This document contains a schedule and record of a drilling fluid engineering course held at Universitas Bhayangkara Jakarta Raya. It lists 16 class sessions held between September 2021 and January 2022, each covering a different topic related to drilling fluids. The schedule matches the actual classes, and both the instructor and students were present for all sessions according to the attendance records.
This document contains a schedule and record of a drilling fluid engineering course held at Universitas Bhayangkara Jakarta Raya. It lists 16 class sessions held between September 2021 and January 2022, each covering a different topic related to drilling fluids. The schedule matches the actual classes, and both the instructor and students were present for all sessions according to the attendance records.
This document contains a schedule and record of a drilling fluid engineering course held at Universitas Bhayangkara Jakarta Raya. It lists 16 class sessions held between September 2021 and January 2022, each covering a different topic related to drilling fluids. The schedule matches the actual classes, and both the instructor and students were present for all sessions according to the attendance records.
SIA Universitas Bhayangkara Jakarta Raya Aly Rasyid, S.T., M.T.
Realisasi Rencana Pembelajaran
Daftar Rencana Dan Realisasi Pembelajaran / Rencana dan Realsasi Pembelajaran
Kelas : TPM5A
Matakuliah : TPM-3527 – Teknik Lumpur Pemboran (+Praktikum)
Dosen : Aly Rasyid, S.T., M.T. (0324047407)
Peserta Kelas : 22
Search:
Action Ke Materi Jadwal Realisasi Kesesuaian Presensi Presensi
SAP Dosen Mahasiswa Selasa, 14 September 2021 Selasa, 14 September 2021 1 Konsep dasar lumpur pemboran SS-319 SS-319 1 Y Y 17:00:00 - 19:00:00 17:00:00 - 19:00:00 SIA Universitas Bhayangkara Jakarta Raya Aly Rasyid, S.T., M.T.
Action Ke Materi Jadwal Realisasi Kesesuaian Presensi Presensi
SAP Dosen Mahasiswa Selasa, 21 September 2021 Selasa, 21 September 2021 2 Fungsi sirkulasi lumpur pemboran, mendesign SS-319 SS-319 1 Y Y property lumpur pemboran 17:00:00 - 19:00:00 17:00:00 - 19:00:00 Selasa, 28 September 2021 Selasa, 28 September 2021 3 Mendesign property lumpur pemboran (lanjutan) SS-319 SS-319 1 Y Y 17:00:00 - 19:00:00 17:00:00 - 19:00:00 Selasa, 5 October 2021 Selasa, 5 October 2021 4 Problem-problem pemboran dan cara SS-319 SS-319 1 Y Y menanggulanginya. 17:00:00 - 19:00:00 17:00:00 - 19:00:00
Selasa, 12 October 2021 Selasa, 12 October 2021
5 Problem-problem pemboran dan cara SS-319 SS-319 1 Y Y Menanggulanginya (lanjutan) 17:00:00 - 19:00:00 17:00:00 - 19:00:00
Selasa, 19 October 2021 Selasa, 19 October 2021
6 Stabilitas lubang sumur dan prediksi minimum SS-319 SS-319 1 Y Y Berat lumpur ideal 17:00:00 - 19:00:00 17:00:00 - 19:00:00
Selasa, 26 October 2021 Selasa, 26 October 2021
7 Tanda-tanda well kick dan penanggulanan SS-319 SS-319 1 Y Y well kick 17:00:00 - 19:00:00 17:00:00 - 19:00:00 Selasa, 2 November 2021 Selasa, 2 November 2021 8 UTS SS-319 SS-319 1 Y Y 17:00:00 - 19:00:00 17:00:00 - 19:00:00 Selasa, 9 November 2021 Selasa, 9 November 2021 Tanda-tanda well kick dan penanggulanan SS-319 SS-319 9 well kick (lanjutan) 17:00:00 - 19:00:00 17:00:00 - 19:00:00 1 Y Y SIA Universitas Bhayangkara Jakarta Raya Aly Rasyid, S.T., M.T.
Action Ke Materi Jadwal Realisasi Kesesuaian Presensi Presensi
SAP Dosen Mahasiswa Selasa, 16 November 2021 Selasa, 16 November 2021 10 Lost circulation, dan design LCM SS-319 SS-319 1 Y Y 17:00:00 - 19:00:00 17:00:00 - 19:00:00 Selasa, 23 November 2021 Selasa, 23 November 2021 11 Lost circulation, dan design LCM (lanjutan) SS-319 SS-319 1 Y Y 17:00:00 - 19:00:00 17:00:00 - 19:00:00 Selasa, 30 November 2021 Selasa, 30 November 2021 12 Cara kerja dan design lumpur pemboran pada SS-319 SS-319 1 Y Y pemboran horizontal 17:00:00 - 19:00:00 17:00:00 - 19:00:00 Selasa, 7 Desember 2021 Selasa, 7 Desember 2021 13 Cara kerja dan design lumpur pemboran pada SS-319 SS-319 1 Y Y pemboran horizontal (lanjutan) 17:00:00 - 19:00:00 17:00:00 - 19:00:00 Selasa, 14 Desember 2021 Selasa, 14 Desember 2021 14 Menghitung estimasi biaya lumpur pemboran SS-319 SS-319 1 Y Y 17:00:00 - 19:00:00 17:00:00 - 19:00:00 Selasa, 21 Desember 2021 Selasa, 21 Desember 2021 15 Menghitung estimasi biaya lumpur pemboran SS-319 SS-319 1 Y Y (lanjutan) 17:00:00 - 19:00:00 17:00:00 - 19:00:00 Selasa, 11 Januari 2022 Selasa, 11 Januari 2022 16 UAS SS-319 SS-319 1 Y Y 17:00:00 - 19:00:00 17:00:00 - 19:00:00