You are on page 1of 26

LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI

PROYEK SISI UDARA BANDARA MENTAWAI BARU


ROKOT SIPORA

Tanggal 7 Desember s/d 31 Desember 2020

Nama: Muhammad

TANGGAL JABATAN URAIAN PEKERJAAN KETERANGAN


7-Desember 20 Quality Engineer
8-Desember-20 Quality Engineer
9-Desember-20 Quality Engineer
10-Desember-20 Quality Engineer
11-Desember-20 Quality Engineer
12-Desember-20 Quality Engineer
13-Desember-20 Quality Engineer
14-Desember-20 Quality Engineer
15-Desember-20 Quality Engineer
16-Desember-20 Quality Engineer
17-Desember-20 Quality Engineer Rapat kordinasi dengan perencana
18-Desember-20 Quality Engineer Alat berat dan peralatan ADHI-MAK tiba di
site bandara rokot. Periksa BM 17, 35, KKOP
II dengan perencana
19-Desember-20 Quality Engineer Cek BM KKOP II, cek BM jalan masuk
bandara, BM 17, BM 35
20-Desember-20 Quality Engineer Cek BM TP 02 pinggir jalan, cek BM
bandara, cek KKOP II apron existing, BM
17,35
21-Desember-20 Quality Engineer Pengukuran center line runway existing
22-Desember-20 Quality Engineer Pengambilan sampel material pasir cor batu
1/2, 2/3 ex Perusda Simaobbuk, pencarian
batas pagar, clearing area 20+000
23-Desember-20 Quality Engineer Clearing area STA 20+000 pengukuran
runway, perbaikan atau perapihan jetty
24-Desember-20 Quality Engineer Clearing area STA 19+900
25-Desember-20 Quality Engineer Libur
26-Desember-20 Quality Engineer Perbaikan jetty, clearing area 19+640
27-Desember-20 Quality Engineer Perbaikan jetty, clearing area STA 19+620
28-Desember-20 Quality Engineer
Perbaikan jetty, inspeksi TL pak Del & team,
clearing area STA 19+580, STA 19+600
29-Desember-20 Quality Engineer Perbaikan jetty, clearing area STA 19+540,
pengcekan TH 14 sampai batu belah
30-Desember-20 Quality Engineer Perbaikan jetty, clearing area STA 20+000 -
19+500 pengukuran
31-Desember-20 Quality Engineer Perbaikan jetty, clearing area akses jalan,
clearing area runway STA 19+500, STA
19+500

Dilaksanakan: Diketahui:

Muhammad Del Rizal


Quality Engineer Team Leader
LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI
PROYEK SISI UDARA BANDARA MENTAWAI BARU
ROKOT SIPORA

Tanggal 1 Januari s/d 31 Januari 2021

Nama: Muhammad
TANGGAL JABATAN URAIAN PEKERJAAN KETERANGAN
1-Jan-21 Quality Engineer Cek lapangan, rapat dgn oner sondir PT.
HASANAH SURVEYOR RAYA
2-Jan-21 Quality Engineer Perbaikan Jetty, clearing area 19+840,
19+920
3-Jan-21 Quality Engineer Perbaikan jetty, clearing area STA
19+600, sondir SG STA 19+870
4-Jan-21 Quality Engineer PEK clearing STA 19+580, lihat makam
penduduk, buka pagar bandara untuk
jalan akses, sondir S5, S8
5-Jan-21 Quality Engineer Pengecekan KKOP II, TH 32 clearing
area STA 19+560 sondir S7,S9
6-Jan-21 Quality Engineer PEK clearing area 19+500, ambil sampel
tanah existing, rapat di kantor ADHI-
MAK Padang
7-Jan-21 Quality Engineer PEK boring B7 dan pengukuran center
line
8-Jan-21 Quality Engineer PEK boring B7 dan pengukuran pagar
9-Jan-21 Quality Engineer PEK boring B7,clearing area STA
19+800, 19+420
10-Jan-21 Quality Engineer PEK boring, clearing area STA 19+800,
19+420 dan pengukuran
11-Jan-21 Quality Engineer
Clearing area 19+420, pengukuran cross,
boring B6, section STA 20+000, 19+980
12-Jan-21 Quality Engineer Clearing area STA 19+580, pengukuran
cross section STA 19+500, buat jalan
akses STA 19+980
13-Jan-21 Quality Engineer
14-Jan-21 Quality Engineer Buat jalan akses proyek STA 19+780,
20+000, clearing area STA 19+640,
boring B5
15-Jan-21 Quality Engineer Buat jalan akses proyek STA 20+000,
STA 19+780, clearing area STA 19+680,
STA 19+510
16-Jan-21 Quality Engineer Boring B5, clearing area STA 19+660
17-Jan-21 Quality Engineer Boring B9 area runway
18-Jan-21 Quality Engineer
Boring B9, pengukuran pagar jalan akses,
clearing area STA 19+680, STA 19+800
19-Jan-21 Quality Engineer Clearing area STA 20+060, buat jalan
akses STA 20+000, 19+800, clearing area
STA 19+720, gali bukit STA 19+780.
rapat dgn bupati, perencana,
perhubungan, MK
20-Jan-21 Quality Engineer
Boring B10, rapat koordinasi dgn kepala
bandara rokot, unit bandara rokot, ADHI,
MAK, Deserco, perencana. Clearing area
STA 19+600, pengukuran batas geotex
21-Jan-21 Quality Engineer Pengukuran center line RW STRIP
20+020, 20+040, 20+060, clearing area
resa STA 20+080, boring B10

Diketahui
LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI
PROYEK SISI UDARA BANDARA MENTAWAI BARU
ROKOT SIPORA

Tanggal 1 Februari s/d 28 Februari


Nama: Muhammad
TANGGAL JABATAN URAIAN PEKERJAAN KETERANGAN

1-Feb-21 Quality Engineer


2-Feb-21 Quality Engineer
3-Feb-21 Quality Engineer
4-Feb-21 Quality Engineer
5-Feb-21 Quality Engineer
6-Feb-21 Quality Engineer
7-Feb-21 Quality Engineer
8-Feb-21 Quality Engineer
9-Feb-21 Quality Engineer
10-Feb-21 Quality Engineer
11-Feb-21 Quality Engineer
12-Feb-21 Quality Engineer
13-Feb-21 Quality Engineer
14-Feb-21 Quality Engineer
15-Feb-21 Quality Engineer
16-Feb-21 Quality Engineer
17-Feb-21 Quality Engineer
18-Feb-21 Quality Engineer
19-Feb-21 Quality Engineer
20-Feb-21 Quality Engineer
21-Feb-21 Quality Engineer
22-Feb-21 Quality Engineer
23-Feb-21 Quality Engineer
24-Feb-21 Quality Engineer
25-Feb-21 Quality Engineer
26-Feb-21 Quality Engineer
27-Feb-21 Quality Engineer
28-Feb-21 Quality Engineer
Dilaksanakan Disetujui Diketahui

Kukuh Jati Prakoso, S.S.T


LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI
PROYEK SISI UDARA BANDARA MENTAWAI BARU
ROKOT SIPORA

Tanggal 1 Maret s/d 31 Maret 2021


Nama: Muhammad
TANGGAL JABATAN URAIAN PEKERJAAN KETERANGAN

1-Mar-21 Quality Engineer


2-Mar-21 Quality Engineer
3-Mar-21 Quality Engineer
4-Mar-21 Quality Engineer
5-Mar-21 Quality Engineer
6-Mar-21 Quality Engineer
7-Mar-21 Quality Engineer
8-Mar-21 Quality Engineer
9-Mar-21 Quality Engineer
10-Mar-21 Quality Engineer
11-Mar-21 Quality Engineer
12-Mar-21 Quality Engineer
13-Mar-21 Quality Engineer
14-Mar-21 Quality Engineer
15-Mar-21 Quality Engineer
16-Mar-21 Quality Engineer
17-Mar-21 Quality Engineer
18-Mar-21 Quality Engineer
19-Mar-21 Quality Engineer
20-Mar-21 Quality Engineer
21-Mar-21 Quality Engineer
22-Mar-21 Quality Engineer
23-Mar-21 Quality Engineer
24-Mar-21 Quality Engineer
25-Mar-21 Quality Engineer
26-Mar-21 Quality Engineer
27-Mar-21 Quality Engineer
28-Mar-21 Quality Engineer
29-Mar-21 Quality Engineer
30-Mar-21 Quality Engineer
31-Mar-21 Quality Engineer
LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI
PROYEK SISI UDARA BANDARA MENTAWAI BARU
ROKOT SIPORA

Tanggal 1 April s/d 30 April 2021


Nama: Turyadi, ST, MT
TANGGAL JABATAN URAIAN PEKERJAAN KETERANGAN

1-Apr-21 Ahli Geonetik


2-Apr-21 Ahli Geonetik
3-Apr-21 Ahli Geonetik
4-Apr-21 Ahli Geonetik
5-Apr-21 Ahli Geonetik
6-Apr-21 Ahli Geonetik
7-Apr-21 Ahli Geonetik
8-Apr-21 Ahli Geonetik
9-Apr-21 Ahli Geonetik
10-Apr-21 Ahli Geonetik
11:00 AM Ahli Geonetik
18-Desember-20 Ahli Geonetik
19-Desember-20 Ahli Geonetik
20-Desember-20 Ahli Geonetik
21-Desember-20 Ahli Geonetik
22-Desember-20 Ahli Geonetik
23-Desember-20 Ahli Geonetik
24-Desember-20 Ahli Geonetik
25-Desember-20 Ahli Geonetik
26-Desember-20 Ahli Geonetik
27-Desember-20 Ahli Geonetik
28-Desember-20 Ahli Geonetik
29-Desember-20 Ahli Geonetik
30-Desember-20 Ahli Geonetik
31-Desember-20 Ahli Geonetik

Dilaksanakan Diketahui
NSTRUKSI
LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI
PROYEK SISI UDARA BANDARA MENTAWAI BARU
ROKOT SIPORA

Tanggal 7 Desember s/d 31 Desember 2020


Nama: Andriyanto, ST
TANGGAL JABATAN URAIAN PEKERJAAN KETERANGAN

7-Desember-20 Ahli Drainase


8-Desember-20 Ahli Drainase
9-Desember-20 Ahli Drainase
10-Desember-20 Ahli Drainase
11-Desember-20 Ahli Drainase
12-Desember-20 Ahli Drainase
13-Desember-20 Ahli Drainase
14-Desember-20 Ahli Drainase
15-Desember-20 Ahli Drainase
16-Desember-20 Ahli Drainase
17-Desember-20 Ahli Drainase
18-Desember-20 Ahli Drainase
19-Desember-20 Ahli Drainase
20-Desember-20 Ahli Drainase
21-Desember-20 Ahli Drainase
22-Desember-20 Ahli Drainase
23-Desember-20 Ahli Drainase
24-Desember-20 Ahli Drainase
25-Desember-20 Ahli Drainase
26-Desember-20 Ahli Drainase
27-Desember-20 Ahli Drainase
28-Desember-20 Ahli Drainase
29-Desember-20 Ahli Drainase
30-Desember-20 Ahli Drainase
31-Desember-20 Ahli Drainase

Dilaksanakan Diketahui
LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI
PROYEK SISI UDARA BANDARA MENTAWAI BARU
ROKOT SIPORA

Tanggal 7 Desember s/d 31 Desember 2020


Nama: Rubiyanto, ST
TANGGAL JABATAN URAIAN PEKERJAAN

7-Desember-20 Ahli Mekanikal/Elektrikal


8-Desember-20 Ahli Mekanikal/Elektrikal
9-Desember-20 Ahli Mekanikal/Elektrikal
10-Desember-20 Ahli Mekanikal/Elektrikal
11-Desember-20 Ahli Mekanikal/Elektrikal
12-Desember-20 Ahli Mekanikal/Elektrikal
13-Desember-20 Ahli Mekanikal/Elektrikal
14-Desember-20 Ahli Mekanikal/Elektrikal
15-Desember-20 Ahli Mekanikal/Elektrikal
16-Desember-20 Ahli Mekanikal/Elektrikal
17-Desember-20 Ahli Mekanikal/Elektrikal
18-Desember-20 Ahli Mekanikal/Elektrikal
19-Desember-20 Ahli Mekanikal/Elektrikal
20-Desember-20 Ahli Mekanikal/Elektrikal
21-Desember-20 Ahli Mekanikal/Elektrikal
22-Desember-20 Ahli Mekanikal/Elektrikal
23-Desember-20 Ahli Mekanikal/Elektrikal
24-Desember-20 Ahli Mekanikal/Elektrikal
25-Desember-20 Ahli Mekanikal/Elektrikal
26-Desember-20 Ahli Mekanikal/Elektrikal
27-Desember-20 Ahli Mekanikal/Elektrikal
28-Desember-20 Ahli Mekanikal/Elektrikal
29-Desember-20 Ahli Mekanikal/Elektrikal
30-Desember-20 Ahli Mekanikal/Elektrikal
31-Desember-20 Ahli Mekanikal/Elektrikal

Dilaksanakan
AJEMEN KONSTRUKSI
NTAWAI BARU

KETERANGAN

Diketahui
LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI
PROYEK SISI UDARA BANDARA MENTAWAI BARU
ROKOT SIPORA

Tanggal 7 Desember s/d 31 Desember 2020


Nama: Ir. Muhammad
TANGGAL JABATAN URAIAN PEKERJAAN KETERANGAN

7-Desember-20 Quality Engineer


8-Desember-20 Quality Engineer
9-Desember-20 Quality Engineer
10-Desember-20 Quality Engineer
11-Desember-20 Quality Engineer
12-Desember-20 Quality Engineer
13-Desember-20 Quality Engineer
14-Desember-20 Quality Engineer
15-Desember-20 Quality Engineer
16-Desember-20 Quality Engineer
17-Desember-20 Quality Engineer
18-Desember-20 Quality Engineer
19-Desember-20 Quality Engineer
20-Desember-20 Quality Engineer
21-Desember-20 Quality Engineer
22-Desember-20 Quality Engineer
23-Desember-20 Quality Engineer
24-Desember-20 Quality Engineer
25-Desember-20 Quality Engineer
26-Desember-20 Quality Engineer
27-Desember-20 Quality Engineer
28-Desember-20 Quality Engineer
29-Desember-20 Quality Engineer
30-Desember-20 Quality Engineer
31-Desember-20 Quality Engineer

Dilaksanakan Diketahui
LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI
PROYEK SISI UDARA BANDARA MENTAWAI BARU
ROKOT SIPORA

Tanggal 7 Desember s/d 31 Desember 2020


Nama: Isa Ashari, ST
TANGGAL JABATAN URAIAN PEKERJAAN KETERANGAN

7-Desember-20 Quality Engineer


8-Desember-20 Quality Engineer
9-Desember-20 Quality Engineer
10-Desember-20 Quality Engineer
11-Desember-20 Quality Engineer
12-Desember-20 Quality Engineer
13-Desember-20 Quality Engineer
14-Desember-20 Quality Engineer
15-Desember-20 Quality Engineer
16-Desember-20 Quality Engineer
17-Desember-20 Quality Engineer
18-Desember-20 Quality Engineer
19-Desember-20 Quality Engineer
20-Desember-20 Quality Engineer
21-Desember-20 Quality Engineer
22-Desember-20 Quality Engineer
23-Desember-20 Quality Engineer
24-Desember-20 Quality Engineer
25-Desember-20 Quality Engineer
26-Desember-20 Quality Engineer
27-Desember-20 Quality Engineer
28-Desember-20 Quality Engineer
29-Desember-20 Quality Engineer
30-Desember-20 Quality Engineer
31-Desember-20 Quality Engineer

Dilaksanakan Diketahui
NSTRUKSI
LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI
PROYEK SISI UDARA BANDARA MENTAWAI BARU
ROKOT SIPORA

Tanggal 7 Desember s/d 31 Desember 2020


Nama: Ir. Bambang Prijambodho
TANGGAL JABATAN URAIAN PEKERJAAN KETERANGAN

7-Desember-20 Ahli K3
8-Desember-20 Ahli K3
9-Desember-20 Ahli K3
10-Desember-20 Ahli K3
11-Desember-20 Ahli K3
12-Desember-20 Ahli K3
13-Desember-20 Ahli K3
14-Desember-20 Ahli K3
15-Desember-20 Ahli K3
16-Desember-20 Ahli K3
17-Desember-20 Ahli K3
18-Desember-20 Ahli K3
19-Desember-20 Ahli K3
20-Desember-20 Ahli K3
21-Desember-20 Ahli K3
22-Desember-20 Ahli K3
23-Desember-20 Ahli K3
24-Desember-20 Ahli K3
25-Desember-20 Ahli K3
26-Desember-20 Ahli K3
27-Desember-20 Ahli K3
28-Desember-20 Ahli K3
29-Desember-20 Ahli K3
30-Desember-20 Ahli K3
31-Desember-20 Ahli K3

Dilaksanakan Diketahui
ONSTRUKSI
LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI
PROYEK SISI UDARA BANDARA MENTAWAI BARU
ROKOT SIPORA

Tanggal 7 Desember s/d 31 Desember 2020


Nama: Sulistianto, ST
TANGGAL JABATAN URAIAN PEKERJAAN KETERANGAN

7-Desember-20 Inspector Arsitektur


8-Desember-20 Inspector Arsitektur
9-Desember-20 Inspector Arsitektur
10-Desember-20 Inspector Arsitektur
11-Desember-20 Inspector Arsitektur
12-Desember-20 Inspector Arsitektur
13-Desember-20 Inspector Arsitektur
14-Desember-20 Inspector Arsitektur
15-Desember-20 Inspector Arsitektur
16-Desember-20 Inspector Arsitektur
17-Desember-20 Inspector Arsitektur
18-Desember-20 Inspector Arsitektur
19-Desember-20 Inspector Arsitektur
20-Desember-20 Inspector Arsitektur
21-Desember-20 Inspector Arsitektur
22-Desember-20 Inspector Arsitektur
23-Desember-20 Inspector Arsitektur
24-Desember-20 Inspector Arsitektur
25-Desember-20 Inspector Arsitektur
26-Desember-20 Inspector Arsitektur
27-Desember-20 Inspector Arsitektur
28-Desember-20 Inspector Arsitektur
29-Desember-20 Inspector Arsitektur
30-Desember-20 Inspector Arsitektur
31-Desember-20 Inspector Arsitektur

Dilaksanakan Diketahui
LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI
PROYEK SISI UDARA BANDARA MENTAWAI BARU
ROKOT SIPORA

Tanggal 7 Desember s/d 31 Desember 2020


Nama: Nurul Inayah, ST
TANGGAL JABATAN URAIAN PEKERJAAN

7-Desember-20 Inspector Struktur


8-Desember-20 Inspector Struktur
9-Desember-20 Inspector Struktur
10-Desember-20 Inspector Struktur
11-Desember-20 Inspector Struktur
12-Desember-20 Inspector Struktur
13-Desember-20 Inspector Struktur
14-Desember-20 Inspector Struktur
15-Desember-20 Inspector Struktur
16-Desember-20 Inspector Struktur
17-Desember-20 Inspector Struktur
18-Desember-20 Inspector Struktur
19-Desember-20 Inspector Struktur
20-Desember-20 Inspector Struktur
21-Desember-20 Inspector Struktur
22-Desember-20 Inspector Struktur
23-Desember-20 Inspector Struktur
24-Desember-20 Inspector Struktur
25-Desember-20 Inspector Struktur
26-Desember-20 Inspector Struktur
27-Desember-20 Inspector Struktur
28-Desember-20 Inspector Struktur
29-Desember-20 Inspector Struktur
30-Desember-20 Inspector Struktur
31-Desember-20 Inspector Struktur

Dilaksanakan
MANAJEMEN KONSTRUKSI
A MENTAWAI BARU

KETERANGAN

Diketahui
LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI
PROYEK SISI UDARA BANDARA MENTAWAI BARU
ROKOT SIPORA

Tanggal 7 Desember s/d 31 Desember 2020


Nama: Fajar Lazuardi, ST
TANGGAL JABATAN URAIAN PEKERJAAN

7-Desember-20 Inspector Sipil Pavement


8-Desember-20 Inspector Sipil Pavement
9-Desember-20 Inspector Sipil Pavement
10-Desember-20 Inspector Sipil Pavement
11-Desember-20 Inspector Sipil Pavement
12-Desember-20 Inspector Sipil Pavement
13-Desember-20 Inspector Sipil Pavement
14-Desember-20 Inspector Sipil Pavement
15-Desember-20 Inspector Sipil Pavement
16-Desember-20 Inspector Sipil Pavement
17-Desember-20 Inspector Sipil Pavement
18-Desember-20 Inspector Sipil Pavement
19-Desember-20 Inspector Sipil Pavement
20-Desember-20 Inspector Sipil Pavement
21-Desember-20 Inspector Sipil Pavement
22-Desember-20 Inspector Sipil Pavement
23-Desember-20 Inspector Sipil Pavement
24-Desember-20 Inspector Sipil Pavement
25-Desember-20 Inspector Sipil Pavement
26-Desember-20 Inspector Sipil Pavement
27-Desember-20 Inspector Sipil Pavement
28-Desember-20 Inspector Sipil Pavement
29-Desember-20 Inspector Sipil Pavement
30-Desember-20 Inspector Sipil Pavement
31-Desember-20 Inspector Sipil Pavement

Dilaksanakan
EMEN KONSTRUKSI
TAWAI BARU

KETERANGAN

Diketahui
LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI
PROYEK SISI UDARA BANDARA MENTAWAI BARU
ROKOT SIPORA

Tanggal 7 Desember s/d 31 Desember 2020


Nama: Daud Tumbur, ST
TANGGAL JABATAN URAIAN PEKERJAAN KETERANGAN

7-Desember-20 Inspector ME
8-Desember-20 Inspector ME
9-Desember-20 Inspector ME
10-Desember-20 Inspector ME
11-Desember-20 Inspector ME
12-Desember-20 Inspector ME
13-Desember-20 Inspector ME
14-Desember-20 Inspector ME
15-Desember-20 Inspector ME
16-Desember-20 Inspector ME
17-Desember-20 Inspector ME
18-Desember-20 Inspector ME
19-Desember-20 Inspector ME
20-Desember-20 Inspector ME
21-Desember-20 Inspector ME
22-Desember-20 Inspector ME
23-Desember-20 Inspector ME
24-Desember-20 Inspector ME
25-Desember-20 Inspector ME
26-Desember-20 Inspector ME
27-Desember-20 Inspector ME
28-Desember-20 Inspector ME
29-Desember-20 Inspector ME
30-Desember-20 Inspector ME
31-Desember-20 Inspector ME

Dilaksanakan Diketahui
LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI
PROYEK SISI UDARA BANDARA MENTAWAI BARU
ROKOT SIPORA

Tanggal 7 Desember s/d 31 Desember 2020


Nama: Fetra Agung W. ST
TANGGAL JABATAN URAIAN PEKERJAAN KETERANGAN

7-Desember-20 Surveyor
8-Desember-20 Surveyor
9-Desember-20 Surveyor
10-Desember-20 Surveyor
11-Desember-20 Surveyor
12-Desember-20 Surveyor
13-Desember-20 Surveyor
14-Desember-20 Surveyor
15-Desember-20 Surveyor
16-Desember-20 Surveyor
17-Desember-20 Surveyor
18-Desember-20 Surveyor
19-Desember-20 Surveyor
20-Desember-20 Surveyor
21-Desember-20 Surveyor
22-Desember-20 Surveyor
23-Desember-20 Surveyor
24-Desember-20 Surveyor
25-Desember-20 Surveyor
26-Desember-20 Surveyor
27-Desember-20 Surveyor
28-Desember-20 Surveyor
29-Desember-20 Surveyor
30-Desember-20 Surveyor
31-Desember-20 Surveyor

Dilaksanakan Diketahui
LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI
PROYEK SISI UDARA BANDARA MENTAWAI BARU
ROKOT SIPORA

Tanggal 7 Desember s/d 31 Desember 2020


Nama: Budi Yaman, Amd
TANGGAL JABATAN URAIAN PEKERJAAN KETERANGAN

7-Desember-20 Cad Drafter


8-Desember-20 Cad Drafter
9-Desember-20 Cad Drafter
10-Desember-20 Cad Drafter
11-Desember-20 Cad Drafter
12-Desember-20 Cad Drafter
13-Desember-20 Cad Drafter
14-Desember-20 Cad Drafter
15-Desember-20 Cad Drafter
16-Desember-20 Cad Drafter
17-Desember-20 Cad Drafter
18-Desember-20 Cad Drafter
19-Desember-20 Cad Drafter
20-Desember-20 Cad Drafter
21-Desember-20 Cad Drafter
22-Desember-20 Cad Drafter
23-Desember-20 Cad Drafter
24-Desember-20 Cad Drafter
25-Desember-20 Cad Drafter
26-Desember-20 Cad Drafter
27-Desember-20 Cad Drafter
28-Desember-20 Cad Drafter
29-Desember-20 Cad Drafter
30-Desember-20 Cad Drafter
31-Desember-20 Cad Drafter

Dilaksanakan Diketahui
LAPORAN AKTIVASI KONSULTAN MANAJEMEN KONSTRUKSI
PROYEK SISI UDARA BANDARA MENTAWAI BARU
ROKOT SIPORA

Tanggal 7 Desember s/d 31 Desember 2020


Nama: Eldwin Muhammad
TANGGAL JABATAN URAIAN PEKERJAAN KETERANGAN

7-Desember-20 Administrasi
8-Desember-20 Administrasi
9-Desember-20 Administrasi
10-Desember-20 Administrasi
11-Desember-20 Administrasi
12-Desember-20 Administrasi
13-Desember-20 Administrasi
14-Desember-20 Administrasi
15-Desember-20 Administrasi
16-Desember-20 Administrasi
17-Desember-20 Administrasi
18-Desember-20 Administrasi
19-Desember-20 Administrasi
20-Desember-20 Administrasi
21-Desember-20 Administrasi
22-Desember-20 Administrasi
23-Desember-20 Administrasi
24-Desember-20 Administrasi
25-Desember-20 Administrasi
26-Desember-20 Administrasi
27-Desember-20 Administrasi
28-Desember-20 Administrasi
29-Desember-20 Administrasi
30-Desember-20 Administrasi
31-Desember-20 Administrasi

Dilaksanakan Diketahui
NSTRUKSI

You might also like