You are on page 1of 28
‘Total Sheet 28 sheet Gtuding thie cover ceed Subsontractor’s name_:PVE ENGINEERING Employer [Nahi Son Refinery and Potrochomical LLC. Contractor IGCS Consortium ona 2 fone Projactname + NSRP Complex Project ‘Subcontract No, _:_CNT-6195-SMP5A5B-001 Document Title _:Waste Management Plan ‘Contractor Dox. No.__: VW3160005:4-405 __Revision. No.1 Issue Purpose to Contractor (FA. FO) _=FC ote or DD AESTCOOE ARR tA» aan wha Resubmission Date: CAw/hd Se SO | construction “HSSE acuimomnsen — LED pce [AEE ese ote A A ai ws v.20) fio ovat de ‘erin [osreb “A: Approved without Comment 8: Approved with Comme eee a ‘ss Purpose Emphye FA, FL FLPC Donuen Cbs: X Others m%4 o> WASTE MANAGEMENT PLAN DOCUMENT CLASS: X Issue Purpose _| For Construction rev | coe | Pane _Desrptn woe | 0 | oenerzore] 27 | tsvotr scree pvr | sax | atte ‘Operation Canter 308 Co: ‘Operation Center Deounent No ———— poe Tne. | fame PhanVan Thao | SulQuang st | Huynh Te Thank Cane flint) ay o> JGcS Tic Wa esr [eer mares | mvs INDEX 4. PURPOSE, 4 2. SCOPE. 4 3. DEFINITIONS AND ABBREVIATIONS 5 84 OEFINTIONS. 5 82. ABBREVIATIONS, 6 4, REFERENCE 6 5, RESPONSIBILITIES. 6 54 Site Manager. 6 52 HSSE Manager 7 8 8 8 8 8 153 PVE’ Porsonnel and worker. 6. MANAGEMENT OF WASTE MATERIAL, 64 Planing 62 Waste herarcy 63 Hazardous Waste and nan Hazardous Waste 64 Cinial Waste, ° 55. Santaryfacty 10 6.6 Transportation 10 8.7 Disposal 1" 7. HEALTH AND SAFETY 12 TA Media 42 12 Solely. 2 7.3. Safety Equipment. 8 8. TRAINING: 8 8.1 Training Requirements 18 8.2. Tralning Records “ 8. MONFTORING “4 2.1 Monitoring wast streams. 1“ 82 Inspection 4 10. DELIVERABLE 18 10.1. Waste management Procedures. 16 10.2. Waste storage Hazardous Waste 7 Page 20127 3GCcS ase > 103 Ware estes ® 104 S08 (ise eo cata see, 8 105 wetetesterom, 8 toe waste Consignment ne os 107 Recaro ee sed aso a {0.8 Racal ofimeray fet eqapment and wapcion, 2 109 Tring ard 2 ‘0.10 Recor of ase compare vod for tans an spose) 2 10.11 Reva ose npeton an onconpians, 2 11. AbPENOn 2 Page 327 UGGS a cman “This document sets out the basic eles for exccution ofthe Waste Management Plan (ere nator known a3 WMP) that shal be eppled to the Ste and Ternporary St, In parieuar i idoniies the manner in which awareness, complance, Inspections, ‘ue and corecten,f requree, shal be performed, ‘This document shall show the way for safe handling and dlsposs! methods for al qua and sold wastes generated ding the execution ofthe project shal be dente, ‘The monitoring programs for waste disposal for the Sito and Temporary Sito trough ination consruclon and reinstatement “This document identifies the Prevention and Response Provedue a the document Identfing actions tobe taken in the event of an enviromental ident inven, land, 2 oF water whlch by defini since fa fale in the WP. ‘= PVE’ sctvtles are compliance wih applicable national, and local regulatory fenviormenial documents, pomit conditions, and conactual commimonts uring the so exocutonphese, 2. scope ‘Tis document describes the waste management program to be ulzed by PVE during the she preparation, consiicton of all process plans, general fects, ‘storage and handing facies, utiles and other cerces and ofa ect “This WMP is spose to the construction. The purpose ofthe WM isto assist PVE In managing al appieable waste management issues for the Sto and Temporary ‘Ske during project ination and closure, during constacton, ‘This deciment identi the manner and mechariams of fl implementation of the WMP, and shall deity the monitoring acvtes to be ulled by PVE to ensure that waste management actives. that could potently impact the environment or reputation are irsifod, rantored and conte ‘This WP applies to: +The Ste 1 The Temporary Sit «+ Construction oftces contained within the Ste & Temporary Ske ‘This WMP ehall be dleribvted to al oganizations engaged in the works at Ste and Temporary Ste Specific procedures shall be produced related tothe methods of excoutlon of the WIMP as identified inthe HSE Procedures implementaton mati. Pago 427 gos; e > f ee CGE | oescrsemerworrmosincn comermoret 3a Cbjostios ofthis WIP aot: + Deine the scope of management ‘Iori input to obtain satsactory management «+ Identity the processes tbe lized within which management shall be echleved, «Ident the corto! mechanisms tote tized in err to ensue management DEFINITIONS AND ABBREVIATIONS. DEFINITIONS she Refers tothe area of the project ste as deslgnated by GCS, Engineering controls Enginoering cons are Incorporated into a work actly or test during engineering. andlor procedural. dovelopment ‘Such controls may consist of, but are not Inte to physical barons, and chemical resisiar andr ol proot ters Field controls Fld controls are implemerted ding construction an commissioning aces and ince: awareness training, fre-work planing, detailed jebayetem wal-doun, Splflease prventon ané containment measures, and the proper pecermance of al identiiod ans necessary work prorequites and precautions when working wih hazardous Iaterals, cheméals, and agents or woere there Is the potential for spifng or eleasing same. SplliRelease ‘Any uncontrolled sping, leaking, pumping poring, emiting, fenpiying, dschargng, injecting, escaping, duping, or sposing of materials to the ervrormert. This includes releases ono the land, Ino round or surface waters oF 6 ambient at Hazardous material Hazardous materials include ptrleum-baced material, ans, solvents, chemicals and the clutons in water, and beproducts of chemical reactons fom commissioning aves. Care must also be taken of matorals lables 33 ronrhazardous but constluing a poluant released to carn environments (e., mineral cll based to surface water). Contractor ascs Subcontractor PvE wa Waste Management Plan Pago Sof27 gees 3.2 ABBREVIATIONS Sse Joa, Safely, Secutty and Enviormnent ISA sob Safety Analysts sos Moral Safety Data Shoot NSRP Nohi_ Son Refinery and Petrochemical Limited Lisbitty ‘company wa Waste Management Plan REFERENCES 15-000-1654-0070V Waste Management Plan “+190 14001 & OHSAS 2001: 44.6; Operatlonal Control ‘+ Low on Environmental Protection, §2/2008/0H1 dated 29112008 + Circular 1212011/TT-BTNMT on Hazardous Wastes Management + Deore 59/2007IND-CP on Sold Waste Mangement S. RESPONSIBILITIES 54. Site Manager = Ensure control measures in accordance with this procedure aa implemented for a work under fs conto ‘Aust ane monitor compfance with reference to “S:600-1654-0002V Sito Aust ‘and inspection Pan 2013) + Ensure that parsonnel are vain in the handling and management of waste materials and including hazardous wastes and that the type and contant of traning has been approved by the JGCS Ske HSSE Manager: Ensure that all wastes including hazardous wastes are identfed, handled, stored used and deposed according ta this procedure. Provide Waste Managemen! Procadue induding the deta information of the controling manner of waste disposal = Shall dovelep # Nonshazardous Waste Management Pian that shal, amongst cher things autine whare ta cll, whan to remove and by whom = Ensure PVE's Nomazardous Waste Pian and procedures are submited for ‘Azproval by JOCS before commencing constuction, + Provide appropiate emergency response equpment where waste materials Including hazardous wastes ae being stored. \Whore itis ented that the heath of personnels at risk as @ result of Heir ‘exposut lo wastes provide heath survllance supervised by IGCS, Page 6ot27 a7 e > GGES ee men = Enaure thet necessary controls, including engineering methods, PPE, work pracices and emergency procadures aro in place when working with waste materials including hazardous wastes = Report to JGCS HSSE Manager any spll or hazard cretod by any wastes Including chemical, substances or hazardous mata Se Manager is accountable for ard has the overall contol ofall WMP on st, such a = _ Providing the WNP ant exereise good WNP discipline over al personnel = Pariipading in PVE WMP. [Ensuring that al levels of supervisors ae qulited wth appropiate raining = Describing. and appying similar respenstities as outlined above for ther ‘organization and thr WMP shal be approved by the Contactor. Ensure safe consineton enuipment, tol, ystems and methods and personnel protactve equipment (PPE) is provided dently training needs and implement waning 52. HSSE Manager ‘The Site HSSE Manager takes the lowing oles ad responses Aa the Ste Managarin the general supervision of tha WMP actos Monitor the implementation ofthe waste management progam Assist Superintendent, Superiore and feramen in promoting a Safty prevention spit witin thelr respective work groups, socordng to the spproved safety programs Ensure that PPE in use is suitable and sufclen for purpose Conduct the investigation incase of accidents, incidents and near misses, ard forward te ports the Sta Manager fer submission to Cent andlr concord authocties| ‘Altond wih the Site Manager to HSSE commitee meeting Provide feecback on performance and atsist Supervision to plan and coorcnate the werkt effectively implement all HSSE roquirements Vert the adequacy and application ofthe ste WP and all elated procedures, preparing any revisions [Ensure the requroments of tho WMP are cascaded to vendors COrparize, plan and parcipate in regular scheduled WIMP wak around Inspectons and Audts on sta, prepare a the relevant reports, acto plans; vanity the folow up ae the timely exenuton of he earectve ction ae 4 a m7 ee = Organize anc ccerinae the waste management traning actives = Organize and participate in al evant HSE meetings, ecepare the relevant Minutes OF Neaing (WOM) ‘Comply with he requrements of tis procedure, SWMS and JSA Immediately report to Ste Manager any spl or hazard coated by any wastes Including chemicals, substances or hazardous material and If appropri take ston o contol, contain, and clean-up hazards and spi ‘Altend traning courses on waste management where they are involved with handling er managing waste, = Comply withthe requtment ofthis procedure, and management structions, do not thought eny waste meteral onthe sit, only Keop at designated area end do ot spl and hazardous matron ste, 6, MANAGEMENT OF WASTE MATERIAL 64 Planning LIGCS shall eviow ou work actos ond identity potential wastes that will be generate inchcing eatinalee or quantties where posable, VE wil have the waste management summary guidance, andi wil be updated by PVE folowing tne actual sie needs, The wastes shall bo classi (e0e below) and ‘characterized on the basis cf sours, type, composition, end ts generstion rte Based on the waste management summary guidance, the Waste inventory shall be prepared and updated rogulatly by PVE Environmental Offeer wih actual data and ‘Shale presented tothe JGCS HSSE Manager ona monthly basi. 62. Waste hierarchy ‘The management of wastes should be conducted in accordance wih the Waste Hierarchy as blow. + Consider waste generation and is consequence from the outset of aches. ‘+ Wherever possible, eiminate waste generation '+ Consider supstiutng raw matertals used (In favor of those resulting In to leseernorhazardous wast). + Reduce waste generation st source + Reuse waste matelal where fesile. + Recyie/ recover waste materi where feasible, + Only consider clsposa! trough incineration andlor anal ifthe above options Page sot 27 a IGES| cnn conn comeinone sare notavatabe 83. Hazardous Waste and non- Hazardous Waste Hazardous Waste Paint, thinners, ballories: used oils and fuel samples; aerosols: offee caries: acdsfoases; chemicals, waste ol, conlarinsted ragsicbtheslloves, spray cars (pace, sovent, cleaning fuld..), chemical sacks! crumscontainer, batleos, sloctonic tems, ping caridge: fhorescent lights, cic waste, contaminated ‘id, electrical waste contain lead, pressured bots or container. Non Hazardous Waste “The definton of nor-hazardous waste is waste which is nether inert no clase to 28 special and it doesnot fal within the hazardous waste clastleaton Ie wastes non reacve and therefore not harmful lo the envronment, Non-hazardous wastes shall be taken by a icensed contactor and spose tothe Municipaly lanl ste known athe Manipal ncneatar. + Topsail + Construction materials (concrete, bricks, sand, gravel) Excavation surplus + Wood + Paper and eardbeard + Glass + Meta scraps + Plaste scrape + Cable pleces + Organic waste +Other nonhazardous wastes, 64 Clinical Waste (na bass of cunt stick regulators, all medical westebio hazardous materials must be lsposed ef accoaingly because they may have been contaminated wih infectious orgenams or agents. Medical wast ganaraly refer = Allsharps neeces, syringes, glass Implement, blades, et - Bllogcally-utured stocks and plates, human blood ortssues, Waste teatment systems allow forthe safe strzation of potently dangerous hazardous waste. The vaste processors simllaneously shred, macerate, dsinfec water ad reat the waste using he ltt technology avalabl inthe el Corto and eispeced of a biological wate toa facity tobe Werte by the medical Page 00t27 “7g = 6s. Sanitary facity nh temporary offce we elect to use temporary tole faites and hire toca! camparias fr colecton and dsposal of sewage and sluige as well s suppvng fresh water during working time. Al flats wil be cleaned every day and has some labo! showing the way to use be toes in oder to keep them clean. (One tlle per 20 person (per gender) 8.6 Transportation: 'No waste colecton receplaces shal be allowed to overfow and unsecured ding ‘ranepotaton. nie uplesding weste onto the truck, Workers and driver must wear appropiate PPE, Nirimum requirements shall be Safely bootslshoes, Salely Glasses; Dusk Mark; Hard Gloves. Special PPE shall be requesiod depend on risks ideniied for ‘examples: Goggles; Organic Mask: Rubber Bool; Rubber Goves. BB from Site of Temporary Sto shall not be permit witout an Environmental Material Gate Pass, Hazardous waste and non-hazardous wsto wil ot be transported in a sam truck, Hazardous qu wast willbe pn cenanars (rum ores) then Be put nip tay during tarpon. avy ee 67 Disposal Non-hazardous wastes shal bo taken by Tasnh Hos Urban Environment & CConstrsion Company (Thanh Hoa URENCO) and dsposed of to the dumping ses ‘approved by Thanh Hoa Local Autores ‘Sewage waste shal be cortsned. No sept tank anit ist be ulized. Sewage shal be faken by icansed company toa Local approved sewage treatment faci, Hezardous waste shal be varsporod by lensed Hazardovs Waste Contractor othe Hazardous Waele Treatment Plat instructed by Thanh Hea Provincial Envtonmenta Department. Medical wast, intuding Hquc or semiguid blood oF ether potently infectious rater; conlarinalod ioms shal be taken by Hazardous Waste Contactor \wansporting tthe local hosel where medical was but in an incinerata. The disposal of any constuction wase st suthorized lotions sont tobe executed at vals appicable local Icense to errand place the waste isi te fect be anc quid waste, hazardous or non-hazardous. URENCO aa) ‘| Hl | Be es en | nn a | aggcs sate ee etc eenetman PVE shall identty, twough the facies dasccbed below, the Keensed lation applicable to dspossl. PVE shall not slow ary waste to leave ste unless tts Ideniied inthe Waste Manifest hat recogrized Fcensed contactor is wanspoting the waste fo the authorized fil. ‘+ Matera for reoycing wil be collected soparety fom general waste sing decated bins ae collection vehicles. ‘Te wast srequred tobe separate ten pu into various ferent bins (3 forpoper, plastics, meals) prior tots colection, ‘+ Prevention of waste material belng created, ako known 36 waste reducien, Methods of avoidance Include ‘reuse of ‘second-hand products, oping broken tems stead of buying new. ‘+ Tom sol couks be delivered to the farm of local household nearby the ste ‘ten It could be reused for planing tree or agicutural purpose Concrete detre could be reused for making. temporary dyke surounding the farm. + Wooden pallets could be considered to make tamporay cage for ferming work + Loca farmer could take these kind of wooden pals to rake thie temporary fences surounding ther farms. + Hazardcus waste generators are divided ito catogories based on be ‘mount of waste, Oflerent regulations appled to cach gonerstor category “+ Hazardous waste transporare move waste from ona sta to anather by highiay, in seme casos, Sate rogulatione govom hazardous waste ‘wanspartation 7. HEALTH AND SAFETY TA. Medical PVE waste management workers and staff undergo screening fer liness and be inmuniz fr totam, ‘Heath Risk Assessment (HRA) fortis activity shall be cared out in socordancs ‘th Heath Management Pan te detemine the extent end frequency of er ring rquie Screening shallte echeculad and cares out by the PVE’ ete medial ffir. Wilten medical recerés shall be maintained and updated for al ervironmental operators kepl and shal be produced when required for audting purposes. 12. safety [Al equpment and storage feitios shal have adequate sign inating the ype of ‘waste handled, operational dangers and safety equipment required for use o ety Page 120827 aye GGES) ocd ecco anne ‘Access o an ext fem the storage facil wil be restcte ether through locked gates, oar, ar bah, Signe shal be placed on all access roads and entrances to he slorage ‘eolty, The sign hal have the logon: "Dango -Unautholzed Personnel Keep Out," The sins shall be inch, Vietnamese and a other languages in use on ste by the labor. PVE supplied with the folowing PPE safely equpmectocany out hak dts + Gloves PVC o Leather where applicable + Safely Boots (Chemical /Oiresetart wore apeale} + Safety helmet + Coveralls 1+ Eye Protocion + Sun Protecton + Dustor vapor mask (applicable fr thor invdual tasks) + Ear Protection + Any oer protective equpmant whichis doomed necessary fo camy cut ‘thot teks ina sae manner 73. Safety Equipment PVE provides adequate saely equipment for conto of waste incidents. This shall be Included witin the waste storage areas but wil be equally appicable for incidents ‘sennere. Equipment sal include + Soil containment kts + ire exingushers + Eyensh kts + Emergoney showers (wash facity) + Spadesshovel for spils + Container ‘Adequate Fite protection system shall be provided to handle Fie emergency arising from flammable and reactive wastes. 8. TRAINING 8.1 Training Requirements VE develop, prepare and implement traning modues for al project personnal ensuring that toy have a good basic knowedge of Waste Management requrement ‘hat wil faciiate compliance and successful impementation of th roquements of ths ‘waste management Pian. ‘The Waste Management Training to all project personnel which shall fom pat of ‘mandatory basic HSSE Induction forthe project shal neue: + Waste dentifcation, B92 MGS) ersovncrneey so rernoceucn coneex rose 92 + Waste minimization, 4+ Waste Handing and storage ‘+ Waste segregation and abating ‘+ In ads to the above Meduas, Waste Management Operators shal ‘S20. rined on ‘+ Waste Tracking and monitoring “Waste transfer procedure 1+ Recordkeeping & reporting. In addon, we shal also be provided trsnings on operating procedures of waste ‘management ‘equipment ox poton there, hich they are response fer. This requirement shall be contained in the Project HSSE Trsning Management Plan (Ref. HSSE reining Programme $-000-1854-0210V), Training Records ‘raining stall be recorded inthe training le maintained by Ste HSSE Manager, and trainees shal be required to sign tha atandance shea. MONFTORING Monitoring waste streams PVE shall monitor and record data on quaites of waste generated quanties recycled ‘cr reused and quaniias cepased of mentoring recon for vates (for hazardous and nomazardovs) should Inude ‘+ Namo and identification umber of the material composing the (eazarcous) wast; + Physical state; + Quant ‘+ Waste shipment tracking docemertaton: 1+ Method and date of storing, repacking, Wea or dposing: “+ Location and quant of each hazardous wast within tho fact ‘Te audting and montrng wil be conducted based onthe checks of atachment 4 of document §-000-1654-0820V and the precedure can be refered io Ste Aut and inspoction Plan (5-000-1854-0002¥) Inspection PVE shall be response for efficient operations of his facies end tis shat be ‘mortored through frequent and regular inspectons. PVE shall Implement the waste management plan 2 schedule of inspections forall his facile in ine with the able elon. Week Inspectons shat be undertaken by JGCS and approved PVE ompotent person vecs 2 [Allirpections shal 9 roared and areas non-compliant wth these stanéards or th reguatons recorded with Mentitcaton of actions required, responsible party and completon timeframe. All reports shal be aval fo inspection by NSRP. 93° Ava Periodic Wasle Management Audis shal be conducted by PVE personnal + Check ifthe handing, storage transportation treatment and dsposal of wasis aren aceardance wih the Waste Management Pan. + Ensue that the requrement of absing and the Waste Manifest System is complied wih 1+ Check hat recores of waste generation and sposal are maintsnes ‘+ Check that personne! responsble for managing the waste ae faiiar ‘ith thi roguatory and the procedural requraments PVE wil cary out ntgmal suds every 3 months ond report to JGCS. The Schedule of Inspection and Audit a indicated above shal frm the basis of Contractors Waste Compliance Registar 10, DELIVERABLE 104 Waste management Procedures Wiaste Production ‘+ Waste produced by routine ofc actives shal be minimized tough re- useand recycing wherever pracicable ‘+ Waste produced from plant and equipment shal be miniized though ts ‘ficient operation and maintenance in accordance with manufacturers! instructors. “+ Wasi from refurbishment and other construction aetivtes wil be minimized by appoprsta design specications +The volume of waste reduced on sles sal be monitored trough visual inepacton of the content of wasta containers and receding of waste quanity produced by ype of waste + Active Bly to produce addtona! or non-routine waste wil be pre noted othe HSSE Manager, ving 9s much notice as possible. Waste Handling and Storage + Moms dassites as waste wil be handled with a duty of care in accordance with agile requirements + Environmental Management System requirement + Waste groduced trough the routine management of outside areas shal be minimized through the preverton of ter accumulation, and trough 124395 GGG | vcrsovrcnen wo versie courexonoscer Tie Waste Maregemnert Plan | cantacerbos ner vareoous.neas | RV on-site composting of ground waste, wherever pratcabie. + Whorovereezcticable, waste should be compacted befee placing in 9 ‘storage container or oft dsposarecying, ‘+ Al wast wil bo stored in a safe and secure manner pending clection bythe party contactors (Thanh Hoa URENCO} fer recovery, recyeing co disposal + Alwaste wi be stored in a manner that prevents Is escape. + Wherever rossible, access to waste containers wil be restcted to the ‘Orgsnizatin'sdeslnsted employees, contactors and contacted waste colectionconiators. ‘+ Ligud wastes shal be stored in containers appropriate forthe properties ‘ofthe was. Such containers wil bo stored na suitably bounded area, + Waste produced ty contractors wil ba stored in designated areas enn Cedealed sealed containers as provided by the contactor, uness ‘therwse agrood by the Ste Manager ! HSSE Manager. Contractors vill demonstrate a duty of cre over any waste predced by them on the ste, + Redundant (T ecugment shall be aporopitaly labeled and stored securely porcng disposal and aangements for its colecton must be rected towards the Procurement Department. + At locations where rovson i made for the segregation of wast for reoyelg the containers wa be clearly and appropriately iabeles, Transportation, Disposal and Collection + Waste preciced on ste by the Orgaization, wl only be tranaporte off so by a registered waste carrier. A copy of the waste carer's val reg)tationcerticate must be cbiained ‘+ Copies of vais waste management eene9s fr th ral destination ofa ‘wastes sal be maintain on st, + Controlled waste wil be eegregated at source, into wastes roquting 102 | Fre Wane Marsoenar Pan ~ corwncr Ov.terwateoansaces | FeV. collections from the same source, a ‘seaton tat’ may be used cover all such transfers during period not exceeding 12 months, Cones of waste Vanster notes il be available at al tes, + Envronmenial Management System Manual ‘vate trait ‘An Aud Trail of waste production storage and dsposal wil be completed ona period basis to establish regulatory compliance in ine withthe Duty of Care requierenis, Waste storage Hazardous Waste Shall be stored Ina manner that wll minimize the potentel for an uncontoled relesse, The storage areas vl be located a least 10 meters from surface water oF ctr sensitive resources. The storage area willbe signposted to ont the hazard of the mater ‘Wiese wl be safely stored in appropiate containers that vl prevent ‘+ Corrsion and dateroraton of the containers ‘Accident laakage or silage: ‘Waste being blown awsy during storage and handing; ‘+ Distubaree by vandals, thieves, trespassers, or animals “+ Uniented chemical rectons between wastes PVE temporary hazardous storage sre have Sreghing fecites euiable for the materials stored. Ensuring that te wasta ig stored in a sutable container and the Contalner fs marked with + Wonty of waste + Hazards associated withthe wast + Desthation of waste; + Storage date; + Disposal requirements Non Hazardous Separate containers wil be used for construction westaldebis and general refuse ‘ch 28 waste paper, plate metal cans and organ fod waste. Each container wi be cleay labeled spectying the kindof waste In order to avoid the improper mong cf hazardous and nor-bazardoue weste ‘A food waste wl be contained in plastic bags before cispoal in the bins, The bine vill be empied ster esch mel break io prevent fy and smel nusence. Consiructon wastlcebis wil be stored in skips (dumpster containers) placed at convenient location wih an easy access for waste removal vii. Separate ships wil be used for metal waste and general constuston wast,

You might also like