BEFORE DEVELOPMENT S. Component process No. of No. of Prod total No costing Strok Stroke QTY process
. e require per 8 cost of requir per hrs per e compo compo. (in Rs) PSC-I (3mm) Blanking 1 & notchingi.e.1200mm scrap, 20 comp PSC-II (2mm) Blanking 2 & notchingi.e.1200mm scrap, 18 comp Stiffner Blanking & 3 notching -i.e.1200mm scrap, 14 comp Stiffener ( HR4 3.15mm) (Forming) for all type - i.e. 1 component Stock Plunger Cover 5 (Inner shell box(Dibbi)) (HR 2mm)Blanking(By four side notching with parting)i.e.1200mm scrap,8 comp
power press shearing machine power press shearing machine power press shearing machine power press press brake power press shearing machine
AFTER DEVELOPMENT SAVING No. of No. of PROD total Total Month Monthl Component process Strok Stroke QTY process process ly y costing
e require per 8 cost of requir per hrs per e compo compo. (in Rs)
power press shearing machine power press shearing machine power press shearing machine power press press brake power press shearing machine
Cost Requir Saving saving ed (in Rs) per QTY compo.( in Rs) -0.05 0.80 0.75 -0.06 0.80 0.74 0.97 0.80 1.77 -1.30 3.33 2.03 3.74 3.33 2200 4468.8 2700 4771.6 8100 6011.3
20 21
18
1 1200
PSC-I (3mm) Blanking 1.04 & notchingi.e.1200mm scrap, 20 0.84 comp 1.88 PSC-II (2mm) Blanking 1.04 & notching0.84 i.e.1200mm scrap, 18 1.89 comp Stiffner Blanking & 2.08 notching -i.e.1200mm 0.86 scrap, 14 comp 2.94 Stiffener ( HR0.00 3.15mm) (Forming) 3.33 for all type -i.e. 1 3.33 component Stock Plunger Cover 5.21 (Inner shell box ( 3.75 Dibbi))(HR -2mm) Blanking(By four side notching with parting)i.e.1200mm scrap,8 comp 8.96
21 1
1.09 0.04 1.13 1.10 0.04 1.14 1.12 0.06 1.17 1.30 0.00 1.30 1.46 0.42
2700 2019.4
19 1.0556 1200 1 0.0556 2000 15 1.0714 1200 1 0.0714 2000 1 0 9 1 1 0 1.125 0.125
1.88
7.08
300
2123
D.P. Malviya
Prod. HOD
Prod. GM
DW sir Date:
1 of 2
BEFORE DEVELOPMENT
S. component costing No . No. of Strok e requir e No. of Stroke require per compo Prod QTY per 8 hrs total process cost of per compo. (in Rs)
SAVINGS
Month ly Requir ed QTY Monthl y Saving (in Rs)
Total Strok Stroke QTY process process e require per 8 cost of Cost requir per hrs per saving e compo compo. per (in Rs) compo (in Rs) 1 0 1 0 960 480 1.30 0.00 1.30 0.65 0.00 0.65 -1.30 13.33 12.03 0.65 0.00
Stock Plunger Cover 6 (Inner shell box (Dibbi) ) (HR 2mm)Four side LBending i.e.1 comp Lock Plunger packing 7 (Brass -3mm)i.e.1 comp
0 4
0 960 4 480
1 0
1 960 0 480
Stock Plunger Cover 0.00 (Inner shell box (Dibbi) ) (HR 13.33 2mm)Four side L13.33 Bending i.e.1 comp Lock Plunger packing 1.30 (Brass -3mm)i.e.2 comp 0.00 1.30 New Door Key 2.50 Punching Key Slot 0.00 2.50 19000 Pillar Set for all type press tool(i.e PS-I) 76000 1850 SRD HANDLE BLOCK Drill Jig 1850 SRD HANDLE Drill Jig
300 3609.4
1 0
0.65 27000 17578 1.25 0.00 1.25 13500 16875 0.00 32000
power press
1 500
power press
1 1000
1.25
9 Pillar Set for all type press tool(i.e PS-I) 10 SRD HANDLE BLOCK Drill Jig 11 SRD HANDLE Drill Jig
M1TR Drill
4 32000
15
M1TR Drill
40 87 140 12192
M1TR Drill
40
M1TR Drill
Prod. HOD
Prod. GM
DW sir Date:
Plan
BEFORE DEVELOPMENT S. component costing No. of No. of Prod total
No . Strok e requir e Stroke QTY process require per 8 cost of per hrs per compo compo. (in Rs)
1 of 2
SAVINGS
Total process Cost saving per compo (in Rs) Month ly Requir ed QTY Monthl y Saving (in Rs)
Rs.
Prod. HOD
Prod. GM
DW sir
SAVING
Process Cost saving per compo. (in %) Total No. of Strock saved
79.00
D.P. Malviya
Date:
1 of 2
SAVINGS
Process Cost saving per compo. (in %)
42.11
70.61 93.243
per month(Apr ox)
97
Date:
1 of 2
SAVINGS
Process Cost saving per compo. (in %)