‫المشروع اإلستراتيجي لمنشئات وزارة الداخلية‬

Ministry of Interior Integrated Project

FIELD INSPECTION CHECKLIST for EARTHWORK CW-04


Grading
Project Title: Ref.#
Consultant : DAR AL RIYADH Date:
Contractor : Contract No.:
Ref. #: Drawing No. Building No. Control# Room no. Location

Check list for Visual / Physical Inspections Disposition


S.NO Description of Activities Accept Reject Hold
.
1. Is Approved grading material used ?
a) Final shaping/compacting and blade and 3-wheel rollers of
8-10 ton ?
2. Is sufficient slope for positive drainage away from
structures to drainage system ?
3. Is rough grading reasonably even and free of irregularity
and allowance made for finish grading ?
4. Is finished grade :
a) Cleaned of all loose and foreign material ?
b) Smooth and even in profile (=1" in 10') and not more than
1" from true elevation ?
REMARKS

CHECKED BY: INSPECTED BY: WITNESSED BY:


Contractor Representative: Q.C. Inspector, Consultant
Contractor
DATE: DATE: DATE: