Planned Production Time = [Shift Length - Breaks] = [1440 - 70]= 1370 minutes
Operating Time = [Planned Production Time - Down Time] = [1370 - 150] = 1220 minutes
3
3
3
3
S. No. Item
1 Day Time in 3 shift
2 Short Breaks
3 Change over Down Time
4 M/C Down Time
5 Ideal Run Rate
6 Total Pieces
7 Rejected Pieces
Data
24 hours = 1440min.
1@ 70 min. = 70min
4@ 30Min. =120min.
1@ 30Min. =30min.
3 pieces per minute
3,000 Pieces
60 Pieces
OEE Calculation
Operating Time
A
Total Ideal Run Actual Time Standard Total
S.No. Date M/c No. Performance
Prod. Qty. Rate/Min. Minute Production shift Time
10
11
12
13
Total 5524
lation Sheet Available Time
Under
maintenance
OK Pieces
B C
Total
Short Planned Change over M/C Down Total Rejected Goods
Availability
Breaks Production Time Down Time Time Inspecton Pieces Pieces
20 1420 50 21 95.00% 21 1 20
OK Pieces
C AXBXC
Quality
(Yield) OEE
98.00% 71.53%
99.58% 86.59%
98.06% 86.20%
95.24% 84.51%
25 Day
MTTR & MTBF Calculation Sheet
M/c Breakdown Time Graph
M/C 12
Planned Breakdown
S.No. Date M/c No. Down Time Loss Reason
Time % 10
Time
1 2-May-20 CNC-1 1440 0 ok 0.00% 8
15 17-May-20 CNC-1 1440 56 The coil of the m/c was burnt. 3.89%
4175384260.591837 162