QUANTITIES

AREA CUT 2.184


QUANTITIES
AREA FILL 0.00
AREA CUT 0.243
ITEM 200 0.508
AREA FILL 0.00
CL CL
ITEM 200 0.17
1.00 1.50
1.70 1.20 6.35 7.00 1.20 1.50 1.50 6.40 6.70
1.00 0.50
fence

0.35

fence
Existing Existing 1.10 Existing
slope

EXISTING
Sidewalk EXISTING
LINED Existing EXISTING
LINED Sidewalk EXISTING Existing LINED Sidewalk
CANAL
CANAL 77.351 77.321 77.345 Shoulder CANAL MANHOLE 77.308 77.303
-3.219 0.000 2.646 78.098 -1.886 0.000 Shoulder
-9.227
77.379 77.293 77.294 77.261 77.196 77.767 77.317 77.348 77.285 77.400
77.227 77.232
-8.471 -6.376 4.874 6.597 7.598 -8.094 -6.359 -4.574 6.041 9.676
9.093 12.746

K 1440+940.000 K 1441+000.000
F.G.E = 77.321 F.G.E = 77.303
O.G.E = 77.321 O.G.E = 77.303
QUANTITIES
AREA CUT 1.185
QUANTITIES
AREA FILL 0.00
AREA CUT 1.525
ITEM 200 0.415
AREA FILL 0.00
CL CL
ITEM 200 0.723
1.20 1.50 1.30 1.50 6.40 6.90 1.00 1.50
1.60 1.20 6.30 6.40

fence
1.75 0.30 0.35
fence

Existing Existing Existing Existing 1.10 0.50


slope slope

EXISTING
Sidewalk LINED EXISTING Sidewalk Existing EXISTING
Sidewalk
CANAL
Remove & Replace LINED Sidewalk/Ramp EXISTING
LINED
CANAL
CANAL 77.762 RCPC Shoulder
77.427 77.366 -9.645 77.324 77.342 77.323 77.375
77.282 77.236 77.248 77.237 77.270 77.304 77.270
-8.432 -3.129 77.118 77.053 77.076 -4.786 -3.224 0.000 3.188 77.121 10.971
0.000 1.729 3.285 5.103 11.012 77.285 5.079
6.407 7.916 9.387 77.254 9.056
-7.898 -6.351

K 1440+920.000 K 1440+980.000
F.G.E = 77.282 F.G.E = 77.323
O.G.E = 77.282 O.G.E = 77.323
QUANTITIES
QUANTITIES AREA CUT 0.475
AREA CUT 1.326 AREA FILL 0.00
AREA FILL 0.00 CL ITEM 200 0.185
ITEM 200 0.66 CL
1.10 1.50
1.20 1.50 6.40 6.80 1.10 1.20

fence
1.60 1.20 6.30 6.90 0.35
1.45 0.30 Existing JETTI
fence

Existing Existing Existing


slope

Sidewalk
EXISTING
Sidewalk EXISTING
LINED EXISTING
LINED
Sidewalk EXISTING
RCPC
Existing LINED
CANAL Remove & Replace CANAL /Ramp Shoulder CANAL

77.719
77.372 77.341 77.311 77.336 77.396 77.406 -8.922 77.493
-9.165 -7.071 -3.369 -2.314 0.000 77.148 77.108 77.074 77.091 0.000 77.294 77.292 77.240 77.230 77.223
-5.585 4.328 5.987
5.848 7.062 8.457 9.490 7.156 8.304 10.361

K 1440+900.000 K 1440+960.000

F.G.E = 77.406 F.G.E = 77.493


O.G.E = 77.406 O.G.E = 77.493

PREPARED: PROJECT NAME AND LOCATION: SHEET CONTENTS: REVIEWED: SUBMITTED: REVIEWED: RECOMMENDED: APPROVED: SET NO. : SHEET NO. :

AS STAKED PLAN FOR NETWORK


8 PILLARS CONSTRUCTION AND DEVELOPMENT - OFF -
CARRIAGEWAY IMPROVEMENT -
Republic of the Philippines C 22
GENERAL MERCHANDISE CROSS SECTIONS LILIBETH N. APARECIO,DM
RUDY RAY M. MEDIANA DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SECONDARY ROADS, CARMEN - STA.1440+900.000 - STA.1441+000.000 Region X
JOHN JEFFERSON A. GARCIA ROEL M. CONDEZA JOSE MARCOS S. DACANAY EVELYN A. TIRADO
PROPRIETOR Cagayan de Oro City 1st District Engineering Office PROJECT ENGINEER II CHEIF, CONSTRUCTION SECTION CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER ASSISTANT REGIONAL DIRECTOR 03 06 25
PATAG-BULUA RD, 10th Regional Equipment Services Compound
DATE DATE DATE DATE DATE CONCURRENT DISTRICT ENGINEER
K1440+718,K1440+775 & K1441+172 Bulua, Cagayan de Oro City DATE