‫المشروع اإلستراتيجي لمنشئات وزارة الداخلية‬

Ministry of Interior Integrated Project

FIELD/INSPECTION CHECKLIST for EARTHWORK CW-01


General
Project Title: Ref.#
Consultant : DAR AL RIYADH Date:
Contractor : Contract No.:
Ref. #: Drawing No. Building No. Control# Room no. Location

Check list for Visual / Physical Inspections Disposition


S.NO. Description of Activities Accept Reject Hold
1. Is area released for work.
2. Is equipment adequate
3. Are exixting structure / utilities adequately protected
4. Is removed material properly dispositioned
5. Dust and dirt control
a) All routes maintained for dust control-by water or
chemical?
b) All paved areas kept clean ?
REMARKS

CHECKED BY: INSPECTED BY: WITNESSED BY:


Contractor Representative: Q.C. Inspector, Contractor Consultant

DATE: DATE: DATE: