You are on page 1of 1

A B C C B A

+4.50 +4.50

Roof Level Roof Level


+3.25 +3.25
Plastered and
Plastered and Painted HCB wall
Painted HCB wall +2.20

Plastered and
Painted HCB wall +1.00

Plastered and
Painted HCB wall
Ground Floor Ground Floor
±0.00 ±0.00

LEFT SIDE ELEVATION RIGHT SIDE ELEVATION


Scale 1:50 Scale 1:50

G-28 CIS Roofing


A B 50x70mm. Wooden Purlin c/c 90cm. C
Eucalyptus Truss
40x50mm. Wooden Ceiling
+4.50 Chipwood Ceiling
125

Roof Level
+3.25
100

100
325
120

120

OFFICE 2 STORE 3
100

100

Ground Floor -0.15


±0.00

PVC Floor Finish


Cement Screed
100mm Thick RC Slab
250mm Thick Hard Core
WINDOW DOOR SCHEDULE
Compacted Soil
SECTION A-A Date Description Rev. No. Rev. By.

Scale 1:50 Project Title

100 180
Plan 100
OFFICE

Project Location
Section Section Section MIDRE GENET

25

25
25
Client

80

80
Ethiopia Customs Commission

80
Elevation Consultant

325

325
120

325

120
120

120
E.F. ARCHITECTS & ENGINEERING

220
220
100 CONSULTING PLC.
90 90 Tel.: 011-8 659011

100
Addis Ababa - Ethiopia
100
180 e-mail: endaledm@yahoo.com

100 DES.-BY License/Signature


EF Design Team
Checked-By Approved-By
Designation W1 W2 D1
CAD By
Size 1.00 x 1.20 1.80 x 1.20 1.00 x 2.20
Frame 38mm. Tubular LTZ Profiles Included 38mm. Tubular LTZ Profiles Included 38mm. Tubular LTZ Profiles Included Date
NOV. 2020
Design Stage
FINAL
20x20x3mm. Metal Grill 20x20x3mm. Metal Grill 20x20x3mm. Metal Grill Sheet Title

Glazing 5mm. Clear Glass 5mm. Clear Glass 5mm. Clear Glass Side Elevations, Section &
Window Door Schedule
Quantity 5psc 7psc 7psc
Scale Rev. No. Sheet No.
Loctaion Ground Floors Ground Floors Ground Floors No.
1:50
AR 03/03

You might also like