LAPORAN KEGIATAN HARIAN INSPECTOR 1

NAMA PAKET : PENGAWASAN TEKNIS PENANGANAN LONGSORAN RUAS JALAN MARISA – DESA TALUDITI DAN
CROSS DRAIN RUAS TABULO- MARISA – LEMITO ( BUN 2)
PENYEDIA JASA : PT. TIMBAR UTAMA JAYA
KONSULTAN SUPERVISI : PT. EPADASCON PERMATA - PT. DAYA CREASI MITRAYASA - PT. MITRA REKAYASA KONSULTAN (KSO)

NO TANGGAL URAIAN KEGIATAN


Mengawasi Pengecoran Wall Box Culvert Fc 30 Mpa Sta 11+812 Arah Marisa Ruas
1 01 SEPTEMBER 2021
Marisa – Lemito.
Mengawasi Pekerjaan Pengecoran Wall Box Culvert Fc 30 Mpa Sta 11+812 Arah Lemito
2 02 SEPTEMBER 2021
Ruas Marisa – Lemito.
Mengawasi Pemasangan Baja Tulangan wall Box Culvert Sta 11+812 Ruas Marisa –
3 03 SEPTEMBER 2021
Lemito.
Mengawasi Pengecoran Bottom dan Koperan Box Culvert Fc 30 Mpa Sta 18+820 Ruas
4 04 SEPTEMBER 2021
Tabulo – Marisa.
Mengawasi Pengecoran Bottom dan Koperan Box Culvert Fc 30 Mpa Sta 23+325 Ruas
5 05 SEPTEMBER 2021
Tabulo – Marisa.
Mengawasi Pengecoran Box Culvert Culvert Fc 30 Mpa Segmen 6 Sta 23+325 Ruas
6 06 SEPTEMBER 2021
Tabulo – Marisa.
Mengawasi Pemasangan Bekisting Wing Wall Box Culvert Fc 30 Mpa Sta 11+812 Ruas
7 07 SEPTEMBER 2021
Marisa – Lemito.
8 08 SEPTEMBER 2021 Mengawasi Pekerjaan Galian Struktur Box Culvert Sta 12+868 (L) Ruas Marisa – Lemito
Mengawasi Pemasangan Baja Tulangan Wing Wall Box Culvert Sta 11+812 Ruas Marisa
9 09 SEPTEMBER 2021
– Lemito.
Mengawasi Pengecoran Wing Wall Box Culvert Fc 30 Mpa Sta 11+812 Arah Marisa
10 10 SEPTEMBER 2021
Ruas Marisa – Lemito.
11 11 SEPTEMBER 2021 Mengawasi Pemasangan Perancah Box Culvert Sta 11+812 Ruas Marisa – Lemito
Mengawasi Pemasangan Baja Tulangan Bottom Box Culvert Sta 12+868 ( L ) Ruas
12 12 SEPTEMBER 2021
Marisa – Lemito.
Mengawasi Pemasangan Baja Tulangan Bottom Box Culvert Sta 12+868 ( L ) Ruas
13 13 SEPTEMBER 2021
Marisa – Lemito.
Mengawasi Pemasangan Baja Tulangan Wall Box Culvert Sta 12+868 ( L ) Ruas Marisa –
14 14 SEPTEMBER 2021
Lemito.
Mengawasi Pemasangan Baja Tulangan Wing Wall Box Culvert Sta 12+868 ( L ) Ruas
15 15 SEPTEMBER 2021
Marisa – Lemito.
16 16 SEPTEMBER 2021 Mengawasi Pemasangan Perancah Box Culvert Sta 11+812 Ruas Marisa – Lemito.
17 17 SEPTEMBER 2021 Mengawasi Pemasangan Perancah Box Culvert Sta 11+812 Ruas Marisa – Lemito.
18 18 SEPTEMBER 2021 Mengawasi Pemasangan Perancah Box Culvert Sta 11+812 Ruas Marisa – Lemito.
19 19 SEPTEMBER 2021 Mengawasi Pemasangan Perancah Box Culvert Sta 11+812 Ruas Marisa – Lemito.
20 20 SEPTEMBER 2021 Mengawasi Pemasangan Perancah Box Culvert Sta 11+812 Ruas Marisa – Lemito.
Mengawasi Pengecoran Bottom dan Koperan Box Culvert Fc 30 Mpa Sta 12+868 (L)
21 21 SEPTEMBER 2021
Ruas Marisa – Lemito.
Mengawasi Pemasangan Baja Tulangan Top Box Culvert Sta 11+812 Ruas Marisa –
22 22 SEPTEMBER 2021
Lemito
Mengawasi Pemasangan Baja Tulangan Top Box Culvert Sta 11+812 Ruas Marisa –
23 23 SEPTEMBER 2021
Lemito
Mengawasi Pemasangan Baja Tulangan Ralling Box Culvert Sta 11+812 Ruas Marisa –
24 24 SEPTEMBER 2021
Lemito
25 25 SEPTEMBER 2021 Mengawasi Pemasangan Baja Tulangan Top Box Culvert Sta 11+812 Ruas Marisa –
Lemito
26 26 SEPTEMBER 2021 Mengawasi Pemasangan Baja Kerb Box Culvert Sta 12+868 ( L ) Ruas Marisa – Lemito
27 27 SEPTEMBER 2021 Mengawasi Pekerjaan Pasangan Batu Talud Sta 11+ 812 ( L ) Ruas Marisa – Lemito
28 28 SEPTEMBER 2021 Mengawasi Pekerjaan Pasangan Batu Talud Sta 11+ 812 ( L ) Ruas Marisa – Lemito
29 29 SEPTEMBER 2021 Mengawasi Pekerjaan Pasangan Batu Talud Sta 11+ 812 ( L ) Ruas Marisa – Lemito
30 30 SEPTEMBER 2021 Mengawasi Pekerjaan Pasangan Batu Talud Sta 11+ 812 ( L ) Ruas Marisa – Lemito