You are on page 1of 55

Date: 25 September 2020

PROPOSAL

Soil Study & Consultancy


for RAPP

Client

Consultant
Soil Study & Consultancy for RAPP

TABLE OF CONTENT

1. INTRODUCTION

2. OBJECTIVES

3. DEFINITION AND ABBREVIATION

4. SCOPE OF WORK

5. DELIVERY SCHEDULE

6. PROJECT COST

7. EXCEPTION AND DEVIATION

8. PERSONNEL

9. ATTACHMENT

i. Attachment Penawaran Harga


ii. Attachment Personnel Curicullum Vitae

Technical Proposal
Soil Study & Consultancy for RAPP

1. INTRODUCTION
This proposal is prepared in respond to provide engineering Soil Study & Consultancy
for RAPP. This proposal will contain study description, scope of work, quotation and
commercial term.

2. OBJECTIVES
PT Prinsipa issues this document as Technical and Commercial Proposal as Consultant of
mentioned study to execute Study & Consultancy Services on mentioned study above. The
detail list of Scope of Work as below.

3. DEFINITION AND ABBREVIATION


The following parties are mentioned in this document:

CLIENT

CONSULTANT PT Abirama Prinsipa Indonesia

4. SCOPE OF WORK
PT Prinsipa scope of work and responsibility shall describe in detail in attachment I , also
include but not limited to the following:

• Engineering Survey
• Topography and Bathymetri
• Soil Analysis Test
• Geolistrik
• Soil and Slope Reinforcement Study
• Konsinyering

5. DELIVERY SCHEDULE
Survey shall be 1 month. Total Time Schedule estimated 1,5 months for 1st Engineering
Issuance, depend on available of Survey Data. Total estimate Completion is 2,5 months.

6. PROJECT COST
Lump Sum Cost
Total cost for this project is: IDR 465.590.000 (Four Hundred Sixy-Five Million Five
Hundred Ninety Thousand Rupiah)

Technical Proposal
Soil Study & Consultancy for RAPP

Terms of Payment
Payment Terms Proposed as bellow:
- 50% on DP
- 20% on Site Survey Finished
- 20% on Submission Docs and Drawings engineering report
- 10% on Approved Docs and Drawings engineering report

Proposal Validity
This proposal and the associate costs are valid for Thirty (30) days from date of issuance.

7. EXCEPTION AND DEVIATION


Exception and deviation from this offer as following:

• The price is included survey topography, geotechnic, geolistrik.


• The price is included any engineering allowance such as airfreight ticket, hotel, land
transport and meal.
• The price is included for konsinyering as required.
• The price exclude any Tax related, such PPN and PPH.
• The price exclude any printing copy required, submission through email by softcopy
(e-file) as attachment. Final hardcopy upon approval are provided.

8. PERSONNEL
This activity shall be support with personnel as bellow:
1. Engineering Leader : Ir. Khairmen Suardi, M.Eng, IPM
2. Deputy Engineering Leader : Aryo Pribadi Wicaksono, S.T
3. Civil Lead Engineer : Agus Suryantoro, S.T, IPM
4. Civil & Structure Engineer : M. Nur Faozi, S.T
5. Drafter : Samsul & Ilham Fakhrurrozi

CV of those above personnel shall be attached following with this proposal.

Technical Proposal
ATTACHMENT FEED DELIVERABLE LIST
Soil Study & Consultancy for RAPP
PROYEK : Soil Study & Consultancy for RAPP
SCOPE : Topography, Bathymetry, Geotechnic,
PEKERJAAN Geolistrik
LOKASI : Riau
PEMBERI TUGAS :
KONSULTAN : PT. Abirama Prinsipa Indonesia
TAHUN : 2020

REKAPITULASI
No. ITEM PEKERJAAN JUMLAH (Rp.)

1 ENGINEERING

A Engineering Survey 39.000.000

B Topography and Bathymetri 111.940.000

C Soil Analysis Test 59.400.000

D Geolistrik 34.150.000

E Soil and Slope Reinforcement Study 171.100.000

F Konsinyering 50.000.000

2 CONSTRUCTION MANAGEMENT -

SUB TOTAL IDR 465.590.000

TOTAL 465.590.000

NOTE:

1. Consultant will not develop any of WPS = Welding Procedures Specification , PQR = Procedures Qualification Record, NDE = Non Destructive Examination, or any document produce by WE and any
Project Reporting to End User.

2. Term of Payment:

- 50% on DP

- 20% on Site Survey Finished

- 20% on submission docs and dwg Eng Report

- 10% on Approved docs and dwg Eng Report

3. The Price is Exclude any Tax Related.

4. Prinsipa will not produce any hardcopy required and submission through email. Final hard copy upon approval are provided.

5. We will generate under crack version for any software required. When license print out will be upon request by Client and will be charge different price.

6. The drawing provide are Engineering drawing, not Shop Drawing.

7. The price are INCLUDED Engineering survey, Engineering Survey for Maximum 3 times, Tickets, aacomodation, Hotel and Land Transport included.

8. The submission are at minimum 3 times (Issued for Comment, Issued For Approval and Approved For Deseign), however, depend on Client requirement. Each revision shall be 7 Days review on
Client Side.

9. Survey shall be 1 month. Total Time Schedule estimated 1,5 months for 1st Issuance Engineering, depend on available of Survey Data, . Total estimate Completion is 2,5 months.
RENCANA ANGGARAN BIAYA

Riau

NO. URAIA VO SAT PRICE TOTAL PRICE


N L (RP)
A MOBILISASI PERSONIL

Mobilisasi dan Demobilisasi (Jakarta-Balikpapan-Penajam)

a. Engineer 1 unit/trip 7.500.000 Rp 7.500.000


b. Assistant Engineer 1 unit/trip 7.500.000 Rp 7.500.000

SUB TOTAL Rp 15.000.000

Penginapan, transportasi lokal

a. Engineer 3 nights 1.500.000 Rp 3.000.000

b. Assistant Engineer 3 nights 1.500.000 Rp 3.000.000


SUB TOTAL Rp 6.000.000
TOTAL Rp 21.000.000

B TUNJANGAN MAKAN & PELAKSANAAN LAPANGAN

1 Remunerasi Engineer 4 days 3.000.000 Rp 12.000.000

Remunerasi Assistant Engineer 4 days 1.000.000 Rp 4.000.000

Uang makan 4 hr 500.000 Rp 2.000.000


SUB TOTAL Rp 18.000.000

JUMLAH Rp 39.000.000
RENCANA ANGGARAN BIAYA
PEKERJAAN PENGUKURAN
TOPOGRAFI
Riau

NO. URAIA VO SAT PRICE TOTAL PRICE


N L (RP)
1 MOBILISASI PERSONIL DAN PERALATAN
Jumlah tim topo = 4 orang
Penginapan 1 ls 600.000 Rp 600.000
Transportasi Jakarta-Riau 4 PP 3.000.000 Rp 12.000.000
Transportasi Lokal 4 hari 750.000 Rp 3.000.000
Lama pengukuran lapangan = 14 hari
SUB TOTAL Rp 15.600.000

2 TUNJANGAN MAKAN & PELAKSANAAN LAPANGAN


Uang Makan Surveyor Topografi 4 4 ls 175.000 Rp 2.800.000
Remunerasi Tenaga Lokal 2 4 ls 225.000 Rp 1.800.000
Uang Makan Tenaga Lokal 2 4 ls 155.000 Rp 1.240.000
SUB TOTAL Rp 5.840.000

3 PERSIAPAN DAN PENGUKURAN TITIK KONTROL


Persiapan 1 ls 5.500.000 Rp 5.500.000
Pengikatan Titik Referensi Orde 2 1 ls 22.500.000 Rp 22.500.000
Pembuatan BM 5 buah 300.000 Rp 1.500.000
SUB TOTAL Rp 29.500.000

4 PENGUKURAN TOPOGRAFI
Remunerasi personil
Sewa GPS 2 Ha 4.500.00 Rp 9.000.000
0
Sewa UAV
include crossing sungai di area darat
SUB TOTAL Rp 9.000.000

5 PENGUKURAN BATHYMETRI
Remunerasi personil
2 Ha 8.500.00 Rp 17.000.00
Sewa GPS 0 0
Sewa kapal & ecosounder
SUB TOTAL Rp 17.000.000

6 PENGOLAHAN DATA, PENGGAMBARAN DAN


LAPORAN
Topografi 1 ls 20.000.000 Rp 20.000.000
Bathymetri 1 ls 15.000.000 Rp 15.000.000
SUB TOTAL Rp 35.000.000

TOTAL Rp 111.940.000
RENCANA ANGGARAN
BIAYA
PEKERJAAN SOIL
INVESTIGATION
Ria

NO. URAIA SATUA VOL HARGA SATUAN TOTAL BIAYA


N N .
A. Persiapan Lapangan ls 1 Rp. 3.500.000 Rp. 3.500.000
Jumlah alat sondir 1 buah
Tim Sondir 4 orang

B. Mobilisasi & Akomodasi


a. Mobilisasi alat dan personel unit/trip 1 Rp. 12.000.000 Rp. 12.000.000
b. Demobilisasi alat dan personel unit/trip 1 Rp. 12.000.000 Rp. 12.000.000
c. Sewa Rumah/Base Camp ls 1 Rp. 2.000.000 Rp. 2.000.000
d. Koordinasi Keamanan ls 1 Rp. 1.000.000 Rp. 1.000.000
e. Akomodasi tim sondir org/hari 4 3 Rp. 150.000 Rp. 1.800.000

C. Sondir Test
a. Sondir , maksimal sampai 30 m atau sampai tanah keras (q >
titik 5 Rp. 4.500.000 Rp. 22.500.000
150
kg/cm2)
b. Move area titik 4 Rp. 525.000 Rp. 2.100.000

D. Pengolahan Data dan Analisa ls 1 Rp. 2.500.000 Rp. 2.500.000

TOTAL Rp 59.400.000
RENCANA ANGGARAN
BIAYA
PEKERJAAN GEOLISTRIK
Ria

NO. URAIA VO SAT PRICE TOTAL PRICE


N L (RP)
A MOBILISASI PERSONIL DAN PERALATAN (by client )

Mobilisasi personil, peralatan & perlengkapan

Transportasi Bandung-Balikpapan-Penajam (include baggage) 2 PP 4.000.000 Rp 8.000.000

Transportasi lokal 3 hr 750.000 Rp 2.250.000

Penginapan 3 hr 500.000 Rp 1.500.000

SUB TOTAL Rp 11.750.000

B REMUNERASI, TUNJANGAN LOKAL DAN TRANSPORTASI LOKAL

1 TENAGA LOKAL 2 3 org/hr 200.000 Rp 800.000

Uang makan 4 3 ls 150.000 Rp 600.000

SUB TOTAL Rp 1.400.000

2 PELAKSANAAN LAPANGAN

Pengambilan dan akuisisi data 5 titik 4.000.000 Rp 20.000.000

SUB TOTAL Rp 20.000.000

3 PEKERJAAN STUDIO

Analisis dan Pelaporan 1 ls 1.000.000 Rp 1.000.000

SUB TOTAL Rp 1.000.000

TOTAL Rp 34.150.000
ENGINEERING DOCUMENT LIST SOIL AND SLOPE REINFORCEMENT STUDY
SOW: CONSULTANT

DURATION
No DELIVERABLES SOW UNIT PRICE TOTAL PRICE Remark
(HOURS)

E SOIL and Slope Reinforcement Study


E.1 REPORT
Topography Report 30 EXT 290.000 Rp8.700.000
Bathymetry Report 30 EXT 290.000 Rp8.700.000
Geotechnic Report 30 EXT 290.000 Rp8.700.000
Geolistrik Report 30 EXT 290.000 Rp8.700.000

E.2 SPECIFICATION
Slope Reinforcement Specification 40 EXT 290.000 Rp11.600.000
Civil and Earth Work Specification 40 EXT 290.000 Rp11.600.000

E.3 CALCULATION
Slope Reinforcement Calculation 50 EXT 290.000 Rp14.500.000
Piling Calculation 50 EXT 290.000 Rp14.500.000
Road Calculation 50 EXT 290.000 Rp14.500.000

E.4 DRAWING
Piling Plan 30 EXT 290.000 Rp8.700.000
Piling Detail Drawing 40 EXT 290.000 Rp11.600.000
Slope Reinforcement Plant 30 EXT 290.000 Rp8.700.000
Slope Reinforcement Detail Drawing 40 EXT 290.000 Rp11.600.000
Cut and Fill Drawing Detail 40 EXT 290.000 Rp11.600.000
Topography Drawing 30 EXT 290.000 Rp8.700.000
Bathymetri Drawing 30 EXT 290.000 Rp8.700.000

TOTAL MH 590

TOTAL PRICE Rp 171.100.000


ATTACHMENT PERSONEL’S CURRICULUM VITAE

Engineering Leader
Ir. KHAIRMEN SUARDI,
M.ENG, IPM
Project Manager

Resume

SUMMARY
Fiveteen years more of experience, mainly in various oil and gas industry in both
offshore and onshore Projects as a Lead or Sr. Mechanical (Static, Package &
Rotary) Engineer and Mechanical Field Engineer. Current role as Engineering
Manager on Engineering Project for Onshore Gas Plant.

A wide range of experience in Project Bids, Conceptual Design, FEED & Detailed
Engineering Design, Construction and Precommissioning/ Commissioning cover-
ing Green & Brown Field Project, Offshore WHP, Offshore CPP, Offshore Living
Quarter, Onshore Gas Plant, and Small Scale Gas Plant Development.

Also have a deep experience of involvement in inspection/ supervision of equip-


ment (Static, Package & Rotary) assembly either at VENDOR workshop or at
construction site.

Familiar with international code and standard such as ASME, API, NFPA, ANSI,
ASTM, ISO, etc.

Experienced handling various mechanical equipment such as Potable Water


Treatment Package, Produced Water Treatment Package, Condensate Treat-
ment Package, Air Compressor & Dryer Package, Electrochlorination Package,
Offshore Sewage Treatment Package, Gas Dryer Package, Glycol Regeneration
Package, Gas Refrigeration Package, Chemical Injection Package, Flare Tip &
Ignition Package, Fire Water Pump Package, Pressure Vessels ASME 8 Div 1
(with all type: Filters, Scrubber, coalescer, 3 phase separator, Slug Cather), API
Centrifugal Pump, API Reciprocating Pump, Submersible Pump, ACHE, STHE,
Fin tube Exchanger, Helix Exchanger, Cold Box, Electric Heater, Fired Heater,
Launcher and Receiver, Erected Tanks, ISO Tanks, ASME 8 DIV 2 Pressure Ves-
sel, Spherical Tanks, Slug Cather finger type, Boiler Package, Gas Turbine Com-
pressor Package, Gas Turbine Package, Gas and Diesel Engine Package, HVAC
Package, Pedestal Crane and Mechanical Handling Equipments.

I am highly motivated person, Strong Leadership, dynamic team player, having


good communication skill and focus on delivering on time, on budget project and
good quality of work

JOB OBJECTIVE
Seeking Eng. Manager/Lead/ Sr Mechanical / Pipeline Engineer position with a
company in which my skills and training can continue to advance
Ir. KHAIRMEN SUARDI,
M.ENG, IPM
Project Manager

Resume

EDUCATIONAL BACKGOURD
- Master Degree in Mechanical Engineering

University: University Technology Malaysia– Year 2005

Faculty of Mechanical Department Material Engineering, GPA: 3.5

- Degree in Engineering

University: University of Indonesia– Year 2001

Faculty of Engineering Department Material and Metallurgical Engineering, GPA:


3.01

CONTACT NO AND ADDRESS


HP: +6281318480424; +62813112415 (Indonesian Number)

Address: Griya Pekapuran Indah Jl. Pekapuran Raya RT 01 RW 07 No D2 Ke-


lurahan Curug Kecamatan Cimanggis, Depok16953 West Java

EXPERIENCE
Oct 2015- Engineering Manager (Structural position)
Present
Key Job Responsibilities:
1. To look for any potential project and development of Company business.
2. Manage Company internal and external affair (Employee wages, Company Taxes, Gov regu-
lation, etc)
3. Lead a team for Preparing PQ and Technical and Commercial Proposal on Tender.
4. Manage people: Project Engineer, Lead Engineer, Project Control and Document Control to
run the project.
5. Responsible for Company Quality Product. .
6. Interdisciplinary coordination and interfacing with Client to ensure smooth execution of the
engineering work.
7. Responsible for Employee Skill and Knowledge development.

Latest Project

 7 km NEB#1 Basement Pipeline Construction Detail Design


 2 km Sabar#2 Sub-Gathering Line Detail Design
 FEED FOR KARAMBA FIELD PRODUCTION FACILITIES
 BASIC DESIGN DAN DOKUMEN TENDER KONTRAKTOR EPC PEMBANGUNAN
WASHING PLANT DAN INFRASTUKTUR DITAMBANG
 GTG and WHRU Installation at BGP, 1 x 20 MW Power Plant
Ir. KHAIRMEN SUARDI,
M.ENG, IPM
Project Manager

Resume

Okt 2017 –
Dec 2017 Engineering Manager – PT Consultant Enjinering

□ FEED and DEDC for City Gas in 4 location in Indonesia: Balik Papan; Penajam;
Musirawaas and Sidoarjo, Client: Ministry of Energy and Mineral Resources Republic
of Indonesia, End User: PT Perusahaan Gas Negara, PT Pertamina, PT Pertagas and
PT Chevron Indonesia

FEED and DEDC support to a pipeline and Interconnecting Gas City with Metering and Regu-
lating Station and Regulating Sector of feed gas capacity varies from 1.5 - 5 MMSCFD. Me-
tering and Regulating Station Equipments are: Gas Filter, Pressure Regulating Skid, Meter-
ing, Closed Drain Tank, Gantry Crane, all Instrumentation, piping and Valves.
Key Job Responsibilities:
1. Engineering Manager for Execution of FEED & DEDC works for all multidiscipline engineer-
ing work: Process, safety, piping, mechanical, Instrument and Control, electrical, Civil and
structure and plant design.
2. Responsible for all engineering deliverables such: Engineering Basis of design, Data Sheet,
Specification, Calculation and Sizing, detail Engineering Drawing, MTO and List.
3. PDMS 3D Modeling.
4. Hazid and Haazop activity.
5. Handling study and handling layout.
6. Owner Cost Estimate
7. Interdisciplinary coordination and interfacing to ensure smooth execution of the engineering
work between internal multidiscipline engineering and to external with Client and Vendor

Jun 2017 –
Lead Mechanical / Pipeline Engineer – Petro Vietnam Engineering, South Vietnam
Sept 2017
□ FEED Block B-O MOn Field Project, a Green Field Pipeline and Gas Distribution Sta-
tion/Gas Distribution Center, Client: Petro Vietnam POC Ltd (100 Million Project); End
User: South West Pipiline Operating Company (SWPOC)
SWPOC’s 28-inch subsea gas pipeline departs from offshore platform of Block B Field oper-
ated by Phu Quoc POC in Northeast direction to An Minh Landfall Station. At KP 209, the
pipeline branches to a 18-inch spur pipeline to approach Mui Tram Landfall Station. The 28-
inch main pipeline after approach to An Minh Landfall Station will run in east direction to ar-
rive at Kien Giang Gas Distribution Station (GDS) and feed Kien Giang Power Plant. The
sales gas will be transported to O Mon Gas Distribution Centre (GDC) via 30-inch diameter,
95km onshore pipeline
Key Job Responsibilities:
1. Lead Engineer for Execution of FEED engineering works for Static, Rotating and Package
such as: Launcher, Pressure Vessel with specific internal, Electric Heater, Filters, Over Head
Crane, emergency Diesel Generator, Closed Drain Pump (Air Operate PD Pump), Air Com-
Ir. KHAIRMEN SUARDI,
M.ENG, IPM
Project Manager

Resume

pressor and Dryer Package, Fuel Gas Package, FFG and Flare Tips Package, HVAC Pack-
age for Control Room, and Chemical Injection Package.
2. Responsible for Data Sheet, Design Basis, Specification, Preliminary Vendor Technical Eval-
uation Review.
3. Handling Study and Handling Layout of 5 Station (Anh Minh LFS, Mui Tram LFS, Kien Giang
GDS, O Mon GDC and LBV Station).
4. Interdisciplinary coordination and interfacing to ensure smooth execution of the engineering
work.

Jan 2016 –
Engineering Manager – PT Consultant Enjinering
Dec 2016
□DDfor EPCI Seberida Metering Station, Client: PT Yuan Sejati as Main Contractor,
E
End User: PT Transportasi Gas Indonesia

DED support to main contractor to develop a Metering Station of Feed gas capacity 100
MMSCFD. Metering plant Equipments are: Gas Filter, Pressure Regulating Skid, Metering,
Fuel Gas Conditioning unit, Fire Water Pump Package, Deep Well Pump, Water Treatment,
General Water Pumps, Diesel Engine Generator, Diesel pump, Diesel Tank, Air Compressor
Package, Closed Drain Tank, Gantry Crane, Switch yard, Trafo and Substation, DCS Plant
Control System, all Instrumentation, piping and Valves.
Key Job Responsibilities:
1. Engineering Manager for Execution of DED works for all multidiscipline engineering work:
Process, safety, piping, mechanical, Instrument and Control, electrical, Civil and structure
and plant design.
2. Responsible for all engineering deliverables such: Engineering Basis of design, Data Sheet,
Specification, Calculation and Sizing, detail Engineering Drawing, MTO and List.
3. PDMS 3D Modeling.
4. Hazid and Hazop activity.
5. Handling study and handling layout.
6. Interdisciplinary coordination and interfacing to ensure smooth execution of the engineering
work between internal multidiscipline engineering and to external with Client and Vendor
7. Precommisioning, commsiioning and star up activity for Plant.

Oct. 2015 – Engineering Manager & Lead Pipeline Eng – PT Consultant Enjinering
Des 2015
□ FS, FEED and DED for Pipeline and New Offtake Station, Client: PT Indo Cipta
Gemilang as Main Contractor, End User: PT Cipta Niaga Gemilang
A complete service from FS, FEED and DED study to develop a 2.751 km Pipeline and new
Offtake station consist of Metering Station, Gas Engine Power Plant (IPP), and Compressed
Natural Gas (CNG) Plant The Feed gas is 5 MMSCFD, to devided into 3 MMSCFD for Gas
Engine Power Plat in equal to 12 MW Electrical Power; and 2 MMSCFD for CNG Plant.
Equipments are: Gas Filter, Pressure Regulating Skid, Metering, Fuel Gas Conditioning unit,
Ir. KHAIRMEN SUARDI,
M.ENG, IPM
Project Manager

Resume

Gas Engine, Gas Dryer, Compact Gas Compressor with ACHE, Fire Water Pump Package,
Deep Well Pump, Water Treatment, General Water Pumps, Diesel Engine Generator, Diesel
pump, Diesel Tank, Air Compressor Package, Closed Drain Tank, Gantry Crane, Switch yard,
Trafo and Substation, DCS Plant Control System, all Instrumentation, piping and Valves.
Key Job Responsibilities:
1. Engineering Manager for Execution of FS, FEED and DED works for all multidiscipline engi-
neering work: Process, safety, piping, mechanical, Instrument and Control, electrical, Civil
and structure and plant design.
2. Responsible for all engineering deliverables such: Feasibility Study, Environmental Study,
Waste Management, Engineering Basis of design, Data Sheet, Specification, Calculation and
Sizing, detail Engineering Drawing, MTO and List.
3. PDMS 3D Modeling.
4. Hazid and Haazop activity.
5. Handling study and handling layout.
6. Interdisciplinary coordination and interfacing to ensure smooth execution of the engineering
work between internal multidiscipline engineering and to external with Client and Vendor.
7. Precommisioning, commsiioning and star up activity for Plant.

Client Engineer Rep. for Machinery and Package Equipment – PT


Consultant En- jinering onbehalf ENI Muara Bakau BV. Project: Jangkrik
FPU

Key Job Responsibilities:


1. On Behalf ENI Muara Bakau BV to represent on FAT for Machinery equipment such API 610
FAT pump, FAT for Flare Package, FAT for Gas Analyzer Package, FAT for Nitrogen Gener-
ator Package, FAT for Seal Gas Package.
2. Produce punch list on Vendor for any outstanding from Company requirement.
3. Prepare Inspection report to ENI Muara Bakau BV.
4. Prepare Anomaly Report to ENI Muara Bakau BV, if available.
June. 2015 Lead Mechanical Engineer – Petro Vietnam Engineering, South Vietnam
– Sept 2015
□ FEED Kinh Ngu Trang Field Project, a Green Field Well Head Production Platform, Cli-
ent: Petro Vietnam POC Ltd (100 Million Project)

Key Job Responsibilities:


1. Lead Engineer for Execution of FEED engineering works for Static, Rotating and Package
such as: Launcher, Pressure Vessel with specific internal, Electric Heater, Filters, Pedestal
Crane, Air Cooled Heat Exchanger, Shell and Tube Exchanger, Gas Turbine Package with
accessories, emergency Diesel Generator, Over Head Crane, Closed Drain Pump (Air Oper-
ate PD Pump), Air Compressor and Dryer Package, Fuel Gas Package, FFG and Flare Tips
Package, HVAC Package for Control Room, Gas Booster Compressor Package and Chemi-
cal Injection Package.
Ir. KHAIRMEN SUARDI,
M.ENG, IPM
Project Manager

Resume

2. Responsible for Data Sheet, Design Basis, Specification, Preliminary Vendor Technical Eval-
uation Review.
3. Handling Study and Handling Layout of KNT Wellhead platform.
4. Lead Engineer for Preliminary Study on Solar Turbine Taurus 60 Set for any Interface Engi-
neering.
5. Interdisciplinary coordination and interfacing to ensure smooth execution of the engineering
work.

Oct. 2014 –
April 2015 Lead Mechanical Engineer – PT. Meindo Elang Indah
□ FEED Tank Farm Project Nilam Utara East Java (FEED for a Green Field Chemical Tank
Farm Facilities), Client: PT AKR

A FEED study to develop Chemical Tank Farm at Nilam Utara, east Java. To develop Tank
Farm station to storage CPO, Petrol, Diesel and Molases. Total Plant Capacity of 188,000
Tons, with 4ea Diesel Tank at 20,000 KL, 4ea Petrol Tank at 7,500 KL, 4ea Mollases Tank at
7,500 KL, 6ea CPO Tank at 5,000 KL, and 6ea CPO Tank at 3,000 KL .
Key Job Responsibilities:
1. Lead Mechanical Engineer for Execution of FEED works for Static and Rotating and Package
such as: Erected Tank with self-support roof and Column Support (CPO, Petrol, Diesel and
Molases), Air Compressor Package, Utility and Instrument Air Receiver Vessel, API 610 Cen-
trifugal Pump and Fire Water Pump Package.

2. Responsible for Data Sheet, Design Basis, Specification, and Calculation.

3. Handling study and handling layout

4. Interdisciplinary coordination and interfacing to ensure smooth execution of the engineering


work

Lead Mechanical Engineer – PT. Meindo Elang Indah


Oct. 2014 –
□ KL Gas Lift Compressor Project, a Brown Field Well Head Production Platform (con-
April 2015
sist of 3 WH Platform: KLA, KLB and KLC), Client: PT PHE ONWJ (100 Million Project)

Key Job Responsibilities:


1. Lead Engineer for Execution of detailed engineering works for Static, Rotating and Package
such as: Launcher, Receiver, Pressure Vessel with specific internal, Electric Heater, Filters,
Jib Crane, Air Cooled Heat Exchanger, Shell and Tube Exchanger, Fin Tube Exchanger, Ni-
trogen Package, Gas Turbine Compressor Package with accessories, Over Head Crane,
Closed Drain Pump (Air Operate PD Pump), Gas Engine Generator, Air Compressor and
Dryer Package, Seal Gas Package, FFG and Flare Tips Package, HVAC Package for Control
Room KLA and KLB Platform.
2. Responsible for Data Sheet, Design Basis, Specification, Technical Evaluation and Detail
Ir. KHAIRMEN SUARDI,
M.ENG, IPM
Project Manager

Resume

Vendor review.
3. Handling Study and Handling Layout of KLA, KLB and KLC Wellhead platform.
4. Lead Engineer for Solar Turbine Saturn 20 MK III Tandem Compressor Set for any Interface
Engineering.
5. Follow on phase vendor fabrication.
6. Provide assistance on Site Installation work, Commisioning and Star up to the Construction
and Commissioning team.
7. Interdisciplinary coordination and interfacing to ensure smooth execution of the engineering
work.
8. Precommisioning, commsiioning and star up activity for Plant.

Jan. 2014 – □ GG New Development Project (a Green Field GGA NUI Well head Platform and
June 2015 OPF Gas processing Facilities), Client: PT PHE ONWJ (172 Million Project)
Key Job Responsibilities:
1. Lead Engineer for Execution of detailed engineering works for Static and Rotating and
Package such as: Launcher, Receiver, Slug Catcher, other Pressure Vessel with specific in-
ternal, Electric Heater, Filters, Flares Package, Nitrogen Package, Field Erected Tank, In-
dustrial Tank, API 610 centrifugal pump, Deep well pump, ANSI high Pressure pump, Over
Head Crane, Fire Water Pump, Gas Engine Generator, Air Compressor and Dryer Package,
TEG Package, Air Operarated Diaphragm Chemical Injection package, RO package, Jib
Crane (Hydraulic driven).
2. Responsible for Data Sheet, Design Basis, Specification, Technical Evaluation and Detail
Vendor review
3. Handling study and handling layout
4. Follow on phase Vendor fabrication
5. Interdisciplinary coordination and interfacing to ensure smooth execution of the engineering
work.
6. Precommisioning, commsiioning and star up activity for Plant
Ir. KHAIRMEN SUARDI,
M.ENG, IPM
Project Manager

Resume

Jan. 2013 – Lead Mechanical Engineer – PT. Amec Berca Indonesia


Apr. 2013
Pasar IX ORF Station project (Client: PT PGN), a Green Field Onshore Gas Plant
Key Job Responsibilities :
1. Lead Engineer for Execution of detailed engineering works for Pig Receiver, Pig
Launcher and Slug Catcher. Responsible for Data Sheet, Specification, Technical
Evaluation and Detail Vendor review.
2. Responsible for Data Sheet, Specification, Technical Evaluation and Detail Vendor re-
view.
3. Handling Study and Handling Layout of Pasar IX ORF Project.
4. Interdisciplinary coordination and interfacing to ensure smooth execution of the engi-
neering work

Mar. 2012 – Lead Mechanical Engineer – PT. Amec Berca Indonesia


Jan. 2013
□ Ruby Tie In Project, a Green Field Onshore receiving gas terminal (Client: TOTAL
EP Indonesia) (30 Million Project)
Key Job Responsibilities :
1. Lead Engineer for Execution of detailed engineering works for Methanol Injection
Package, Instrument Air Compressor and Dryer Package, Finger Tip Slug Catcher, Pig
Receiver, Gas Scrubber, FWKO Drum, Instrument Air Receiver , Utility Air Receiver
and Condensate pump.
2. Responsible for Data Sheet, Specification, Technical Evaluation and Detail Vendor
review
3. Lead Engineer for Reliability, Availability and Maintainability (RAM) Study of Ruby Tie
In Project .
4. Handling Study and Handling Layout of Ruby Tie In Project.
5. Interdisciplinary coordination and interfacing to ensure smooth execution of the engi-
neering work
6. Follow on phase on Vendor Fabrication
7. Provide assistance on Site Installation work, Precommisioning, Commisioning and
Star up working with to the Construction and Commissioning team

Oct. 2012 – Lead Mechanical Engineer – PT. Amec Berca Indonesia


Jan. 2013
□ Eastern Hub Mercury Removal (EHMR) Project (Client: CONOCO PHILIPS Inc, Ltd), a
Brown Field Offshore FPSO Belanak
Key Job Responsibilities :
Ir. KHAIRMEN SUARDI,
M.ENG, IPM
Project Manager

Resume

1. Lead Engineer for Execution of detailed engineering works for Water Injection Pump
Package with 1.1 MW Electric motor, Valves and piping, Instrumentation, electrical,
Unit Control Panel and skid structural.
2. Lead Engineer for Execution of detailed engineering works for Biocide Injection Pump
Package, Valves and piping, Instrumentation, electrical, Unit Control Panel and skid
structural
3. Responsible for Data Sheet, Specification, Technical Evaluation and Detail Vendor re-
view
4. Handling Study and Handling Layout of EHMR Project.
5. Interdisciplinary coordination and interfacing to ensure smooth execution of the engi-
neering work
6. Follow on phase on Vendor Fabrication
7. Provide assistance on Site Installation work, Precommisioning, Commisioning and
Star up working with to the Construction and Commissioning team

Sep 2011 - Senior Mechanical Engineer – PT Saipem Indonesia


Mar. 2012.
OFON Project, Green Field Offshore CPP + LQ – Nigeria (Client: Total EP Nigeria
Limited)
Key Job Responsibilities :
1. Package Engineer for Execution of detailed engineering works for Water Desalination
Packages covering RO Water Maker Package, High Pressure Pumps, Potable Water
Pumps, Chemical injection units and Filters Package, Valves and piping, Instrumenta-
tion, electrical, Unit Control Panel and skid structural.
2. Package Engineer for Execution of detailed engineering works for Potable Water
Treatment Package and Distribution covering UV Sterilization Package, Chemical In-
jection units, PD Pumps, Calorifier Heater Package, Hydrophore Package, Valves and
piping, Instrumentation, electrical, Unit Control Panel and skid structural.
3. Interdisciplinary coordination and interfacing to ensure smooth execution of the engi-
neering work.

Dec 2008 - Senior Mechanical Engineer – PT. Saipem Indonesia


Sep 2011.
□ GAJAH BARU Project, Green Field Offshore CPP + LQ and WHP – Natuna Sea,
Indonesia (Client: Premier Oil Natuna Sea BV) (348 Million Project)
Key Job Responsibilities :
1. Package Engineer for Bid Phase: engineering works for mechanical Static equipment
covering Launchers, Vessel Drums, Scrubbers, Heaters and Iso Tanks. For Package
equipment: Instrument Air Receiver Package, Nitrogen Package and Water Treatment
Package. Performing bid evaluation, vendor selection, and vendor print review.
Ir. KHAIRMEN SUARDI,
M.ENG, IPM
Project Manager

Resume

2. Package Engineer for Execution of detailed engineering works for mechanical Static
equipment covering Launchers, Vessel Drums, Scrubbers, Heaters, ACHE, Filters and
ISO Tanks.
3. Package Engineer for Execution of detailed engineering works for Potable Water
Packages covering RO Water Maker Package, High Pressure Pumps, Potable Water
Tanks Package, Potable Water Pumps and Filters Package, UV Sterilizer Package
and Hot Water Calorifier Package, Valves and piping, Instrumentation, electrical and
skid structural.
4. Package Engineer for Execution of detailed engineering works for Chemical Injection
and Methanol Injection Package covering PD Pumps, Tanks, Valves and piping, In-
strumentation, electrical and skid structural.
5. Package Engineer for Execution of detailed engineering works for Hypochorination
Package covering Electrolitic Cells Generator, Tanks, Centrifugal pumps, Blowers,
Valves and piping, Instrumentation, electrical and skid structural.
6. Interdisciplinary coordination and interfacing to ensure smooth execution of the engi-
neering work.
7. Package Engineer for assistance on Site Installation work, Commisioning and Star up
phase for Launchers, Vessel Drums, Scrubbers, Heaters, Iso Tanks, RO Water Maker
Package, Potable Water Tanks Package, Potable Water Pumps and Filters Package,
UV Sterilizer Package and Hot Water Calorifier Package, Chemical Injection and
Methanol Injection Package.
8. Provide assistance on Site Installation work, Precommisioning, Commisioning and
Star up working with to the Construction and Commissioning team

Dec. 2007 – Sr. Engineer / Temporary Lead Mechanical Eng – PT. Rekayasa Industri
Dec. 2008
Green Field Onshore Propylene Plant (ROPP) Project – Client: PT. Pertamina UP VI –
Balongan, Indramayu – West Java. (248 Million Project)

Key Job Responsibilities :


1. Execution of Basic Engineering in South Korea and detailed engineering works for all
mechanical Static equipment covering Towers (highest tower 100mtrs), Vessel Drums
and Dryers, Filters, Electric Heaters, Spherical Tanks, Shop and Field Tanks (fixed
Cone Roof), Fin Fan Coolers, STHE, Brazed HE, Cold Box, Reactors and boilers.

2. Temporary Lead Engineer for Execution of detailed engineering works works for all
mechanical Static equipment covering Towers (highest tower 100mtrs), Vessel Drums
and Dryers, Filters, Electric Heaters, Spherical Tanks, Shop and Field Tanks (fixed
Cone Roof), Fin Fan Coolers, STHE, Brazed HE, Cold Box, Reactors and boilers.

3. Performing bid evaluation, vendor selection, and vendor print review for all mechani-
cal static equipment.

4. Follow on phase on Vendor fabrication for all static equipments


5. Interdisciplinary coordination and interfacing to ensure smooth execution of the engi-
neering work
Ir. KHAIRMEN SUARDI,
M.ENG, IPM
Project Manager

Resume

6. Senior Engineer for Provide assistance on Site Installation work, Precommisioning,


Commisioning and Star up working with to the Construction and Commissioning team.
Sep. 2006 - Mechanical Engineer – PT. Rekayasa Industri
Dec. 2007
>South Sumatra West Java, a Green Field Onshore Gas Facilities Station Pipeline Con-
struction – Client: PT. PGN at Labuhan Maringgai – West Java

>a Green Field Onshore LPG processing Project - Client: PT LPG Lembak at Lembak,
South Sumatra, Indonesia

Key Job Responsibilities :


1. Execution of detailed engineering works for all static and rotating machinery, main fo-
cus on static.
2. Performing bid evaluation, vendor selection, and vendor print review for all static
equipment (Towers, Vessel Drums, Filter, Scrubbers, Over Head Crane, Tanks).
3. As construction superintendent at plant site, coordinating and supervising the installa-
tion work, commissioning, startup, and maintenance of major Static Equipment.
4. Inspection (Shop and Field) for quality of product from static and rotating equipments
(Raw/ bulk materials inspection, Tanks and vessels inspection, Overhead crane in-
spection, and rotating equipments inspection such as pumps and compressors).

Dec 2006 – Mechanical Engineer – PT. Rekayasa Industri


Sep. 2007
>Kamojang Geothermal Power Plant 1 x 60 MW Kamojang, West Java, Indonesia, Client:
PT Pertamina Geothermal

>Lahendong 2 Geothermal Power Plant 1 x 20 MW Lahendong, South Sulawesi, Indone-


sia, Client: PT PLN

Key Job Responsibilities :


1. Execution of detailed engineering works for all static and rotating machinery, main fo-
cus on static.
2. Performing bid evaluation, vendor selection, and vendor print review for all static
equipment.
3. Inspection (Shop and Field) for quality of product from static and rotating equipments
(Raw/ bulk materials inspection, Tanks and vessels inspection, Overhead Crane, and
rotating equipments inspection such as pumps).

Sep 2005 – Mechanical Engineer – PT. Tripatra Engineering and Constructors


Sep. 2006
Tender Proposal for Following Bids:

• Tender proposal for Ulumbu Geothermal Power Plant 2x2.5 MW project (as engineer), responsi-
ble for design engineering for Pressure Vessel, Tanks, Heat Exchanger, HRSG, HVAC and
Ir. KHAIRMEN SUARDI,
M.ENG, IPM
Project Manager

Resume

pumps.
□ Tender proposal for Energi Musi Makmur Gas fired Power Plant 4 x 58 MW project (as coordina-
tor engineer) , responsible for design engineering for Pressure Vessel, Tanks, Heat Exchanger,
HRSG, HVAC and pumps.
□ Tender proposal for Indo Medco Power Gas Fired Power Plant 2x 40 MW project (as engineer),
responsible for design engineering for Pressure Vessel, Tanks, Heat Exchanger, HVAC and
pumps.
□ Tender proposal for Gas Booster Station Project (as engineer); Client: PT. Transportasi Gas In-
donesia, responsible for design engineering for Pressure Vessel, Tanks, Heat Exchanger,
HVAC and pumps.
• Tender proposal for Oil Processing Facilities and LPG Facilities Ujung Pangkah Liquid Devel-
opment Project (as engineer); Client: Amerada Hess (Pangkah – Indonesia) Limited, responsi-
ble for design engineering for Pressure Vessel, Column Treating Vessel, LPG Storage Sphere,
Electrostatic Treater, Field Erected Tanks, Heat Exchanger, HVAC and pumps. Proposal was
the winner for project execution.
• Tender proposal for Floating Roof Oil Storage Tanks Project (as engineer); Client: Amerada
Hess (Pangkah – Indonesia) Limited, responsible for design engineering for Floating Roof Oil
Storage Tanks. Proposal was the winner for projectexecution.
• Tender proposal for Oil Processing Facilities Jambi Merang Liquid Development Project (as en-
gineer); Client: JOB Amerada Hess – Pertamina, responsible for design engineering for Pres-
sure Vessel, Column Treating Vessel, LPG Storage Sphere, Electrostatic Treater, Field Erected
Tanks, Heat Exchanger, HVAC and pumps.

Key Job Responsibilities :


1. Responsible for design engineering on static and rotating equipments (main focus job on
static equipments).
2. Prepared Data Sheet as per Client Specification.
3. Prepared Technical Bid Analysis and Commercial Bid Analysis

July 2002 – Mechanical Research Engineer, Mechanical Lecturer – University Technology


May 2005 Malaysia

Key Job Responsibilities :


1. Hands on Research Project on Malaysian Government Ministry Science and Technology
under project theme “Low Temperature Corrosion Behavior of γ-TiAl”.
2. Lecture for Material science, Metallography, Physical Metallurgy, Corrosion, Metal forming
and shaping, failure analysis (Total 6 SKS in 1 semester).

March 2001 – Maintenance Engineer – PT Trimanggada Nusantara Lines-Gear Bulk Ag, Jakarta
July 2002 Indonesia

Key Job Responsibilities :


Ir. KHAIRMEN SUARDI,
M.ENG, IPM
Project Manager

Resume

1. Monitoring Vessel Maintenance Scheme Plan, responsible for any maintenance on struc-
tural, static and rotating equipments on ship.
2. Monitoring and Coordinating any Ships Repair and Material Order.
3. Monitoring and Prepare any Ships Certificate.
4. Internal Auditor for ISM CODE and ISO 9000.
5. Assisting Superintendent in Vessel Dry Docking.

Registrations/Affiliations
- Persatuan Insinyur Indonesia (PII) , Member no: 0901.09.025010

- Registered as level “Insinyur Professional Madya (IPM), SIP No: 0901.09.025010. The
level in equal to PE or ASEAN Professional Certified Engineer.

- Registered and certified as “Ahli Mekanikal Madya”, from Lembaga Pengembangan Jasa
Konstruksi (LPJK), no registration: 1.2.301.2.142.04.1087020.

Publications/Presentations

Proceeding Papers Publication (July 2002 – June 2005):

1. E. Hamzah, K. Suardi, A. Ourdjini and K.W.Lau. 2002. Effect of heat treatment on microstructure and
properties of γ-base titanium aluminide. Proc. 11th Scient. Conf. E.M.S of Malaysia: 103 – 110.
2. E. Hamzah, K. Suardi, A. Ourdjini and K.W.Lau. 2003. Effect of cooling rate on the microstructures
and hardness of γ-base titanium aluminide. Proc. 3rd Int. Conf. R.A.M 2003: 416 – 424.
3. Khairmen Suardi, E. Hamzah and A. Ourdjini. 2003. Effect of alpha-2 and gamma phases on the sus-
ceptibility to hydrogen attack of gamma-base titanium aluminide. Proc. Conf. Malaysian Science
and Technology Congress: 98.
4. E. Hamzah, Khairmen Suardi, A. Ourdjini. 2003. Corrosion behavior of heat treated gamma-base tita-
nium aluminide after hydrogen attack under immersion in 1.0 m sulfuric acid solution. Proc. 12th Sci-
ent. Conf. E.M.S of Malaysia: 134 – 143.
5. E. Hamzah, Khairmen Suardi, and A. Ourdjini. 2004. Effect of chromium content on titanium alu-
minide due to hydrogen attack under immersion in severe acid solution. Proc. 4th Int. Mat. Tech. Conf.
Exh: 600- 608.
6. Khairmen Suardi , E.Hamzah and A.Ourdjini. 2004. Effect of heat treatment on the diffusion coefficient
of hydrogen absorption in gamma titanium aluminide. Proc. 3rd Int. Conf. Adv. Man. Tech (accepted
for oral presentation on May, 11th – 13th 2004).
7. E.Hamzah, K. Suardi and A.Ourdjini. 2004. Effect of microstructures on the hydrogen attack to gamma
titanium aluminide at low temperature. Proc. First Cappadocia Int. Mech. Eng. Sym. (accepted
for oral presentation on 14- 16 July 2004 at Cappadocia, Turkey).
8. K. Suardi, E. Hamzah and A.Ourdjini, 2004, X-ray diffraction Analysis on Gamma Titanium Aluminide
Subjected to Hydrogen Attack. Proc. ICXRI-2004 Int. Conf. on X-Rays and Related Techniques in Re-
th th
search and Industry (accepted for oral presentation on September, 15 -16 2004 at Penang Malay-
sia).
9. E. Hamzah, K. Suardi and A. Amrin, Applicability of Titanium Aluminides in Oil and Gas Production.
Proc. Int. Conf on Material Selection, Application and Inspection for Upstream Oil and Gas (accepted
th th
as keynote speaker paper on September, 28 -29 at Kuala Lumpur).
Ir. KHAIRMEN SUARDI,
M.ENG, IPM
Project Manager

Resume

10. E. Hamzah, K. Suardi, A. Amrin. High and Low Temperature Corrosion Behavior of Gamma Titanium
Aluminide. Proc. 13th Scient. Conf. E.M.S of Malaysia 2004 (accepted for keynote speaker presenta-
tion on December 2004 at Putra Jaya, Kuala Lumpur).
K. Suardi, E. Hamzah and A. Ourjini. Hydrogen Attack on Chroium Added γ-Ti-48%Al. Proc. 8 Inter-
th
11.
th
national Conference on Quality in Research 2005. (Accepted for oral presentation on 8-9 August
2005, FTUI Depok Indonesia).
E. Hamzah, K. Suardi and A. Ourjini. Hydrogen Attack on Heat Treated γ-Titanium Aluminide. Proc. 2
nd
12.
th
Asian Conference on Material Science and Technology (Accepted for oral presentation on 5-6 August
2005, LIPI Jakarta, Indonesia).

Journal Papers Publications (July 2002 – July 2004):

1. E. Hamzah, K. Suardi, A. Ourdjini and K.W.Lau. 2003. Effect of heat treatment on microstructure and
hardness of g- base titanium aluminide (TiAl). Journal Ins. Mat. Mal. 4: 83 – 101.

2. Khairmen Suardi , E.Hamzah, A.Ourdjini and V.C. Venkatesh. 2004. Effect of heat treatment on the
diffusion coefficient of hydrogen absorption in gamma titanium aluminide. Journal Mat. Proc. Tech.
Elsevier. (accepted for publication).
3. E. Hamzah, Khairmen Suardi, and A. Ourdjini. 2004. Effect of chromium content on titanium alu-
minide due to hydrogen attack under immersion in severe acid solution. Journal Ins. Mat. Mal. (accept-
ed for publication).
5. E.Hamzah, K. Suardi and A.Ourdjini. 2004. Effect of microstructures on the hydrogen attack to gam-
ma titanium aluminide at low temperature. Journal Material Science and Engineering Part A. 397/1-
2: pp. 41-49.

Specific Technical Expertise


• PV Elite

• Compress

• Tank Coade/ E Tank

• Windows, MS Office (Word, Excel, Power Point, Access), Internet

Specific Specialist Courses


• Design Engineering for Fire Water Pump Package, an inside of detail engineering Fire Water Pump
Package, Held by PT Saipem Indonesia, 2011.
• Design Engineering for Diesel Engine Generator Package, an inside of detail engineering Diesel Engine
Generator Package, Held by PT Saipem Indonesia, 2011.
• Design Engineering for ORMAT Energy Converter Package, an inside of detail engineering ORMAT En-
ergy Converter Package, Held by PT Saipem Indonesia, 2011.
• Design Engineering for Gas Dehydration Treatment and Processing Package, an inside of detail engineer-
ing Glycol Regeneration Packages, Methanol Injection Packages, Held by PT Saipem Indonesia, January
2010.
• Inspection for Tank API 650 and Pump API 610, held by PT Rekayasa Industri Engineering and Construc-
tors, June, 8th 2007.
• Inspection for Pressure Vessel ASME VIII and Overhead Crane, held by PT Rekayasa Industri Engineer-
ing and Constructors, June, 7th 2007.
Ir. KHAIRMEN SUARDI,
M.ENG, IPM
Project Manager

Resume

• Design and Inspection for Fire Heater, Shell and Tube HE, Boiler, ACHE, PHE, held by PT Rekayasa In-
dustri Engineering and Constructors, May, 4th 2006.
• Design and Inspection for Packaged Unit in Oil and Gas Industry, held by PT Rekayasa Industri Engineer-
ing and Constructors, June, 4th 2006.

th
Inspection for Blasting and Painting, held by PT Rekayasa Industri Engineering and Constructors, June, 7 -
th
11 2007.
• Quality Control Manual, held by PT Rekayasa Industri Engineering and Constructors, November, 14th
2006.
• Process Welding Quality, held by PT Rekayasa Industri Engineering and Constructors, November, 13th
2006.
• Tank design and calculation (Tank Coade Application), held by PT Tripatra Engineering and Constructors,
May, 11 - 12 2006.
• Vessel Design and Calculation (PV elite application), held by PT Tripatra Engineering and Constructors,
May, 9 - 10 2006.
• Piping engineering, piping design and piping standard and code, held by PT tripatra Engineering and Con-
structors, December, 1st 2005.
• Valves and its application, held by PT Tripatra Engineering and Constructors, December, 30 2005.
• Pumps and its application, held by PT Tripatra Engineering and Constructors, January, 9 2006.
• Short Course on Risk Base Inspection, held by Faculty of Chemical Engineering Dept. Petroleum Engi-
neering UTM, July 5 – 8, 2004.
• Workshop on advance metallography technique and microstructure analysis for engineering application,
April 9-10 2003, Skudai UTM.
• Superintendent Vessel Maintenance Engineer Course (Role of Superintendent, Ships maintenance, Class
regulation, IMO/IACS regulations, Ships rules and regulations, Project Costing). Held by DNV Indonesia,
th th
Bandung Indonesia, June 8 -13 2002.
• ISM CODE Internal Auditor Course, Held by Biro Klasifikasi Indonesia (BKI), Puncak Indonesia, October,
th th
24 -26 2001.
• Course and Exercise on: Introduction, Documentation technique and Internal Quality Audit of ISO 9000,
April 5 – 8 2000, Bandung Indonesia, held by Lembaga Bantuan Management Indonesia.
• English Language Course on Conversation Class,January – November 2000 at Lembaga Bahasa Asing
LIA ,Jakarta.
• 11th Scientific Conference on Electron Microscopy Science of Malaysia, 12-15 December 2002, Stulang
Laut Johor Bahru Malaysia, as author and presenter of scientific paper.
• Conference of Malaysian Science and Technology Congress, 23-25 October 2003, Kuala Lumpur Malay-
sia, as author and presenter of scientific paper.
• 3rd International Conference on Advance Manufacturing Technology, 11-13 May 2004, Kuala Lumpur Ma-
laysia, as author and presenter of scientific paper.
• ICXRI-2004 International Conference on X-Rays and Related Techniques in Research and Industry, 15-16
September 2004, Penang Malaysia, as author and presenter of scientific paper.

nd
2 Asian Conference on Material Science and Technology, 5-6 August 2005, Jakarta Indonesia, as author
and presenter of scientific paper.

th
8 International Conference on Quality in Research 2005, 8-9 August 2005, Depok Indonesia, as author
and presenter of scientific paper

Organization
Past

• Tutor on "Orientasi Perguruan Tinggi" in 1999 & 2000.


• Chief of Bureau Production 1998 – 1999 at Student Co-Ops FTUI.
• Head of Business Development Division 1999 – 2000 at Student Co-Ops FTUI.
• Board of Auditing Committee 2000 – 2001 at Student Co-Ops.
• Taekwondo Club University of Indonesia From 1998 – present as member.
Ir. KHAIRMEN SUARDI,
M.ENG, IPM
Project Manager

Resume

• Chief of external relation division at Indonesian Student Society Organization-UTM, July 2003- July 2004.
• Member of Institution Materials Malaysia, July 2002 – June 2005.

Present

• Member of The Institution Of Engineers Indonesia, No: 0901.09.025010.


ATTACHMENT PERSONEL’S CURRICULUM VITAE

Deputy Engineering Leader


ARYO PRIBADI WICAKSONO
SENIOR PROCESS ENGINEER / CORROSION ENGINEER
Project:
PT PERTAMINA HULU MAHAKAM – FEED SMK LLP
COMPRESSION PROJECT This project covered installation
new LLP Compressor System in existing facilities.

The responsible for this project are checking and approving


detailed process engineering document such as:
♦ PFD and P&ID
♦ Project Design Basis
♦ Equipment Sizing Report
♦ Line Sizing Report
♦ PSV and BDV Sizing
♦ Vent Network Study
♦ Equipment List
♦ Line List
1. PROPOSED POSITION : ♦ Emergency Shutdown Logic Diagram
Deputy Engineering Leader
PT PERTAMINA HULU MAHAKAM – FEED PECIKO 8B
2. NAME : LLP COMPRESSION PROJECT This project covered
Aryo Pribadi Wicaksono installation new LLP Compressor System in existing facilities.
HP: 089654073090
Email: pribadi.aryo@gmail.com The responsible for this project are checking and approving
detailed process engineering document such as:
♦ PFD and P&ID
3. DATE OF BIRTH : ♦ Project Design Basis
Jakarta, December 23, 1981
♦ Equipment Sizing Report
♦ Line Sizing Report
4. NATIONALITY ♦ PSV and BDV Sizing
Indonesian
♦ Vent Network Study
♦ Equipment List
5. EDUCATION ♦ Line List
Graduate student of Chemical Engineering Department,
♦ Emergency Shutdown Logic Diagram
Faculty of Engineering, Gadjah Mada University,
Yogyakarta – Indoensia
PT PERTAMINA HULU MAHAKAM – PRE-FEED PECIKO
8B LLP COMPRESSION PROJECT This project covered
6. OTHER QUALIFICATIONS / TRAINING /CERTIFICATION installation new LLP Compressor System in existing facilities.
QUALIFICATION
Process Engineer has good knowledge in International The responsible for this project are checking and approving
Standard and Code (API, NORSOK), good spoken and detailed process engineering document such as:
written in English, and good software capability (MS ♦ PFD and P&ID
Office, HYSYS, PIPEFLOW, and PIPESIM) ♦ Project Design Basis
♦ Equipment Sizing Report
♦ Line Sizing Report
♦ Line List
7. LANGUAGES AND PROFICIENCY IN EACH
♦ Emergency Shutdown Logic Diagram
Language Speaking Writing Reading
Position held:
Indonesia Native Native Native Process Engineer
English Good Good Good
Project:
PT PLN PERSERO - PEKERJAAN PENYUSUNAN
8. COUNTRIES OF WORK EXPERIENCE FEASIBILITY STUDY (FS), FRONT END ENGINEERING
Indonesia DESIGN (FEED), DAN HARGA PERKIRAAN ENJINIRING
(HPE) INFRASTRUKTUR GAS KLASTER SULAWESI This
9. EMPLOYMENT RECORD: project covered installation new Re-gasification facility in
Kolaka, Southeast Sulawesi.
QUALIFICATION
Process Engineer has good knowledge in International The responsible for this project are checking and approving
Standard and Code (API, NORSOK), good spoken and detailed process engineering document such as:
written in English, good software capability (MS Office, ♦ Line Sizing Report
HYSYS, FLARENET, PIPEFLOW, and PIPESIM), and ♦ Line List
participating in HAZOP.
Position held:
EMPLOYMENT EXPERIENCE Lead Process Engineer

November 2014 – present Project:


PT SINGGAR MULIA MEDCO E&P MALAKA – DED FTP BLOCK-A
DEVELOPMENT PROJECT. This project covered installation
Position held: of new Flowline, Trunkline, Pipeline, and Sales Gas Pipeline
Senior Process Engineer in Block-A Field, Aceh, Indonesia

Page 1 of 4
ARYO PRIBADI WICAKSONO
SENIOR PROCESS ENGINEER / CORROSION ENGINEER
The responsible for this project are checking and approving and Compression System, located in North Java Sea, West
detailed process engineering document such as: Java. The facility consists of Separator, Closed Drain,
♦ Project Design Basis Compressor, and Pump.
♦ Flowline, Trunkline, & Pipeline Philosophy Responsibilities:
♦ PFD and P&ID ♦ PFD and P&ID
♦ Flowline, Trunkline & Pipeline Hydraulic Simulation ♦ Equipment Sizing Report
♦ PSV and BDV Sizing ♦ Line Sizing Report
♦ Line Sizing & Line List ♦ Relief and Blowdown Study

Position held: August 2012 – September 2013


Lead Process Engineer PT AMEC BERCA INDONESIA

Project: Position held:


PT PERTAMINA HULU ENERGY WMO – Blanket Senior Process Engineer
Engineering Services This project covered 7 (seven) Work
Order (WO) as listed below: Project:
1. PPP Flare Improvement Study PT PERUSAHAAN GAS NEGARA – Pemindahan Stasiun
2. Process Design for PPP Flare Engineering Assessment Pasar IX dan Fasilitasnya. This project covered installation
3. PPP Laser Scan As Built of Stasiun Pasar IX located at North Sumatera.
4. Poleng Mini Custody Metering Responsibilities:
5. ORF Ground Flare Relocation ♦ HYSYS Process Simulation
6. Detail Design Compact Test Separator of PHE-30 ♦ HMB, PFD and P&ID
7. Optimization of Poleng Allocation Meter System ♦ Equipment Sizing Report
♦ Line Sizing Report
The responsible for this project are checking and approving ♦ Relief and Depressuring Study
detailed process engineering document such as: ♦ Adequacy Existing Facility Report
♦ PFD and P&ID ♦ SAFE CHART
♦ Shutdown Philosophy
♦ Operating and Control Philosophy Project:
♦ Project Design Basis CONOCO PHILLIPS INDONESIA Inc. Ltd. – South Belut
♦ Equipment Sizing Report Development Project. This project covered detailed
♦ Line Sizing Report engineering of South Belut Development Project located at
♦ Relief and Emergency Depressuring Study flare stack located in South Natuna Sea, Riau. The facilities
♦ Equipment List consist of Separation System, Compressor System, and Flare
♦ Line List System.
♦ SAFE CHART Responsibilities:
♦ Shutdown Matrix Diagram ♦ HYSYS Process Simulation
♦ HMB, PFD and P&ID
Position held: ♦ Equipment Sizing Report
Senior Process Engineer ♦ Line Sizing Report
♦ Relief and Blowdown Study
Project: ♦ Emergency Depressuring Report
PT PERTAMINA EP CEPU – Gas Development Project for ♦ Adequacy Existing Facility Report
the Unitization of The Jambaran-Tiung Biru Field. This ♦ SAFE CHART
project covered installation of Gas Plant located at Cepu,
Central Java, Indonesia March 2012 – August 2012
Responsibilities: BP BERAU (3rd Party Contract under PT DEPRIWANGGA)
♦ PFD and P&ID
♦ Equipment Sizing Report Position held:
♦ Relief and Emergency Depressuring Study Process Engineer
♦ Equipment List
♦ Line List Project:
♦ SAFE CHART BP BERAU Ltd. – RSME Project. This project covered
verification and validation of existing flare system facilities
September 2013 – October 2014 (PSV scenarios, PSVs device, tail pipe, flare header, Flare
PT MEINDO ELANG INDAH KO Drum, and flare stack located in Bintuni Bay, Papua.
Responsibilities:
Position held: ♦ PSV Scenarios Verification
Senior Process Engineer ♦ Flare System Optimization

Project: Dcember 2011 – March 2012


Mini LNG Bali Project. This project covered installation of PT. DEPRIWANGGA – ENGINEERING CONSULTANTS
LNG Plant located at Bali.
Responsibilities: Position held:
♦ PFD and P&ID Process Engineer
♦ Equipment Sizing Report
♦ Line Sizing Report Project:
PERTAMINA HULU ENERGY ONWJ – UL Field
Project: Development STC 0687. This project covered installation of
PERTAMINA HULU ENERGY ONWJ – KL Field Separation and Compression System, located in North Java
Development. This project covered installation of Separation Sea, West Java. The facility consists of Separator, Closed
Drain, Compressor, and Pump.

Page 2 of 4
ARYO PRIBADI WICAKSONO
SENIOR PROCESS ENGINEER / CORROSION ENGINEER
Responsibilities: ♦ Prepare line sizing
♦ Prepare PFD and P&ID UL Field Development ♦ Prepare Process Data Sheet
♦ Optimization and De-bottlenecking study report
♦ Relief and Drain calculation June 2007 – February 2009
♦ Shutdown Philosophy PT. LOKA WAHANA USAHA – Subsidiary of PT. PRIME
PETROSERVICES, EPCI and Rental Oil and Gas
March 2009 – Dcember 2011
PT. SINGGAR MULIA – ENGINEERING CONSULTANTS Position held:
Process Engineer
Position held:
Process Engineer Project:
PT KALILA (BENTU) LIMITED – Seng and Segat Field
Project: Development. This project covered engineering of new Gas
Plant located at approximately 90 km South East from Pekan
CHEVRON MAKASSAR LIMITED – Bullhead System Baru, Riau Province, Sumatra Island. The facilities consist of
Upgrade. This project covered installation of Bullhead Separator, Gas Scrubber, Glycol Dehydration Unit, and Liquid
System at TLP-A West Seno Facilities, located in Makassar Tank with capacity 60 MMSCFD.
Strait, East Kalimantan. The Bullhead System consists of Responsibilities:
Bullhead Tank, Bullhead Charge Pump, Diesel Filter, ♦ Prepare PFD and P&ID
Bullhead Pump, and Electric Heater. ♦ Prepare line sizing
Responsibilities: ♦ Equipment sizing (Separator, Gas Scrubber, KO Drum,
♦ Prepare PFD and P&ID Bullhead System Upgrade KO Drum Pump)
♦ Prepare line sizing ♦ HYSYS simulation
♦ Calculation (Utility Consumption, Relief Load) ♦ PIPESIM simulation
♦ Prepare Process Data Sheet ♦ Flare Sizing and Radiation Study
♦ Prepare Process Data Sheet
Project:
CHEVRON MAKASSAR LIMITED – Oil Surge Tank West Project:
Seno. This project covered re-using of Void Tank to Oil Surge PT. INDOGAS KRIYA DWIGUNA – Installation of CNG
Tanks at FPU West Seno Facilities, located in Makassar Compressor. This project covered installation of compressor
Strait, East Kalimantan. for CNG Facility.
Responsibilities: Responsibilities:
♦ Prepare PFD and P&ID ♦ Prepare line sizing
♦ Prepare line sizing ♦ Vent Sizing and Radiation Study
♦ Prepare Process Data Sheet
Project:
Project: PT SEMBERANI PERSADA OIL – Pipeline Semberah
SBM OFFSHORE – FLNG Lease Feasibility Study. This Binangat Project. This project covered engineering of
project covered FLNG feasibility study located at MASELA, pipeline SEMCO UKM4 to VICO
Maluku. The facility consists of Scrub Column, De-Ethanizer, Responsibility:
De-Propanizer, and De-Butanizer. PIPESIM simulation
Responsibilities:
♦ Prepare PFD Project:
♦ Prepare line sizing PT INSANI MITRSANI GELAM – Gelam Gas Production
♦ Equipment sizing (Scrub Column, De-Ethanizer, De- Facility. This project covered engineering of new Gas Plant
Propanizer, and De-Butanizer) located at Jambi Province, Sumatra Island. The facilities
♦ Prepare Process Data Sheet consist of Separator, Glycol Dehydration Unit, and Liquid
Tank with capacity 2.5 MMSCFD.
Project: Responsibilities:
PETROCHINA INTERNATIONAL JABUNG Ltd. – Betara ♦ Prepare line sizing
Complex Development Phase 4. This project covered ♦ Equipment sizing (Fire Water Demand, Fire Water
detailed engineering of Inlet Compression Betara Gas Plant Pump, Instrument Air, KO Drum Pump)
(BGP) located at Jambi Province, Sumatra Island. The ♦ HYSIS simulation
facilities consist of Slug Catcher, Gas Scrubber, Compressor, ♦ Flare Sizing and Radiation Study
and Cooler with capacity 100 MMSCFD.
Responsibilities: Project:
♦ Prepare PFD and P&ID Inlet Compression Betara Gas PT INDELBERG INDONESIA PERKASA – Suci Gas
Plant (BGP) Production Facility. This project covered engineering of new
♦ Remark PFD and P&ID Gas Recovery Facilities (from Gas Plant located at Gresik, East Java Province. The facilities
FEED document) consist of Production Separator, Liquid Tank, CO2 Removal,
♦ Prepare line sizing Desiccant Dehydration Unit, Custody Meter, KO Drum, and
♦ Equipment sizing (Slug Catcher, Gas Scrubber, Ground Flare with capacity 10 MMSCFD.
Compressor, Cooler) Responsibilities:
♦ HYSYS version 7 simulation ♦ Prepare Process Design Basis
♦ Prepare Process Data Sheet ♦ Prepare PFD and P&ID
♦ Prepare line sizing
Project: ♦ Equipment sizing (Production Separator, Liquid Tank,
EXXON MOBIL– Arun Cluster Liquid Consolidation Phase KO Drum Pump)
2. This project covered installation of produced water pump ♦ HYSYS simulation
for Condensate Water Separator Facility. ♦ Flare Sizing and Radiation Study
Responsibilities:
♦ Prepare PFD

Page 3 of 4
ARYO PRIBADI WICAKSONO
SENIOR PROCESS ENGINEER / CORROSION ENGINEER
Project :
KANGEAN ENERGY INDONESIA – Water Treatment
Upgrade. This project covered installation new Production
Separator, Produced Water Pump, Produced Water
Separation Pump, Hydrocyclone, Hydrocyclone Pump and
Water Treatment Unit for Sepanjang Oil Production Facility
located at Sepanjang Island is located 35 km south of
Pagerungan Besar Island, East Java, Indonesia.
Responsibilities:
♦ Prepare PFD and P&ID
♦ Prepare line sizing
♦ Equipment sizing (Production Separator, Produced
Water Pump, Produced Water Separation Pump,
♦ Hydrocyclone Pump, Instrument Air Demand, and Air
Receiver)
♦ HYSYS simulation
♦ Prepare line list
♦ Prepare equipment list
♦ Prepare SAFE CHART

I, the undersigned, certify that to the best of my knowledge and believe, the bio data contained in this CV
correctly describe myself, my qualifications and my expertise. I, hereby agree and commit to be assigned
during the contract period to perform the Work within specified time frame as defined in each Work Order.

ARYO PRIBADI WICAKSONO

Page 4 of 4
ATTACHMENT PERSONEL’S CURRICULUM VITAE

Lead Civil and Structure Engineer


CURRICULUM VITAE
Private Data
Name : Agus Suryantoro, ST, IPM
Occupation : - Lead/Sr. Civil & Structure Engineer
- Project Engineer
Place/ Birthday : Central Java , 22nd Nov ,1982
Gender/Marital : Male/Married
Religion/Nationality : Islam/Indonesia
Address : Kartasura, Sukoharjo, Central Java
Mobile phone : +62 812 197 190 77
Passport Number : B9384274
E-mail : agus.suryantoro@gmail.com
Linkedin:
https://www.linkedin.com/profile/view?id=AAIAAATV2W4BzG0BbF
tGvwb4OG0LJm-tjLv2bR8&trk=nav_responsive_tab_profile

Summary
Experiences in civil design, construction stage and project management for 13 years
extensive experiences throughout international and national project, combine advance
engineering knowledge and site application method.
- My capacity in design and analysis structure i.e general design steel structure & concrete
structure, define loading, define load combination, define specific member of beam &
column, calculated member capacity, calculated steel connection, calculated concrete
reinforcement, detailing concrete reinforce length development,
Determined single pile bearing capacity and soil bearing capacity from CPT & SPT data,
calculate deep pile foundation type, shallow foundation type and calculated heavy
machinery foundation (dynamic) type.
- My capacity in construction work involved in calculated and arrange heavy lifting structure
and equipment (define SWL crane, calculate Pad eye/lifting lug), preparing construction
method and installation procedure. And familiar in project management application such
controlling schedule & budgeting, MTO, pricing and Vendor Evaluating.

Education
Bachelor Degree, Civil Engineering, Engineering Faculty, Gadjah Mada University (2000-2005)
(GPA 3.42/4.00) Academic Paper: Homogenous Soil Embankment Stability Analysis by finite
element method.
Agus Suryantoro, ST, IPM
Mobile Phone: +62 812 197 190 77 (Indonesia)

Works Experiences
Employer: CONSULTANT ENGINEERING
Position : Project Lead Engineer
Period : 01 Jan 2017– Present
Project : FEED - Gas Pipeline Development for domestic
consumption.
Key Skill: Project management, Engineering Design, STAAD Pro,
AutoCAD, Ms. Excel, MTO & BoQ,
Report to: Project Director
Job description / Responsibility:
 Coordinate interface discipline, mechanical, pipeline, E&I and civil, developing
topographic survey and consumer location become optimum pipeline alignment.
 Provide engineering calculation for structure, foundation shelter Metering, Regulating
and Station. Structure modeled as frame with pin connection at foundation (material
ASTM A36/SS-400), connection bolt as fix connection at frame type, and pin type in
structure modeled as truss member (ASTM A-325M), structure design by STAAD Pro as
per AISC-ASD.
 Provide engineering calculation for pipe support (gathering pipeline diameter 12”) and
foundation itself. Pipe support by WF profile and pipe sch.40 and connection type use
fillet welding electrode E60xx (WPS and PQR approved).
 Approved, review, design and drawing before submitted to client (ESDM / Energy and
Mine Resources Ministry). Review engineering drawing and fabrication drawing as per
standard drawing.
 Prepared overview and calculation presentation to client.
 Developing calculation procedure, basic civil philosophy.
 Interfacing with others discipline, developing communication system among them.
 Monitoring project progress, planning the recovery and speed up strategy to achieved
the target.

Employer: BP LNG Tangguh


Position : Project Engineer (Work pack Engineer)
Period : 01 July 2014 – 30 Sept 2016
Project : Category-C Project / Civil Blanket Project
Key Skill: Project management, Engineering Design, method
Statement, Task Risk Assessment, Erection structure, MAXIMO,
Microsoft Project, STAAD Pro, Auto Cad.
Report to: Construction Team Leader
Job description / Responsibility:
 Prepared work pack for every single project that include; describe project summary,
define detail scope of work, management of change, site query, prepared project
execution plan, engineering method statement, job risk assessment (L2RA), PTW (permit
to Work), Schedule 2WLAH, 6WLAH, BP procedure, completion procedure, MAXIMO
work order, manpower planning, equipment planning mobilization schedule, MSDS, and
lesson learn.
 Work-pack (project modification) has been done,

Page 2 of 9
Agus Suryantoro, ST, IPM
Mobile Phone: +62 812 197 190 77 (Indonesia)

1) Sludge Catcher modification, modified existing catcher with new finger type catcher
due to pipeline pigging activity. foundation precast concrete, upper structure steel
frame, tapping to existing live pipeline (Hot Tapping), lifting precast on brown field area.
2) BOG cliff Protection, to protect cliff from abrasion by putting geo bag layer in cliff toe,
and next project to be strengthened by pumping dredging mud in front of cliff.
3) CWAA refurbishment, upgrading existing wood structure with new steel structure in
area incinerator, chipper, composter and loading-unloading waste material.
4) NEW Potable Tank dormitory area, Build new potable tank to increase the capacity
water storage due to additional worker on board.
5) BOG Dehumidifier modification, to optimized instrumentation perform of BOG shall be
equipped by dehumidifier (controlling temperature and moist)
6) Road patrol & securities project, upgrading quality road patrol and security facility.
 Develop Job safety analysis, level 1 Task Risk Assessment (for routine activities), level 2
Task Risk Assessments, and brought to high level risk assessment based on 8x8
probability-severity diagram, Deliver major safety campaign program to contractor
worker by daily tool box, safety tool box meeting and monthly safety town hall meeting.
 Monitoring project under civil blanked contract, performance schedule (SPI), Commercial
Performance (CPI), and Earn Value management. Make a planning of manpower,
equipment and material when it shall be mobilized and demobilization.
 Ensure the project execution by prepared activities planning for 2 Weeks ahead, 4 Weeks
ahead, 8 Weeks look ahead before execution, including administration, material,
engineering document, and budget. Submit our planning to maintenance and logistic
department as highlight activities to be considered.
 Supervised project execution to guarantee that project will be done as per ITP, schedule
and budget AFE (Authorization for Expenditure) approved by SKK Migas.
 Prepared Project Execution Plan / Construction method statement for work pack above,
including lifting arrangement and engineering calculation.
 Interface coordination among department, to support the project success, logistic
infrastructure, lifting team, workshop team, maintenance team, operating team and
engineering team.

Employer: Pertamina EP Cepu


Position : Sr. Structure / Civil Engineer
Period : 01 July 2012 – 30 June 2014
Project : FEED JAMBARAN-TIUNG BIRU (JTB) Gas Development
Project cap. 330 MMSCFD
Key Skill: Civil design, structure design, interface management, Cost-
Time-Resources, Microsoft Project, Ms. Project, STAAD Pro,
AutoCAD.
Report to: Lead Engineer / Engineering Manager

Page 3 of 9
Agus Suryantoro, ST, IPM
Mobile Phone: +62 812 197 190 77 (Indonesia)

Job description / Responsibilities:


 Prepare bundle EPC project Package-A for “early civil work gas Jambaran-Tiung Biru
development Project”, including
1) Define scope of work to be delivering by contractor. The scope of work including:
Construct access road 14 km for heavy truck loaded RIG Century Dynamic 25, (major
specification sub-grade CBR 4%, sub base course by local soil typ. SC-GC, degree of
compaction 90%. Construct well pad foundation for drilling activity equipped by water
pit, mud pit, flare pit, diverted pit, fence, “handak” warehouse, temporary camp,
utility, sewer and drainage and security post.
2) Review and monitoring engineering consultant during develop engineering product
(drawing, calculation design, and schedule) by LAPI-ITB & UTC (Upstream Technology
Center-PERTAMINA)
3) Developing budget and schedule as tender owner basis.
 Preparing bundle project Package-B “FEED JTB Gas development project”, including:
1) Prepared civil design basis & philosophy for early civil work, Prepared preliminary Gas
plot plant layout, Non Process Facility Area integrated to Process facility. Refers to
national such SNI 1726-2012, and international code such ASCE 7-95, ACI-318, AISC-
ASD 9th edition
2) Manage acquisition primary and secondary data as consultant’s basic design. Soil
investigation report, soil resistivity report, shallow refraction report, hydrology-
weather report, geological report, and topography report.
3) Perform Heavy Haul Transportation study
4) Creating CTR (Cost, Time and Resources) for giving instruction to contractor

Employer : JGC Gulf International


Position : Field Civil / Structure Engineer
Period : 24 Nov 2010 – 20 Nov 2011
Project : Sea Water Treatment (RO) Expansion Project (SAUDI
ARAMCO) – Saudi Arabia
Key Skill: Method statement, erection steel, site management, job
risk assessment, STAAD Pro, Sketch up, Ms. Office, AUTOCAD 2D.
Report to: Site Manager
Job description / Responsibilities:
 Engineering phase:
 Preparing Structure software design template (STAAD Pro) as per SAES (Saudi Aramco
Engineering Standard)
 Preparing engineering calculation design. (Structure roughing filter, fine filter,
chlorination, RO unit). Steel profile structure optimizes design (checking moment,
shear, axial, punch, torsion, slenderness), design steel connection by bolt or weld
connection type.
 Heavy foundation engineering calculation for static equipment, rotating machine,
heavy steel structure. Shallow foundation engineering calculation for sleeper and
light structure foundation.
 Preparing steel erection method / Construction method statement. Define crane
requirement, rigging arrangement crane and lifting accessories, erection sequence --
> Lifting plan & schedule.
 Vendor fabrication steel structure review, MTO, detail connection, material
specification, type of connection (moment connection type, shear connection type,
Page 4 of 9
Agus Suryantoro, ST, IPM
Mobile Phone: +62 812 197 190 77 (Indonesia)

axial and truss connection type), dimension check and quantity of material.
 Material erection preparation. Coordinate with warehouse to provide material steel
structure and its part accessories that would be erected.

 Construction phase:
 Due to actual condition, that is way almost designs need to adjust and redesign.
Majority reasons was existing structure clashing with new structure, the as-built
drawing are not update as per actual condition and interface or interference
between others discipline.
 Prepared Field Changed Sheet if our design needs to modified, Site Query if we need
to disturb the owner exiting facility, Site Instruction if we need to inform additional
work / out of scope to our subcontractor (Modern Arab Contractor).
 Prepared lifting plan including crane arrangement, lifting accessories detail, valid
certificate (operator and equipment tagging)
 Prepared engineering calculation to support site engineering decision, Prepared
structure material prior steel structure erection, develop schedule and method
installation.
 Define work sequence; define potential hazard, prepared (TRA) Task Risk Assessment
and conduct tool box meeting prior activity.
 Coordinate our subcontractor, monitoring and reporting progress activity to site
manager.

Employer : JGC Indonesia


Position : CIVIL / STRUCTURE Engineer
Period : 03 May 2010 – 15 July 2012
Project : Asahimas-IV Expansion Project – Cilegon
NDD-12 Development project - Duri
Key Skill: STAAD Pro, Structure Design, Technical Bid Evaluation,
AUTOCAD 2D, Ms. Office.
Report to: Discipline Engineering Leader

Job description / Responsibilities:


 Central gathering Station (CGS), Central infrastructure Facility (CIF) project (PT. Chevron
Pacific Indonesia)
1) Design structure facilities and foundation equipment supporting to CGS-1, CGS-3,
CGS-5 and CIF area. Including foundation for rotary Pump, LV/HV transformer, Pit
Pump, Wash Tank, Flare stack, Scrubber Vessel, Shelter, warehouse and pipe rack.
Coordinate to the others discipline in order to manage the information of change.
2) Define Steel pipe pile dia, 10”, 12” and 14” (Excess pipeline) bearing capacity for deep
pile foundation from SPT and CPT data.
3) Calculated steel structure and concrete structure based on ASCE, AISC 9th edition ASD
and ACI318M codes.
 Asahimas-IV chemical expansion project.
1) Structure engineering design for supporting equipment such as Brain reactor
structure, Caustic soda structure, Chloride structure, pipe rack, steel walkway, steel
shelter, control room building, and substation building as per AISC 9th edition (ASD).
Page 5 of 9
Agus Suryantoro, ST, IPM
Mobile Phone: +62 812 197 190 77 (Indonesia)

- Define design LOADs, (1) Dead Load, (2) LIVE Load, (3) Equipment Load, (4) Pipe rack
& cable tray Load, (5) Wind Load, (6) Seismic Load, (7) Impact Load, (8) Thermal Load,
(9) Bundle Pulling Load, (10) Blasting Load, (11)
- Define typical Load combination for Allowable stress design or Strength design
(LRFD)
-Check the steel member stress ratio (Beam, column, truss), checking the connection
capacity for Shear connection type, moment connection type, and axial connection
type, checking the structure stability (Deflection L/200, Sway H/200), and checking
the slenderness of steel member.
- for dynamic structure or shelter that coverage the dynamic machine shall check the
resonance between structure natural frequency and machine frequency (30% below
or 130% above the frequency of machine.)
2) Pile foundation design for Brain reactor structure, Caustic soda structure, Chloride
structure, substation building. Determined the pile capacity from CPT and N-SPT soil
investigation (Axial and lateral capacity), determined the requirement/number of pile
in every structure column.
3) Shallow foundation design for pipe rack, shelter, sleeper, lighting pole, small pump,
and small transformer. Check the stability overturning, settlement (1 inc) and sliding,
checking the soil bearing capacity and compare with soil capacity as per soil
investigation.
 Structure software design template (STAAD Pro)
 3D isometric review design with others discipline by Navis Frame work.
 Update standard drawing based on client standard.
 Vendor review drawing. (dimension, connection, welding symbol, as per standard
drawing)

Employer : Gunanusa Utama Fabrikator


Position : Structure / Installation Engineer
Period : 01 Oct 2009 – 30 April 2010
Project : ”Ujung Pangkah” Development Offshore Phase II Project,
CPP &AUP Topside, HESS (Ujung Pangkah) Ltd. Gunanusa Utama
Fabrikator
Key Skill: SAP 2000, AUTOCAD 2D Steel structure calculation,
interface coordination, Ms. Office
Report to: Area Project Superintendent

Job description / Responsibilities:


 Calculated the lifting lug / pad eye for hook lifting as per DNV code chapter rules for
marine operation.
 Prepared CPP (Compression Processing Plant) & AUP (Accommodation and Utilities
Platform) Main Deck top side stacking procedure.
 Prepared CPP (Compression Processing Plant) & AUP (Accommodation and Utilities
Platform) Main deck top side lifting procedure.
 Prepare welding procedure and sequence for haunch, girder, main beam, secondary

Page 6 of 9
Agus Suryantoro, ST, IPM
Mobile Phone: +62 812 197 190 77 (Indonesia)

beam and floor plate AUP Top Side Main Deck


 Prepare and maintenance yard facilities related to offshore platform activities. I.e.
prepare road access heavy crane, calculate spreader bar for lifting equipment, calculate
and arrange lifting lug/pad eye for heavy lifting, Prepare and calculate the skid beam
platform for foundation, prepare stool pipe as skid beam support
 Control platform stress and deformation ratio when it was lift/stack up.
 Arrange the crane capacity and movement for lifting CPP (Compression Processing Plant)
& AUP (Accommodation and Utilities Platform) platform.
 Review drafter drawing before submit to client.

Employer : Rekayasa Industri


Position : CIVIL / Structure Engineer
Period : 25 May 2007 – 30 Sept 2009
Project : NH3 Plant (PT. Kaltim Nitrate Industry - Orica)
Key Skill: Budgeting, MTO, Engineering design, standard drawing,
Technical Bid evaluation, Proposal Tender, Direct-indirect Cost,
STAAD Pro, PLAXIS, Ms. Office, AUTOCAD 2D, Win Estimation
Report to: Discipline Manager
Job description / Responsibilities:
 Structure engineering design & calculations by STAAD pro structure software as per
ACI-318 for concrete, AISC-ASD or LFRD for steel structure, IBC, ASCE-07 or local code
such SNI and PPBGI 87 for define load.
 Develop standard drawing for concrete and structure.
 Sub-contractor engineering drawing – calculation review. (Fabrication steel structure,
re-enforcement concrete structure).
 Engineering design and review pile capacity for coal conveyor due to additional coal
embankment in both sides of conveyor. Soft soil beneath the reclamation area are
making sliding effect when coal embankment added, checking the horizontal force
effect to pile sustainability.
 Prepare project proposal bidding price, Indirect cost (Management service,
Engineering service, Procurement service and Construction service). Direct cost
(Engineering Material take off & pricing), convert to user document form submission.
 Vendor engineering and price evaluation, Technical Bid Evaluation (TBE)
 Develop procurement & engineering cost code using WINEST software integrated to
prolog manager and prepare civil data base and cost code

Organization Experience
2013 – Present Project Management Instituted
2013 – Present PII (Persatuan Insinyur Indonesia), member no. 0905-15-032575
Certificate number.: 2-15-00-000718-00
2007 – Present KMI “Komunitas Migas Indonesia”
2013 – Present IAFMI (Ikatan Ahli Fasilitas Migas Indonesia)
2005 – 2006 Trainer, Plaxis Geotechnical Software course, Computer Laboratory of
Civil Department and lecture assistant.

Page 7 of 9
Agus Suryantoro, ST, IPM
Mobile Phone: +62 812 197 190 77 (Indonesia)

2004 – 2005 Vice Head of Civil Engineering Assistance Corps, Civil Engineering Dept.
2004 Head of Assistant Grant Committee, Civil Engineering Dept.
2003 – 2004 Lecture Assistant for Foundation engineering, Irrigation Engineering and
Concrete Technology

Course & Training & SEMINAR


2004 Structure Analysis Program 90 & 2000, PKTS, Yogyakarta
2005 -2006 Lecture project assistant for underground barrage construction for micro hydro
power system project at Bribin Yogyakarta special province. Vertical drilling
shaft by herrenknecht German, barrage construction by WIKA.
2007 WinEst (Budgeting &Analytical Price Software), PT. Estindo Reka Graha, Jakarta
2009 Short Course Minimum Design Loads for buildings and other Structure by HAKI
(Himpunan Ahli Konstruksi Indonesia), Borobudur Hotel, Jakarta
2011 Incident & Injury-Free orientation basic mandatory employee, JMJ Associates,
Tanajib Saudi Arabia
2011 Incident & Injury-Free orientation for supervisor , JMJ Associates, Tanajib Saudi
Arabia.
2012 Optimize GPS navigation for survey and pemetaan, Bandung by Upstream
Technology Center.
2013 Autodesk University Extension Indonesia, Jakarta by Autodesk International
USA.
2013 Project Management Workshop, PMI Chapter Indonesia-SKK Migas, Jakarta.
2013 First Aider level-1, Safety Code, Pertamina EP Cepu, Jakarta
2013 Project Management Training, Project Management Instituted Education
representative Prosys Indonesia, Jakarta
2014 Area Authority (AA) and Personal Authority (PA) training, Upstream Learning
Center, BP LNG Tangguh, Indonesia.
2015 Muhammadiyah University of Surakarta, Key note speaker “Introducing oil & gas
industry Challenge for Civil Engineer ”
2016 IPM (Insinyur Profesional Madya) hold certificate number: 2-15-00-000718-00 (by
PII-Persatuan Insinyur Indonesia).

LANGUAGE & COMPUTER LITERATURE

Bahasa Indonesia : Native Language


English : Professional Language, written: good, speaking: good, listening: good
Arabic : Professional Language, written: enough, speaking: good, listening: enough

STAAD Pro: advance, AUTOCAD-2D: good, Ms. Project: Good, SAP2000: good, PLAXIS: good,
Navis Frame Work: good, Ms. Office: advance, Math cad: good.

REFERENCE

Ir. Bambang Ernanto, Manager SBU Gas PT. Rekayasa Industri

Page 8 of 9
Agus Suryantoro, ST, IPM
Mobile Phone: +62 812 197 190 77 (Indonesia)

Ir. Edi Zanuar Muhtadi, Civil Section Head Department PT. Pertamina EP Cepu
Ir. AAB. Partha Wijaya, Project & Modification Team Leader British Petroleum Berau,Ltd

I declare that all information above is true.


Kindly Regards,
Agus Suryantoro, ST, IPM
+62 812 197190 77
E: agus.suryantoro@gmail.com

Page 9 of 9
ATTACHMENT PERSONEL’S CURRICULUM VITAE

Civil & Structure Engineer


CURRICULUM VITAE
Education
Background
• SD Negeri 1 Sirkandi, Purwareja Klampok, Banjarnegara
• SMP Negeri 1 Purwareja Klampok, Banjarnegara
• SMK Negeri 2 Purwokerto, Banyumas
• Bachelor Degree in Civil Engineering of Bakrie University

ORGANIZATION
EXPERIENCE
CONTACT INFO • Periode 2017-2018

Name : Student Association of Civil Engineering at Bakrie University


Muhamad Nur Faozi
PROFESSIONAL SKILL
Address :
Sirkandi RT3 RW3 Purwareja SUMMARY
Klampok, Banjarnegara • Computer Skills

Mobile Phone : Microsoft office (word, excell, power point), AutoCAD, SketchUp,
085895968401 ETABS, SAP, STAAD.Pro

Email: • Language : Indonesian, English


ojjimuhammad@gmail.com
TRAININGS &
PERSONAL PARTICULARS SEMINARS
• Pelatihan Jarak Jauh LPJK bidang Kepala Pengawas Pekerjaan
Place/Date of Birth: Jalan dan Jembatan (2017)
Banjarnegara, May 5th1999 • Pelatihan Jarak Jauh LPJK bidang Ahli Muda Manajemen Konstruksi
(2019)
Nationality :
Indonesian
EXPERIENCE
Gender :
Male • Drafter Structure at CV. Nirma Cipta (2014)

Marital Status : • Asisten Dosen Ilmu Ukur Tanah, Universitas Bakrie (2018)
Single • Asisten Dosen Gambar Teknik, Universitas Bakrie (2018)
• Asisten Laboratorium Fisika, 2018 (2018)
• Asisten Dosen Ilmu Ukur Tanah, Universitas Bakrie (2019)
• Supervisor at PT. Wiratman Cipta Manggala (2019)
- Thamrin Nine Tower Project
• Structure Engineer 2019-Present)
- 8 km Pipeline Riau Segat and Seng, Pipeline Detail Construction
(2019-2020), on progress
- 7 km NEB#1 Basement Pipeline Construction Detail Design (2019-
2020), completed
- 2 km Sabar#2 Sub-Gathering Line Detail Design (2019),
completed
- GTG and WHRU Instalation at BGP, 1 x 20 MW Power Plant
(2019-2020), on progress
- Boat Crane 150 Ton (2019-2020), on progress
- CPF Bangkudulis (2019-2020), on progress

Scope of work
- Develop calculation sheet for structure and foundation
- Develop drawing for structure and foundation

Declaration:

I declare that all information provided on this CV above (provided by myself) is absolutely true
to the best of my knowledge.

Author

Muhamad Nur Faozi, S.T


ATTACHMENT PERSONEL’S CURRICULUM VITAE

Drafter Engineer Team


CURRICULUM VITAE

Personal Information
Name : Ilham Fakhrurrozi
Place/Date of Birth : Bekasi/26-09-1996
Gender : Laki-Laki
Religion : Islam
Nationality : Indonesia
Phone Number/E-mail : 0895330705622
aim.fi.642@gmail.com
Alamat : Jl.kelimutu M.5 Komp.Kodau V Rt/Rw 004/02
Kel.Jatimekar Ke.Jatiasih Kota Bekasi

Educations

2002-2008 MI.Nurul Islam


2008-2011 SMPIT At-Taqwa 05
2011-2014 SMK Merah Putih (Tekhnik Komputer Jaringan)

Informal Education
March2017-May2017 AutoCad Course at AMD Engineering School
Job Experience

2014-2015 CV.Lafel General Technologi


As Technical Support
2016-2017 Gamer Village Mangga Dua
As Junior Computer Technician
2017-Present PT.Consultant Enjineering
As Drafter
 June-August 2017
Epcc Seberida Metering Station
Scope:
Civil Drawing for Ditch and Fencing Plan
 August-November 2017
Mobile Power Plant And Fixed Type Gas Engine
Power Plant Package III For PLTMG Merauke &
Tanjung Selor
Scope:
Civil Drawing for Engine and Transformer Foundation
 December 2017 – March 2018
FEED & DEDC JARGAS Penajam Pasir Utara
Scope:
Civil Drawing for Safety Equpment Layout & Escape
Route
Piping Long Section Drawing
 November 2018 – Present
GTG & WHRU Installation at BGP
Electrical Drawing for
• Grounding Layout & Section
• Cable Tray Layout & Section
• Power & Control Layout and Section
• Electrical Schematic & Interconnection
Diagram
• Lighting Layout

Declaration:
I declare that all information provided on this CV above (provided by myself) is absolutely
true to the best of my knowledge.

Author

Ilham Fakhrurrozi
CURRICULUM VITAE

Name : Samsul
Place/Date of birth : Palimanan, August,02nd 1986
Nationality : Indonesian
Religion : Moslem
Status : Menikah
Address : Jalan Raya Bogor Km 33
Gang Sawo Rt 01 Rw 02 Kel. Curug
Kec. Cimanggis Kota Depok 16453
Email : samsul0286@gmail.com

Phone Number 081519515107


Qualification : Drafter AutoCAD

Education Formal :
 2002 – 2005 Technical High School SMK Al-Nur – Bogor
 1999 – 2002 Junior High School at MTS Al-Islam - Depok
 1993 – 1999 Elementary School at MI Al-Islam – Depok

Education In Formal :
January 2012– March 2012
- Course AutoCAD at Depok Engineering Drafting School ( DEDS )
October 2013 – December 2013
- Freelance : Project PT. PHE ONWJ
- Job Description : Redraw Structural Jacket And Deck Platform

Computer Skill :
 AutoCAD Release All Version
 Microsoft Office
WORKING EXPERIENCE

Desember 2017–Maret 2018 :


PT.CONSULTANT ENJINEERING
Project : FEED & DEDC JARGAS Penajam Pasir Utara & Balikpapan
Position : Drafter
Scope of work : Civil Drawing for Safety Equpment Layout & Escape Route
: KeyPlan & Pipeline Route
: Alignment Sheet Pipe Distribusi
: Pipe Support & Crossing Pipa PE
: Piping Long Section Drawing

November 2018 :
GTG & WHRU Installation at BGP

Scope of work : Gas Turbine Generator Shelter Architectural Drawing


: Gas Engine Generator Shelter Structural Drawing
: Steel Pipe Rack Utility Piperack Drawing
: Pipe Rack Foundation Drawing
: Foundation Filter, Service Platfom & Pipesupport Layout & Detail
: Piling Plan and Schedule
: Road, Pavement, Sewer and Drainge Layout Drawing
: Platfom Service Detail Drawing
: Fence Layout & Detail Drawing

April 2019 :
FEED for Karamba Field Production Facilities ( Pandawa )

Scope of work : Diesel fuel Pump Foundation Drawing


: Instrument Gas Separator Foundation Drawing
: Foundation Drawing
: Fire Water Pumps Shelter Foundation Drawing
: Pipe Support Foundation Drawing
: Piping Isometic Production Separator
: Piping Isometic Fire Water System
: Piping Isometic Diesel Engine Generator
: Piping Isometic Raw Water System
February 2015–desember 2016 :
PT. BERCA SCHINDLER LIFT
Address : Jl. DR. Ide Anak Agung Gde Agung Lot 5.1,
Kawasan Mega kuningan Jakarta 12950
Position : Drafter
Scope of Work :
: Shop drawing & as built drawing
: Created design plan for requirment the elevator
: Coordinate with fulfilment dept
: Check shaft & site survey
: Support sales dept.
: Detail elevator
: Detail lift

January 2014– Januari 2015 :


PT. EMERSON INDONESIA
Address : Wisma 46 – Kota BNI, 16th Floor Suite 16.01
Jl. Sudirman Kav.1 Jakarta 10220 - Indonesia
Position : Drafter
Project : Axis Telekom Indonesia
Owner : Tower dea
Scope of Work :
: As-Built Drawing
: Installation Cable Drawing
: Rack Baterry GFMJ 1000
: Instrument Symbol & Index Drawing
: Instrument Wiring Diagram
: Rack Baterry View
Owner : Axis Telekom
Project : TOC Surabaya
Scope of Work :
: As-Built Drawing
: Single Line Diagram
: Detail Position Rectifier
: Equipment Layout
: Section & Isometric
: Rack Baterry View
: Detail Position Rectifier Section & Isometric
Januari 2013– Desember 2013:
PT. Gotrans Engineering
Address : Jl. Fatmawati Raya No. 100
Gdg. 100 Floor A, B & C - Jakarta Selatan
Position : Drafter
Project : As-Built Drawing
Owner : PT. PERTAMINA PHE ONWJ Ltd.
Scope of Work :
: As-Built Drawing
: Instrument Diagram Drawing
: Instrument Hook-Up & Detail Drawing
: Loop Diagram
: Instrument Symbol & Index Drawing Instrument Wiring Diagram
: PT. Esdm Kementrian Energi & Sumber Daya Mineral
: Piping plan & Isometric As-built Drawing
: Prepare Piping Plan & Isometric Drawing
: Prepare Piping Plan, Isometric, Equipment Layout & detail
Drawing
: Springkler detail & Isometric As-built Drawing
: Hydrant detail
: Schedule Drawing
April 2012 – Desember 2012:
PT. InfraCELL Nusatama
Address : Word Trade 12th Floor
Jl. Sudirman Kav 29-31 Jakarta 12920
Position : Drafter
Project : Indosat
Owner : PT. Graha Adira
Scope of Work :
: As-Built Drawing
: Installation Cable Drawing
: Loop Diagram
: Instrument Symbol & Index Drawing
: Instrument Wiring Diagram Cable Routing Drawing
Owner : PT. Regata Pratama
Project : Telkomsel
Scope of Work :
: AC Installation & Ventilation
: Jalur Kabel Power & Grounding
: Installation Lighting
: Schematic Diagram
: Control Panel System

Owner : PT. Mega Pekalongan


Project : XL
Scope of Work :
: As-Built Drawing
: AC Installation & Ventilation
: Jalur Kabel Power & Grounding
: Installation Lighting
: Schematic Diagram
: Control Panel System
: Electrical wiring

Declaration:
I declare that all information provided on this CV above (provided by myself) is absolutely true
to the best of my knowledge.

Author

Samsul