1 FABRICATION
1.1 Structure
- High 49 - 84 Ton 50 30
- Medium 139 - 164 Ton 60 40
- Light 181 - 348 Ton 80 50
1.2 Ducting, Ep. Stack, Plate Work 79 - 169 Ton 70 50
1.3 Misc. structure like platform, ladder, handrail 140 Ton 80 60
1.4 Piping pre-fabrication (shop fab.)
- CS 2.3 DI 1 0.7
- SS/AS 3 DI 1.2 1
- Titanium 4 DI 2 1.5
- HP (Steam) Ton 60 40
1.5 Pre-fabrication tank
- CS 40 - 41 Ton 35 25
- SS/AS 70 Ton 50 35
1 FABRICATION
1.1 Structure
- High 49 - 84 Ton 50 30
- Medium 139 - 164 Ton 60 40
- Light 181 - 348 Ton 80 50
1.2 Ducting, Ep. Stack, Plate Work 79 - 169 Ton 70 50
1.3 Misc. structure like platform, ladder, handrail 140 Ton 80 60
1.4 Piping pre-fabrication (shop fab.)
- CS 2.3 DI 1 0.7
- SS/AS 3 DI 1.2 1
- Titanium 4 DI 2 1.5
- HP (Steam) Ton 60 40
1.5 Pre-fabrication tank
- CS 40 - 41 Ton 35 25
- SS/AS 70 Ton 50 35
Source: Proposal of :
PT Indah Kiat Pulp & Paper Tbk - Perawang Mill
Engineering Division
MB/TG 23 PART LIST AND DELIVERY SCHEDULE
Revision:1/ Up-date: 20 September 2006
Made by: HS, informed at Oct 2, 2006
Q'ty as per
No Part Item Unit BoQ
Unit MH
A BOILER
1 Anchor bolts, embedded, packer plate Tons 32 55.0
2 Steel Structure, platforms, walkways, stairs
a First layer Tons 310 40.0
b Second layer Tons 408 45.0
c Third layer, main girders, hanger beams, pent house Tons 382 45.0
d Other steel structures, platforms, walkways, stairs Tons 780 60.0
3 Pressure Parts
a Drum, hangers Tons 96 95.0
b Air preheater Tons 550 95.0
c Economizer Tons 408 95.0
d Water wall membrane, distribution plate, air cap Tons 493 95.0
e Superheater and high pressure pipes Tons 436 95.0
f Cyclone, separator, return material system Tons 213 85.0
g Pressurized tanks, headers Tons 87 85.0
4 Installation of ducting, expansion bellows, dampers, ventury Tons 450 60.0
5 Installation and of silos, hoppers Tons 400 60.0
6 Machineries (comp, pumps, blowers, burners, slag coolers) Tons 500 80.0
7 Aux. equipment, coal, sand & lime stone handling Tons 570 75.0
8 Installation of process piping, supports, valves, soot blowers, manholes Tons 50 125.0
9 Electrostatic Precipitator (ESP) Tons 1500 76.0
10 Refractory Lining
a Castable Tons 200
b Brick Tons 850
11 Thermo insulation M2
a Thickness Below 100 mm M2
b Thickness 100 mm - below 200 mm M2
c Thickness 200 and above M2 3300
12 Roofing, bondeck for civil concrete M2 1500 0.45
13 Exterior wall/ siding M2 2500 0.45
14 Other devices
15 Training pipe material short
16 Hydrotest (temporary facilities, install & dismantle) lot 1
17 Acid cleaning - refractory curing (temporary facilities, install & dismantle) lot 1
18 Steam flushing & production test (temporary facilities, install & dismantle) lot 1
OPTION
1 Fabrication & installation of ducting, expansion bellows, dampers, ventury Tons 450 50.0
2 Fabrication & Installation and of silos, hoppers Tons 400 50.0
Fabrication & installation of process piping, supports, valves, soot blowers,
3
manholes
Tons 50 125.0
4 Sand blasting and painting M2 600
Q'ty as per
No Part Item Unit BoQ
Unit MH
Ttl MH
1,760
12,400
18,360
17,190
46,800
9,120
52,250
38,760
46,835
41,420
18,105
7,395
27,000
24,000
40,000
42,750
6,250
114,000
-
-
-
-
-
-
675
1,125
-
-
-
22,500
20,000
6,250
550
4,400
5,250
36,000
71,750
8 / 10
Ttl MH
825
19,950
17,000
14,300
17,000
1,875
300
8,500
-
-
-
-
1,900
-
-
-
26,000
45,500
-
Manhours Standart
NO DESCRIPTION Unit Unit NO DESCRIPTION Unit Unit
MH MH