Excavation of Trenching Project Title: Ref.# Consultant : DAR AL RIYADH Date: Contractor : Contract No.: Ref. #: Drawing No. Building No. Control# Room no. Location
Check list for Visual / Physical Inspections Disposition
S.NO Description of Activities Accept Reject Hold . 1. Does completed depth and configuration comply with drawings and specifications ? 2. Required shoring and bracing in place ? 3. Existing utilities protected ?