WD 17 MISS 92 With 2 Corregendum-CorregendumNo-2 Issued On October 2016
WD 17 MISS 92 With 2 Corregendum-CorregendumNo-2 Issued On October 2016
WD-
17-MISC-92 for Axlebox Grease for Cylindrical & Spherical Roller Bearings of
Coaches, Locomotives & Wagons.
All the provisions contained in RDSO’s ISO procedures laid down in Document No. QO-D-7.1-11 dated
19.07.2016 (titled “Vendor-Changes in Approved status”) and subsequent versions/amendments
thereof, shall be binding and applicable on the successful vendor/vendors in the contracts floated by
Railways to maintain quality of products supplied to Railways.
OORBIGIIWIlM 10. , or "A~.l 1993 !!O DDUB - .
KAlD'AY grAlllDAlm sPBaUIOA:rICDr W.Q..1"~
lOR AIlollBQI QREASI lOR an.IBDilCJlo ~ amEHl .
JlOIJ.'RB BRARJVOB OF OGA.0HF8,U>OCIlO'l'lViS. ~ .M}0I8~
... -
1.1 This specif icat ion covers the requ1:l:ements of qrease for
lubricating ~oller bearings axleboxes of coaches, waqons
and locoDIOt i ves •
2.3 consistency
The finished qrease shall be homogenous and free from
lumps.
GREASE.SPE 1
The petroleum oil, shall confor. to the following
properties:
162.3-205.6 (Cst)
6.0 GlUlASB
OR
GREASE.SPE 3
.,s
-- -----
10.0 PACltlltO
1l. 0 NAlUtIIIO
GREASE.SPE ..
12.0 I lfSPRCTI ON
GREASE.SPE 5
APPENDIX-A
6.3 Penetration
6.4 Drop Point
6.7 structure Stability after 1,00,000 double strokes
GREASB. SPE 6
APPENDIX-B
1.0 SCOPE
4.0 APPRATUS
5.0 PROCEDURE
GREASE.SPE 7
r
5.2 Place 50 9 of the unvorked grease sample 1n the test
cylinder. Distribute the grease uniformly on the inside
~all of the cylinder with a spatula. Place the weighted
roll in the cylinder and tighten the cap.
5.4 At the end of the 96 hour roller period remove the test
cylinder from the machine and allow to cool to room
temperature. After cooling, transfer a sufficient
quantity of grease to the quarter-scale worker and
adjt:st to a temperature of 71· .t.l'P (25±.O. SoC) if
necessary. Work the sample of test grea3e fc~ 60 strokes
and determine the quarter-scale worked penetration, in
accordance with ASTM 0-1403.
I
FREAS!. SPB 8
APPBlfDIX -D
Specification paragraph
a) Penetration 6.3
bl Drop point 6.4
c) structural stability 6.7
ORUS!!!. SP!!! 10
APPENDIX-C
QUALITY CONTROL
1.0 The tests and checks given ir. Claus~ 2.0 below will be
made at least once a year at RDSO by Director General
(M'CI on jcur~al r~ll~r ~earl~g ~r~a5e br~~ds approved
by ROSO. Any other te~t 3S given in Clause 6.1, 6.S and
6.1D can also be conducted at the discretion of the
purchaser.
2.0 Tests
GRlI!ASS.SPS 9