You are on page 1of 36

REBAR BERAT (kg/m)

6 0.222
8 0.395
9 0.5 Tonase
10 0.617 1581.929 7.404
12 0.888
13 1.04
16 1.578 767.4319 18.936
16 1.578
19 2.23 5865.839 26.76
22 2.98 919.2627 35.76
25 3.85 3348.013 46.2
28 4.83
29 5.18
32 6.31 278.20 75.72
36 7.99
6p 0.22
8p 0.4
9p 0.5
10p 0.62
12p 0.89
13p 1.04
16p 1.57
16p 1.58
19p 2.23
22p 2.98
25p 3.85
28p 4.83
29p 5.19
32p 6.31
36p 7.99
qtt
213.6587

40.52767

219.2017
25.70645
72.46782

3.67
1P1 PILECAP RE-BAR BENDING SCHEDULE
SIZE REBAR LENGTH (mm) TOTAL WEIGHT
TYPE Σ
Bar (a) Σ (b) Σ (c) Σ (d) Σ Length (mm) (kg/m)
25 A 500 2 2300 2 1818 1 7418 28 800.284
16 B 1818 1 500 2 2818 28 124.511
TOTAL WEIGHT 924.79

1P1C PILECAP RE-BAR BENDING SCHEDULE


SIZE REBAR LENGTH (mm) TOTAL WEIGHT
TYPE Σ
Bar (a) Σ (b) Σ (c) Σ (d) Σ Length (mm) (kg/m)
25 A 500 2 2200 2 1818 1 7218 28 778.707
16 B 1818 1 500 2 2818 28 124.511
TOTAL WEIGHT 903.22

1P1D PILECAP RE-BAR BENDING SCHEDULE


SIZE REBAR LENGTH (mm) TOTAL WEIGHT
TYPE Σ
Bar (a) Σ (b) Σ (c) Σ (d) Σ Length (mm) (kg/m)
25 A 500 2 2300 1 1818 1 1700 1 6818 14 367.777
25 B 500 2 2300 2 1818 1 7418 9 257.234
25 C 500 2 1700 2 1818 1 6218 5 119.790
25 D 1818 1 500 2 2818 5 54.289
16 E 1818 1 500 2 2818 28 124.511
TOTAL WEIGHT 923.60

1P1BF PILECAP RE-BAR BENDING SCHEDULE


SIZE REBAR LENGTH (mm) TOTAL WEIGHT
TYPE Σ
Bar (a) Σ (b) Σ (c) Σ (d) Σ Length (mm) (kg/m)
25 A 500 2 2300 1 1818 1 1700 1 6818 18 472.856
25 B 500 2 1700 2 1818 1 6218 10 239.580
25 C 1818 1 500 2 2818 10 108.578
16 D 1850 2 300 2 4300 28 189.991
TOTAL WEIGHT 1011.00

1P1 PILECAP RE-BAR BENDING SCHEDULE


SIZE REBAR LENGTH (mm) TOTAL WEIGHT
TYPE Σ
Bar (a) Σ (b) Σ (c) Σ (d) Σ Length (mm) (kg/m)
25 A 500 2 2300 2 1818 1 7418 28 800.284
19 B 1818 1 1000 2 3818 10 84.874
16 C 1818 1 500 2 2818 28 124.511
TOTAL WEIGHT 1009.67
2p2 PILECAP RE-BAR BENDING SCHEDULE
SIZE REBAR LENGTH (mm) TOTAL WEIGHT
TYPE Σ
Bar (a) Σ (b) Σ (c) Σ (d) Σ Length (mm) (kg/m)
36 A 500 2 2300 2 5518 1 11118 14 1243.659
25 B 500 2 1700 2 1818 1 6218 27 646.865
16 C 5550 1 300 2 1850 1 8000 28 353.472
TOTAL WEIGHT 2244.00

2p2D PILECAP RE-BAR BENDING SCHEDULE


SIZE REBAR LENGTH (mm) TOTAL WEIGHT
TYPE Σ
Bar (a) Σ (b) Σ (c) Σ (d) Σ Length (mm) (kg/m)
36 A 2450 1 1700 1 5518 1 1450 1 11118 14 1243.659
36 B 500 1 2300 1 2800 14 313.208
25 C 500 2 2300 2 1818 1 7418 14 400.142
25 D 500 2 1700 2 1818 1 6218 13 311.453
25 E 1700 2 1818 1 5218 13 261.364
25 F 1818 1 850 2 3518 13 176.213
16 G 5550 1 300 2 1850 1 8000 28 353.472
TOTAL WEIGHT 3059.51

4P3 PILECAP RE-BAR BENDING SCHEDULE


REBAR
OWNER: TWJO
PROJECT: MRT CP 101-SP 02
BUILDI : D02 -WORKSHOP OFF
1. TIE BEAM 2B1-2B2 SIMILAR 2B18-2B19
1200 400

825 1800

BEAM RE-BAR BENDING SCHEDULE 1B1-1B2 SIMILAR 1B14-1B15 ( 1200x400 )

LEGEND UNIT TOTAL


REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
A 22 (a1) 625 1 4,885 1 2.98 5.51 16.42 8 44.08 137.93
B 22 (a2) 7,930 1 2.98 7.93 23.63 4 31.72 99.25
A 19 (a3) 425 1 2,900 1 2.23 3.33 7.41 8 26.60 62.28
B 19 (a2) 5,400 1 2.23 5.40 12.04 4 21.60 50.58

Main B 19 s1 4,835 1 2.23 4.84 10.78 8 38.68 90.57


Rebar B 19 s2 7,930 1 2.23 7.93 17.68 8 63.44 148.54
B 19 s3 3,785 1 2.23 3.79 8.44 8 30.28 70.90

A 25 b1 675 1 8,000 1 3.85 8.68 33.40 4 34.70 140.27


A 25 b2 675 1 9,590 1 3.85 10.27 39.52 4 41.06 165.99

D D10-200 (c1) 1,045 2 250 2 80 2 0.62 2.75 1.70 35 96.25 62.36


Stirrup D D10-300 (c2) 1,045 2 250 2 80 2 0.62 2.75 1.70 27 73.33 47.51
10
SUB TOTAL WEIGHT 1,183.80 2 2,367.59

2. TIE BEAM 1B5-1B6 SIMILAR 1B9-1B10 & 1B18-1B19


1200 400 825 1800

BEAM RE-BAR BENDING SCHEDULE 1B5-1B6 SIMILAR 1B9-1B10 & 1B18-1B19 ( 1200x400 )
( AXIS 1/A~E)
LEGEND UNIT TOTAL
REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
A 22 (a1) 4,875 1 625 1 2.98 5.50 16.39 8 44.00 137.68
B 22 (a2) 9,050 1 2.98 9.05 26.97 4 36.20 113.27
A 19 (a4) 2,900 1 425 1 2.23 3.33 7.41 8 26.60 62.28
B 19 (a5) 5,400 1 2.23 5.40 12.04 4 21.60 50.58

Main B 19 s1 4,825 1 2.23 4.83 10.76 8 38.60 86.08


Rebar B 19 s2 7,950 1 2.23 7.95 17.73 8 63.60 141.83 Waste
coefficien0.0
B 19 s3 3,775 1 2.23 3.78 8.42 8 30.20 67.35 5

A 25 b1 675 1 8,000 1 3.85 8.68 33.40 4 34.70 133.60


A 25 b2 675 1 9,590 1 3.85 10.27 39.52 4 41.06 158.08

D D10-200 (c1) 1,045 2 250 2 80 2 0.62 2.75 1.70 35 96.25 59.39


Stirrup D D10-300 (c2) 1,045 2 250 2 80 2 0.62 2.75 1.70 27 73.33 45.25
10
SUB TOTAL WEIGHT 804.42 3 2,654.59

Page 5 of 36
3. TIE BEAM 1B3-1B4
400 800

1800 825

BEAM RE-BAR BENDING SCHEDULE 1B3~1B4 ( 400x800 )


( AXIS 17/A~E )
LEGEND UNIT TOTAL
REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
A 22 (a1) 8,715 1 625 1 2.98 9.34 27.83 4 37.36 116.90
A 22 (a2) 8,715 1 625 1 2.98 9.34 27.83 4 37.36 116.90

B 19 s1 5,200 1 2.23 5.20 11.60 4 20.80 46.38


B 16 s2 4,835 1 1.58 4.84 7.63 4 19.34 30.52
Main Waste
Rebar B 16 s3 8,930 1 1.58 8.93 14.09 4 35.72 56.37
coefficien0.0
B 16 s4 4,785 1 1.58 4.79 7.55 4 19.14 30.20 5

A 22 b1 625 1 8,075 1 2.98 8.70 25.93 4 34.80 103.70


A 32 b2 675 1 9,345 1 6.31 10.02 63.23 4 40.08 252.90

D D10-200 (c1) 670 2 250 2 80 2 0.62 2.00 1.23 19 38.00 24.62


D D10-300 (c2) 670 2 250 2 80 2 0.62 2.00 1.23 13 26.67 17.28
Stirrup
D D10-150 (c4) 670 2 250 2 80 2 0.62 2.00 1.23 40 80.00 51.83
D D10-100 (c3) 670 2 250 2 80 2 0.62 2.00 1.23 18 35.00 22.67
SUB TOTAL WEIGHT 828.71 1 828.71

4. TIE BEAM 1B7-1B6 SIMILAR 1B16-1B17

1800 825

BEAM RE-BAR BENDING SCHEDULE 1B7-1B6 SIMILAR 1B16-1B17 ( 400x700 )

LEGEND UNIT TOTAL


REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
A 22 (a1) 8,665 1 425 1 2.98 9.09 27.09 4 36.36 113.77
A 19 (a2) 8,715 1 425 1 2.23 9.14 20.38 4 36.56 85.61

Main
Rebar B 19 (s1) 5,200 1 389 1 2.23 5.59 12.46 4 22.36 52.35

A 25 (b1) 8,050 1 625 1 3.85 8.68 33.40 4 34.70 140.27 Waste


A 25 (b2) 9,320 1 625 1 3.85 9.95 38.29 4 39.78 160.81 coefficien0.0
5
C D10-200 (c1) 570 2 250 2 80 2 0.62 1.80 1.11 19 34.20 22.16
C D10-300 (c2) 570 2 250 2 80 2 0.62 1.80 1.11 13 24.00 15.55
Stirrup
C D10-150 (c4) 570 2 250 2 80 2 0.62 1.80 1.11 40 72.00 46.65
C D10-100 (c3) 570 2 250 2 80 2 0.62 1.80 1.11 18 31.50 20.41
10
SUB TOTAL WEIGHT 723.32 2 1,315.13

5. TIE BEAM 1B11

825 1800

BEAM RE-BAR BENDING SCHEDULE 11 ( 300x500 )


(AXIS E/1~17)
LEGEND UNIT TOTAL
REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
C 19 (a1) 8,350 1 425 2 2.23 9.20 20.52 4 36.80 86.17
Main
Rebar B 16 (s1) 8,350 1 1.58 8.35 13.18 14 116.90 193.69
C 25 (b1) 8,350 1 675 2 3.85 9.70 37.35 4 38.80 156.85 Waste
coefficien0.0
C D10-150 (c1) 1,770 2 250 2 80 2 0.62 4.20 2.59 21 88.20 57.14 5
Stirrup C D10-300 (c2) 1,770 2 250 2 80 2 0.62 4.20 2.59 15 64.19 41.59
10
Page 6 of 36
SUB TOTAL WEIGHT 588.98 1 588.98

Page 7 of 36
6. TIE BEAM 1B12

825 1800

BEAM RE-BAR BENDING SCHEDULE 1B12 ( 400x1900 )

LEGEND UNIT TOTAL


REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
C 19 (a1) 5,235 1 425 2 2.23 6.09 13.57 4 24.34 56.99
Main B 16 (s1) 5,235 1 1.58 5.24 8.26 14 73.29 121.43
Rebar Waste
C 25 (b1) 5,235 1 675 2 3.85 6.59 25.35 4 26.34 106.48
coefficien0.0
5
C D10-250 (c1) 1,770 2 250 2 80 2 0.62 4.20 2.59 19 79.55 51.54
Stirrup
10
SUB TOTAL WEIGHT 370.09 1 370.09

7. TIE BEAM 1B13

825 1800

BEAM RE-BAR BENDING SCHEDULE 1B13 ( 400x700 )

LEGEND UNIT TOTAL


REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
Main C 19 (a1) 8,350 1 425 2 2.23 9.20 20.52 4 36.80 86.17
Rebar C 25 (b1) 8,300 1 675 2 3.85 9.65 37.15 4 38.60 156.04 Waste
coefficien0.0
D D10-300 (c2) 570 2 250 2 80 2 0.62 1.80 1.11 26 47.40 30.71 5
10
SUB TOTAL WEIGHT 300.21 1 300.21

8. TIE BEAM 1B20-23

BEAM RE-BAR BENDING SCHEDULE 1B20-23( 400x1200 )


825 1800
LEGEND UNIT TOTAL
REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
A 19 (a1) 4,275 1 425 1 2.23 4.70 10.48 8 37.60 88.04
A 19 (a2) 9,050 1 2.23 9.05 20.18 12 108.60 254.29
A 19 (a3) 2,900 1 425 1 2.23 3.33 7.41 8 26.60 62.28
B 19 (a4) 5,400 1 2.23 5.40 12.04 12 64.80 151.73

B 19 (s1) 4,275 1 2.23 4.28 9.53 16 68.40 160.16


Main B 19 (s2) 9,050 1 2.23 9.05 20.18 12 108.60 254.29
Rebar Waste
coefficien0.0
A 19 (b1) 7,925 1 425 1 2.23 8.35 18.62 4 33.40 78.21 5
B 19 (b2) 8,920 1 2.23 8.92 19.89 8 71.36 167.09
A 25 (b3) 9,445 1 675 1 3.85 10.12 38.96 4 40.48 163.64
B 19 (b4) 4,120 1 2.23 4.12 9.19 2 8.24 19.29

Stirrup C D10-300 (c1) 1,070 2 250 2 80 2 0.62 2.64 1.63 101 267.65 173.39
#REF! 19 25 32
SUB TOTAL WEIGHT 1,729.65 1 1,729.65

Page 8 of 36
9. TIE BEAM 1B24

825 1800

BEAM RE-BAR BENDING SCHEDULE 1B24 ( 400x1900 )


(AXIS E/1~17)
LEGEND UNIT TOTAL
REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
Main C 19 (a1) 6,640 1 425 2 2.23 7.49 16.70 4 29.96 70.15
Rebar B 16 (s1) 6,640 1 1.58 6.64 10.48 14 92.96 154.03
C 25 (b1) 6,640 1 625 2 3.85 7.89 30.38 4 31.56 127.58 Waste
coefficien0.0
D D10-150 (c1) 1,720 2 250 2 80 2 0.62 4.10 2.53 15 61.50 39.84 5
Stirrup D D10-300 (c1) 1,720 2 250 2 80 2 0.62 4.10 2.53 13 51.80 33.56
10
SUB TOTAL WEIGHT 467.67 1 467.67

10. TIE BEAM 1B25

825 1800

BEAM RE-BAR BENDING SCHEDULE 1B1&1B2 ( 1200x400 )


(AXIS E/1~17)
LEGEND UNIT TOTAL
REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
Main C 16 (a1) 3,350 1 325 2 1.58 4.00 6.31 3 12.00 19.88
Rebar C 16 (b1) 3,300 1 325 2 1.58 3.95 6.23 3 11.85 19.63 Waste
coefficien0.0
D D10-250 (c1) 370 2 150 2 80 2 0.62 1.20 0.74 11 13.68 8.86 5
Stirrup
10
SUB TOTAL WEIGHT 53.22 1 53.22

11. TIE BEAM 1B26

825 1800

BEAM RE-BAR BENDING SCHEDULE 1B1&1B2 ( 1200x400 )


(AXIS E/1~17)
LEGEND UNIT TOTAL
REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
Main C 25 (a1) 3,100 1 325 2 3.85 3.75 14.44 3 11.25 45.48
Rebar C 25 (b1) 3,100 1 325 2 3.85 3.75 14.44 3 11.25 45.48
B 16 (s1) 3,100 1 1.58 3.10 4.89 14 43.40 71.91 Waste
coefficien0.0
5
D D10-250 (c1) 1,770 2 250 2 80 2 0.62 4.20 2.59 10 43.68 28.30
Stirrup
10
SUB TOTAL WEIGHT 210.28 1 210.28

Page 9 of 36
12. TIE BEAM 1B27-1B30

825 1800

BEAM RE-BAR BENDING SCHEDULE 1B27-1B30 ( 400x1200/400x1900 )

LEGEND UNIT TOTAL


REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
Main A 25 (a1) 4,925 1 675 1 3.85 5.60 21.56 8 44.80 181.10
Rebar B 25 (a2) 9,050 1 3.85 9.05 34.84 12 108.60 439.02
A 19 (a3) 2,900 1 425 1 2.23 3.33 7.41 8 26.60 62.28
B 19 (a4) 5,400 1 2.23 5.40 12.04 12 64.80 151.73

B 19 (s1) 4,890 1 2.23 4.89 10.90 8 39.12 91.60


B 19 (s2) 9,050 1 2.23 9.05 20.18 24 217.20 508.57
B 19 (s3) 4,560 1 2.23 4.56 10.17 8 36.48 85.42
B 19 (s4) 9,880 1 2.23 9.88 22.03 2 19.76 46.27
B 19 (s5) 9,440 1 2.23 9.44 21.05 2 18.88 44.21
B 19 (s6) 9,010 1 2.23 9.01 20.09 2 18.02 42.19
B 19 (s7) 9,160 1 2.23 9.16 20.43 2 18.32 42.90
B 19 (s8) 8,940 1 2.23 8.94 19.94 2 17.88 41.87 Waste
coefficien0.0
B 19 (s9) 8,720 1 2.23 8.72 19.45 2 17.44 40.84 5

A 25 (b1) 9,610 1 675 1 3.85 10.29 39.60 4 41.14 166.31


C 25 (b2) 8,540 1 1,990 2 3.85 12.52 48.20 4 50.08 202.45
B 25 (b3) 10,780 1 3.85 10.78 41.50 4 43.12 174.31
C 25 (b4) 8,440 1 2,010 1 675 1 3.85 11.13 42.83 4 44.50 179.89
B 19 (b5) 4,110 1 2.23 4.11 9.17 2 8.22 19.25

D D10-150 (c1) 1,070 2 250 2 80 2 0.62 2.80 1.73 46 128.80 83.44


D D10-150 (c3) 1,770 2 250 2 80 2 0.62 4.20 2.59 46 193.20 125.16
Stirrup D D10-200 (c2) 1,070 2 250 2 80 2 0.62 2.80 1.73 32 89.60 58.05
D D10-200 (c4) 1,770 2 250 2 80 2 0.62 4.20 2.59 32 134.40 87.07
10
SUB TOTAL WEIGHT 3,161.32 1 3,161.32

13. TIE BEAM 1B31-1B34

825 1800

BEAM RE-BAR BENDING SCHEDULE 1B31-1B34 ( 400x1200 )


(AXIS E/1~17)
LEGEND UNIT TOTAL
REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
A 19 (a1) 4,775 1 425 1 2.23 5.20 11.60 8 41.60 97.41
B 19 (a2) 9,050 1 2.23 9.05 20.18 12 108.60 254.29
A 19 (a3) 2,900 1 425 1 2.23 3.33 7.41 8 26.60 62.28
B 19 (a4) 5,400 1 2.23 5.40 12.04 12 64.80 151.73

B 19 (s1) 4,725 1 2.23 4.73 10.54 8 37.80 88.51


Main B 19 (s2) 9,050 1 2.23 9.05 20.18 24 217.20 508.57
Rebar B 19 (s3) 4,775 1 2.23 4.78 10.65 8 38.20 89.45 Waste
coefficien0.0
5
A 19 (b1) 7,975 1 425 1 2.23 8.40 18.73 4 33.60 78.67
B 19 (b2) 8,920 1 2.23 8.92 19.89 8 71.36 167.09
A 19 (b3) 9,395 1 2.23 9.40 20.95 4 37.58 87.99
B 19 (b4) 4,120 1 2.23 4.12 9.19 2 8.24 19.29

D D10-300 (c1) 1,070 2 250 2 80 2 0.62 2.80 1.73 101 283.73 183.82
Stirrup
10
SUB TOTAL WEIGHT 1,968.01 1 1,968.01

TOTAL WEIGHT 16,015.45

Page 10 of 36
FORMWORK
OWNER : TWJO
PROJECT : MRT CP 101-SP 02
BUILDING AREA : D04 -WORK SHOP
NOS LENGTH HEIGHT SIDES VOLUME TOTAL VOLUME
No. TYPE JOB DESCRIPTION REMARKS
c (pcs) a (m) b (m) d (nos) e= (axbxd) (m2) f =(cxe) (m2)
1 A 1B1 (OUTSIDE)
a= 8500 8.50 1.80 1 15.30
2.00 0.60 1 -1.20

600
6.50 0.60 1 -3.90

b2 =
0.50 0.60 1 -0.30
1800

1800
9.90
b=

b=
b4 = 800

b3 = 600
a4= 500 a2= 2000
a3= 6500
a= 8500
1
(INSIDE)
a= 8500 8.50 1.80 1 15.30
0.50 0.80 1 -0.40
b5 = 600

6.50 0.60 1 -3.90


0.50 1.20 1 -0.60
1800

1200

1800
2.00 0.60 1 -1.20
b=

b4 =

b=
800
b3 = 600

9.20
b2 =

a5= 2000
a4= 500 a3= 6500 a2= 500
a= 8500 19.10 19.10
B 1B2; 1B3; 1B4;
1B5; 1B6; 1B7; a= 9000 9.00 1.80 2 32.40
1B8; 1B9; 1B10; 0.50 0.80 2 -0.80
1B11; 1B12; 8.00 0.60 2 -9.60
1B13; 1B14; 0.50 0.80 2 -0.80
1B15
1800

1800

21.20
b=

b=
800

600
800

14
b4 =

b3 =
b2 =

a4= 500 a3= 8000 a2= 500


a= 9000

21.20 296.80
C 1B16
a= 8900 8.90 1.80 2 32.04
0.50 0.80 2 -0.80
8.00 0.60 2 -9.60
0.40 0.80 2 -0.64
1800

1800

21.00
1
b=

b=
b4= 800

b2 = 800
b3 = 600

a4= 400 a3= 8000 a2= 500


a= 8900

21.00 21.00
SUB TOTAL 16 336.90 m2
2 A 1B97
a= 6700 6.70 1.80 2 24.12
6.70 0.60 2 -8.04
600

16.08
b2=
1800

1800

1
b=

b=

a= 6700

16.08 16.08

Page 11 of 36
NOS LENGTH HEIGHT SIDES VOLUME TOTAL VOLUME
No. TYPE JOB DESCRIPTION REMARKS
c (pcs) a (m) b (m) d (nos) e= (axbxd) (m2) f =(cxe) (m2)
B 1B98
a= 8450 8.45 1.80 2 15.21
8.45 0.60 2 -5.07

600
10.14

b2 =
1800

1800
1

b=

b=
a= 8450

10.14 10.14
C 1B99
a= 8250 8.25 1.80 2 29.70
8.25 0.60 2 -9.90
600

19.80
b2 =
1800

1800
1
b=

b=
a= 8250

19.80 19.80
D 1B100
a= 7700 7.70 1.80 2 27.72
7.70 0.60 2 -9.24
b2 = 600 1.25 0.40 2 -1
1.95 0.40 2 -1.56
1800

1800
400

15.92
1
b=

b=
b3&4 =

a4= 1950 a3= 1250


a= 7700

15.92 15.92
E 1B101; 1B102
a= 4750 4.75 1.80 2 17.10
4.75 0.60 2 -5.70

1.25 0.40 2 -1.00


400 b2 = 600

10.40
1800

1800

2
b=
b3 =
b=

a3= 1250
a= 4750

10.40 20.80
F 1B103
a= 7000 7.00 1.80 2 25.20
7.00 0.60 2 -8.40
600

0.50 0.40 2 -0.40


b2=
400

1.33 0.40 2 -1.06


b3&4=
1800

1800

1 15.34
b=

b=

a4= 1325 a3= 500


a= 7000

15.34 15.34
SUB TOTAL 7 98.08 m2
3 A 1B153
a= 7275 7.28 1.80 2 26.19
6.20 0.60 2 -7.44
0.40 0.80 2 -0.64
0.68 0.80 2 -1.08
1800

1800

17.03
b=

b=
b4= 800

b3 = 800

1
b2 = 600

a4= 675 a2= 6200 a3= 400


a= 7275

17.03 17.03

Page 12 of 36
NOS LENGTH HEIGHT SIDES VOLUME TOTAL VOLUME
No. TYPE JOB DESCRIPTION REMARKS
c (pcs) a (m) b (m) d (nos) e= (axbxd) (m2) f =(cxe) (m2)
B 1B154
a= 8575 8.58 1.80 2 30.87
1.33 0.80 2 -2.12

2.95 0.40 2 -2.36

400 b4 = 600
8.58 0.60 2 -10.29

b = 1800

1800
1.25 0.40 2 -1.00

b=
1
b3&5=

800
15.10

b2 =
a5= 1250 a2= 1325
a3= 2950
a= 8575

15.10 15.10
C 1B155
a= 5000 5.00 1.80 2 18.00
1.25 0.40 2 -1.00

5.00 0.60 2 -6.00

b3 = 600
11.00
1800

b = 1800
1

b2 = 400
b=

a2= 1250
a= 5000

11.00 11.00
D 1B156; 1B157;
1B158 a= 2500 2.50 1.80 2 9.00
2.50 0.60 2 -3.00
600

6.00
b2 =
1800

1800

3
b=

b=

a= 2500

6.00 18.00
E 1B159
4.75 1.80 2 17.10
a= 4750 4.75 0.60 2 -5.70
0.50 0.40 2 -0.40
b2 = 600

11.00
1800
400

1800

1
b=

b=
b3=

a3= 500
a= 4750
11.00 11.00
SUB TOTAL 7 72.13 m2
4 A 1B81
a= 8000 8.00 1.80 2 28.80
8.00 0.60 2 -9.60
600

1.25 0.40 2 -1.00


0.50 0.40 2 -0.40
400 b2=
1800

1800

17.80
1
b=
b3&4=

b=

a4= 500 a3= 1250


a= 8000

17.80 17.80

Page 13 of 36
NOS LENGTH HEIGHT SIDES VOLUME TOTAL VOLUME
No. TYPE JOB DESCRIPTION REMARKS
c (pcs) a (m) b (m) d (nos) e= (axbxd) (m2) f =(cxe) (m2)
B 1B82; 1B83;
1B84; 1B85; a= 8000 8.00 1.80 2 28.80
1B86; 1B87; 1.25 0.40 2 -1.00
1B88; 1B89

b4 = 600
1.25 0.40 2 -1.00
8.00 0.60 2 -9.60

1800

b = 1800
400

400
17.20
8
b=
b3 =

b2 =
a3= 1250 a2= 1250
a= 8000

17.20 137.60
SUB TOTAL 9 155.40 m2
5 A 1B90
a= 8000 8.00 1.80 2 28.80
1.25 0.40 2 -1.00

400 b4 = 600
1.25 0.40 2 -1.00
8.00 0.60 2 -9.60
1800

b = 1800
400

1 17.20
b=
b3 =

b2 =
a3= 1250 a2= 1250
a= 8000

17.20 17.20
SUB TOTAL 1 17.20 m2
6 A 1B91; 1B92;
1B94; 1B95 a= 8000 8.00 1.80 2 28.80
1.25 0.40 2 -1.00
8.00 0.60 2 -9.60
400 b3 = 600

18.20
1800

1800

4
b=

b2 =
b=

a2= 1250
a= 8000

18.20 72.80
B 1B93
a= 8000 8.00 1.80 2 28.80
1.25 0.40 2 -1.00
b4 = 600

1.25 0.40 2 -1.00


8.00 0.60 2 -9.60
1
1800

b = 1800
400

b2 = 400

17.20
b=
b3 =

a3= 1250 a2= 1250


a= 8000
17.20 17.20
C 1B96
a= 8000 8.00 1.80 2 28.80
8.00 0.60 2 -9.60
600

0.50 0.40 2 -0.40


400 b2=

1.25 0.40 2 -1.00


1800

1800

17.80
1
b=

b=
b3&4=

a4= 1250 a3= 500


a= 8000

17.80 17.80
SUB TOTAL 6 107.80 m2

Page 14 of 36
NOS LENGTH HEIGHT SIDES VOLUME TOTAL VOLUME
No. TYPE JOB DESCRIPTION REMARKS
c (pcs) a (m) b (m) d (nos) e= (axbxd) (m2) f =(cxe) (m2)
7 A C17 (OUTSIDE)
a= 8000
8.00 1.80 1 14.40

1800

1800
b=

b=
a= 8000
(INSIDE)
a= 8000 1
a2= 500 a3= 500 8.00 1.80 1 14.40
0.50 0.40 1 -0.20
400

0.50 1.80 1 -0.90


b2 =

13.30
1800

1800
b=

b=
a= 8000
27.70 27.70
SUB TOTAL 1 27.70 m2
8 A 1B18
a= 9000 9.00 1.80 2 32.40
0.50 0.80 2 -0.80
8.00 0.20 2 -3.20
b6= 400

8.50 0.40 2 -6.80


1800

1800

0.10 0.40 2 -0.08


1
b=

b=

9.00 0.40 2 -7.20


b4= 400

b3 = 200
b2 = 800

14.32
b5= 400

a3= 8000
a5= 100 a2= 500
a4= 8500
a= 9000
14.32 14.32
B 1B19 (INSIDE)
a= 9500
9.50 1.80 1 17.10
600

b5 = 400
b7 = 150

4.00 0.60 1 -2.40


b2 =
b3 = 400

2.25 0.40 1 -0.90


1800

1800
b8 = 150

1.00 0.80 1 -0.80


b6 = 600
b=

b=
800

b4 = 800

6.00 0.40 1 -2.40


b10=

b9 = 200

8.00 0.60 1 -4.80


a2= 4000 0.50 0.15 1 0.08
a5= 6000 a3 = 2250 0.50 0.15 1 -0.08
a6= 8000 a4 = 1000 0.50 0.20 1 -0.10
a10= 500 a7&8&9= 500 0.50 0.80 1 -0.40
a= 9500 5.30

1
(OUTSIDE)
a= 9500
9.50 1.80 1 17.10
600

150

6.00 0.40 1 -2.40


b5=
1800

400

1800
b6 =
400

0.50 0.80 1 -0.40


b=

b7=

b2=

b=
b4 = 600

8.00 0.60 1 -4.80


800

800

4.00 0.60 1 -2.40


0.50 0.15 1 0.08
b8=

b3=

a5= 4000 2.25 0.40 1 -0.90


a7 = 2250 a3= 500 1.00 0.80 1 -0.80
a8= 1000 a2= 6000 5.48
a4= 8000
a6= 500
a= 9500

10.78 10.78

Page 15 of 36
NOS LENGTH HEIGHT SIDES VOLUME TOTAL VOLUME
No. TYPE JOB DESCRIPTION REMARKS
c (pcs) a (m) b (m) d (nos) e= (axbxd) (m2) f =(cxe) (m2)
C 1B20; 1B21;
1B22; 1B23; a= 10000 10.00 1.80 2 36.00
1B24; 1B25; 10.00 0.60 2 -12.00
1B26; 1B27;

600
1B28; 1B29; 2.25 0.40 2 -1.80
1B30; 1B31

b2 =
1.00 0.80 2 -1.60

1800

1800
400

400
8.00 0.40 2 -6.40

b3 =
b=
2.25 0.40 2 -1.80
800 b6=
b=
12

800
b5 = 400
1.00 0.80 2 -1.60
b7=

b4 =
10.80
a6= 2250 a3= 2250
a7= 1000 a5= 8000 a4= 1000
a= 10000

10.80 129.60
D 1B32
a= 9500
9.50 1.80 2 34.20

600
9.50 0.60 2 -11.40

b2 =
1.00 0.40 2 -0.80
1800

1800
800 b6= 400

b5 = 400 b3 = 400
0.50 0.80 2 -0.80
b=

b=
8.00 0.40 2 -6.40
1

b4 = 800
2.25 0.40 2 -1.80
b7=

1.00 0.80 2 -1.60


a6= 2250 a3= 1000 11.40
a7= 1000 a5= 8000 a4= 500
a= 9500

11.40 11.40
SUB TOTAL 15 166.095 m2
9 A 1B104 a= 7300
7.30 1.80 2 26.28
600

7.30 0.60 2 -8.76


b2=

7.30 0.60 2 -8.76


1800

1800

1 8.76
b=

b=
600
b3=

a= 7300
8.76 8.76
SUB TOTAL 1 8.76 m2
10 A 1B111
a= 6875 6.88 1.80 2 24.75
6.88 0.60 2 -8.25
600

16.50
b2=

1
b = 1800

b = 1800

a= 6875
16.50 16.50
B 1B114; 1B119;
1B120; 1B121; a= 6200
1B122; 1B123; 6.20 1.80 2 22.32
1B124; 1B125;
600

6.20 0.60 2 -7.44


1B126; 1B127;
b2=

1B218; 1B129; 14.88


1800

1800

1B130; 1B131 14
b=

b=

a= 6200
14.88 208.32
SUB TOTAL 15 224.82 m2
TOTAL 78 1,214.89 m2

Page 16 of 36
CONCRETE
OWNER : TWJO
PROJECT : MRT CP 101-SP 02
BUILDING AREA : D04 -WORK SHOP
NOS LENGTH HEIGHT WIDTH VOLUME TOTAL VOLUME
No. TYPE JOB DESCRIPTION REMARKS
c (pcs) a (m) b (m) d (m) e= (axbxd) (m3) f =(cxe) (m3)
1 A 1B1
a= 8500
8.50 1.80 0.83 12.62

600
2.00 0.60 0.83 -0.99

b2 =
6.50 0.60 0.83 -3.22
1800

1800
1 0.50 0.80 0.83 -0.33
b=

b=
b4 = 800

b3 = 600
8.09

a4= 500 a2= 2000


a3= 6500
a= 8500 8.09 8.09
B 1B2; 1B3; 1B4;
1B5; 1B6; 1B7; a= 9000
1B8; 1B9; 1B10; 9.00 1.80 0.83 13.37
1B11; 1B12; 1B13; 0.50 0.80 0.83 -0.33
1B14; 1B15 8.00 0.60 0.83 -3.96
1800

1800
0.50 0.80 0.83 -0.33
14
800

600
800
b=

b=
8.75
b4 =

b3 =
b2 =
a4= 500 a3= 8000 a2= 500
a= 9000
8.75 122.43
C 1B16
a= 8900
8.90 1.80 0.83 13.22
0.50 0.80 0.83 -0.33
8.00 0.60 0.83 -3.96
1800

1800

1 0.40 0.80 0.83 -0.26


b=

b=
b4= 800

b2 = 800
b3 = 600

8.66

a4= 400 a3= 8000 a2= 500


a= 8900

8.66 8.66
SUB TOTAL 16 139.18 m3
2 A 1B97
a= 6700 6.70 1.80 0.83 9.95
6.70 0.60 0.83 -3.32
600

6.63
b2=
1800

1800

1
b=

b=

a= 6700

6.63 6.63
B 1B98
a= 8750
8.75 1.80 0.83 12.99
600

0.30 1.80 0.23 -0.12


b3=

8.45 0.60 0.83 -4.18


1
1800

1800

8.69
b=

b=

a3= 8450 a2= 300


a= 8750 8.69 8.69
C 1B99
a= 8550
8.55 1.80 0.83 12.70
600

0.30 1.80 0.23 -0.12


b3=

0.30 0.60 0.83 -0.15


1
1800

1800

12.43
b=

b=

a2= 300 a3= 8250


a= 8550 12.43 12.43

Page 17 of 36
NOS LENGTH HEIGHT WIDTH VOLUME TOTAL VOLUME
No. TYPE JOB DESCRIPTION REMARKS
c (pcs) a (m) b (m) d (m) e= (axbxd) (m3) f =(cxe) (m3)
D 1B100
a= 7700
7.70 1.80 0.83 11.43

b2 = 600
7.70 0.60 0.83 -3.81
1.25 0.40 0.83 -0.41

1800

1800
1

b3&4 = 400
1.95 0.40 0.83 -0.64

b=

b=
6.57

a4= 1950 a3= 1250


a= 7700

6.57 6.57
E 1B101; 1B102
a= 4750
4.75 1.80 0.83 7.05
400 b2 = 600

4.75 0.60 0.83 -2.35


1.25 0.40 0.83 -0.41
1800

1800
2
4.29
b=
b3 =

b=
a3= 1250
a= 4750 4.29 8.58
F 1B103
a= 7000
7.00 1.80 0.83 10.40
600

7.00 0.60 0.83 -3.47


0.50 0.40 0.83 -0.17
b3&4= 400 b2=
b = 1800

1800

1
1.33 0.40 0.83 -0.44
6.33
b=

a4= 1325 a3= 500


a= 7000

6.33 6.33
SUB TOTAL 7 49.22 m3
3 A 1B153
a= 7275
7.28 1.80 0.83 10.80
6.20 0.60 0.83 -3.07
0.40 0.80 0.83 -0.26
1800

1800

0.68 0.80 0.83 -0.45


1
b=

b=
b4= 800

b3 = 800
b2 = 600

7.02

a4= 675 a2= 6200 a3= 400


a= 7275
7.02 7.02
B 1B154
a= 8575
8.58 1.80 0.83 12.73

1.33 0.80 0.83 -0.87


b3&5= 400 b4 = 600

2.95 0.40 0.83 -0.97


b = 1800

1800

8.58 0.60 0.83 -4.24


1
b=
b2 = 800

1.25 0.40 0.83 -0.41


6.23

a5= 1250 a2= 1325


a3= 2950
a= 8575

6.23 6.23
C 1B155
a= 5000
5.00 1.80 0.83 7.43

1.25 0.40 0.83 -0.41


b3 = 600

5.00 0.60 0.83 -2.48


1800

b = 1800

1
4.54
b2 = 400
b=

a2= 1250
a= 5000
4.54 4.54

Page 18 of 36
NOS LENGTH HEIGHT WIDTH VOLUME TOTAL VOLUME
No. TYPE JOB DESCRIPTION REMARKS
c (pcs) a (m) b (m) d (m) e= (axbxd) (m3) f =(cxe) (m3)
D 1B156; 1B157;
1B158 a= 2500
2.50 1.80 0.83 3.71

600
2.50 0.60 0.83 -1.24

b2 =
2.48

1800

1800
3

b=

b=
a= 2500
2.48 7.43
E 1B159
a= 4750
4.75 1.80 0.83 7.05

b2 = 600
4.75 0.60 0.83 -2.35

0.50 0.40 0.83 -0.17


1800
400

1800
1 4.54
b=
b3=

b=
a3= 500
a= 4750

4.54 4.54
SUB TOTAL 7 29.75 m3
4 A 1B81
a= 8000
8.00 1.80 0.83 11.88
600

8.00 0.60 0.83 -3.96


400 b2=

1.25 0.40 0.83 -0.41


1800

1800

0.50 0.40 0.83 -0.17


1
b=
b3&4=

b=

7.34

a4= 500 a3= 1250


a= 8000
7.34 7.34
B 1B82; 1B83; 1B84;
1B85; 1B86; 1B87; a= 8000
1B88; 1B89 8.00 1.80 0.83 11.88
b4 = 600

1.25 0.40 0.83 -0.41


b3 = 400

1.25 0.40 0.83 -0.41


1800

b = 1800

8
b2 = 400

8.00 0.60 0.83 -3.96


7.10
b=

a3= 1250 a2= 1250


a= 8000
7.10 56.76
SUB TOTAL 9 64.10 m3
5 A 1B90
a= 8000
8.00 1.80 0.83 11.88
b2 = 400 b4 = 600

1.25 0.40 0.83 -0.41


1.25 0.40 0.83 -0.41
b = 1800

b = 1800

1
b3 = 400

8.00 0.60 0.83 -3.96


7.10

a3= 1250 a2= 1250


a= 8000

7.10 7.10
SUB TOTAL 1 7.10 m3
6 A 1B91; 1B92; 1B94;
1B95 a= 8000
8.00 1.80 0.83 11.88

1.25 0.40 0.83 -0.41


b2 = 400 b3 = 600

8.00 0.60 0.83 -3.96


4
b = 1800

b = 1800

7.51

a2= 1250
a= 8000 7.51 30.03

Page 19 of 36
NOS LENGTH HEIGHT WIDTH VOLUME TOTAL VOLUME
No. TYPE JOB DESCRIPTION REMARKS
c (pcs) a (m) b (m) d (m) e= (axbxd) (m3) f =(cxe) (m3)
B 1B93
a= 8000
8.00 1.80 0.83 11.88

b2 = 400 b4 = 600
1.25 0.40 0.83 -0.41
1.25 0.40 0.83 -0.41

b = 1800

b = 1800
1

b3 = 400
8.00 0.60 0.83 -3.96
7.10

a3= 1250 a2= 1250


a= 8000

7.10 7.10
C 1B96
a= 8000
8.00 1.80 0.83 11.88
600

8.00 0.60 0.83 -3.96


400 b2=

0.50 0.40 0.83 -0.17


1800

1800
1 1.25 0.40 0.83 -0.41
b=
b3&4=

b=
7.34

a4= 1250 a3= 500


a= 8000
7.34 7.34
SUB TOTAL 6 44.47 m3
7 A 1B17
a= 8000
8.00 1.80 0.83 11.88
1800

1800

1
b=

b=

a= 8000
11.88 11.88
SUB TOTAL 1 11.88 m3
8 A 1B18
a= 9000 9.00 1.80 0.83 13.37
0.50 0.80 0.83 -0.33
8.00 0.20 0.83 -1.32
b6= 400

8.50 0.40 0.83 -2.81


1800

1800

0.10 0.40 0.83 -0.03


1
b=

b=

9.00 0.40 0.83 -2.97


b4= 400

b3 = 200
b2 = 800
b5= 400

5.91
a3= 8000
a5= 100 a2= 500
a4= 8500
a= 9000 5.91 5.91
B 1B19
a= 9500
9.50 1.80 0.83 14.11
600

150

6.00 0.40 0.83 -1.98


b5=
1800
400

1800
b6 =
400

0.50 0.80 0.83 -0.33


b=
b7=

b2=

b=
b4 = 600

8.00 0.60 0.83 -3.96


800

800

1
4.00 0.60 0.83 -1.98
b8=

b3=

0.50 0.15 0.83 0.06


a5= 4000 2.25 0.40 0.83 -0.74
a7 = 2250 a3= 500 1.00 0.80 0.83 -0.66
a8= 1000 a2= 6000 4.52
a4= 8000
a6= 500
a= 9500 4.52 4.52
C 1B20; 1B21; 1B22;
1B23; 1B24; 1B25; a= 10000 10.00 1.80 0.83 14.85
1B26; 1B27; 1B28; 10.00 0.60 0.83 -4.95
1B29; 1B30; 1B31
600

2.25 0.40 0.83 -0.74


b2 =

1.00 0.80 0.83 -0.66


1800

1800
400

400

8.00 0.40 0.83 -2.64


12
b=
b6=

b3 =
b=

2.25 0.40 0.83 -0.74


800

800
b5 = 400

1.00 0.80 0.83 -0.66


b7=

b4 =

4.46
a6= 2250 a3= 2250
a7= 1000 a5= 8000 a4= 1000
a= 10000 4.46 53.46

Page 20 of 36
NOS LENGTH HEIGHT WIDTH VOLUME TOTAL VOLUME
No. TYPE JOB DESCRIPTION REMARKS
c (pcs) a (m) b (m) d (m) e= (axbxd) (m3) f =(cxe) (m3)
D 1B132
a= 9500
9.50 1.80 0.83 14.11

600
9.50 0.60 0.83 -4.70

b2 =
1.00 0.40 0.83 -0.33

1800

1800
400

400
1 0.50 0.80 0.83 -0.33

b=

b5 = 400 b3 =
b=
8.00 0.40 0.83 -2.64

800 b6=

b4 = 800
b7= 2.25 0.40 0.83 -0.74
1.00 0.80 0.83 -0.66
a6= 2250 a3= 1000 4.70
a7= 1000 a5= 8000 a4= 500
a= 9500 4.70 4.70
SUB TOTAL 15 68.59 m3
9 A 1B104
a= 7300
7.30 1.80 0.83 10.84
600

7.30 0.60 0.83 -3.61


b2=

7.30 0.60 0.83 -3.61


1800

1800
1
3.61
b=

b=
600
b3=

a= 7300
3.61 3.61
SUB TOTAL 1 3.61 m3
10 A 1B111
a= 6875 6.88 1.80 0.83 10.21
6.88 0.60 0.83 -3.40
600

6.81
b2=

1
1800

1800
b=

b=

a= 6875 6.81 6.81


B 1B114; 1B119;
1B120; 1B121; a= 6200 6.20 1.80 0.83 9.21
1B122; 1B123; 6.20 0.60 0.83 -3.07
600

1B124; 1B125; 6.14


1B126; 1B127;
b2=

1B218; 1B129;
14
1800

1800

1B130; 1B131
b=

b=

a= 6200 6.14 85.93


SUB TOTAL 15 92.74 m3
TOTAL 78 510.64 m3

Page 21 of 36
REBAR
OWNER: TWJO
PROJECT: MRT CP 101-SP 02
BUILDI : D02 -WORKSHOP OFF
1. TIE BEAM 2B1-2B2 SIMILAR 1B18-1B19
700 400

825 1800

BEAM RE-BAR BENDING SCHEDULE 2B1-2B2 SIMILAR 1B18-1B19 ( 700x400 )

LEGEND UNIT TOTAL


REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
A 25 (a1) 8,775 1 520 1 3.85 9.30 35.79 8 74.36 300.60
A 19 (a2) 2,890 1 520 1 2.23 3.41 7.60 8 27.28 63.88
Main B 19 (a2) 5,400 1 2.23 5.40 12.04 4 21.60 50.58
Rebar

D D10-200 650 2 320 2 80 2 0.62 2.10 1.30 35 73.50 47.62


Stirrup D D10-300 650 2 350 2 80 2 0.62 2.16 1.33 27 57.60 37.32
10
SUB TOTAL WEIGHT 549.98 4 2,199.94

2. TIE BEAM 2B20~2B23 SIMILAR 2B31~2B34


700 400 825 1800

BEAM RE-BAR BENDING SCHEDULE 2B20~2B23 SIMILAR2B31~2B34 ( 700x400 )

LEGEND UNIT TOTAL


REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
A 25 (a1) 4,875 1 625 1 3.85 5.50 21.18 8 44.00 177.87
B 22 (a2) 9,050 1 2.98 9.05 26.97 4 36.20 113.27
A 19 (a4) 2,900 1 425 1 2.23 3.33 7.41 8 26.60 62.28
B 19 (a5) 5,400 1 2.23 5.40 12.04 4 21.60 50.58

Main B 19 s1 4,825 1 2.23 4.83 10.76 8 38.60 86.08


Rebar B 19 s2 7,950 1 2.23 7.95 17.73 8 63.60 141.83 Waste
coefficien0.0
B 19 s3 3,775 1 2.23 3.78 8.42 8 30.20 67.35 5

A 25 b1 675 1 8,000 1 3.85 8.68 33.40 4 34.70 133.60


A 25 b2 675 1 9,590 1 3.85 10.27 39.52 4 41.06 158.08

D D10-200 (c1) 545 2 250 2 80 2 0.62 1.75 1.08 35 61.25 37.79


Stirrup D D10-300 (c2) 545 2 250 2 80 2 0.62 1.75 1.08 27 46.67 28.79
10
SUB TOTAL WEIGHT 766.37 3 2,299.12

Page 22 of 36
3. TIE BEAM 1B3-1B4
400 800

1800 825

BEAM RE-BAR BENDING SCHEDULE 1B3~1B4 ( 400x800 )


( AXIS 17/A~E )
LEGEND UNIT TOTAL
REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
A 22 (a1) 8,715 1 625 1 2.98 9.34 27.83 4 37.36 116.90
A 22 (a2) 8,715 1 625 1 2.98 9.34 27.83 4 37.36 116.90

B 19 s1 5,200 1 2.23 5.20 11.60 4 20.80 46.38


B 16 s2 4,835 1 1.58 4.84 7.63 4 19.34 30.52
Main Waste
Rebar B 16 s3 8,930 1 1.58 8.93 14.09 4 35.72 56.37
coefficien0.0
B 16 s4 4,785 1 1.58 4.79 7.55 4 19.14 30.20 5

A 22 b1 625 1 8,075 1 2.98 8.70 25.93 4 34.80 103.70


A 32 b2 675 1 9,345 1 6.31 10.02 63.23 4 40.08 252.90

D D10-200 (c1) 670 2 250 2 80 2 0.62 2.00 1.23 19 38.00 24.62


D D10-300 (c2) 670 2 250 2 80 2 0.62 2.00 1.23 13 26.67 17.28
Stirrup
D D10-150 (c4) 670 2 250 2 80 2 0.62 2.00 1.23 40 80.00 51.83
D D10-100 (c3) 670 2 250 2 80 2 0.62 2.00 1.23 18 35.00 22.67
SUB TOTAL WEIGHT 753.38 1 753.38

4. TIE BEAM 1B7-1B6 SIMILAR 1B16-1B17

1800 825

BEAM RE-BAR BENDING SCHEDULE 1B7-1B6 SIMILAR 1B16-1B17 ( 400x700 )

LEGEND UNIT TOTAL


REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
A 22 (a1) 8,665 1 425 1 2.98 9.09 27.09 4 36.36 113.77
A 19 (a2) 8,715 1 425 1 2.23 9.14 20.38 4 36.56 85.61

Main
Rebar B 19 (s1) 5,200 1 389 1 2.23 5.59 12.46 4 22.36 52.35

A 25 (b1) 8,050 1 625 1 3.85 8.68 33.40 4 34.70 140.27 Waste


A 25 (b2) 9,320 1 625 1 3.85 9.95 38.29 4 39.78 160.81 coefficien0.0
5
C D10-200 (c1) 570 2 250 2 80 2 0.62 1.80 1.11 19 34.20 22.16
C D10-300 (c2) 570 2 250 2 80 2 0.62 1.80 1.11 13 24.00 15.55
Stirrup
C D10-150 (c4) 570 2 250 2 80 2 0.62 1.80 1.11 40 72.00 46.65
C D10-100 (c3) 570 2 250 2 80 2 0.62 1.80 1.11 18 31.50 20.41
10
SUB TOTAL WEIGHT 405.84 2 811.69

5. TIE BEAM 1B11

825 1800

BEAM RE-BAR BENDING SCHEDULE 11 ( 300x500 )


(AXIS E/1~17)
LEGEND UNIT TOTAL
REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
C 19 (a1) 8,350 1 425 2 2.23 9.20 20.52 4 36.80 86.17
Main B 16 (s1) 8,350 1 1.58 8.35 13.18 14 116.90 193.69
Rebar
C 25 (b1) 8,350 1 675 2 3.85 9.70 37.35 4 38.80 156.85 Waste
coefficien0.0
C D10-150 (c1) 1,770 2 250 2 80 2 0.62 4.20 2.59 21 88.20 57.14 5
Stirrup C D10-300 (c2) 1,770 2 250 2 80 2 0.62 4.20 2.59 15 64.19 41.59
10
SUB TOTAL WEIGHT 535.43 1 535.43

Page 23 of 36
6. TIE BEAM 1B12

825 1800

BEAM RE-BAR BENDING SCHEDULE 1B12 ( 400x1900 )

LEGEND UNIT TOTAL


REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
C 19 (a1) 5,235 1 425 2 2.23 6.09 13.57 4 24.34 56.99
Main
B 16 (s1) 5,235 1 1.58 5.24 8.26 14 73.29 121.43
Rebar Waste
C 25 (b1) 5,235 1 675 2 3.85 6.59 25.35 4 26.34 106.48
coefficien0.0
5
C D10-250 (c1) 1,770 2 250 2 80 2 0.62 4.20 2.59 19 79.55 51.54
Stirrup
10
SUB TOTAL WEIGHT 336.44 1 336.44

7. TIE BEAM 1B13

825 1800

BEAM RE-BAR BENDING SCHEDULE 1B13 ( 400x700 )

LEGEND UNIT TOTAL


REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
Main C 19 (a1) 8,350 1 425 2 2.23 9.20 20.52 4 36.80 86.17
Rebar C 25 (b1) 8,300 1 675 2 3.85 9.65 37.15 4 38.60 156.04 Waste
coefficien0.0
D D10-300 (c2) 570 2 250 2 80 2 0.62 1.80 1.11 26 47.40 30.71 5
10
SUB TOTAL WEIGHT 272.92 1 272.92

8. TIE BEAM 1B20-23

BEAM RE-BAR BENDING SCHEDULE 1B20-23( 400x1200 )


825 1800
LEGEND UNIT TOTAL
REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
A 19 (a1) 4,275 1 425 1 2.23 4.70 10.48 8 37.60 88.04
A 19 (a2) 9,050 1 2.23 9.05 20.18 12 108.60 254.29
A 19 (a3) 2,900 1 425 1 2.23 3.33 7.41 8 26.60 62.28
B 19 (a4) 5,400 1 2.23 5.40 12.04 12 64.80 151.73

B 19 (s1) 4,275 1 2.23 4.28 9.53 16 68.40 160.16


Main
Rebar B 19 (s2) 9,050 1 2.23 9.05 20.18 12 108.60 254.29 Waste
coefficien0.0
A 19 (b1) 7,925 1 425 1 2.23 8.35 18.62 4 33.40 78.21 5
B 19 (b2) 8,920 1 2.23 8.92 19.89 8 71.36 167.09
A 25 (b3) 9,445 1 675 1 3.85 10.12 38.96 4 40.48 163.64
B 19 (b4) 4,120 1 2.23 4.12 9.19 2 8.24 19.29

Stirrup C D10-300 (c1) 1,070 2 250 2 80 2 0.62 2.64 1.63 101 267.65 173.39
#REF! 19 25 32
SUB TOTAL WEIGHT 1,572.41 1 1,572.41

Page 24 of 36
9. TIE BEAM 1B24

825 1800

BEAM RE-BAR BENDING SCHEDULE 1B24 ( 400x1900 )


(AXIS E/1~17)
LEGEND UNIT TOTAL
REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
Main C 19 (a1) 6,640 1 425 2 2.23 7.49 16.70 4 29.96 70.15
Rebar B 16 (s1) 6,640 1 1.58 6.64 10.48 14 92.96 154.03
C 25 (b1) 6,640 1 625 2 3.85 7.89 30.38 4 31.56 127.58 Waste
coefficien0.0
D D10-150 (c1) 1,720 2 250 2 80 2 0.62 4.10 2.53 15 61.50 39.84 5
Stirrup D D10-300 (c1) 1,720 2 250 2 80 2 0.62 4.10 2.53 13 51.80 33.56
10
SUB TOTAL WEIGHT 425.16 1 425.16

10. TIE BEAM 1B25

825 1800

BEAM RE-BAR BENDING SCHEDULE 1B1&1B2 ( 1200x400 )


(AXIS E/1~17)
LEGEND UNIT TOTAL
REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
Main C 16 (a1) 3,350 1 325 2 1.58 4.00 6.31 3 12.00 19.88
Rebar C 16 (b1) 3,300 1 325 2 1.58 3.95 6.23 3 11.85 19.63 Waste
coefficien0.0
D D10-250 (c1) 370 2 150 2 80 2 0.62 1.20 0.74 11 13.68 8.86 5
Stirrup
10
SUB TOTAL WEIGHT 48.38 1 48.38

11. TIE BEAM 1B26

825 1800

BEAM RE-BAR BENDING SCHEDULE 1B1&1B2 ( 1200x400 )


(AXIS E/1~17)
LEGEND UNIT TOTAL
REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
Main C 25 (a1) 3,100 1 325 2 3.85 3.75 14.44 3 11.25 45.48
Rebar C 25 (b1) 3,100 1 325 2 3.85 3.75 14.44 3 11.25 45.48
B 16 (s1) 3,100 1 1.58 3.10 4.89 14 43.40 71.91 Waste
coefficien0.0
5
D D10-250 (c1) 1,770 2 250 2 80 2 0.62 4.20 2.59 10 43.68 28.30
Stirrup
10
SUB TOTAL WEIGHT 191.16 1 191.16

Page 25 of 36
12. TIE BEAM 1B27-1B30

825 1800

BEAM RE-BAR BENDING SCHEDULE 1B27-1B30 ( 400x1200/400x1900 )

LEGEND UNIT TOTAL


REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
Main A 25 (a1) 4,925 1 675 1 3.85 5.60 21.56 8 44.80 181.10
Rebar B 25 (a2) 9,050 1 3.85 9.05 34.84 12 108.60 439.02
A 19 (a3) 2,900 1 425 1 2.23 3.33 7.41 8 26.60 62.28
B 19 (a4) 5,400 1 2.23 5.40 12.04 12 64.80 151.73

B 19 (s1) 4,890 1 2.23 4.89 10.90 8 39.12 91.60


B 19 (s2) 9,050 1 2.23 9.05 20.18 24 217.20 508.57
B 19 (s3) 4,560 1 2.23 4.56 10.17 8 36.48 85.42
B 19 (s4) 9,880 1 2.23 9.88 22.03 2 19.76 46.27
B 19 (s5) 9,440 1 2.23 9.44 21.05 2 18.88 44.21
B 19 (s6) 9,010 1 2.23 9.01 20.09 2 18.02 42.19
B 19 (s7) 9,160 1 2.23 9.16 20.43 2 18.32 42.90
B 19 (s8) 8,940 1 2.23 8.94 19.94 2 17.88 41.87 Waste
coefficien0.0
B 19 (s9) 8,720 1 2.23 8.72 19.45 2 17.44 40.84 5

A 25 (b1) 9,610 1 675 1 3.85 10.29 39.60 4 41.14 166.31


C 25 (b2) 8,540 1 1,990 2 3.85 12.52 48.20 4 50.08 202.45
B 25 (b3) 10,780 1 3.85 10.78 41.50 4 43.12 174.31
C 25 (b4) 8,440 1 2,010 1 675 1 3.85 11.13 42.83 4 44.50 179.89
B 19 (b5) 4,110 1 2.23 4.11 9.17 2 8.22 19.25

D D10-150 (c1) 1,070 2 250 2 80 2 0.62 2.80 1.73 46 128.80 83.44


D D10-150 (c3) 1,770 2 250 2 80 2 0.62 4.20 2.59 46 193.20 125.16
Stirrup D D10-200 (c2) 1,070 2 250 2 80 2 0.62 2.80 1.73 32 89.60 58.05
D D10-200 (c4) 1,770 2 250 2 80 2 0.62 4.20 2.59 32 134.40 87.07
10
SUB TOTAL WEIGHT 2,873.93 1 2,873.93

13. TIE BEAM 1B31-1B34

825 1800

BEAM RE-BAR BENDING SCHEDULE 1B31-1B34 ( 400x1200 )


(AXIS E/1~17)
LEGEND UNIT TOTAL
REBAR LENGTH (mm) LENGTH WEIGHT TOTAL WEIGHT NOS
TYPE SIZE BAR ON SHOP WEIGHT Σ WEIGHT REMARKS
DWG (a) Σ (b) Σ (c) Σ (kg/m) (m) (kg) Length (m) (kg) (pcs) (kg)
A 19 (a1) 4,775 1 425 1 2.23 5.20 11.60 8 41.60 97.41
B 19 (a2) 9,050 1 2.23 9.05 20.18 12 108.60 254.29
A 19 (a3) 2,900 1 425 1 2.23 3.33 7.41 8 26.60 62.28
B 19 (a4) 5,400 1 2.23 5.40 12.04 12 64.80 151.73

B 19 (s1) 4,725 1 2.23 4.73 10.54 8 37.80 88.51


Main B 19 (s2) 9,050 1 2.23 9.05 20.18 24 217.20 508.57
Rebar B 19 (s3) 4,775 1 2.23 4.78 10.65 8 38.20 89.45 Waste
coefficien0.0
5
A 19 (b1) 7,975 1 425 1 2.23 8.40 18.73 4 33.60 78.67
B 19 (b2) 8,920 1 2.23 8.92 19.89 8 71.36 167.09
A 19 (b3) 9,395 1 2.23 9.40 20.95 4 37.58 87.99
B 19 (b4) 4,120 1 2.23 4.12 9.19 2 8.24 19.29

D D10-300 (c1) 1,070 2 250 2 80 2 0.62 2.80 1.73 101 283.73 183.82
Stirrup
10
SUB TOTAL WEIGHT 1,789.10 1 1,789.10

TOTAL WEIGHT 14,109.05

Page 26 of 36
TIE BEAM D-02
OWNER : TWJO
PROJECT : MRT CP 101-SP 02
BUILDING AREA : D02 -WORKSHOP OFFICE

LENGTH WIDTH THICKNESS QUANTITY CONCRETE FORMWORK REBAR


No. TYPE
m m m unit m3 m2 kg
1 1B1~1B2 8.00 0.40 1.20 2 8.45 42.24
2,367.59
2 1B14~1B15 8.00 0.40 1.20 2 8.45 42.24
3 1B5~1B6 8.00 0.40 1.20 2 8.45 42.24
4 1B9~1B10 8.00 0.40 1.20 2 8.45 42.24 2,654.59
5 1B18~1B19 8.00 0.40 1.20 2 8.45 42.24
6 1B3~1B4 8.00 0.40 0.80 2 5.63 28.16 828.71
7 1B6~1B7 8.00 0.40 0.70 2 4.93 24.64
1,315.13
8 1B16~1B17 8.00 0.40 0.70 2 4.93 24.64
9 1B11 8.00 0.30 0.50 1 1.32 8.80 588.98
10 1B12 4.39 0.40 0.90 1 1.74 8.69 370.09
11 1B13 8.00 0.40 0.70 1 2.46 12.32 300.21
12 1B20~1B23 8.00 0.40 1.20 4 16.90 84.48 1,729.65
13 1B24 6.40 0.40 1.90 1 5.35 26.75 467.67
14 1B25 3.00 0.30 0.50 1 0.50 3.30 53.22
15 1B26 2.90 0.30 0.50 1 0.48 3.19 210.28
16 1B27 8.00 0.40 1.90 1 6.69 33.44
17 1B28 8.00 0.40 1.20 1 4.22 21.12
3,161.32
18 1B29 8.00 0.40 1.90 1 6.69 33.44
19 1B30 8.00 0.40 1.20 1 4.22 21.12
20 1B31~1B34 8.00 0.40 1.20 4 16.90 84.48 1,968.01
TOTAL 34 125.19 629.77 16,015.45
Dia 10 2056.51 Kg 213.66 Btg Prepared by; Checked by; Approved by;
Dia 16 997.66 Kg 40.53 Btg
Dia 19 7,625.59 Kg 219.20 Btg
Dia 22 1,195.04 Kg 25.71 Btg Ridwan Widodo Pungkas
Dia 25 4,352.42 Kg 72.47 Btg
Dia 32 361.65 Kg 3.67 Btg
BEAM 2nd fl D-02
OWNER : TWJO
PROJECT : MRT CP 101-SP 02
BUILDING AREA : D02 -WORKSHOP OFFICE

LENGTH WIDTH THICKNESS QUANTITY CONCRETE FORMWORK REBAR


No. TYPE
m m m unit m3 m2 kg
1 1B1~1B2 8.00 0.40 1.20 2 8.45 42.24
2,367.59
2 1B14~1B15 8.00 0.40 1.20 2 8.45 42.24
3 1B5~1B6 8.00 0.40 1.20 2 8.45 42.24
4 1B9~1B10 8.00 0.40 1.20 2 8.45 42.24 2,654.59
5 1B18~1B19 8.00 0.40 1.20 2 8.45 42.24
6 1B3~1B4 8.00 0.40 0.80 2 5.63 28.16 828.71
7 1B6~1B7 8.00 0.40 0.70 2 4.93 24.64
1,315.13
8 1B16~1B17 8.00 0.40 0.70 2 4.93 24.64
9 1B11 8.00 0.30 0.50 1 1.32 8.80 588.98
10 1B12 4.39 0.40 0.90 1 1.74 8.69 370.09
11 1B13 8.00 0.40 0.70 1 2.46 12.32 300.21
12 1B20~1B23 8.00 0.40 1.20 4 16.90 84.48 1,729.65
13 1B24 6.40 0.40 1.90 1 5.35 26.75 467.67
14 1B25 3.00 0.30 0.50 1 0.50 3.30 53.22
15 1B26 2.90 0.30 0.50 1 0.48 3.19 210.28
16 1B27 8.00 0.40 1.90 1 6.69 33.44
17 1B28 8.00 0.40 1.20 1 4.22 21.12
3,161.32
18 1B29 8.00 0.40 1.90 1 6.69 33.44
19 1B30 8.00 0.40 1.20 1 4.22 21.12
20 1B31~1B34 8.00 0.40 1.20 4 16.90 84.48 1,968.01
TOTAL 34 125.19 629.77 16,015.45
Prepared by; Checked by; Approved by;

Ridwan Widodo Pungkas


B
ADDITIONAL TIE BEAM PERIMETER
b b
c c
a a
b
a a
b
A B
D

BEAM RE-BAR BENDING SCHEDULE 1B53 ( 800x1800 )


800 1800
SIZE REBAR LENGTH (mm) WEIGHT TOTAL TOTAL WEIGHT
NO
Bar
TYPE
(a) Σ (b) Σ (c) Σ (kg/m) Length (mm)
Σ (kg)
a1 36 A 8975 1 350 1 7.99 9325 8 596.05
a2 36 A 4475 1 350 1 7.99 4825 8 308.41

s1 19 B 3300 1 2.23 3300 12 88.31


s2 19 B 9550 1 2.23 9550 12 255.56

b1 36 A 10400 1 350 1 7.99 10750 8 687.14


b2 36 A 2800 1 350 1 7.99 3150 8 201.35
b3 32 A 10040 1 350 1 6.31 10390 8 524.49
b4 32 A 2720 1 350 1 6.31 3070 8 154.97
b5 32 A 9840 1 350 1 6.31 10190 8 514.39
b6 32 A 2640 1 350 1 6.31 2990 8 150.94

c1 D13-100 D 1645 2 650 3 130 2 1.04 5500 29 165.88


c2 D13-125 D 1645 2 650 3 130 2 1.04 5500 20 114.40
c3 2D13-150 D 1645 2 650 3 130 2 1.04 5500 18 101.05
c3 2D13-150 D 1645 2 300 3 130 2 1.04 4450 18 81.76
13 19 32 36
SUB TOTAL WEIGHT 3,944.70

bb
c c
a a
b b b
a a a b
A B C D

BEAM RE-BAR BENDING SCHEDULE 1B105~1B106 (500x2800)


500 2800
SIZE REBAR LENGTH (mm) WEIGHT TOTAL TOTAL WEIGHT
NO
Bar
TYPE
(a) Σ (b) Σ (c) Σ (kg/m) Length (mm)
Σ (kg)
a1 25 C 4510 1 1275 1 2900 1 3.853 5788.853 5 111.52
a2 25 C 540 1 500 2 3.853 1540 10 59.34
a3 25 A 6860 1 2900 2 3.853 12660 5 243.89
a4 25 A 4200 1 1275 1 2900 1 3.853 8375 5 161.34
a5 26 A 3450 1 3.853 3450 10 132.93

s1 16 B 4510 1 1.578 4510 20 142.34


s2 16 B 6860 1 1.578 6860 20 216.50
s3 16 B 4300 1 1.578 4300 20 135.71
s4 16 B 10125 1 1.578 10125 18 287.59
s5 16 B 9775 1 1.578 9775 18 277.65

b1 25 A 8950 1 1275 1 3.853 10225 5 196.98


b2 25 B 10500 1 3.853 10500 5 202.28
b3 25 A 1900 1 1275 1 3.853 3175 5 61.17

c1 D10-300 D 2645 2 350 3 100 2 0.617 6540 58 232.70


10 19 25
SUB TOTAL WEIGHT 2,461.94
bb
c c
a a
b
a a
b
A B D

BEAM RE-BAR BENDING SCHEDULE 1B107~1B108 (500x1800)


500 1800
SIZE REBAR LENGTH (mm) WEIGHT TOTAL TOTAL WEIGHT
NO
Bar
TYPE
(a) Σ (b) Σ (c) Σ (kg/m) Length (mm)
Σ (kg)
a1 32 A 8100 1 900 1 6.313 9000 5 284.09
a2 32 A 12600 1 900 1 6.313 13500 5 426.13
a3 32 A 8020 1 900 1 6.313 8920 5 281.56
a4 32 A 12520 1 900 1 6.313 13420 5 423.60
a5 32 A 7940 1 900 1 6.313 8840 5 279.03
a6 32 A 12440 1 900 1 6.313 13340 5 421.08

s1 19 B 10075 1 2.223 10075 24 537.52

b1 32 A 9275 1 900 1 6.313 10175 5 321.17


b2 32 A 11425 1 900 1 6.313 12325 5 389.04
b3 32 A 9195 1 900 1 6.313 10095 5 318.65
b4 32 A 11345 1 900 1 6.313 12245 5 386.51
b5 32 A 9115 1 900 1 6.313 10015 5 316.12
b6 32 A 11265 1 900 1 6.313 12165 5 383.99

c1 D13-100 D 1645 2 350 3 100 2 1.04 4540 72 337.59


c2 D13-150 D 1645 2 350 3 100 2 1.04 4540 26 124.34
c3 D13-200 D 1645 2 350 3 100 2 1.04 4540 31 145.19
13 19 32
SUB TOTAL WEIGHT 5,375.61

bb
c c
a a
b b
a a a b
A B C D

BEAM RE-BAR BENDING SCHEDULE 1B109~1B110 (500x1800)


500 1800
SIZE REBAR LENGTH (mm) WEIGHT TOTAL TOTAL WEIGHT
NO
Bar
TYPE
(a) Σ (b) Σ (c) Σ (kg/m) Length (mm)
Σ (kg)
a1 32 C 4600 1 1150 2 6.31 6900 20 870.78
a2 32 B 2720 1 6.31 2720 20 343.26
a3 32 A 2950 1 1150 1 6.31 4100 20 517.42
a4 32 C 3550 1 1150 2 6.31 5850 10 369.14

s1 19 B 4600 1 2.23 4600 24 246.19


s2 19 B 4740 1 2.23 4740 4 42.28
s3 19 B 5150 1 2.23 5150 4 45.94
s4 19 B 5560 1 2.23 5560 4 49.60
s5 19 B 5560 1 2.23 5560 4 49.60
s6 19 B 5970 1 2.23 5970 4 53.25
s7 19 B 6100 1 2.23 6100 4 54.41
s8 19 B 7625 1 2.23 7625 12 204.05

b1 32 A 3450 1 1150 1 6.31 4600 20 580.52


b2 32 C 4250 1 3500 1 2875 1 6.31 10625 20 1,340.88
b3 32 B 4300 1 6.31 4300 10 271.33

c1 D10-300 D 1645 2 350 3 100 2 0.617 4540 58 161.98


0 19 32
SUB TOTAL WEIGHT 5,200.62
bb
cc

b a a
a a
b
A B
D

BEAM RE-BAR BENDING SCHEDULE 1B112~1B113 (1200x2100)


1200 2100
SIZE REBAR LENGTH (mm) WEIGHT TOTAL TOTAL WEIGHT
NO
Bar
TYPE
(a) Σ (b) Σ (c) Σ (kg/m) Length (mm)
Σ (kg)
a1 32 A 6700 1 900 1 6.313 7600 12 575.75
a2 32 B 11100 1 6.313 11100 24 1,681.78
a3 32 A 4525 1 700 1 6.313 5225 12 395.83
a4 32 A 6620 1 900 1 6.313 7520 12 569.69
a5 32 A 4445 1 700 1 6.313 5145 12 389.76

s1 19 B 10300 1 2.223 10300 48 1,099.05

b1 32 A 8675 1 900 1 6.313 9575 12 725.36


b2 32 B 11600 1 6.313 11600 36 2,636.31
b3 32 A 2075 1 700 1 6.313 2775 12 210.22
b4 32 A 8595 1 900 1 6.313 9495 12 719.30
b5 32 A 1995 1 700 1 6.313 2695 12 204.16
b6 32 A 8515 1 900 1 6.313 9415 12 713.24
b7 32 A 1915 1 700 1 6.313 2615 12 198.10

c1 D13-100 D 1230 2 1050 2 970 2 1.04 6500 170 1,149.20


c1 D13-100 D 1230 2 300 2 970 2 1.04 5000 170 884.00
0 19 32
SUB TOTAL WEIGHT 12,151.76

bb
c c
a a
b
a a b
A B D

BEAM RE-BAR BENDING SCHEDULE 1B115~1B116 (1200x2100)


1200 2100
SIZE REBAR LENGTH (mm) WEIGHT TOTAL TOTAL WEIGHT
NO
Bar
TYPE
(a) Σ (b) Σ (c) Σ (kg/m) Length (mm)
Σ (kg)
a1 32 A 6700 1 500 1 6.313 7200 12 545.44
a2 32 A 9900 1 500 1 6.313 10400 12 787.86
a3 32 A 6620 1 500 1 6.313 7120 12 539.38
a4 32 A 9820 1 500 1 6.313 10320 12 781.80

s1 19 B 10225 1 2.223 10225 12 272.76


s2 19 B 6025 1 2.223 6025 12 160.72

b1 32 A 8475 1 900 1 6.313 9375 12 710.21


b2 32 A 8125 1 900 1 6.313 9025 12 683.70
b3 32 A 8395 1 900 1 6.313 9295 12 704.15
b4 32 A 8045 1 900 1 6.313 8945 12 677.64
b5 32 A 8315 1 900 1 6.313 9215 12 698.09
b6 32 A 7965 1 900 1 6.313 8865 12 671.58

c1 D13-100 D 1945 2 1050 3 130 2 1.04 7300 98 740.22


c2 D13-100 D 1945 2 300 3 130 2 1.04 5050 98 512.07
0 19 32
SUB TOTAL WEIGHT 8,485.63
bb
c c
b b b a a
a a a
b
A B C D

BEAM RE-BAR BENDING SCHEDULE 1B117~1B118 (500x2000)


500 2000
SIZE REBAR LENGTH (mm) WEIGHT TOTAL TOTAL WEIGHT
NO
Bar
TYPE
(a) Σ (b) Σ (c) Σ (kg/m) Length (mm)
Σ (kg)
a1 32 C 4530 1 900 1 1900 1 6.313 5436.313 5 171.60
a2 32 C 590 1 600 2 6.313 1790 30 339.01
a3 32 C 6900 1 1900 2 6.313 10700 5 337.75
a4 32 C 4230 1 900 1 1900 1 6.313 7030 5 221.90
a5 32 C 4370 1 900 1 1900 1 6.313 7170 5 226.32
a6 32 C 6740 1 900 1 1900 1 6.313 9540 5 301.13
a7 32 C 4070 1 900 1 1900 1 6.313 6870 5 216.85
a8 32 C 4210 1 900 1 1900 1 6.313 7010 5 221.27
a9 32 C 6580 1 900 1 1900 1 6.313 9380 5 296.08
a10 32 C 3910 1 900 1 1900 1 6.313 6710 5 211.80

s1 19 B 10225 1 2.223 10225 12 272.76


s1 19 B 9875 1 2.223 9875 12 263.43

b1 32 A 8875 1 900 1 6.313 9775 5 308.55


b2 32 A 11550 1 900 1 6.313 12450 5 392.98
b3 32 A 8795 1 900 1 6.313 9695 5 306.02
b4 32 A 11470 1 900 1 6.313 12370 5 390.46

c1 D13-125 D 1845 2 350 3 130 2 1.04 5000 90 470.08


c1 D13-250 D 1845 2 350 3 130 2 1.04 5000 21 108.16
0 19 32
SUB TOTAL WEIGHT 5,056.15

bb
c c
a a
b c
a b
C D

BEAM RE-BAR BENDING SCHEDULE 1B42 (1500x1800)


1500 1800
SIZE REBAR LENGTH (mm) WEIGHT TOTAL TOTAL WEIGHT
NO
Bar
TYPE
(a) Σ (b) Σ (c) Σ (kg/m) Length (mm)
Σ (kg)
a1 36 C 11850 1 500 1 500 1 7.99 12357.99 15 1,481.11
a2 36 C 11670 1 500 1 500 1 7.99 12670 15 1,518.50

s1 19 B 11850 1 2.223 11850 12 316.11

b1 36 C 11850 1 500 1 500 1 7.99 12850 15 1,540.07


b2 36 C 11670 1 500 1 500 1 7.99 12670 15 1,518.50
b3 36 C 11490 1 500 1 500 1 7.99 12490 15 1,496.93

c1 D13-100 D 1645 2 1350 3 130 2 1.04 7600 58 460.01


c2 D13-100 D 1645 2 250 3 130 2 1.04 4300 171 762.92
13 19 36
SUB TOTAL WEIGHT 9,094.15
bb
c c

b a a
a a
b
A B D

BEAM RE-BAR BENDING SCHEDULE 1B33~1B35 ( 500x1400 )


500 1B36,1B37,1B38,1B47,1B48,1B49,1B50,1B51 &1B52 (SIMILAR) 1400
SIZE REBAR LENGTH (mm) WEIGHT TOTAL TOTAL WEIGHT
NO
Bar
TYPE
(a) Σ (b) Σ (c) Σ (kg/m) Length (mm)
Σ (kg)
a1 25 A 6850 1 900 1 3.853 7750 5 149.30
a2 25 B 11250 1 3.853 11250 10 433.46
a3 25 A 7075 1 900 1 3.853 7975 5 153.64
a4 25 A 6780 1 900 1 3.853 7680 5 147.96
a5 25 B 7005 1 3.853 7005 5 134.95
a6 25 B 5600 1 3.853 5600 10 215.77

s1 19 B 6900 1 2.223 6900 8 122.71


s2 19 B 11250 1 2.223 11250 8 200.07
s3 19 B 7025 1 2.223 7025 8 124.93

b1 25 A 5650 1 900 1 3.853 6550 5 126.19


b2 25 B 11250 1 3.853 11250 15 650.19
b3 25 A 8275 1 900 1 3.853 9175 5 176.76
b4 25 A 5580 1 900 1 3.853 6480 5 124.84
b5 25 B 8205 1 3.853 8205 5 158.07

c1 D10-200 D 1451 2 350 3 100 2 0.617 4152 100 254.90


10 19 25
SUB TOTAL WEIGHT 3,173.73

bb
c c
b
a a a
a
b
A B
D

BEAM RE-BAR BENDING SCHEDULE 1B39~1B41/1B44~1B46


( 500x1400 ) 500 1400
SIZE REBAR LENGTH (mm) WEIGHT TOTAL TOTAL WEIGHT
NO
Bar
TYPE
(a) Σ (b) Σ (c) Σ (kg/m) Length (mm)
Σ (kg)
a1 25 A 6850 1 900 1 3.85 7750 10 298.38
a2 25 B 11250 1 3.85 11250 10 433.13
a3 25 A 7075 1 900 1 3.85 7975 10 307.04
a4 25 B 5600 1 3.85 5600 10 215.60

s1 19 B 6900 1 2.23 6900 8 123.10


s2 19 B 11250 1 2.23 11250 8 200.70
s3 19 B 7025 1 2.23 7025 8 125.33

b1 25 A 5650 1 900 1 3.85 6550 10 252.18


b2 25 A 11250 1 900 1 3.85 12150 10 467.78
b3 25 A 8275 1 900 1 3.85 9175 10 353.24

c1 D10-200 D 1245 2 350 3 100 2 0.617 3740 106 243.68


10 19 25
SUB TOTAL WEIGHT 3,020.13
bb
c c

b a a
a a
b
A B D

BEAM RE-BAR BENDING SCHEDULE 1B54~1B55 (800x1800)


800 1800
SIZE REBAR LENGTH (mm) WEIGHT TOTAL TOTAL WEIGHT
NO
Bar
TYPE
(a) Σ (b) Σ (c) Σ (kg/m) Length (mm)
Σ (kg)
a1 36 A 8875 1 900 1 7.99 9775 8 624.82
a2 36 B 12000 1 7.99 12000 8 767.04
a3 36 A 4475 1 900 1 7.99 5375 8 343.57
a4 32 A 8875 1 900 1 6.31 9775 8 493.44
a5 32 B 12000 1 6.31 12000 8 605.76
a6 32 A 4485 1 900 1 6.31 5385 8 271.83

s1 19 B 11075 1 2.23 11075 12 296.37


s2 19 B 11500 1 2.23 11500 12 307.74

b1 32 A 10150 1 900 1 6.31 11050 8 557.80


b2 32 B 11600 1 6.31 11600 24 1,756.70
b3 32 A 2800 1 900 1 6.31 3700 8 186.78
b4 32 A 10070 1 900 1 6.31 10970 8 553.77
b5 32 A 2720 1 900 1 6.31 3620 8 182.74
b6 32 A 2720 1 900 1 6.31 3620 8 182.74

c1 D10-100 D 1645 2 650 3 100 2 0.617 5440 135 453.12


c2 D10-200 D 1645 2 650 3 100 2 0.617 5440 15 50.35
c3 D10-100 D 1645 2 300 3 100 2 0.617 4390 55 148.97
10 19 32 36
SUB TOTAL WEIGHT 7,783.54
ADDITIONAL TIE BEAM PIT 1
WIDTH (l) THICKNESS (t) TOTAL L.C (m2) CONCRETE FORMWORK REBAR
NO TYPE
(mm) (mm) (unit) T = 50 mm 3
(m ) 2
(m ) (Kg)
1 1B53 800 1800 1 8 11.52 27.7 3,944.70
2 1B105~1B106 500 2800 2 9.94 80.24 23.82 2,461.94
3 1B107~1B108 500 1800 2 9.94 15.66 50.88 5,375.61
4 1B109~1B110 500 1800 2 13.57 18.78 62.04 5,200.62
5 1B112~1B113 1200 2100 2 20.3 38.1624 63.604 12,151.76
6 1B115~1B116 1200 2100 2 13.65 28.6272 39.312 8,485.63
7 1B117~1B118 500 2000 2 10.78 15.24 43.87 5,056.15
8 1B42 1500 1800 1 13.6 20.25 25.64 9,094.15
9 1B33~1B35 500 1606 3 13.244 17.52146 55.255 3,173.73
10 1B36~1B38 500 1606 3 13.244 17.52146 55.255 3,173.73
11 1B47~1B49 500 1606 3 13.244 17.34596 54.42 3,173.73
12 1B50~1B52 500 1606 3 12.684 17.29646 54.06 3,173.73
13 1B39~1B41 500 1400 3 13.244 15.274 41.92 3,020.13
14 1B44~1B46 500 1400 3 13.244 15.274 41.92 3,020.13
15 1B54~1B55 800 1800 3 16 22.96 39.7 7,783.54
35.00 194.68 351.67 679.40 78,289.29

You might also like