engineering performance
requirements:
Yes____No_____
Confidential Information - ©This document is copyright by Linamar Corporation and no person shall reproduce,
retransmit, copy or use, in whole or in part, this document without the express written permission of Linamar
Corporation.
Contact Information
Date: Survey Conducted By:
Supplier Name: Address:
Tel/Fax Number: Country:
Contacts: Supplier Web Site:
Plant Manager/Director: Tel#/Email:
Quality Manager: Tel#/Email:
Engineering Manager: Tel#/Email:
Facility Information
What is overall capacity in out years? Main products:
Y1 _______Y2_______Y3_______Y4_______ Part Name/Production%___________________________
Part Name/Production%___________________________
Part Name/Production%___________________________
Customers (List%) :
Heat Treatment
In House heat treatment? yes / no
CQI9 updated in last 12 months? yes / no
Is there a metallurgical lab on-site? yes / no
Is lab A2LA accredited? yes / no
Is there a Metallurgist on-site? yes / no
Process Control
Metal treatment (phosphating and adhesives) in-house?
Stamping operations in-house, and what products is it used
for?
Rubber compounding in house?
Types of rubber molding employed (compression, injection,
transfer)?
Coating technologies offered?
Test capabilities for static and dynamic sealing components
(thermal, environmental, vibration, etc.)?
Secondary Operations
What secondary operations are available at supplier?
Notes: ____________
Product Development
Ability to design a part from engineering performance
requirements:
Yes____No_____
Confidential Information - ©This document is copyright by Linamar Corporation and no person shall reproduce,
retransmit, copy or use, in whole or in part, this document without the express written permission of Linamar
Corporation.
Contact Information
Date: Survey Conducted By:
Supplier Name: Address:
Tel/Fax Number: Country:
Contacts: Supplier Web Site:
Plant Manager/Director: Tel#/Email:
Quality Manager: Tel#/Email:
Engineering Manager: Tel#/Email:
Facility Information
What is overall capacity in out years? Main products:
Y1 _______Y2_______Y3_______Y4_______ Part Name/Production%___________________________
Part Name/Production%___________________________
Part Name/Production%___________________________
Bed size:
Heat Treatment
In House heat treatment? yes / no
CQI9 updated in last 12 months? yes / no
Is there a metallurgical lab on-site? yes / no
Is lab A2LA accredited? yes / no
Is there a Metallurgist on-site? yes / no
Process Control
Blank or coil steel used?
Conventional or fine blanking process?
Progressive, transfer, compound tooling used?
Deburring process used?
Metal treatment (phosphating and coatings) in-house?
Wash system used?
Testing capabilities for components (contamination,
metallurgical, etc.)?
Secondary Operations
What secondary operations are available at supplier
(welding, painting, bending, etc.)?
List below:
Product Development
Ability to design a part from engineering performance
requirements:
Yes____No_____
Confidential Information - ©This document is copyright by Linamar Corporation and no person shall reproduce,
retransmit, copy or use, in whole or in part, this document without the express written permission of Linamar
Corporation.
Date of Original Audit:
Date of Re-Audit:
Supplier Contact:
Supplier Ph: