MAINTENANCE Attachments:
: Aircon Preventive Maintenance Technical Report & Photos
DESCRIPTION
Approved Budget
DATE : June 2, 2021 Quotations
SMR
Reference Cost
JUSTIFICATION : Aircon Preventive Maintenance
Layout/Drawings
Particulars Item
Equipment FCU/ACCU
Usage To maintain comfortable cooling of ACE Hardware – Festival Mall
Quantity and Specification 12 Units
Installed Date and Age
One-Time Maintenance
○ Note: _____________________________________________________________________
Type of Maintenance Service _____________________________________________________________________
Preventive/Corrective Maintenance
Predictive Maintenance
Required Downtime
Possible Interruption
Contractors Original Bid Negotiated Bid
1. Ayic Construction
Php 108,000.00 Php 108,000.00
Inc.
Ayic Construction Inc. is the Accredited Contractor for ACE Hardware – Festival Mall
Charge to Tenant Charge to SM Charge to Insurance
Project Cost Php 108,000.00 CAPEX
OPEX
Reference Cost Warranty ________________
Arch. Mary Christine D. Bautista Arch. Rosella D. Ballesil Arch. Remedios N. Macato
DO – Design RANF DM/RDM – Design RANF AVP – Design RANF
Q U O T A T I O N
Project Title: QUARTERLY CLEANING OF TWELVE (12) UNITS FCUs AT ACE HARDWARE, FESTIVAL MALL.
CUSTOMER: SM Prime Holdings Inc.
LOCATION: ACE HARDWARE - FESTIVAL MALL.
NOTES:
1. Water and power supply shall be supplied by the stores.
E.AFRICA
2. Work permits shall be processed by the concern stores.
3. Stores shall ensure the availability of the spare parts to be replaced during warranty period.
4. Above price covers Labor only. All consumable like freon, belts, fuse and alike shall be quoted saparately.
5. All Repair services shall be quoted separately.
Terms of Payment :
Within Thirty (30) days upon presentation of Sales Invoice..
Prepared by:
01.07.21
JIMBO B. ANDRES DATE