TOP OF RIDGE
D D
CORR. GI SHEET
#50
PLAIN CEMENT
FIRE WALL
0.05 0.90 0.05 0.05 0.80 0.05
STRUCTURAL OPENING STRUCTURAL OPENING
RAILINGS 0.80 0.70
0.05
0.05
2ND FLOOR LEVEL
TOP OF LANDING
3.00
2.10
2.10
1.50
NATURAL GROUND
FOUR (4) SETS WOODEN PANEL DOOR TWO (2) SETS PVC DOOR
D D
(2.10M X 0.80M) (2.10M X 0.70M)
SCALE 1:10
A-1
TOP OF RIDGE
LONG SPAN
ROOFING
1.20
1.20
FIRE WALL
2.10
2.10
RAILINGS
0.90
0.90
TOP OF LANDING
3.00
1.50
NATURAL GROUND
W 1
4 THK. BRONZE GLASS WINDOW
W 1
1 4 THK. BRONZE GLASS WINDOW 2
PANEL ON ANALOK FRAME(TYPL) PANEL ON ANALOK FRAME(TYPL)
A REAR SIDE ELEVATION
SCALE 1:10
A-1
PREPARED BY: PROJECT TITILE : TWO STOREY EVACUATION CENTER APPROVED BY : SHEET CONTENT : SHEET NO. :
MUNICIPALITY OF ORAS,
A PROPOSED FRONT ELEVATION
ARTEMIO M. MAISO OFFICE OF THE ENIGINEERING
EVACUATION CENTER VIVIANE P. ALVAREZ REAR SIDE
A-2
MUNICIPAL ENGINEER MUNICIPAL MAYOR SCHEDULE OF DOOR AND WINDOWS
PROVINCE OF EASTERN SAMAR