Placing / Backfilling and Compacting/Bedding & Backfill of Pipe & Utility Trenches Project Title: Ref.# Consultant : DAR AL RIYADH Date: Contractor : Contract No.: Ref. #: Drawing No. Building No. Control# Room no. Location
Check list for Visual / Physical Inspections Disposition
S.NO. Description of Activities ACCEPT REJECT HOLD 1. Excavation properly compacted and verified by test lab? 2. a) All sleeves, pipe cable, grounding, conduit installed and approved 3. Is Approved backfill material is used? 4. Is bedding fully compacted to support pipe or utility at line, grade, slope required and verified by inspector? 5. Is fill being placed in level lifts within thickness limits?--NA 6. Is proper compaction attained and verified by test lab? 7. Have contaminated (and spogy) areas been cut out, filled and compacted with approved material? 8. Is compacting equipment acceptable? REMARKS