Professional Documents
Culture Documents
Calculation Finishing Work (Repaired)
Calculation Finishing Work (Repaired)
2.46E+11
#REF!
WEIGHT (%COLUMN "ARemarks
COST SUMMARY (Building Work)
Site Area 0
Exterior Area 0
Const. Period 20 (twenty)
No. DESCRIPTION
A DIRECT COST
Value Engineering
B TEMPORARY WORK
C SITE EXPENSE
D JAPANESE EXPENSE
1 TOTAL ( A - D )
E OTHERS EXPENSE
– BID BOND
– INSURANCE - JAMSOSTEK
– INSURANCE - Third Party Liability
– INSURANCE - Profesional
– INSURANCE - CAR
– ADVANCE BOND
– PERFORMANCE BOND
– MAINTENANCE BOND
2 TOTAL ( 1 + E )
DUTY STAMP
TAX ( WITHOLDING )
PROFIT
CONTINGENCIES
TOTAL
VAT.
GRAND TOTAL
ADJUSTED
SUBMISSION AMOUNT
Bidding Date
T PROJECT (SP 2)
0 x
0.0015
0
0
0.0015 x
0 x
0 x
0 x
TOTAL ( 1 + E )
0
0.03
0.08
0
0.1
GRAND TOTAL
ADJUSTED
SUBMISSION AMOUNT
24 June 2016 Prepared by
Sqm.
Sqm.
1st Storeyes Building Height
5th Storeyes Building Height
AMOUNT
1767.68 m2 -9E+08
m2
m2
m2
m2
25 m2
180 m2
90 m2
536 m2
92.88 m2
95 m2
748.8 m2
1767.68 m2 4.1E+09
1767.68 m2 -5E+09
3.3E+09
4.31E+09
3.22E+10
3.89E+10
1.15E+08
0.015 x 1 0
65772183
0
0
0.75 x 1 49329137
0.018 x 1 0
0.015 x 1 0
0.018 x 1 0
3.9E+10
0
1.32E+09
3.51E+09
0
4.38E+10
4.38E+09
4.82E+10
1.16E+11
1.6E+11
Devi Yandri Date
0 M. (Administration Office)
0 M.
% REMARKS
-0.020525 -509142
0
0
0
0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0.093505 2319424
-0.11403 -2828566
0.075185
0.098362
0.734353
0.887375
0.002625
0
0.0015
0
0
0.001125
0
0
0
0.89
0
0.03
0.08
0
1 #DIV/0!
1.1
0.725949
24 June 2016
(Administration Office)
Rp/sqm
Rp/sqm 0
Rp/sqm 0
Rp/sqm 0
Rp/sqm 0
Rp/sqm 0
Rp/sqm 0
Rp/sqm 0
Rp/sqm 0
Rp/sqm 0
Rp/sqm 0
Rp/sqm 0
Rp/sqm
Rp/sqm
3.98E+10
3.65E+10
1E+09
1.126919
0.112625 -48.72014
/M2 0.887375 Price 1.3156
1
4.68E+09 3.18E+10
2.2E+10 1.02E+10
COST SUMMARY (Building Work)
Site Area 0
Exterior Area 0
Const. Period 20 (twenty)
No. DESCRIPTION
A WORKSHOP OFFICE
WORKSHOP OFFICE
Structure Work
– Bored pile (Stripping Head Only)
– Earth Work
– Concrete Work
– Reinforcement Bar
– Formwork
– Integrated waterproofing
– Steel Structure for Canopy
Architecture Work
– Waterproofing coating
– Flooring Work
– Walling Work
– Ceiling Work
– Door and Windows Work
– Painting Work
– Miscellaneous Work
– Sanitary Work
TOTAL
M/E Work -
1US$ = Rp.12.700 ----> Rp. 18.416.370.000 (disc. 15%)
– Cold Room (wall & ceiling panel)
– Mechanical Work
– Electrical Work
– Site Expenses
– Overhead
Site Area 0
Exterior Area 0
Const. Period 20 (twenty)
No. DESCRIPTION
Architecture Work
– Waterproofing coating
– Flooring Work
– Walling Work
– Ceiling Work
– Door and Windows Work
– Painting Work
– Miscellaneous Work
– Sanitary Work
TOTAL
Site Area 0
Exterior Area 0
Const. Period 20 (twenty)
No. DESCRIPTION
A WORKSHOP
WORKSHOP
Structure Work
– Bored pile (Stripping Head Only)
– Earth Work
– Concrete Work
– Reinforcement Bar
– Formwork
– Steel Structure
Architecture Work
– Waterproofing coating
– Flooring Work
– Walling Work
– Ceiling Work
– Door and Windows Work
– Painting Work
– Miscellaneous Work
– Sanitary Work
TOTAL
M/E Work -
1US$ = Rp.12.700 ----> Rp. 18.416.370.000 (disc. 15%)
– Cold Room (wall & ceiling panel)
– Mechanical Work
– Electrical Work
– Site Expenses
– Overhead
Site Area 0
Exterior Area 0
Const. Period 20 (twenty)
No. DESCRIPTION
A INSPECTION SHED
INSPECTION SHED
Structure Work
– Bored pile (Stripping Head Only)
– Earth Work
– Concrete Work
– Reinforcement Bar
– Formwork
– Steel Structure
Architecture Work
– Flooring Work
– Walling Work
– Ceiling Work
– Door and Windows Work
– Painting Work
– Miscellaneous Work
– Sanitary Work
TOTAL
Taiyo
0.149963 from cost
0.099987 from cost
0 nos
0 m3
0 m2
0 kg
0 kg
Bidding Date
Bidding Date
0 nos
0 m3
0 m2
0 kg
cture for Column kg
cture for Roof kg
cture for Inspection Deck kg
cture for Crane kg
Bidding Date
512 Sqm.
1536 Sqm.
3rd Storeyes Building Height
5th Storeyes Building Height
AMOUNT
1536 m2 0
1536 m2 0
1536 m2 0
0 nos
1536 m2
m3
kg
m2
m2 0
kg 0
1536 m2 0
1536 m2 0
1536 m2
1536 m2
1536 m2
1536 m2
1536 m2
1536 m2
1536 m2
0 m2 0
Taiyo
1536 m2 0
1536 m2 6.64E+09
1536 m2 8.31E+09
1536 m2 2.24E+09
1536 m2 1.72E+09
= 0 m3/m2 floor
= m2/m3 concrete
= kg/m3 concrete
= #DIV/0! kg/m2
512 Sqm.
1024 Sqm.
2nd Storeyes Building Height
5th Storeyes Building Height
AMOUNT
1024 m2 0
1024 m2 0
1024 m2 0
0 nos
1024 m2
m3
kg
m2
m2 0
kg 0
1024 m2 0
1024 m2 0
1024 m2
1024 m2
1024 m2
1024 m2
1024 m2
1024 m2
1024 m2
= 0 m3/m2 floor
= m2/m3 concrete
= kg/m3 concrete
= #DIV/0! kg/m2
11672 Sqm.
11672 Sqm.
1st Storeyes Building Height
5th Storeyes Building Height
AMOUNT
11672 m2 0
11672 m2 0
11672 m2 0
0 nos
11672 m2
m3
kg
m2
kg
11672 m2 0
11672 m2 0
11672 m2
11672 m2
11672 m2
11672 m2
11672 m2
11672 m2
11672 m2
0 m2 0
Taiyo
1536 m2 0
1536 m2 6.64E+09
1536 m2 8.31E+09
1536 m2 2.24E+09
1536 m2 1.72E+09
= 0 m3/m2 floor
= m2/m3 concrete
= kg/m3 concrete
= 0 kg/m2
= 0 kg/m2
= 0 kg/m2
= 0 kg/m2
5402 Sqm.
5402 Sqm.
1st Storeyes Building Height
5th Storeyes Building Height
AMOUNT
5402 m2 0
5402 m2 0
5402 m2 0
0 nos
5402 m2
m3
kg
m2
kg
5402 m2 0
5402 m2
5402 m2
5402 m2
5402 m2
5402 m2 0
5402 m2
5402 m2
= 0 m3/m2 floor
= m2/m3 concrete
= kg/m3 concrete
= 0 kg/m2
= 0 kg/m2
= 0 kg/m2
Devi Yandri Date
% REMARKS
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! #DIV/0!
#DIV/0! 0
#DIV/0!
#DIV/0!
#DIV/0!
#REF!
#REF!
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#REF! #DIV/0!
#REF! 0
#REF! 4324902
#REF! 5406901
#REF! 1459408
#REF! 1118978
(Area = 0 m2 )
% REMARKS
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! #DIV/0!
#DIV/0! 0
#DIV/0!
#DIV/0!
#DIV/0!
#REF!
#REF!
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
(Area = 0 m2 )
18.955 M. (Workshop)
0 M.
% REMARKS
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! #DIV/0!
#DIV/0! 0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#REF! #DIV/0!
#REF! 0
#REF! 4324902
#REF! 5406901
#REF! 1459408
#REF! 1118978
(Area = 10032 m2 )
(Area = 10032 m2 )
(Area = 10032 m2 )
(Area = 10032 m2 )
% REMARKS
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! #DIV/0!
#DIV/0! 0
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
#DIV/0! 0
(Area = 4164 m2 )
(Area = 4164 m2 )
(Area = 4164 m2 )
24 June 2016
(Wokshop Office)
Rp/sqm 0
Rp/sqm
Rp/sqm
Rp/m2
Rp/nos
Rp/m3
Rp/kg
Rp/m2
Rp/m2
Rp/kg
Rp/sqm
Rp/m2
Rp/m2
Rp/m2
Rp/nos
Rp/m2
Rp/m2
Rp/m2
Rp/m2
/M2
Rp/m2
Rp/m2
Rp/m2
Rp/m2
Rp/m2
Rp/m2
13500
24 June 2016
(Maintenance Office)
Rp/sqm 0
Rp/sqm
Rp/sqm
Rp/m2
Rp/nos
Rp/m3
Rp/kg
Rp/m2
Rp/m2
Rp/kg
Rp/sqm
Rp/m2
Rp/m2
Rp/m2
Rp/nos
Rp/m2
Rp/m2
Rp/m2
Rp/m2
/M2
13500
24 June 2016
(Workshop)
Rp/sqm 0
Rp/sqm
Rp/sqm 0
Rp/m2
Rp/nos
Rp/m3
Rp/kg
Rp/m2
Rp/kg
Rp/sqm 0
Rp/m2
Rp/m2
Rp/m2
Rp/nos
Rp/m2
Rp/m2
Rp/m2
Rp/m2
/M2
Rp/m2
Rp/m2
Rp/m2
Rp/m2
Rp/m2
Rp/m2
13500
24 June 2016
(Inspection Shed)
Rp/sqm 0
Rp/sqm
Rp/sqm
Rp/m2
Rp/nos
Rp/m3
Rp/kg
Rp/m2
Rp/kg
Rp/sqm
Rp/m2
Rp/m2
Rp/nos
Rp/m2
Rp/m2
Rp/m2
Rp/m2
/M2
13500
JAKARTA MASS RAPID TRANSIT PROJECT
WIKA-TOKYU JOINT OPERATION
STRUCTURE & ARCHITECTURAL WORKS FOR SUBCONTRACT PACKAGE 2 (SP 2)
MILESTONE PAYMENT SCHEDULE
No3b.3 b . Complete all plants, and buildings of depot including structural frames, foundations, exte
Subtotal W 0 0 #DIV/0! 0
Subtotal In 0 0 #DIV/0! 0
Subtotal W 0 0 #DIV/0! 0
Subtotal I 0 0 #DIV/0! 0
Subtotal G 0 0 #DIV/0! 0
Subtotal C 0 0 #DIV/0! 0
Subtotal S 0 0 #DIV/0! 0
Subtotal M 0 0 #DIV/0! 0
Subtotal Dr 0 0 #DIV/0! 0
Subtotal M 0 0 #DIV/0! 0
Note :
1 Subcontractor should be re-check the work items and its quantity
2 The Work items and its quantity only for guidance (indicative).
3 Subcontractor can revise it accordance to the tender reference drawings.
2.46E+11
-2.46E+11
WEIGHT (%COLUMN "ARemarks
0
0
0
JAKARTA MASS RAPID TRANSIT PROJECT
WIKA-TOKYU JOINT OPERATION
STRUCTURE & ARCHITECTURAL WORKS FOR SUBCONTRACT PACKAGE 2 (SP 2)
SUMMARY
No3b.3 b . Complete all plants, and buildings of depot including structural frames, foundations, exte
Subtotal W 0 0 #DIV/0! 0
Subtotal In 0 0 #DIV/0! 0
Subtotal W 0 0 #DIV/0! 0
Subtotal I 0 0 #DIV/0! 0
Subtotal G 0 0 #DIV/0! 0
Subtotal C 0 0 #DIV/0! 0
Subtotal S 0 0 #DIV/0! 0
Subtotal M 0 0 #DIV/0! 0
Subtotal Dr 0 0 #DIV/0! 0
Subtotal M 0 0 #DIV/0! 0
Note :
1 Subcontractor should be re-check the work items and its quantity
2 The Work items and its quantity only for guidance (indicative).
3 Subcontractor can revise it accordance to the tender reference drawings.
2.46E+11
-2.46E+11
WEIGHT (%COLUMN "ARemarks
0
0
0
JAKARTA MASS RAPID TRANSIT PROJECT
WIKA-TOKYU JOINT OPERATION
STRUCTURE & ARCHITECTURAL WORKS
BILL OF QUANTITY
PACKAGE 2
Milestone DESCRIPTI Qty Unit UNIT PRICETOTAL Qty Unit UNIT PRICE
PRELIMINARIES
1 The Contract Docume Note Note
The cost of making and printing copies of the Contract Documents 5 ( five ) complete with drawings and other exp
2 Insurance of the WorksNote Exclude Note
3 Site Management and Note Note
Allow for all on and off site management and establishment cost. The Subcontractor must provide the costs incurr
4 Plant, Tools, Material, Note Note
Allow for all equipment, plant, tools, materials, labour, etc. necessary for the proper execution and protection of t
5 Safety, Health an Wel Note Note
Allow for all costs incurred in complying with all Safety, Health and Welfare Regulations appertaining to all workm
6 Report Note Note
The Subcontractor shall make daily, weekly and monthly progress reports as well as the work of other reports.
7 The Subcontractor's WNote Note
In addition to necessary site meetings chaired by the Contractor's Representative, the Subcontractor is to organize
8 Permits and Fees Note Note
The Subcontractor is responsible for obtaining the normal statutory permits and permission that he requires to ex
9 Drawings Note Note
The Subcontractor is responsible for the cost of procurement for all Drawings required (Construction Design, Shop
10 Setting out the Works Note Note
The Subcontractor shall provided all necessary surveying instruments and personnel as required by the Contracto
The Subcontractor is to employ a qualified Surveyor approved by the Project Manager to set out the Works. The S
The Subcontractor will be responsible for the accuracy of all setting out and for establishing all levels accurately. A
11 Samples and Prototyp Note Note
The quality of materials and articles supplied for any purpose are to be approved prior to their use in the Works. W
The Subcontractor shall submit in good time or provide for approval samples of workmanship and prototypes of p
Should any material or article be rejected it shall be removed from the site at the Subcontractor's expense
12 Testing of Materials Note Note
The Subcontractor shall carry out tests on all materials required refer to the Technical Specifications and/or by the
13 Safeguarding the Wor Note Note
Allow for safeguarding the Works, materials and plant against damage or theft including providing all necessary lig
The Subcontractor shall be solely responsible for the safety from damage or theft of all his own materials, plant, to
14 Maintenance and Protec Note Note
Maintain all existing roads, footpaths, fences etc., and reinstate any damage caused by any reason whatsoever, du
15 Protection of Private Note Note
Protect, uphold, upkeep and maintain all pipes, ducts, storm water drains, sewers, electrical and telephone cables
16 Signboard Note Note
Provide and maintain in an approved position two illuminated signboard (approximately ten square meters in area
17 Site Fencing Note EXCL. Note
The Contractor has erected temporary fencing and gates to fence off the Site from the public. The Subcontractor s
The Subcontractor shall allow for providing all additional fencing and hoardings within the site boundary as are re
18 Progress Photographs Note Note
Provide for coloured photographs to show the work in progress. Digital photographs shall be taken at monthly int
19 Safety Helmets and PrNote Note
Provide and maintain in good and clean condition a sufficient number of safety helmets and protective clothing, b
20 Telephones Note Note
The Subcontractor shall provide sufficient telephones for his own use
21 Water Note Note
Provide all necessary clean, fresh water for use in the Works. The Contractor shall be responsible for determining
Provide all temporary meters, mains, storage tanks and distribution pipe work as required to provide water where
Maintain and adapt whenever and wherever necessary and required to do so by the Contractor's Representative t
22 Lighting and Power Note Note
Provide all necessary temporary lighting and power supply for use in the Works, for all trades. The Subcontractor s
23 Removal of Water Note Note
The Subcontractor shall allow for providing all pumping that may be required to keep the Works dry down to the l
24 Fire Protection Note Note
Allow for keeping the Site safe from fire hazard. The Subcontractor shall take all necessary precautions including t
25 Defect Liability Period Note Note
The Subcontractor must carry out repairs during the maintenance period for the work that is still lacking or defect
26 Temporary Access Note Note
Allow for providing and maintaining temporary roads, hardstandings, bridges, crossings, and the like necessary for
27 Material Stockyard a Note Note
The Contractor will determining temporary space for material stockyard and/or Warehouse for materials, the Sub
Provide, erect, maintain and clear away on completion of the Works all necessary temporary watertight sheds for
28 The Subcontractor's SiNote Note
Provide, erect, maintain and clear away on completion of the Works all necessary temporary site offices and other
29 General Scaffolding a Note Note
Provide all necessary temporary scaffolding, stagings, platforms, planks, catwalks, gangways, ladders, etc. of what
30 Shoring, propping and Strutting
Provide all necessary shoring, propping, strutting, etc., whether for the support of new work under construction o
31 Temporary Drainage Note Note
The Subcontractor shall allow for providing all necessary temporary channels and temporary drainage works whic
32 Protection of the Wor Note Note
The Subcontractor shall provide for covering up and protecting the Works from inclement weather
The Subcontractor shall provide full and adequate protection for all finished surfaces and for all materials subject
33 Removal of Rubbish Note Note
All materials shall be stored on site and in the building in a neat and orderly manner. All rubbish, disused shoring
34 Cleaning up Note Note
The Subcontractor shall on completion of the works leave all roofs throughout watertight and clean, ease doors an
TOTAL
ith drawings and other expenses in connection with such stamp duty etc .
Exclude
ust provide the costs incurred to conduct technical personnel and project manager in the field who are competent , proficient, master the
ecution and protection of the Works. The Subcontractor at its own expense should provide all the means of implementation, materials, wo
appertaining to all workmen employed on the site including those employed by all specialist contractors
ubcontractor is to organize and conduct weekly site meetings among his own Sub-contractors and other interested parties if any for the p
sion that he requires to execute contract work of this nature. The Contractor shall be responsible for obtaining the Building Permit. All oth
required by the Contractor's Representative for the purpose of establishing or checking dimensions or levels
to set out the Works. The Subcontractor is also required to set up permanent bench marks on site which must be tied to an existing Gover
hing all levels accurately. Any errors in setting out and any consequential loss to the Contractor will be made good at the Subcontractor's
o their use in the Works. Wherever practicable samples are to be submitted for approval before bulk supplies are delivered to the Site. Sa
anship and prototypes of pavings, wall and ceiling finishes, fair faced concrete, painting, etc., and other work where requested by the Cont
ntractor's expense
pecifications and/or by the Contractor's Representative and to be tested at his own expense and shall pay all charges in connection with t
g providing all necessary lighting, watchmen, barriers and all safe-guards for the prevention of site accidents and theft, and the protection
his own materials, plant, tools and equipment .
y ten square meters in area) and revise and alter as instructed by the Contractor's Representative with the work executed by experienced
EXCL.
public. The Subcontractor shall review and adapt as necessary for his own purposes, pay all maintenance costs and remove on completion
he site boundary as are required for the performance of Subcontract Works during the course of the Subcontract Works
all be taken at monthly intervals throughout the whole of the construction period and these will show the overall progress of the Works p
and protective clothing, boots, etc. of approved manufacture, design size and colour for the Employers Representatives and supervisory s
rades. The Subcontractor shall provide temporary power plants or artificial lighting for work purposes and night lighting used for needs. A
he Works dry down to the level of the bottom of the excavations and for removing the whole of the water finding its way into the excavati
ary precautions including those specified by the Insurance Company insuring the works and the Subcontractor shall provide all necessary fi
hat is still lacking or defects or imperfections resulting from the use of the substance or quality of the work that do not qualify are recorde
, and the like necessary for carrying out the Works. Clear away on completion of the Works and make good all damage done
ouse for materials, the Subcontractor will use it during construction period and required space in m2 will be calculated by the subcontract
orary watertight sheds for the stockyard/storage of the Subcontractor's materials and plant.
orary site offices and other accommodation including adequate sanitary facilities for the use of site staff
ways, ladders, etc. of whatever height for the proper execution and completion of the Work and pay all costs and charges in connection th
work under construction or of existing buildings and existing slopes. All shoring, propping, strutting, etc. required by the Contractor's Repr
orary drainage works which may be necessary to drain off water from the site and to prevent nuisance due to run-off on to adjacent land.
nd for all materials subject to injury or staining including the work of Specialist Contractors of the Contractor and shall be responsible for m
ll rubbish, disused shoring, crates, surplus materials, etc. are to be removed from the site or surrounding areas as soon as is possible and a
ht and clean, ease doors and windows, oil ironmongery, handover keys, cut out cracks in plastering and make good clean all wall linings an
nt , proficient, master the job and experienced that will manage the execution of the work and take care of all matters related to its respo
lementation, materials, workers , including transport to and from the field, in and around work and other equipment needed in the implem
ted parties if any for the purpose of coordinating and programming the work. Minutes are to be properly kept and are to be circulated to
the Building Permit. All other permits shall be obtained by the Subcontractor. The Subcontractor shall comply with and give all notices req
e tied to an existing Government bench mark and shall use these bench marks to set out the Works.
od at the Subcontractor's expense, and to the satisfaction of the Contractor's Representative
re delivered to the Site. Samples, and any packing for same, are to be provided free of charge by the Subcontractor
here requested by the Contractor's Representative before proceeding with the work
arges in connection with tests ordered by the Contractor's Representative to be carried out by others
d theft, and the protection of the public. Provide accommodation and other facilities for any watchmen/security guards so required
o prevent undermining of foundations to service lines, and the Subcontractor is to make good any damage due to any cause within his con
executed by experienced sign writers all to the Contractor's Representative's design and pay all charges in connection therewith. Pay all
all progress of the Works plus close-ups of construction works of particular interest. An electronic copy of each photograph shall be supplie
lighting used for needs. All power consumption costs during project implementation including the necessary licenses and perapihan after
g its way into the excavations and basement from rain, springs, or any other sources. No accumulation of water will be permitted at any ti
hall provide all necessary fire fighting equipment and properly trained staff to the satisfaction of the Contractor's Representative. The app
do not qualify are recorded upon delivery of the first known work and consequently in the maintenance period. The Subcontractor shall g
amage done
d charges in connection therewith. Alter, shift and adapt from time to time as necessary and remove on completion of the Works
d by the Contractor's Representative shall not be interpreted as in any way reducing the Subcontractor's responsibility. the Contractor's R
un-off on to adjacent land. He shall remove them as necessary as they are replaced by the permanent surface drainage work
d shall be responsible for making good all damage done to such finished surfaces and materials until the Works are handed over complete
as soon as is possible and at least once daily during the course of the contract so as to maintain unhindered access to and easy inspection
ood clean all wall linings and floors, clean all glass inside and out, touch up all painted and polished work and leave the whole of the premi
matters related to its responsibilities for this contract including all costs administration required during project implementation .
ment needed in the implementation of good work for temporary work , the preparatory work and the main work ( between another is the
and are to be circulated to the interested parties as directed by the Contractor's Representative. The Employer's Representative, Project M
ith and give all notices required by any Law or Decree of the Government or any regulation or by Law of the Local Authority and any Publi
guards so required
to any cause within his control at his own costs and expenses and pay all costs and charges in connection therewith
nection therewith. Pay all costs and charges in connection with the operation and maintenance thereof and remove the signboard on com
hotograph shall be supplied to the Contractor's Representative. Each photograph shall be numbered, dated and annotated to show the ge
will be permitted at any time during the execution of the Contract. Disposal of water shall be in accordance with applicable regulations of
s Representative. The approval of the Contractor's Representative shall not limit the Subcontractor's liability
. The Subcontractor shall guarantee the Work for at least a two year period (“Defects Notification Period”) from the time of the issuance o
nsibility. the Contractor's Representative may subsequently provide drawings detailing his requirements and the Subcontractor shall const
rainage work
ess to and easy inspection of all work. The Subcontractor shall provide and maintain for as long as required for the Works a temporary ext
ve the whole of the premises and surrounding ground clean and in good order to the satisfaction of the Contractor's Representative
mplementation .
rk ( between another is the barricade , while the lightning rod , hoist material , cargo , scaffolding lifts , concrete mixers , concrete pumps ,
Representative, Project Manager, and other interested parties shall have the right to attend and participate in these meetings if so requi
al Authority and any Public Service Company or Authority and pay all fees and charges legally demandable.
move the signboard on completion of the Works
d annotated to show the general details of and the positions from which they were taken
the time of the issuance of the Taking Over Certificate for the Works issued by the Contractor.
e Subcontractor shall construct the shoring, propping, strutting, etc. in accordance with such drawings at no extra cost. The use of timber s
he Works a temporary external rubbish chute which shall be constructed and located to the approval of the Contractor's Representative
ctor's Representative
mixers , concrete pumps , generators, compressors , alarms work and others ) .
ntractor's Representative
actor's Representative
JAKARTA MASS RAPID TRANSIT PROJECT
WIKA-TOKYU JOINT OPERATION
STRUCTURE & ARCHITECTURAL WORKS
BILL OF QUANTITY
PRELIMINARIES
General Notes :
1 This Bill is to be rea Note
2 The words "as describ Note
3 Notwithstanding anythNote
4 Access to and egress f Note
5 The Contractor shall c Note
6 The Contractor shall s Note
7 The Contractor shall alNote
8 The Contractor shall bNote
9 The Contractor shall be responsible for ensuring that the setting out of items built into the Works is correct
10 In the event of the Co Note
11 In the event of pipes, Note
12 The Contractor shall bNote
13 The Contractor shall a Note
14 The Contractor shall a Note
15 The Contractor shall a Note
16 The Contractor shall a Note
17 The Contarctor shall a Note
3b.3.(2).2 Earth Work
3b.3.(2).2. Site Clearance etc.
a Allow for c 1 Item Include 1
b Allow for r 1 Item Include 1
3b.3.(2).2. Excavation commencing from existing level including dispose excavated soil off-site work
a Excavate f 260 m3 0 0 260
TOTAL Earth Work - 0
3b.3.(2).3. STRUCTURE WORK
3b.3.(2).3. 1st FL
3b.3.(2).3. Stripping heads of precast reinforced concrete piles to the required cut off level including disposal of debris and fo
a Bored pile 7 No 0 0 7 5
b Ditto; dia 3 No 0 0 3 3
c Ditto; dia 5 No 0 0 5 7
3b.3.(2).3. Sand bedding, as described
a Sand bed l 0 m2 0 0 Please check the ref. 0
3b.3.(2).3. Lean concrete, as described
a Blinding l 545 m2 0 0 545
3b.3.(2).3. Vibrated Reinforced concrete fc' 24 N/mm2
a Pile cap 80.61 m3 0 0 80.61
b Ground slab 77.76 m3 0 0 77.76 78.9
c Ground be 111.92 m3 0 0 111.92
d Column 24.3 m3 0 0 24.3
e Cable tren 9 m3 0 0 9
3b.3.(2).3. Bar reinforcement; deformed high tensile steel BJTD 40
a General rei 8752.27 kg 0 0 8752.27 0
b Ditto; in g 12391.34 kg 0 0 12391.34 12800
c Ditto; in 15064.59 kg 0 0 15064.59 0
d Ditto; in c 11065.95 kg 0 0 11065.95 0
e Ditto; in c 848.08 kg 0 0 848.08 0
3b.3.(2).3. Permanent Formwork
a Side of pil 196.2 m2 0 0 196.2
b Side of gro 26.97 m2 0 0 26.97 488
c Side of gr 561.05 m2 0 0 561.05
3b.3.(2).3. Fair face finish formwork
a Side of co 162 m2 0 0 162
b Cable tren 52 m2 0 0 52
TOTAL 1st FL - TO FO 0
3b.3.(2).3. 2nd FL
3b.3.(2).3. Vibrated Reinforced concrete fc' 24 N/mm2
a Slab 66.71 m3 0 0 66.71 72.81
b Beam 67.28 m3 0 0 67.28
d Column 21.6 m3 0 0 21.6
3b.3.(2).3. Bar reinforcement; deformed high tensile steel BJTD 40
a General rei 9681.08 kg 0 0 9681.08 11445
b Ditto; in b 14132.12 kg 0 0 14132.12 0
d Ditto; in c 4261.82 kg 0 0 4261.82 0
3b.3.(2).3. Fair face finish formwork
a Sides and s 395.29 m2 0 0 395.29 457.8
b Sides and 388.55 m2 0 0 388.55
a Side of co 144 m2 0 0 144
TOTAL 2nd FL - TO F 0
3b.3.(2).3. 3rd FL
3b.3.(2).3. Vibrated Reinforced concrete fc' 24 N/mm2
a Slab 66.71 m3 0 0 66.71 72.81
b Beam 70.26 m3 0 0 70.26
d Column 21.6 m3 0 0 21.6
3b.3.(2).3. Bar reinforcement; deformed high tensile steel BJTD 40
a General rei 10466.2 kg 0 0 10466.2 11445
b Ditto; in b 14034.56 kg 0 0 14034.56 0
d Ditto; in c 4162.76 kg 0 0 4162.76 0
3b.3.(2).3. Fair face finish formwork
a Sides and s 395.29 m2 0 0 395.29 457.8
b Sides and 403.45 m2 0 0 403.45
a Side of co 144 m2 0 0 144
TOTAL 3rd FL - TO FO 0
3b.3.(2).3. Roof
3b.3.(2).3. Vibrated Reinforced concrete fc' 24 N/mm2
a Slab 69.54 m3 0 0 69.54 69.1625
b Beam 72.08 m3 0 0 72.08
d Column 1.73 m3 0 0 1.73
3b.3.(2).3. Bar reinforcement; deformed high tensile steel BJTD 40
a General rei 9977.68 kg 0 0 9977.68 1729.063
b Ditto; in b 10874.38 kg 0 0 10874.38 0
d Ditto; in c 430.25 kg 0 0 430.25 0
3b.3.(2).3. Fair face finish formwork
a Sides and s 411.8 m2 0 0 411.8 463.1775
b Sides and 404.56 m2 0 0 404.56
a Side of co 17.28 m2 0 0 17.28
TOTAL Roof FL - TO 0
3b.3.(2).3. Pump Room FL
3b.3.(2).3. Vibrated Reinforced concrete fc' 24 N/mm2
a Slab 4.91505 m3 0 0 4.91505 5.25
b Beam 5.976 m3 0 0 5.976
3b.3.(2).3. Bar reinforcement; deformed high tensile steel BJTD 40
a Slab 540.9171 kg 0 0 540.9171 131.25
b Beam 740.8177 kg 0 0 740.8177 0
3b.3.(2).3. Fair face finish formwork
a Slab 32.767 m2 0 0 32.767 35
b Beam 44.82 m2 0 0 44.82
TOTAL MISCELLANEOUS 0
3b.3.(2).3. Interior Finishing Work
3b.3.(2).3. Supply and Install sanitary fixture, supply and install hanger/support and all necessary accessories as indicated on
a Floor Trap 33 No 0 0 33
b Hand Bidet 13 No Incl. Closet 13
c Shower He 4 No 0 0 4
d Toilet Roll 13 No 0 0 13
e Recessed S 4 No 0 0 4
f Urinal 13 No 0 0 13
g Urinal Sep 13 No 0 0 13
h Wash Basi 16 No 0 0 16
i Water Clos 13 No 0 0 13
3b.3.(2).3. Mirrors 5mm thick, beveled edge, fixed to timber frame with 9mm thick multiplex on backing, install complete inc
a Mirror, ov 4 no 0 0 4
b Mirror, ov 1 no 0 0 1
c Mirror, ov 1 no 0 0 1
3b.3.(2).3. Toilet Cubicle, 2100mm high, timber cubicle partition, devided into partition and door, install complete including p
a Overall si 13 no 0 0 Please check the ref. 13
b Overall si 0 no 0 0 0
3b.3.(2).3. Vanity Counter Top Table Granite
a 2974mm x 0 no 0 0 Please check the ref. 0
b 2600mm x 0 no 0 0 0
c 1100mm x 0 no 0 0 0
d Counter, o 10 no 0 0 10
3b.3.(3).3. Ledge Top of Urinoir/Closet Granite
a 3815mm x 2 no 0 0 2
b 2415mm x 1 no 0 0 1
c 900mm x 2 no 0 0 2
d 1100mm x 1 no 0 0 1
3b.3.(3).3. Stair Finishes
a 200x200mm c 0 m2 0 0 Please check the ref. 0
b Heavy duty 222 m 0 0 222
c Handraillin 0m 0 0 0
d Handrail f 100 m 0 0 100
e Handrail f 292 m 0 0 292
f Handrail f 100 m 0 0 100
TOTAL MISCELLANEOUS 0
Unit UNIT PRICETOTAL Remarks
Note
Note
Note
Note
Note
Note
Note
Note
he Works is correct
Note
Note
Note
Note
Note
Note
Note
Note
Item Include
Item Include
kg 0 0 0 3762.55
m2 75000 3975000
m2 130000 17550000
m2 450000 3.25E+08
TOTAL Flooring- Inter 5.73E+08
m2 48000 58368000
nt cement ex. Mortar Utama or equal, pointed in coloured grouting ex. AM or equal as described to:
m2 210500 35995500
TOTAL Walling- Exter 4.38E+08
m2 48000 66864000
nt cement ex. Mortar Utama or equal, pointed in coloured grouting ex. AM or equal as described to:
m2 210500 80621500
TOTAL Walling- Interi 6.84E+08
oncrete soffit consist with 5 mm diameter galvanized steel including wall trim, fixed with scrimped and flush joint, including forming holes
m2 200000 2.07E+08
m2 155250 25305750
m2 28900 5462100
TOTAL Ceiling Work - 2.38E+08
luding ironmongery and all fixing accessories, all the exposed frame to prime fire rated
No 8200000 49200000 8200000 5500000 8200000
No 8200000 24600000 8200000 5500000 8200000
No 8200000 24600000 8200000 5500000 8200000
No 8200000 24600000 8200000 5500000 8200000
No 10500000 3.05E+08 10500000 7500000 10500000
No 10500000 10500000 10500000 7500000 10500000
No 10500000 63000000 14500000 7500000 10500000
No 10500000 63000000 9900000 7500000 10500000
No 10500000 42000000 17500000 7900000 10500000
No 10500000 10500000 17500000 7900000 10500000
No 10500000 42000000 17500000 7900000 10500000
No 19800000 39600000 19800000 12500000 19800000
No 19800000 19800000 19800000 12500000 19800000
No 19800000 19800000 33700000 12500000 19800000
No 21400000 21400000 35800000 13500000 21400000
No 19800000 19800000 27800000 12500000 19800000
No 19800000 39600000 34750000 12500000 19800000
ass with aluminum frame powder coating finish, installed complete with ironmongeries, gasket, seal, fitting and all necessary fixing accesso
No 19000000 19000000
truded frame in powder coating finish, installed complete with ironmongeries, gasket, seal, fitting and all necessary fixing accessories; al a
No 22752000 45504000
No 6912000 41472000
No 6480000 51840000
No 6480000 58320000
No 9720000 1.56E+08
No 16200000 48600000
TOTAL Doors & Windo 1.24E+09
m2 48000 1.3E+08
m2 48000 57456000
m2 48000 9072000
TOTAL Painting Work 1.96E+08
m2 1200000 20400000
m 432000 42552000
TOTAL MISCELLANEOUS
62952000
no 2240000 4480000
no 1400000 1400000
no 950000 1900000
no 1155000 1155000
PRELIMINARIES
General Notes :
1 This Bill is to be rea Note
2 The words "as describ Note
3 Notwithstanding anythNote
4 Access to and egress f Note
5 The Contractor shall c Note
6 The Contractor shall s Note
7 The Contractor shall alNote
8 The Contractor shall bNote
9 The Contractor shall be responsible for ensuring that the setting out of items built into the Works is correct
10 In the event of the Co Note
11 In the event of pipes, Note
12 The Contractor shall bNote
13 The Contractor shall a Note
14 The Contractor shall a Note
15 The Contractor shall a Note
16 The Contractor shall a Note
17 The Contarctor shall a Note
3b.3.(3).2 Earth Work
3b.3.(3).2. Site Clearance etc.
a Allow for c 1 Item Include 1
b Allow for r 1 Item Include 1
3b.3.(3).2. Excavation commencing from existing level including dispose excavated soil off-site work
a Excavate f 333 m3 0 0 333
TOTAL Earth Work - 0
3b.3.(3).3. STRUCTURE WORK
3b.3.(3).3. 1st FL
3b.3.(3).3. Stripping heads of precast reinforced concrete piles to the required cut off level including disposal of debris and fo
a Bored pile 5 No 0 0 5 5
b Ditto; dia 10 No 0 0 10 10
3b.3.(3).3. Sand bedding, as described
a Sand bed l 0 m2 0 0 Please check the ref. 0
3b.3.(3).3. Lean concrete, as described
a Blinding l 547.686 m2 0 0 547.686
3b.3.(3).3. Vibrated Reinforced concrete fc' 24 N/mm2
a Pile cap 49 m3 0 0 49
b Ground sla 85.1824 m3 0 0 85.1824
c Ground be 94 m3 0 0 94
d Column 27.81 m3 0 0 27.81
3b.3.(3).3. Bar reinforcement; deformed high tensile steel BJTD 40
a General rei 4374 kg 0 0 4374 0
b Ditto; in g 8890 kg 0 0 8890
c Ditto; in 20650 kg 0 0 20650 0
d Ditto; in c 6952.5 kg 0 0 6952.5 0
3b.3.(3).3. Permanent Formwork
a Side of pil 132 m2 0 0 132
b Side of sla 72.7275 m2 0 0 72.7275
c Side of gr 471 m2 0 0 471
Fair face finish formwork
a Side of co 185.4 m2 0 0 185.4
TOTAL 1st FL - TO FO 0
3b.3.(3).3. 2nd FL
3b.3.(3).3. Vibrated Reinforced concrete fc' 24 N/mm2
a Slab 76 m3 0 0 76 70.995
b Beam 43 m3 0 0 43
c Column 19.17 m3 0 0 19.17
3b.3.(3).3. Bar reinforcement; deformed high tensile steel BJTD 40
a Ditto; in sl 7537 kg 0 0 7537 9466
b Ditto; in b 9290 kg 0 0 9290 0
c Ditto; in c 4792.5 kg 0 0 4792.5 0
3b.3.(3).3. Fair face finish formwork
a Sides and s 436 m2 0 0 436 473.3
b Sides and 291 m2 0 0 291
c Side of co 127.8 m2 0 0 127.8
TOTAL 2nd FL - TO F 0
3b.3.(3).3. Roof FL
3b.3.(3).3. Vibrated Reinforced concrete fc' 24 N/mm2
a Slab 78.2715 m3 0 0 78.2715 73.8975
b Beam 42.22325 m3 0 0 42.22325
c Concrete p 7.162625 m3 0 0 7.162625
d Column 1.632 m3 0 0 1.632
3b.3.(3).3. Bar reinforcement; deformed high tensile steel BJTD 40
a Ditto; in sl 7827.15 kg 0 0 7827.15 9853
b Ditto; in b 9162.445 kg 0 0 9162.445 0
c Concrete p 895.3281 kg 0 0 895.3281
d Column 359.04 kg 0 0 359.04 0
3b.3.(3).3. Fair face finish formwork
a Sides and s 534.2825 m2 0 0 534.2825 492.65
b Sides and 290.21 m2 0 0 290.21
a Slab 33.496 m2 0 0 33.496
b Column 16.32 m2 0 0 16.32
TOTAL Roof FL - TO 0
3b.3.(3).3. Pump Room FL
3b.3.(3).3. Vibrated Reinforced concrete fc' 24 N/mm2
a Slab 2.9025 m3 0 0 2.9025 2.9025
b Beam 2.27475 m3 0 0 2.27475
c RC wall 1.161 m3 0 0 1.161 1.29
3b.3.(3).3. Bar reinforcement; deformed high tensile steel BJTD 40
a Slab 293.1525 kg 0 0 293.1525 387
b Beam 493.6208 kg 0 0 493.6208 0
c RC wall 145.125 kg 0 0 145.125 129
3b.3.(3).3. Fair face finish formwork
a Slab 19.35 m2 0 0 19.35 19.35
b Beam 20.22 m2 0 0 20.22
c RC wall 17.2 m2 0 0 17.2 12.9
TOTAL Pump Room FL 0
3b.3.(3).3. Stair
3b.3.(3).3. Vibrated Reinforced concrete fc' 24 N/mm2
a Stair 16 m3 0 0 16
3b.3.(3).3. Bar reinforcement; deformed high tensile steel BJTD 40
a Ditto; in st 2260 kg 0 0 2260
3b.3.(3).3. Fair face finish formwork
a Stair 98 m2 0 0 98
TOTAL Stair - TO FOR 0
3b.3.(3).3. ARCHITECTURAL WORK
3b.3.(3).3. FLOORING WORK
3b.3.(3).3. Exterior Finishing Work
3b.3.(3).3. Supply and install homogenous/ceramic tile, laid on screed bedded and jointed in instant cement ex. Mortar Utam
a F1A, HT 6 60 m2 0 0 60
3b.3.(3).3. Sundries
a F11, Aspha 531 m2 0 0 531
TOTAL Flooring- Extt 0
3b.3.(3).3. Interior Finishing Work
3b.3.(3).3. Waterproofing coating system as specified, applied strictly in accordance with the manufacturer's instruction, all a
a Toilet floo 0 m2 0 0 Please check the ref. 0
3b.3.(3).3. Supply and install homogenous/ceramic tile, laid on screed bedded and jointed in instant cement ex. Mortar Utam
a F1, HT 60 51 m2 0 0 51
b F2, HT 40 281 m2 0 0 281
c F3, CT 20 76 m2 0 0 76
3b.3.(3).3. Floor Hardener Non-metalic 3 kg/m2 complete including cement mortar screeding and 50mm thick topping conc
a F8 42 m2 0 0 42
3b.3.(3).3. Sundries
a F11, Aspha 76 m2 0 0 76
b F12, Lightw 11 m2 0 0 11
c F13, Carpet 354 m2 0 0 354
TOTAL Flooring- Inte 0
3b.3.(3).3. WALLING WORK
3b.3.(3).3. Exterior Finishing Work
3b.3.(3).3. Block wall in dry mix mortar system, complete with reinforcement, lintels, stiffeners, anchorage, latching and acce
a 200mm thi 832 m2 0 0 832
3b.3.(3).3. Plaster trowelled smooth in dry mix mortar system as described
a General 832 m2 0 0 832
3b.3.(3).3. Supply and install homogenous/ceramic tile, laid on screed bedded and jointed in instant cement ex. Mortar Utam
a External wal 160 m2 0 0 160
TOTAL Walling - Exte 0
3b.3.(3).3. Interior Finishing Work
3b.3.(3).3. Block wall in dry mix mortar system, complete with reinforcement, lintels, stiffeners, anchorage, latching and acce
a 200mm thi 1176 m2 0 0 1176
b 100mm thi 0 m2 0 0 0
c Gypsum bo 379 m2 0 0 379
3b.3.(3).3. Plaster trowelled smooth in dry mix mortar system as described
a General 2440 m2 0 0 2440
3b.3.(3).3. Supply and install homogenous/ceramic tile, laid on screed bedded and jointed in instant cement ex. Mortar Utam
Note: 3.2 m height from floor level
a W4, CT 20 295 m2 0 0 295
TOTAL Walling - Inte 0
3b.3.(3).3. CEILING WORK \
3b.3.(3).3. Supply and install suspended ceiling framing with metal furring and C channel fixed to concrete soffit consist with
a Gypsum bo 698 m2 0 0 698
b Silicate C 75 m2 0 0 75
c Cement pla 148 m2 0 0 148
d Cornice 0m 0 0 Please check the ref. 0
TOTAL Ceiling Work - 0
3b.3.(3).3. DOORS AND WINDOWS
3b.3.(3).3. Supply assemble, set and install steel doors and frames finish duco, install complete including ironmongery and al
a SD-1, over 2 No 0 0 2
b SD-1, over 4 No 0 0 4
c SD-1, over 4 No 0 0 4
d SD-1, over 1 No 0 0 1
e SD-1, over 27 No 0 0 27
f SD-1, over 1 No 0 0 1
g SD-2, over 5 No 0 0 5
h SD-3, over 6 No 0 0 6
i SD-5, over 4 No 0 0 4
j SD-5, over 1 No 0 0 1
k SD-5, over 1 No 0 0 1
l SD-5, over 2 No 0 0 2
m SD-5, over 2 No 0 0 2
n SD-5, over 1 No 0 0 1
o GL-1, over 1 No 0 0 1
3b.3.(3).3. Supply assemble, set and install glass window, 8mm thick clear glass with aluminum extruded frame in powder co
a W1, overal 2 No 0 0 2
b W4, overal 1 No 0 0 1
c W5, overal 1 No 0 0 1
d W6, overal 4 No 0 0 4
e W8, overal 1 No 0 0 1
f W11, overa 8 No 0 0 8
g W14, overa 1 No 0 0 1
h W17, overa 2 No 0 0 2
i W18, overa 1 No 0 0 1
j W19, overa 2 No 0 0 2
k W20, overa 2 No 0 0 2
l W21, overa 1 No 0 0 1
TOTAL Doors & Windo 0
3b.3.(3).3. PAINTING WORKS
3b.3.(3).3. Prepare and apply syntetic resin emulsion paint finish, all as described to:
a Wall and c 2008 m2 0 0 2008
b Gypsum and 773 m2 0 0 773
c Exposed co 148 m2 0 0 148
TOTAL Painting Work 0
3b.3.(3).3. MISCELLANEOUS WORK
3b.3.(3).3. Exterior Finishing Work
3b.3.(3).3. Roofing
a Gutter : ga 97.9 m' 0 0 97.9
3b.3.(3).3. CANOPY
a Steel Cano 1 Item 0 0 1
b Steel Cano 2 Item 0 0 2
c Curtain Bo 4.53 m2 0 0 4.53
TOTAL MISCELLANEOUS 0
3b.3.(3).3. Interior Finishing Work
3b.3.(3).3. Supply and Install sanitary fixture, supply and install hanger/support and all necessary accessories as indicated on
a Floor Trap 28 No 0 0 28
b Hand Bidet 11 No Incl. Closet 11
c Shower He 9 No 0 0 9
d Toilet Roll 11 No 0 0 11
e Recessed S 9 No 0 0 9
f Urinal 5 No 0 0 5
g Urinal Sep 5 No 0 0 5
h Wash Basi 9 No 0 0 9
i Water Clos 11 No 0 0 11
3b.3.(3).3. Mirrors 5mm thick, beveled edge, fixed to timber frame with 9mm thick multiplex on backing, install complete inc
a Mirror, ov 1 no 0 0 1
b Mirror, ov 1 no 0 0 1
c Mirror, ov 2 no 0 0 2
3b.3.(3).3. Toilet Cubicle, 2100mm high, timber cubicle partition, devided into partition and door, install complete including p
a 770mm 9 no 0 0 9
b 900mm 2 no 0 0 2
c 935mm 1 no 0 0 1
d 900mm x 5 no 0 0 5
e 1050mm x 1 no 0 0 1
f 900mm x 3 no 0 0 3
g 985mm x 1 no 0 0 1
3b.3.(3).3. Vanity Counter Top Table Granite
a 625mm x 1 no 0 0 1
b 625mm x 1 no 0 0 1
c 625mm x 1 no 0 0 1
d 625mm x 1 no 0 0 1
3b.3.(3).3. Ledge Top of Urinoir/Closet Granite
a 175mm x 1 no 0 0 1
b 175mm x 1 no 0 0 1
c 400mm x 1 no 0 0 1
d 400mm x 1 no 0 0 1
3b.3.(3).3. Stair Finishes
a 200x200mm c 60 m2 0 0 60
b Heavy duty 110 m 0 0 110
c Handraillin 0m 0 0 Please check the ref. 0
d Handrail f 60 m 0 0 60
e Handrail f 56 m 0 0 56
f Handrail f 56 m 0 0 56
TOTAL MISCELLANEOUS 0
Unit UNIT PRICETOTAL Remarks
Note
Note
Note
Note
Note
Note
Note
Note
he Works is correct
Note
Note
Note
Note
Note
Note
Note
Note
Item Include
Item Include
m3 0 0
TOTAL Earth Work - 0 Concrete Rebar Fomwork
-49 #DIV/0! m3 0
-85.1824 #DIV/0! m3 0 0
-94 #DIV/0! m3 0 0
-27.81 #DIV/0! m3 0 0
-185.4 #DIV/0! m2 0
TOTAL 1st FL - TO FO 0
-41.6325 -0.084507 m2 0 0 0
-290.21 #DIV/0! m2 0 0 874.3085
m2 0 0
-16.32 #DIV/0! m2 0 0
TOTAL Roof FL - TO 0
0 0 m3 0 0 0 6.33825
-2.27475 #DIV/0! m3 0 0
0.129 0.1 m3 0 0
0 0 m2 0 0 0 56.77
-20.22 #DIV/0! m2 0 0
-4.3 -0.333333 m2 0 0
TOTAL Pump Room FL 0
m3 0 0 0 16
kg 0 0 0 2260
m2 0 0 0 98
TOTAL Stair - TO FOR 0
nt cement ex. Mortar Utama or equal, pointed in coloured grouting ex. AM or equal as described to:
m2 0
m2 0
TOTAL Flooring- Extt 0
m2 0
m2 0
m2 0
TOTAL Flooring- Inte 0
m2 0
nt cement ex. Mortar Utama or equal, pointed in coloured grouting ex. AM or equal as described to:
m2 0
TOTAL Walling - Exte 0
m2 0
nt cement ex. Mortar Utama or equal, pointed in coloured grouting ex. AM or equal as described to:
m2 0
TOTAL Walling - Inte 0
\
oncrete soffit consist with 5 mm diameter galvanized steel including wall trim, fixed with scrimped and flush joint, including forming holes
m2 0
m2 0
m2 0
m 0 0 Please check the ref. drawing
TOTAL Ceiling Work - 0
luding ironmongery and all fixing accessories, all the exposed frame to primed with approved primer, grouting the frames in water proofin
No 0 7900000
No 0 0 8200000
No 0 0 8200000
No 0 0 10500000
No 0 10500000
No 0 0 19800000
No 0 14500000
No 0 9900000
No 0 17500000
No 0 0 19800000
No 0 19800000
No 0 19800000
No 0 0 33700000
No 0 35800000
No 0 0 33700000
truded frame in powder coating finish, installed complete with ironmongeries, gasket, seal, fitting and all necessary fixing accessories; al a
No 23508000 47016000
No 0
No 0
No 0 0
No 1296000 1296000
No 9720000 77760000
No 3240000 3240000
No 5112000 10224000
No 4860000 4860000
No 19440000 38880000
No 32400000 64800000
No 32400000 32400000
TOTAL Doors & Windo 2.8E+08
m2 0
m2 0 0
m2 0 0
TOTAL Painting Work 0
m' 0
no 2948750 2948750
no 3036250 3036250
no 3559500 3559500
no 4550000 4550000
no 759500 759500
no 1200500 1200500
no 2895200 2895200
no 3063200 3063200
m2 0
m 0
m 0 Please check the ref. drawing
m 0
m 0
m 0
TOTAL MISCELLANEOUS1.42E+08
nt, including forming holes and additional framing for ME fitting, all as described;
he frames in water proofing cement mortar, protecting frames and cleaning on completion, all as described;
sary fixing accessories; al as described:
the manufacturer's instructions
Calculation volume finishing D02 Workshop Office
OWNER : TWJO
PROJECT : MRT CP 101-SP 02
BUILDING AREA : D02 - WORKSHOP OFFICE
FINISHING WORK
No. ROOM NA M2 FLOOR Ceramic Ceramic WALL
Hardener 40 x 40 20 x 20 WaterprooColumn praBrick Plaster
1st Floor
1 PORCH 42.3 42.3 15.8 169.2 169.2
2 ENRANCE H 44.2 44.2 89.5 176.8 176.8
3 CANTEEN 202.1 202.1 956.8 808.4 808.4
4 KITCHEN 41.2 41.2 31.75 164.8 164.8
5 ELECTRICA 10.2 10.2 35.8 40.8 40.8
6 STORE 1 15.2 15.2 22.35 60.8 60.8
7 STORE 2 11.2 11.2 35.8 44.8 44.8
8 STORE 3 7.5 7.5 62.65 30 30
9 MACHINERY MACHIN 0 64.4 0 0
10 SERVICE 8.7 8.7 44.75 34.8 34.8
11 TOILET MA 22.3 22.3 22.3 12.2 89.2
12 TOILET FE 22.3 22.3 22.3 12.2 89.2
13 STAIRCASE 20.9 20.9 44.75 83.6 83.6
14 STARICASE 17.1 17.1 32.9 68.4 68.4
15 CORRIDOR 37.5 37.5 150 150
16 LIFT 6.3 6.3 17.9 25.2 25.2
2nd Floor
17 PRAYING 36.1 36.1 44.75 144.4 144.4
18 GENERAL A 133 133 85.8 532 532
19 MEETING 30 30 55.9 120 120
20 MEETING 32.8 32.8 58.15 131.2 131.2
21 GUEST RO 11.7 11.7 53.7 46.8 46.8
22 SUB MANA 53.4 53.4 80.5 213.6 213.6
23 STAIRCASE 21.4 21.4 21.4 44.75 85.6 85.6
24 STAIRCASE 25.3 25.3 25.3 32.9 101.2 101.2
25 HALL 9.5 9.5 35.8 38 38
26 SERVICE 8.4 8.4 17.9 33.6 33.6
27 TOILET MA 22.5 22.5 22.5 12.2 90
28 TOILET FE 21.2 21.2 21.2 12.2 84.8
29 LOCKER R 13.4 13.4 53.7 53.6 53.6
30 LOCKER R 14.1 14.1 62.65 56.4 56.4
31 CORRIDOR 58.6 58.6 234.4 234.4
3rd Floor
32 GENERAL 127.2 127.2 81.3 508.8 508.8
33 LOUNGE 14 14 27.7 56 56
34 RESTING P 33.9 33.9 62.65 135.6 135.6
35 RESTING P 50.3 50.3 80.55 201.2 201.2
36 TOILET MA 28.4 28.4 28.4 53.7 113.6
37 TOILET FE 8.2 8.2 8.2 35.8 32.8
38 STAIRCASE 21.5 21.5 44.75 86 86
39 STAIRCASE 25.3 25.3 32.9 101.2 101.2
40 SERVICE 8.4 8.4 17.9 33.6 33.6
41 HALL 42.9 42.9 35.8 171.6 171.6
42 STORE 8 8 26.85 32 32
43 ROOM 1 9.6 9.6 35.8 38.4 38.4
44 ROOM 2 9.5 9.5 35.8 38 38
45 ROOM 3 9.6 9.6 35.8 38.4 38.4
46 ROOM 4 9.5 9.5 35.8 38 38
47 ROOM 5 9.5 9.5 35.8 38 38
48 ROOM 6 9.6 9.6 35.8 38.4 38.4
49 ROOM 7 10.3 10.3 35.8 41.2 41.2
50 ROOM 8 9.5 9.5 35.8 38 38
51 ROOM 9 9.6 9.6 35.8 38.4 38.4
52 ROOM 10 9.5 9.5 35.8 38 38
Top Roof Floor
53 SERVICE 9.6 9.6 17.9 38.4 38.4
54 STAIRCASE 22.5 22.5 44.75 90 90
55 TOP ROOF 481.6 481.6
Ridwan
Ceramic CEILING Silicate PAINTING DOOR
SHS SHS SHS SHS SD1
20 x 20 Gypsum Calcium Wall Ceiling (4.2x3.0) (4.2x6) (3.2x3.0) (5.05x3.0) (0.65x2.2)
Widodo Pungkas
SD1 SD1 SD3 SD3 SD5 SD5 SD5 SD5 SD8 SSD1
(0.75x2.2) (0.8x2.2) (0.8x2.2) (0.75x2.2) (1.2x2.4) (1.3x2.4) (1.5x2.2) (4.2x6) (1.3x2.2) (3x3)
0 0 0 0 0 0 0 0 0 0
GL1 Cubicle WINDOWS
w=60.0 WINDOWS
w=1.6 + LOUVER w=4.6
w=3.1 w=6.2 w=7.55 w=9.1 w=9.1
(1.5x2.4) (0.8x2.2) h=1.8 h=2.45 h=2.45 h=2.45 h=2.45 h=2.45 h=2.45 h=2.55
0 0 0 0 0 0 0 0 0 0
0
w=1.0 w=1.0 w=1.0 FORMWORREBAR
h=0.6 h=1.0 h=1.2
m2 kg
0 0 0 0 0 0
FINISHING WORK
OWNER : TWJO
PROJECT : MRT CP 101-SP 02
BUILDING AREA : D04 - WORKSHOP BUILDING
1 RESTING ROOM 01
a= 5000
7400
10000 b2 =
b=
2600
b1 =
c= 5000
2 RESTING ROOM 02
a= 5000
6000
b=
c= 5000
3500
b=
c= 9000
4 TOILET 01 (M)
a= 3000
5500
b=
c= 3000
5 SHOWER ROOM (M)
a= 5000
4800
b=
c= 5000
6 TOILET 01 (F)
a= 5000
3500
b=
c= 5000
7 SHOWER ROOM 01 (F)
a= 4000
3500
b=
c= 4000
8 STAFF KITCHEN
a= 3200
3200
b=
c= 3200
c1= 5700
10 PRAY ROOM
a= 5000
4000
b=
c= 5000
11 CORRIDOR 1
a1= 2150 a2=
16000
b=
c= 4600
12 AIR SOURCE ROOM
a= 12000
9500
b=
c= 12000
13 SUBSTATION,
TRANSFORMER ROOM a= 12000
21500
b=
c1= 6000
c3= 12000
14 BOILER ROOM
a= 12000
5500
b=
c= 12000
15 ELECTRIC EQUIPMENT
SHOP a= 18000
15000
b=
c= 18000
16 TOILET 02 (F)
a= 6800
3000
b=
c1=
c= 6800
17 TOILET 02 (M)
a= 6800
6000
b=
c1=
c= 6800
18 BATTERY CHARGING
ROOM a= 6800
9000
b=
c= 6800
19 VALVE SHOP
a= 13200
15000
b=
c= 13200
20 BEARING SHOP
a= 10000
12500
b=
c1= 5000 c2
c= 10000
21 CLIMATE CONTROL
STORAGE a= 14000
4000
b=
c1= 4000 c2
c= 14000
22 STORAGE OFFICE
a= 6000
4000
b=
c= 6000
23 WAREHOUSE
a= 20000
14500
b=
c= 20000
24 ENTRANCE HALL
a= 2500
4000
b=
c= 2500
25 COORIDOR 02
a= 6000
15000
b=
c= 6000
8200
b=
18500
b 1=
21800 c1= 12000
b2= 15000
b3 = c2= 44000
c6= 88000
28 INSPECTION ROOM
2nd a= 12000
2000
b=
1200
b1 =
c1= 2000
c= 12000
FINISHING LENGTH WIDTH HEIGHT NOS
Flooring:
Cramic 400 5 10 1
Wall :
a 5 6 1
10000 b1 2.6 6 1
b2 7.4 7 1
d= c 5 6 1
d 0 0 0 0
Plaster:
a 5 6 1
b1 2.6 6 1
b2 7.4 7 1
c 5 6 1
d 10 18.5 1
30 43.5
Ceiling:
Gypsum 5 10 1
Painting:
Wall EP
Ceiling EP
Door:
SD5 1.5 2.2 1
Windows:
Overall , w 1.6 2.45 2
Flooring:
Cramic 400 5 6 1
Wall :
a 5 6 1
6000 b 6 6 1
d= c 5 6 1
d 0 0 0 0
Plaster:
a 5 6 1
b 6 6 1
c 5 6 1
d 6 18.5 1
Ceiling:
Gypsum 5 6 1
Painting:
Wall EP
Ceiling EP
Door:
SD5 1.5 2.2 1
Windows:
Overall , w 1.6 2.45 2
Flooring:
Cramic 400 9 3.5 1
Wall :
a 9 6 1
3500 b 3.5 7 1
d= c 0 0 0 0
d 0 6 1
Plaster:
a 9 6 1
b 3.5 7 1
c 9 12 1
d 3.5 6 1
Ceiling:
Gypsum 9 3.5 1
Painting:
Wall EP
Ceiling EP
Door:
SD1 0.8 2.2 1
SSD1 3 3 1
Windows:
Overall , w 4.6 2.45 1
Overall , w 1.6 2.45 1
Flooring:
Cramic 200 3 5.5 1
Waterproofing:
3 5.5 1
2000 Wall :
d1= a 3 6 1
5500 b 5.5 6 1
d= c 0 0 0 0
d 5.5 6 1
d1 2 2 2
Plaster:
a 3 6 1
b 5.5 6 1
c 3 6 1
d 5.5 6 1
d1 2 2 4
Ceiling:
Silicate Ca 3 5.5 1
Painting:
Wall EP
Ceiling EP
Door:
SD3 0.8 2.2 1
Wall Ceramic:
a 3 3.3 1
b 5.5 3.3 1
c 3 3.3 1
d 5.5 3.3 1
d1 2 2 4
Door:
SD1 0.8 2.2 0
Toilet Cubicle:
Overall 0.8 2 3
Flooring:
Cramic 200 5 4.8 1
Waterproofing:
5 4.8 1
2000 Wall :
d2= a 5 6 1
4800 b 4.8 7 1
d3= c 0 0 0 0
1500 d1 1.5 2 5
d1= d2 2 2 5
d3 0 0 0 0
Plaster:
a 5 6 1
b 4.8 7 1
c 5 6 1
d1 1.5 2 10
d2 2 2 10
d3 4.8 6 4
Ceiling:
Silicate Ca 5 4.8 1
Painting:
Wall EP
Ceiling EP
Door:
SD3 0.75 2.2 2
Wall Ceramic:
a 5 3.3 1
b 4.8 3.3 1
c 5 3.3 1
d1 1.5 2 10
d2 2 2 10
d3 4.8 3.3 1
Door:
SD1 0.8 2.2 0
Toilet Cubicle:
Overall 0.8 2 10
Flooring:
Cramic 200 5 3.5 1
Waterproofing:
5 3.5 1
Wall :
a 5 6 1
3500 b 3.5 6 1
2000 d= c 0 0 0 0
d1= d 3.5 6 1
d1 2 2 3
Plaster:
a 5 6 1
b 3.5 6 1
c 5 6 1
d 3.5 6 1
d1 2 2 6
Ceiling:
Silicate Ca 5 3.5 1
Painting:
Wall EP
Ceiling EP
Wall Ceramic:
a 5 3.3 1
b 3.5 3.3 1
c 5 3.3 1
d 3.5 3.3 1
d1 2 2 5
Door:
SD1 0.8 2.2 0
Door:
SD3 0.8 2.2 1
Toilet Cubicle:
Overall 0.8 2 3
Flooring:
Cramic 200 4 3.5 1
Waterproofing:
4 3.5 1
Wall :
a 4 6 1
3500 b 3.5 7 1
2000 d= c 0 0 0 0
d1= d 0 0 0 0
d1 2 2 3
Plaster:
a 4 6 1
b 3.5 7 1
c 4 6 1
d 3.5 6 1
d1 2 2 6
Ceiling:
Silicate Ca 4 3.5 1
Painting:
Wall EP
Ceiling EP
Wall Ceramic:
a 4 3.3 1
b 3.5 3.3 1
c 4 3.3 1
d 3.5 3.3 1
d1 2 2 6
Door:
SD1 0.8 2.2 1
Toilet Cubicle:
Overall 0.8 2 4
Flooring:
Cramic 400 3.2 3.2 1
Wall :
a 3.2 6 1
3200 b 3.2 6 1
d= c 0 0 0 0
d 3.2 6 1
Plaster:
a 3.2 6 1
b 3.2 6 1
c 3.2 6 1
d 3.2 6 1
Ceiling:
Gypsum 3.2 3.2 1
Painting:
Wall EP
Ceiling EP
Door:
SD1 0.8 2.2 1
Flooring:
Cramic 400 8.9 1.5 1
5.7 2.5 1
1500
d2= Wall :
a 8.9 7 1
b 4 7 1
2500 c1 0 0 0 0
c2 0 0 0 0
d1= d1 0 0 0 0
d2 1.5 6 1
c2= 3200
Plaster:
a 8.9 7 1
b 4 7 1
c1 5.7 6 1
c2 3.2 6 1
d1 2.5 6 1
d2 1.5 6 1
Ceiling:
Gypsum 8.9 1.5 1
5.7 2.5 1
Painting:
Wall EP
Ceiling EP
Door:
SD1 0.8 2.2 1
Flooring:
Cramic 400 5 4 1
Wall :
a 0 0 0 0
4000 b 4 6 1
d= c 5 6 1
d 0 0 0 0
Plaster:
a 5 0 1
b 4 6 1
c 5 6 1
d 4 18.5 1
Ceiling:
Gypsum 5 4 1
Painting:
Wall EP
Ceiling EP
Door:
SD1 0.8 2.2 1
Windows:
Overall , w 1.6 2.45 1
Flooring:
2450 Cramic 400 2.15 12.3 1
4.6 3.7 1
12300 Wall :
d2= a1 2.15 7 1
a2 0 0 0 0
3700 b 0 0 0 0
d1= c 0 0 0 0
d1 3.7 6 1
d2 0 0 0 0
Plaster:
a1 2.15 7 1
a2 2.45 6 1
b 16 6 1
c 4.6 12 1
d1 3.7 6 1
d2 12.3 6 1
Ceiling:
Gypsum 2.15 12.3 1
4.6 3.7 1
Painting:
Wall EP
Ceiling EP
Door:
GL1 1.5 2.4 1
Windows:
Overall , w 3.1 2.45 1
Flooring:
Floor Hard 12 9.5 1
Wall :
a 12 6 1
9500 b 0 0 0 0
d= c 12 6 1
d 9.5 6 1
Plaster:
a 12 6 1
b 9.5 18.5 1
c 12 6 1
d 9.5 6 1
Ceiling:
Gypsum 12 9.5 1
Painting:
Wall EP
Ceiling EP
Door:
SHS 4.2 3 1
SD5 1.5 2.4 1
Windows:
louver 1 0.6 2
Door:
SD5 1.7 2.2 0
Flooring:
Floor Hard 12 21.5 1
12000 18900 Wall :
d1= d3= a 12 7 1
b 0 0 0 0
2600 c1 6 6 3
d2= c2 2.6 6 1
c2= 2600 c3 0 0 0 0
d1 12 6 1
d2 2.6 6 1
d3 18.9 7 1
Plaster:
a 12 7 1
b 21.5 18.5 1
c1 6 6 6
c2 2.6 6 2
c3 12 6 1
d1 12 6 2
d2 2.6 6 2
d3 18.9 7 1
Ceiling:
Gypsum 12 21.5 1
0 2.6 1
Painting:
Wall EP
Ceiling EP
Door :
SD1 0.8 2.2 3
SD5 1.5 2.2 2
Flooring:
Floor Hard 12 5.5 1
Wall :
a 0 0 0 0
5500 b 0 0 0 0
d= c 12 6 1
d 5.5 6 1
Plaster:
a 12 6 1
b 5.5 18.5 1
c 12 6 1
d 5.5 6 1
Ceiling:
Gypsum 12 5.5 1
Painting:
Wall EP
Ceiling EP
Door:
SRS 3.2 3 1
SD1 0.8 2.2 1
Windows:
louver 1 1 1
Flooring:
Floor Hard 18 15 1
Wall :
15000 a 18 6 1
d= b 0 0 0 0
c 0 0 0 0
d 15 7 1
Plaster:
a 0 7 1
b 15 6 1
c 18 12 1
d 15 7 1
Ceiling:
Gypsum 0 15 1
Painting:
Wall EP
Ceiling EP
Door:
SD1 0.8 2.2 1
SSD1 3 3 1
Windows:
Overall , w 7.55 2.45 1
Overall , w 9.1 2.45 1
Flooring:
Cramic 200 6.8 3 1
Waterproofing:
6.8 3 1
Wall :
a 6.8 7 1
3000 b 0 0 0 0
d= c 6.8 6 1
c1 2 6 2
d 3 2 1
2000
Plaster:
a 6.8 7 1
b 3 0 1
c 6.8 6 1
c1 2 6 4
d 3 2 1
Ceiling:
Silicate Ca 6.8 3 1
Painting:
Wall EP
Ceiling EP
Wall Ceramic:
a 6.8 3.3 1
b 3 3.3 1
c 6.8 3.3 1
c1 2 2 4
d 3 3.3 1
Door:
SD3 0.8 2.2 1
Windows:
Overall 2.1 0.6 0
Toilet Cubicle:
Overall 0.8 2 3
Flooring:
Cramic 200 1.5 3 1
6.8 3 1
5300 Waterproofing:
3000 1.5 3 1
d2= 6.8 3 1
Wall :
3000 a1 1.5 7 1
d1= a2 0 0 0 0
b 6 7 1
2000 c 6.8 6 1
c1 2 2 2
d1 3 6 1
d2 0 0 0 0
Plaster:
a1 1.5 7 1
a2 5.3 6 1
b 6 7 1
c 6.8 6 1
c1 2 2 4
d1 3 6 1
d2 3 6 1
Ceiling:
Silicate Ca 1.5 3 1
6.8 3 1
Painting:
Wall EP
Ceiling EP
Wall Ceramic:
a1 1.5 3.3 1
a2 5.3 3.3 1
b 6 3.3 1
c 6.8 3.3 1
c1 2 2 4
d1 3 3.3 1
d2 3 3.3 1
Door:
SD3 0.8 2.2 1
Toilet Cubicle:
Overall 0.8 2 3
Flooring:
Floor Hard 6.8 9 1
Wall :
a 0 0 0 0
9000 b 9 7 1
d= c 0 0 0 0
d 9 6 1
Plaster:
a 6.8 6 1
b 9 7 1
c 6.8 12 1
d 9 6 1
Ceiling:
Gypsum 6.8 9 1
Painting:
Wall EP
Ceiling EP
Door:
SD1 0.8 2.2 1
Windows:
Overall , w 3.1 2.45 1
Flooring:
Floor Hard 13.2 15 1
Wall :
a 13.2 7 1
15000 b 0 0 0 0
d= c 0 0 0 0
d 15 7 1
Plaster:
a 13.2 7 1
b 15 6 1
c 13.2 12 1
d 15 7 1
Ceiling:
Gypsum 13.2 15 1
Painting:
Wall EP
Ceiling EP
Door:
SSD1 3 3 1
SD1 0.8 2.2 1
Windows:
Overall , w 6.2 2.45 2
Flooring:
Floor Hard 10 12.5 1
Wall :
a 10 9 1
12500 b 12.5 7 1
d= c1 5 7 1
c2 0 0 0 0
d 0 0 0 0
5000 Plaster:
a 10 9 1
b 12.5 7 1
c1 5 7 1
c2 5 6 1
d 12.5 18.5 1
Ceiling:
Gypsum 10 12.5 1
Painting:
Wall EP
Ceiling EP
Door:
SD1 0.8 2.2 2
SSD1 3 3 1
Windows:
Louver 1 1 1
Flooring:
Floor Hard 14 4 1
Wall :
a 14 9 1
4000 b 4 9 1
d= c1 4 9 1
c2 0 0 0 0
d 0 0 0 0
10000 Plaster:
a 14 9 1
b 4 9 1
c1 4 9 1
c2 10 9 1
d 4 9 18.5
Ceiling:
Gypsum 14 4 1
Painting:
Wall EP
Ceiling
Door:
SD5 1.2 2.4 1
Windows:
Louver 1 1 0
Flooring:
Floor Hard 6 4 1
Wall :
a 6 9 1
4000 b 4 9 1
d= c 6 9 1
d 0 0 0 0
Plaster:
a 6 9 1
b 4 9 1
c 6 9 1
d 4 9 1
Ceiling:
Gypsum 6 4 1
Painting:
Wall EP
Ceiling
Door:
SD5 1.2 2.4 1
Flooring:
Floor Hard 20 14.5 1
Wall :
a 20 9 1
14500 b 14.5 9 1
d= c 0 0 0 0
d 0 0 0 0
Plaster:
a 20 9 1
b 14.5 9 1
c 20 9 1
d 14.5 18.5 1
Painting:
Wall EP
Door:
SRS 4.2 3 1
SD1 0.8 2.2 1
SD5 1.2 2.4 1
Windows:
Overall , w 9.1 2.45 1
Flooring:
Cramic 400 2.5 4 1
Wall :
a 0 0 0 0
4000 b 0 0 0 0
d= c 0 0 0 0
d 0 0 0 0
Plaster:
a 2.5 6 1
b 4 6 1
c 2.5 18.5 1
d 4 12 1
Ceiling:
Gypsum 2.5 4 1
Painting:
Wall EP
Ceiling EP
Door:
SD5 1.2 2.4 1
Flooring:
Floor Hard 6 15 1
Wall :
a 0 0 0 0
15000 b 0 0 0 0
d= c 0 0 0 0
d 0 0 0 0
Plaster:
a
b 15 7 1
c 6 7 1
d 15 12 1
Painting:
Wall EP
Door:
SHS 3.2 3 1
SD1 0.8 2.2 1
Flooring:
Floor Hard 160 8.2 1
Wall :
8200 a 0 0 0 0
d= b 0 0 0 0
c1 10 4.8 1
c2 150 4.8 1
d 0 0 0 0
Plaster:
a 160 12 1
b 8.2 18.5 1
c1 10 4.8 1
c2 150 4.8 1
d 8.2 18.5 1
Painting:
Wall EP
Door:
SD1 0.8 2.2 3
SD5 1.3 2.4 1
SD5 4.2 6 1
Windows:
Overall , w 1.6 2.45 2
Overall , w 7.55 2.45 3
Overall , w 9.1 2.45 13
Overall , w 9.1 2.55 16
Flooring:
Floor Hard 140 18.5 1
44 21.8 1
18500 88 15 1
d1= 12500 7400 10 12.5 1
d3= d4= 11 7.4 1
16000 80.5 21.8 1
c3= 10000 d2=
c4= 5000
c5= 11000 Wall :
a1 0 0 0 0
a2 0 0 0 0
b1 0 0 0 0
b2 0 0 0 0
b3 0 0 0 0
c1 0 0 0 0
c2 0 0 0 0
c3 0 0 0 0
c4 0 0 0 0
c5 0 0 0 0
c6 0 0 0 0
d1 0 0 0 0
d2 0 0 0 0
d3 0 0 0 0
d4 0 0 0 0
Plaster:
a1 10 4.8 1
a2 120 4.8 1
b1 18.5 1
b2 21.8 7 1
b3 15 7 1
c1 12 7 1
c2 44 7 1
c3 10 9 1
c4 5 7 1
c5 11 7 1
c6 88 12 1
d1 18.5 9 1
d2 16 7 1
d3 12.5 7 1
d4 7.4 7 1
Painting:
Wall EP
Door:
SRS 4.2 6 2
SRS 3.2 3 1
SRS 5.2 3 1
SD1 0.8 2.2 3
Windows:
Overall 60 1.8 2
Louver 1 1.2 1
Overall , w 1.6 2.45 1
Overall , w 9.1 2.45 6
Overall , w 9.1 2.55 16
Flooring:
Cramic 400 12 2 1
Wall :
a 12 4 1
2000 b 2 4 1
d= b1 1.2 4 1
c 12 4 1
c1 2 4 1
d 2 4 1
Plaster:
a 12 4 2
b 2 4 2
b1 1.2 4 2
c 12 4 2
c1 2 4 2
d 2 4 2
Ceiling:
Gypsum 12 2 1
Painting:
Wall EP
Ceiling EP
Door:
SD1 0.75 2.2 2
SD1 0.65 2.2 1
SD8 1.3 2.2 1
VOLUME TOTAL VO UNIT REMARKS
d (m)
50 m2
50
127.4 m2 254.8
30
15.6
51.8
30
0 exterior
312.4 m2
30
15.6
51.8
30
185
50 m2
50
362.4 m2
312.4
50
1 nos
1
2 nos
2
30 m2
30
96 m2
30
36
30
0 exterior
207 m2
30
36
30
111
30 m2
30
237 m2
207
30
1 nos
1
2 nos
2
31.5 m2
31.5
78.5 m2
54
24.5
0 exterior
0
207.5 m2
54
24.5
108
21
31.5 m2
31.5
239 m2
207.5
31.5
2 nos
1
1
2 nos
1
1
16.5 m2
16.5
16.5 m2
16.5
92 m2
18
33
0 Inc. (3)
33
8
118 m2
18
33
18
33
16
16.5 m2
16.5
62.4 m2
45.9
16.5
1 nos
1
72.1 m2
9.9
18.15
9.9
18.15
16
0 nos
0
3 nos
3
24 m2
24
24 m2
24
98.6 m2
30
33.6
0 Inc. (3)
15
20
0 Inc. (4)
278.8 m2
30
33.6
30
30
40
115.2
24 m2
24
195.12 m2
171.12
24
2 nos
2
107.68 m2
16.5
15.84
16.5
3
40
15.84
0 nos
0
10 nos
10
17.5 m2
17.5
17.5 m2
17.5
84 m2
30
21
0 Inc. (4,5)
21
12
126 m2
30
21
30
21
24
17.5 m2
17.5
67.4 m2
49.9
17.5
76.1 m2
16.5
11.55
16.5
11.55
20
0 nos
0
1 nos
1
2 nos
2
14 m2
14
14 m2
14
60.5 m2
24
24.5
0 Inc. (5)
0 Inc. (6)
12
117.5 m2
24
24.5
24
21
24
14 m2
14
58 m2
44
14
73.5 m2
13.2
11.55
13.2
11.55
24
1 nos
1
4 nos
4
10.24 m2
10.24
57.6 m2
19.2
19.2
0 Inc. (6)
19.2
76.8 m2
19.2
19.2
19.2
19.2
10.24 m2
10.24
87.04 m2
76.8
10.24
1 nos
1
27.6 m2
13.35
14.25
99.3 m2
62.3
28
0 Inc. (6,7)
0 Inc. (8)
0 Inc. (8)
9
167.7 m2
62.3
28
34.2
19.2
15
9
27.6 m2
13.35
14.25
195.3 m2
167.7
27.6
1 nos
1
20 m2
20
54 m2
0 Inc. (2)
24
30
0 exterior
128 m2
0
24
30
74
20 m2
20
148 m2
128
20
1 nos
1
1 nos
1
43.465 m2
26.445
17.02
37.25 m2
15.05
0 Inc. (10)
0 Inc. (4,6,8)
0 exterior
22.2
0 Inc. (1,2,10)
276.95 m2
15.05
14.7
96
55.2
22.2
73.8
43.465 m2
26.445
17.02
320.415 m2
276.95
43.465
1 nos
1
1 nos
1
114 m2
114
201 m2
72
0 exterior
72
57
376.75 m2
72
175.75
72
57
114 m2
114
490.75 m2
376.75
114
2 nos
1
1
2 nos
2
0 nos
0
258 m2
258
427.5 m2
84
0 exterior
108
15.6
0 Inc. (12)
72
15.6
132.3
1108.45 m2
84
397.75
216
31.2
72
144
31.2
132.3
258 m2
258
0
1366.45 m2
1108.45
258
3 nos
3
2
66 m2
66
105 m2
0 Inc. (12)
0 exterior
72
33
278.75 m2
72
101.75
72
33
66 m2
66
344.75 m2
278.75
66
2 nos
1
1
1 nos
1
270 m2
270
213 m2
108
0 Inc. (12,14)
0 exterior
105
411 m2
0
90
216
105
0 m2
0
411 m2
411
0
2 nos
1
1
2 nos
1
1
20.4 m2
20.4
20.4 m2
20.4
118.4 m2
47.6
0 Inc. (17)
40.8
24
6
142.4 m2
47.6
0
40.8
48
6
20.4 m2
20.4
82.12 m2
61.72
20.4
80.68 m2
22.44
9.9
22.44
16
9.9
1 nos
1
0 nos
0
3 nos
3
24.9 m2
4.5
20.4
24.9 m2
4.5
20.4
119.3 m2
10.5
0 Inc. (16)
42
40.8
8
18
0 Inc. (16)
177.1 m2
10.5
31.8
42
40.8
16
18
18
24.9 m2
4.5
20.4
101.52 m2
76.62
24.9
100.48 m2
4.95
17.49
19.8
22.44
16
9.9
9.9
1 nos
1
3 nos
3
61.2 m2
61.2
117 m2
0 Inc. (17)
63
0 exterior
54
239.4 m2
40.8
63
81.6
54
61.2 m2
61.2
300.6 m2
239.4
61.2
1 nos
1
1 nos
1
198 m2
198
197.4 m2
92.4
0 Inc. (16,17,18)
0 exterior
105
445.8 m2
92.4
90
158.4
105
198 m2
198
643.8 m2
445.8
198
2 nos
1
1
2 nos
2
125 m2
125
212.5 m2
90
87.5
35
0 Inc. (1)
0 exterior
473.75 m2
90
87.5
35
30
231.25
125 m2
125
598.75 m2
473.75
125
3 nos
2
1
1 nos
1
56 m2
56
198 m2
126
36
36
0 Inc. (20)
0 exterior
954 m2
126
36
36
90
666
56 m2
56
1010 m2
954
56
1 nos
1
0 nos
0
24 m2
24
144 m2
54
36
54
0 Inc. (21)
180 m2
54
36
54
36
24 m2
24
204 m2
180
24
1 nos
1
290 m2
290
310.5 m2
180
130.5
0 Inc. (21,22)
0 exterior
758.75 m2
180
130.5
180
268.25
758.75 m2
758.75
2 nos
1
1
1
1 nos
1
10 m2
10
0 m2
0 Inc. (10)
0 Inc. (11)
0 exterior
0 exterior
133.25 m2
15
24
46.25
48
10 m2
10
143.25 m2
133.25
10
1 nos
1
90 m2
90
0 m2
0
0 Inc. (15)
0 Inc. (17,18)
0 exterior
327 m2
105
42
180
327 m2
327
2 nos
1
1
1312 m2
1312
768 m2
0 exterior
0 exterior
48
720
0 exterior
2991.4 m2
1920
151.7
48
720
151.7
2991.4 m2
2991.4
5 nos
3
1
1
34 nos
2
3
13
16
6830.5 m2
2590
959.2
1320
125
81.4
1754.9
0 m2
0 Inc. (26)
0 Inc. (26)
0 exterior
0 Inc. (13)
0 Inc. (19)
0 Inc. (13)
0 Inc. (15,19)
0 Inc. (22)
0 Inc. (20)
0 Inc. (9)
0 exterior
0 Inc. (22,23)
0 Inc. (20)
0 Inc. (2)
0 Inc. (3,5,7,9)
2949.4 m2
48
576
0
152.6
105
84
308
90
35
77
1056
166.5
112
87.5
51.8
2949.4 m2
2949.4
7 nos
2
1
1
3
26 nos
2
1
1
6
16
24 m2
24
124.8 m2
48
8
4.8
48
8
8
249.6 m2
96
16
9.6
96
16
16
24 m2
24
273.6 m2
249.6
24
4 nos
2
1
1
3b.3.(2).3. ARCHITECTURAL WORK
3b.3.(2).3. FLOORING WORK
3b.3.(2).3. Exterior Finishing Work
3b.3.(2).3. Supply and install homogenous/ceramic tile, laid on screed bedded and jointed in instant cement ex. Mortar Utam
a F1A, HT 6 120 m2 485500 58260000
3b.3.(2).3. Sundries
a F11, Aspha 0 m2 259200 0
TOTAL Flooring- Exter 58260000
3b.3.(2).3. Interior Finishing Work
3b.3.(2).3. Waterproofing coating system as specified, applied strictly in accordance with the manufacturer's instruction, all a
a Toilet floo 135 m2 171100 23098500
3b.3.(2).3. Supply and install homogenous/ceramic tile, laid on screed bedded and jointed in instant cement ex. Mortar Utam
a F1, HT 60 255 m2 485500 1.24E+08
b F2, HT 40 232 m2 375700 87162400
c F3, CT 20 235 m2 258600 60771000
3b.3.(2).3. Floor Hardener Non-metalic 3 kg/m2 complete including cement mortar screeding and 50mm thick topping conc
a F8 74 m2 32900 2434600
3b.3.(2).3. Sundries
a Flued Appl 53 m2 98700 5231100
b F11, Aspha 135 m2 171100 23098500
c F13, Carpet 723 m2 592100 4.28E+08
TOTAL Flooring- Inter 7.54E+08
3b.3.(2).3. WALLING WORK
3b.3.(2).3. Exterior Finishing Work
3b.3.(2).3. Block wall in dry mix mortar system, complete with reinforcement, lintels, stiffeners, anchorage, latching and acce
a 200mm thi 1216 m2 372400 4.53E+08
3b.3.(2).3. Plaster trowelled smooth in dry mix mortar system as described
a General 1216 m2 63200 76851200
3b.3.(2).3. Supply and install homogenous/ceramic tile, laid on screed bedded and jointed in instant cement ex. Mortar Utam
Note: 3.2 m height from floor level
a External wal 171 m2 277000 47367000
TOTAL Walling- Exter 5.77E+08
3b.3.(2).3. Interior Finishing Work
3b.3.(2).3. Block wall in dry mix mortar system, complete with reinforcement, lintels, stiffeners, anchorage, latching and acce
a 200mm thi 1393 m2 372400 5.19E+08
b 100mm thi 0 m2 0 0
c Gypsum bo 713 m2 263200 1.88E+08
3b.3.(2).3. Plaster trowelled smooth in dry mix mortar system as described
a General 1393 m2 63200 88037600
3b.3.(2).3. Supply and install homogenous/ceramic tile, laid on screed bedded and jointed in instant cement ex. Mortar Utam
Note: 3.2 m height from floor level
a W4, CT 20 383 m2 277000 1.06E+08
TOTAL Walling- Interi 9.01E+08
3b.3.(2).3. CEILING WORK
3b.3.(2).3. Supply and install suspended ceiling framing with metal furring and C channel fixed to concrete soffit consist with
a Gypsum bo 1034 m2 263200 2.72E+08
b Silicate C 163 m2 204300 33300900
c Cement pla 189 m2 38100 7200900
TOTAL Ceiling Work - 3.13E+08
3b.3.(2).3. DOORS AND WINDOWS
3b.3.(2).3. Supply assemble, set and install steel doors and frames finish duco, install complete including ironmongery and al
a : SD-1, ove 6 No 10788000 64728000
b : SD-1, ove 3 No 10788000 32364000
c : SD-1, ove 3 No 10788000 32364000
e : SD-1, ove 3 No 10788000 32364000
f : SD-1, ove 29 No 13813800 4.01E+08
g : SD-1, ove 1 No 13813800 13813800
h : SD-2, ove 6 No 13813800 82882800
i : SD-3, ove 6 No 13813800 82882800
j : SD-5, ove 4 No 13813800 55255200
k : SD-5, ove 1 No 13813800 13813800
l : SD-5, ove 4 No 13813800 55255200
m : SD-5, ove 2 No 26048900 52097800
n : SD-5, ove 1 No 26048900 26048900
o : SD-5, ove 1 No 26048900 26048900
p : SD-5, ove 1 No 28153900 28153900
q : SD-6, ove 1 No 26048900 26048900
r : SD-6, ove 2 No 26048900 52097800
3b.3.(2).3. Supply assemble, set and install glass door and window, 12mm thick tempered clear glass with aluminum frame p
GL-1, doub 1 No 24996400 24996400
3b.3.(2).3. Supply assemble, set and install glass window, 8mm thick clear glass with aluminum extruded frame in powder co
a W1, overal 2 No 29932600 59865200
b W6, 1800 6 No 9093500 54561000
c W4, overal 8 No 8525100 68200800
d W5, overal 9 No 8525100 76725900
e W11, overa 16 No 12787700 2.05E+08
f W16, overa 3 No 21312800 63938400
TOTAL Doors & Windo 1.63E+09
3b.3.(2).3. PAINTING WORKS
3b.3.(2).3. Prepare and apply syntetic resin emulsion paint finish, all as described to:
a Wall and c 2702 m2 63200 1.71E+08
b Gypsum and 1197 m2 63200 75650400
c Exposed co 189 m2 63200 11944800
TOTAL Painting Work 2.58E+08
3b.3.(2).3. MISCELLANEOUS WORK
3b.3.(2).3. Exterior Finishing Work
3b.3.(2).3. Canopy
a Steel Canop 17 m2 1578800 26839600
3b.3.(2).3. Roof
a gutter 98.5 m 568400 55987400
nt cement ex. Mortar Utama or equal, pointed in coloured grouting ex. AM or equal as described to:
nt cement ex. Mortar Utama or equal, pointed in coloured grouting ex. AM or equal as described to:
nt cement ex. Mortar Utama or equal, pointed in coloured grouting ex. AM or equal as described to:
oncrete soffit consist with 5 mm diameter galvanized steel including wall trim, fixed with scrimped and flush joint, including forming holes
luding ironmongery and all fixing accessories, all the exposed frame to primed with approved primer, grouting the frames in water proofin
ass with aluminum frame powder coating finish, installed complete with ironmongeries, gasket, seal, fitting and all necessary fixing accesso
truded frame in powder coating finish, installed complete with ironmongeries, gasket, seal, fitting and all necessary fixing accessories; al a
ccessories as indicated on drawing and spesification.
acking, install complete including sealant and all necessary fixing acessories as described;
nstall complete including pedestal, ironmongery, door stopper with hook and all necessary fixing accessories as the manufacturer's instruc
nt, including forming holes and additional framing for ME fitting, all as described;
he frames in water proofing cement mortar, protecting frames and cleaning on completion, all as described;
PRELIMINARIES
General Notes :
1 This Bill is to be rea Note Note
2 The words "as describ Note Note
3 Notwithstanding anythNote Note
4 Access to and egress f Note Note
5 The Contractor shall c Note Note
6 The Contractor shall s Note Note
7 The Contractor shall alNote Note
8 The Contractor shall bNote Note
9 The Contractor shall bNote Note
10 In the event of the Co Note Note
11 In the event of pipes, Note Note
12 The Contractor shall bNote Note
13 The Contractor shall a Note Note
14 The Contractor shall a Note Note
15 The Contractor shall a Note Note
16 The Contractor shall a Note Note
17 The Contarctor shall a Note Note
3b.3.(5).3. EARTH WORK
3b.3.(5).3. Site Clearance etc.
a Allow for c 1 Item Include 1 Item
b Allow for r 1 Item Include 1 Item
3b.3.(5).3. Excavation commencing from existing level including disPlease check the ref. drawing
Excavate f 0 m3 0 0 0 m3 0
TOTAL Earth Work - 0 TOTAL Earth Work -
3b.3.(5).3. STEEL WORKS
3b.3.(5).3. Stripping heads of precast reinforced concrete piles to the required cut off level including disposal of debris and fo
Bored pile 64 No 0 0 64 No 0
Ditto; dia 65 No 0 0 65 No 0
3b.3.(5).3. Sand bedding, as described
a Sand bed la 0 m2 0 0 Please chec 0 m2 0
3b.3.(5).3. Lean concrete, as described
a Blinding la 4662 m2 0 0 4662 m2 0
3b.3.(5).3. Vibrated Reinforced concrete fc' 24 N/mm2
a Pile Cap 1698 m3 0 0 1698 m3 0
b Drop Panel 1239 m3 0 0 1239 m3 0
c Slab 1553.088 m3 0 0 1553.088 m3 0
d Ground be 571 m3 0 0 571 m3 0
e Ceiling sla 112 m3 0 0 112 m3 0
f Corbel 5.4 m3 0 0 5.4 m3 0
Column
3b.3.(5).3. Bar reinforcement; deformed high tensile steel BJTD 40
a General rei 153751 kg 0 0 153751 kg 0
b Ditto; in d 123845 kg 0 0 123845 kg 0
c Ditto; in sl 155308.8 kg 0 0 155308.8 kg 0
d Ditto; in 125453 kg 0 0 125453 kg 0
e Ditto; in ce 11200 kg 0 0 11200 kg 0
f Corbel 675 kg 0 0 675 kg 0
Column
3b.3.(5).3. Fair face finish formwork
a Side of pil 1300 m2 0 0 1300 m2 0
b Side of dro 429 m2 0 0 429 m2 0
c Side of sla 239.52 m2 0 0 239.52 m2 0
d Side of gr 463 m2 0 0 463 m2 0
e Side of ceil 56 m2 0 0 56 m2 0
f Corbel 29.64984 m2 0 0 29.64984 m2 0
Column
3b.3.(5).3. Supply and install structural steel frame works, fixed to the existing concrete and/or to steel coulmn and beams; in
a SRC - HB 3 145870 kg 0 145870 kg 0
b ST1 - WF 2 10453 kg 0 0 10453 kg 0
c ST2 - HB 2 85593 kg 0 0 85593 kg 0
d ST3 - HB 8 37800 kg 0 0 37800 kg 0
e ST4 - UNP 14630 kg 0 0 14630 kg 0
f ST5 - C 15 11294 kg 0 0 11294 kg 0
g ST6 - HB 1 8729 kg 0 0 8729 kg 0
h ST7 - WF 1 4200 kg 0 0 4200 kg 0
i SB1 - HB 5 37632 kg 0 0 37632 kg 0
j Base Palte 1126 kg 0 0 1126 kg 0
k Plate & Bol 22924 kg 0 22924 kg 0
l M25 Anchor 366 No 0 0 366 No 0
Additional 79000 kg 0 0 79000 kg 0
# Paint Finis 459251 kg 0 0 0 kg 0
# Sandblast, 11545 m2 0 m2
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
0 0 m3 0 0 0
0 TOTAL Earth Work - 0
ng disposal of debris and for any cleaning, straightening and bending of projecting reinforcement
0 0 No 0 0 64 72 8 0.111111
0 0 No 0 0 65 57 -8 -0.140351
0 0 m2 0 0 0
0 0 m2 0 0 4662 -4662 #DIV/0!
steel coulmn and beams; including all labour, materials and plant in fabricati 380251 459251 79000 0.172019
0 0 kg 0 0 145870 -145870 #DIV/0!
0 0 kg 0 0 10453 -10453 #DIV/0!
0 0 kg 0 0 85593 -85593 #DIV/0!
0 0 kg 0 0 37800 -37800 #DIV/0!
0 0 kg 0 0 14630 -14630 #DIV/0!
0 0 kg 0 0 11294 -11294 #DIV/0!
0 0 kg 0 0 8729 -8729 #DIV/0!
0 0 kg 0 0 4200 -4200 #DIV/0!
0 0 kg 0 0 37632 37632 0 0
0 0 kg 0 0 1126 1126 0 0
0 0 kg 0 0 22924 22924 0 0
0 0 No 0 0 366 0 -366 #DIV/0!
0 0 kg 0 0 79000 0 -79000 #DIV/0!
0 kg kg #VALUE! #VALUE! 459251 0 -459251 #DIV/0!
0 0 11545
0 11545 m2 #VALUE! #VALUE! 11545
0 11545 m2 #VALUE! #VALUE! 11545
0 11545 m2 #VALUE! #VALUE! 11545
0 11545 m2 #VALUE! #VALUE! 11545
0 TOTAL Steel Work - #VALUE!
0 -76 m2 0 0 76
0 -7085 m2 0 0 7085
mes and all necessary fixing accessories as described to:-
0 0 m2 0 0 3616
0 -7634 m2 0 0 7634
nt cement ex. Mortar Utama or equal, pointed in coloured grouting ex. AM or equal as described to:
0 -302 m2 0 0 302
oncrete soffit consist with 5 mm diameter galvanized steel including wall trim, fixed with scrimped and flush joint, including forming holes
0 -332 m2 0 0 332
0 -150 m2 0 0 150
0 -482 m2 0 0 482
ling mechine and rolling box, fitting and all necessary fixing accessories; all as described:
0 -1 No 0 0 6
luding ironmongery and all fixing accessories, all the exposed frame to primed with approved primer, grouting the frames in water proofin
0 14 No 0 0 7
0 6 No 0 0 4
0 -7 No 0 0 7
0 9 No 0 0 11
0 2 No 0 0 11
truded frame in powder coating finish, installed complete with ironmongeries, gasket, seal, fitting and all necessary fixing accessories; al a
0 -1 No 0 0 1
0 -1 No 0 0 1
0 -1 No 0 0 1
0 -1 No 0 0 1
0 -1 No 0 0 1
0 -1 No 0 0 1
0 -1 No 0 0 1
0 -19 No 0 0 19
0 -1 No 0 0 1
0 -1 No 0 0 1
0 -4 No 0 0 4
0 -28 No 0 0 28
0 -4 No 0 0 4
0 4 No 0 0 4
0 30 No 0 0 4
0 1 No 0 0 4
0 4 No 0 0 4
0 1 No 0 0 4
0 1 No 0 0 4
0 5 No 0 0 4
0 1 No 0 0 4
0 1 No 0 0 4
0 2 No 0 0 4
0 2 No 0 0 4
0 3 No 0 0 4
0 19 No 0 0 4
0 -19 No 0 0 19
0 -4 No 0 0 4
0 -4 No 0 0 4
0 -1 No 0 0 1
0 -1 No 0 0 1
0 -1 No 0 0 1
0 -1 No 0 0 1
n and beams; including all labour, materials and plant in fabricating, assembling and erecting with welded and bolted shop and site connec
0 0 m2 0 0 4103 3942 -161 -0.040842
0 0 m2 0 0 260 312 52 0.166667
0 0m 0 0 262 312 50 0.160256
0 0 No 0 0 25 25 0 0
0 0 No 0 0 2 2 0 0
nstall complete including pedestal, ironmongery, door stopper with hook and all necessary fixing accessories as the manufacturer's instruc
0 -1 No 0 0 1
0 -1 No 0 0 9
0 -1 No 0 0 1
0 -2 No 0 0 14
acking, install complete including sealant and all necessary fixing acessories as described;
0 0 No 0 0 1
0 0 No 0 0 1
0 0 No 0 0 1
0 0 No 0 0 1
0 0 No 0 0 1
0 0 No 0 0 1
0 0 No 0 0 1
0 0 No 0 0 1
0 0 No 0 0 1
0 0 No 0 0 1
0 0 No 0 0 1
0 0 No 0 0 1
ccessories as indicated on drawing and spesification.
0 0 No 0 0 11
0 0 No 0 0 8
0 0 No 0 0 6
0 0 No 0 0 5
0 0 No 0 0 11
0 0 No 0 0 31
0 0 No 0 0 14
0 1 no 0 0
0 3 No 0 0
0 10 No 0 0 1
0 3 No 0 0 1
0 1 No 0 0 1
0 1 No 0 0 1
0 1 No 0 0 1
0 1 No 0 0 1
0 2 No 0 0 1
0 TOTAL Architectural 0
0
Note Note
Note Note
Note Note
Note Note
Note Note
Note Note
Note Note
Note Note
Note Note
Note Note
Note Note
Note Note
Note Note
Note Note
Note Note
Note Note
Note Note
No 0 64 No 0 0 0
No 0 65 No 0 0 0
0 0
m2 0 Please chec 0 m2 0 0 0
0 0
m2 0 4662 m2 0 0 0
0 0
m3 0 1698 m3 0 0 0
m3 0 0 1239 m3 0 0 0
m3 0 0 1553.088 m3 0 0 0
m3 0 0 571 m3 0 0 0
m3 0 0 112 m3 0 0 0
m3 0 0 5.4 m3 0 0 0
0 0
0 0
kg 0 153751 kg 0 0 0
kg 0 0 123845 kg 0 0 0
kg 0 0 155308.8 kg 0 0 0
kg 0 0 125453 kg 0 0 0
kg 0 0 11200 kg 0 0 0
kg 0 0 675 kg 0 0 0
0 0
0 0
m2 0 1300 m2 0 0 0
m2 0 0 429 m2 0 0 0
m2 0 0 239.52 m2 0 0 0
m2 0 0 463 m2 0 0 0
m2 0 0 56 m2 0 0 0
m2 0 0 29.64984 m2 0 0 0
0 0
380251 0 0
kg 0 145870 kg 0 0 0
kg 0 0 10453 kg 0 0 0
kg 0 0 85593 kg 0 0 0
kg 0 0 37800 kg 0 0 0
kg 0 0 14630 kg 0 0 0
kg 0 0 11294 kg 0 0 0
kg 0 0 8729 kg 0 0 0
kg 0 0 4200 kg 0 0 0
kg 0 0 37632 kg 0 0 0
kg 0 0 1126 kg 0 0 0
kg 0 22924 kg 0 0 0
No 0 366 No 0 0 0
kg 0 0 0 kg 0 0 79000
kg 0 0 kg 0 0
m2 0 m2 0
m2 0 m2 0
m2 0 m2 0
m2 0 m2 0
m2 0 m2 0
TOTAL Steel Work - 0 TOTAL Steel Work - 0
m2 0 114 m2 0 0 0
0 0 0
m2 0 4424.16 m2 0 0 569.16
0 0 0 0
m2 0 0 m2 0 0 -169
m2 0 0 m2 0 0 -114
0 0 0 0
m2 20000 1520000 0 m2 20000 0 -76
0 0 0 0
0 0 0 0
m2 0 0 m2 0 0 -3543
0 0 0 0
m2 0 Please chec 0 m2 0 0 0
0 0 0 0
m2 0 0 m2 0 0 -7085
0 0 0 0
m2 0 3616 m2 0 0 0
0 0 0 0
m2 0 0 m2 0 0 -7634
0 0 0 0
m2 0 0 0 m2 0 0 -302
0 0 0 0
nt, including forming holes and additional framing for ME fi 0 0 0 0
m2 0 0 m2 0 0 -332
m2 0 0 m2 0 0 -150
0 0 0 0
m2 0 0 0 m2 0 0 -482
0 0 0 0
0 0 0 0
No 61965000 3.72E+08 5 No 61965000 3.1E+08 -1
he frames in water proofing cement mortar, protecting f 0 0 0 0
No 0 21 No 0 0 14
No 0 0 10 No 0 0 6
No 0 0 No 0 0 -7
No 0 20 No 0 0 9
No 0 0 2 No 0 0 2
sary fixing accessories; al as described: 0 0 0 0
No 3168000 3168000 0 No 3168000 0 -1
No 3024000 3024000 0 No 3024000 0 -1
No 2736000 2736000 0 No 2736000 0 -1
No 2988000 2988000 0 No 2988000 0 -1
No 8928000 8928000 0 No 8928000 0 -1
No 8496000 8496000 0 No 8496000 0 -1
No 2880000 2880000 0 No 2880000 0 -1
No 23760000 4.51E+08 0 No 23760000 0 -19
No 20160000 20160000 0 No 20160000 0 -1
No 13968000 13968000 0 No 13968000 0 -1
No 21600000 86400000 0 No 21600000 0 -4
No 32400000 9.07E+08 0 No 32400000 0 -28
No 30240000 1.21E+08 0 No 30240000 0 -4
No 31104000 1.24E+08 4 No 31104000 1.24E+08 4
No 39312000 1.57E+08 30 No 39312000 1.18E+09 30
No 1584000 6336000 1 No 1584000 1584000 1
No 3024000 12096000 4 No 3024000 12096000 4
No 4176000 16704000 1 No 4176000 4176000 1
No 5544000 22176000 1 No 5544000 5544000 1
No 23940000 95760000 5 No 23940000 1.2E+08 5
No 9408000 37632000 1 No 9408000 9408000 1
No 18228000 72912000 1 No 18228000 18228000 1
No 35868000 1.43E+08 2 No 35868000 71736000 2
No 41160000 1.65E+08 2 No 41160000 82320000 2
No 44394000 1.78E+08 3 No 44394000 1.33E+08 3
No 53508000 2.14E+08 19 No 53508000 1.02E+09 19
0 0 0
0 0 0
0 0 0 0
No 6750000 1.28E+08 0 No 6750000 0 -19
No 5617500 22470000 0 No 5617500 0 -4
No 5250000 21000000 0 No 5250000 0 -4
No 2325000 2325000 0 No 2325000 0 -1
No 2212500 2212500 0 No 2212500 0 -1
No 3487500 3487500 0 No 3487500 0 -1
No 750000 750000 0 No 750000 0 -1
0 0 0 0
0 0 0 0
olted shop and site connections, complete including zinc 0 0 0 0
m2 0 4103 m2 0 0 0
m2 0 260 m2 0 0 0
m 0 262 m 0 0 0
No 0 25 No 0 0 0
No 23250000 46500000 2 No 23250000 46500000 0
0 0 0 0
the manufacturer's instructions 0 0 0 0
No 7395000 7395000 0 No 7395000 0 -1
No 7995000 71955000 8 No 7995000 63960000 -1
No 2700000 2700000 0 No 2700000 0 -1
No 2400000 33600000 12 No 2400000 28800000 -2
0 0 0 0
No 1550000 1550000 1 No 1550000 1550000 0
No 1575000 1575000 1 No 1575000 1575000 0
No 1800000 1800000 1 No 1800000 1800000 0
No 2150000 2150000 1 No 2150000 2150000 0
0 0 0 0
No 3850000 3850000 1 No 3850000 3850000 0
No 4410000 4410000 1 No 4410000 4410000 0
No 5040000 5040000 1 No 5040000 5040000 0
No 2756250 2756250 1 No 2756250 2756250 0
0 0 0 0
No 1008000 1008000 1 No 1008000 1008000 0
No 966000 966000 1 No 966000 966000 0
No 1540000 1540000 1 No 1540000 1540000 0
No 655200 655200 1 No 655200 655200 0
0 0 0 0
No 6995000 76945000 11 No 6995000 76945000 0
No 3000000 24000000 8 No 3000000 24000000 0
No 0 6 No 0 0 0
No 1200000 6000000 5 No 1200000 6000000 0
No 0 11 No 0 0 0
No 421000 13051000 31 No 421000 13051000 0
No 0 14 No 0 0 0
0 0 0 0 0
3900000 1 no 3900000 3900000 1
3 No 0 0 3
0 0 0 0
No 1200000 1200000 10 No 1200000 12000000 10
No 2760000 2760000 3 No 2760000 8280000 3
No 4620000 4620000 1 No 4620000 4620000 1
No 6600000 6600000 1 No 6600000 6600000 1
No 71400000 71400000 1 No 71400000 71400000 1
No 67200000 67200000 1 No 67200000 67200000 1
No 33600000 33600000 2 No 33600000 67200000 2
0 0 0
0 0
0 0
0
TOTAL Architectural 3.74E+09 TOTAL Architectural 3.62E+09
3.74E+09 3.62E+09
0
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Item Include
Item Include
m3 0
TOTAL Earth Work - 0
No 0 0
No 0 0
0 0 0
m2 0 0
0 0 0
m2 0 0
0 0 0
m3 0 0
m3 0 0
m3 0 0
m3 0 0
m3 0 0
m3 0 0
0 0 0
0 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
0 0 0
0 0 0
m2 0 0
m2 0 0
m2 0 0
m2 0 0
m2 0 0
m2 0 0
0 0 0
0 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
No 0 0
kg 0 0
kg 0
m2 0
m2 0
m2 0
m2 0
m2 0
TOTAL Steel Work - 0
m2 0 0
0 0 0
m2 0 0 #DIV/0!
0 0 0 #DIV/0!
m2 0 0 #DIV/0!
m2 0 0 #DIV/0!
0 0 0 #DIV/0!
m2 20000 -1520000 0
0 0 0 #DIV/0!
0 0 0 #DIV/0!
m2 0 0 #DIV/0!
0 0 0 #DIV/0!
m2 0 0 #DIV/0!
0 0 0 #DIV/0!
m2 0 0 #DIV/0!
0 0 0 #DIV/0!
m2 0 0 #DIV/0!
0 0 0 #DIV/0!
m2 0 0 #DIV/0!
0 0 0 #DIV/0!
m2 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
m2 0 0 #DIV/0!
m2 0 0 #DIV/0!
0 0 0 #DIV/0!
m2 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
No 61965000 -61965000 0
0 0 0 #DIV/0!
No 0 0 #DIV/0!
No 0 0 #DIV/0!
No 0 0 #DIV/0!
No 0 0 #DIV/0!
No 0 0 #DIV/0!
0 0 0 #DIV/0!
No 3168000 -3168000 0
No 3024000 -3024000 0
No 2736000 -2736000 0
No 2988000 -2988000 0
No 8928000 -8928000 0
No 8496000 -8496000 0
No 2880000 -2880000 0
No 23760000 -4.51E+08 0
No 20160000 -2E+07 0
No 13968000 -13968000 0
No 21600000 -86400000 0
No 32400000 -9.07E+08 0
No 30240000 -1.21E+08 0
No 31104000 1.24E+08 0
No 39312000 1.18E+09 0
No 1584000 1584000 0
No 3024000 12096000 0
No 4176000 4176000 0
No 5544000 5544000 0
No 23940000 1.2E+08 0
No 9408000 9408000 0
No 18228000 18228000 0
No 35868000 71736000 0
No 41160000 82320000 0
No 44394000 1.33E+08 0
No 53508000 1.02E+09 0
0 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
No 6750000 -1.28E+08 0
No 5617500 -22470000 0
No 5250000 -21000000 0
No 2325000 -2325000 0
No 2212500 -2212500 0
No 3487500 -3487500 0
No 750000 -750000 0
0 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
m2 0 0 #DIV/0!
m2 0 0 #DIV/0!
m 0 0 #DIV/0!
No 0 0 #DIV/0!
No 23250000 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
No 7395000 -7395000 0
No 7995000 -7995000 0
No 2700000 -2700000 0
No 2400000 -4800000 0
0 0 0 #DIV/0!
No 1550000 0 #DIV/0!
No 1575000 0 #DIV/0!
No 1800000 0 #DIV/0!
No 2150000 0 #DIV/0!
0 0 0 #DIV/0!
No 3850000 0 #DIV/0!
No 4410000 0 #DIV/0!
No 5040000 0 #DIV/0!
No 2756250 0 #DIV/0!
0 0 0 #DIV/0!
No 1008000 0 #DIV/0!
No 966000 0 #DIV/0!
No 1540000 0 #DIV/0!
No 655200 0 #DIV/0!
0 0 0 #DIV/0!
No 6995000 0 #DIV/0!
No 3000000 0 #DIV/0!
No 0 0 #DIV/0!
No 1200000 0 #DIV/0!
No 0 0 #DIV/0!
No 421000 0 #DIV/0!
No 0 0 #DIV/0!
0 0 0 #DIV/0!
no 3900000 3900000 0
No 0 0 #DIV/0!
0 0 0 #DIV/0!
No 1200000 12000000 0
No 2760000 8280000 0
No 4620000 4620000 0
No 6600000 6600000 0
No 71400000 71400000 0
No 67200000 67200000 0
No 33600000 67200000 0
0 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
0 0 0 #DIV/0!
TOTAL Arch 0 1.12E+09 0
1.12E+09
JAKARTA MASS RAPID TRANSIT PROJECT
WIKA-TOKYU JOINT OPERATION
STRUCTURE & ARCHITECTURAL WORKS
BILL OF QUANTITY
PRELIMINARIES
General Notes :
1 This Bill is to be rea Note
2 The words "as describ Note
3 Notwithstanding anythNote
4 Access to and egress f Note
5 The Contractor shall c Note
6 The Contractor shall s Note
7 The Contractor shall alNote
8 The Contractor shall bNote
9 The Contractor shall bNote
10 In the event of the Co Note
11 In the event of pipes, Note
12 The Contractor shall bNote
13 The Contractor shall a Note
14 The Contractor shall a Note
15 The Contractor shall a Note
16 The Contractor shall a Note
17 The Contarctor shall a Note
3b.3.(07).1Site Clearance etc.
a Allow for c 1 Item Include 1
b Allow for r 1 Item Include 1
c Well compa 41.61 m2 0 0 41.61 42
3b.3.(07).1Sand bedding, as described
a Sand bed la 0 m2 0 0 Please check the ref. 0
3b.3.(07).1Lean concrete, as described
a Blinding la 0 m2 0 0 0
3b.3.(07).1Vibrated Reinforced concrete fc' 24 N/mm2
a Slab, drop 18.12 m3 0 0 18.12
Column 1.53125
3b.3.(07).1Bar reinforcement; deformed high tensile steel BJTD 40
a General rei 2284 kg 0 0 2284
Column 306.25
3b.3.(07).1Fair face finish formwork
a Side of sl 59 m2 0 0 59
Column 24.5
3b.3.(07).1Supply and install structural steel frame works, fixed to the existing concrete and/or to steel coulmn and beams; in
a B4 WF 200 253.79 kg 0 253.79 277.3333
b Purlin CN 243.72 kg 0 0 243.72 121.86
c Base plat 34 kg 0 0 34 31.93547
d Plate 6mm 16 kg 0 0 16 15.96773
e Bolt M16 48 No 0 0 48 48
f Bolt M12 48 No 0 0 48 48
# Paint Finis 547.51 kg 0 0 547.51 0
# Sandblast, 7.6137 m2
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
0 #DIV/0! m2 0
-18.12 #DIV/0! m3 0
1.53125 1
-2284 #DIV/0! kg 0
-59 #DIV/0! m2 0
24.5 1
steel coulmn and beams; including all labour, materials and plant in fabricating, assembling and erecting with welded and bolted shop and
23.54333 0.084892 kg 0
-121.86 -1 kg 0 0
-2.064533 -0.064647 kg 0 0
-0.032267 -0.002021 kg 0 0
0 0 No 13200 633600
0 0 No 11000 528000
-547.51 #DIV/0! kg 0
7.6137 m2 0
m2 0
m2 0
m2 0
m2 0
m2 0
Mortar Utama or equal, pointed in coloured grouting ex. AM or equal as described to:
m2 0 0
m2 0
luding ironmongery and all fixing accessories, all the exposed frame to primed with approved primer, grouting the frames in water proofin
No 0 10500000 10500003
truded frame in powder coating finish, installed complete with ironmongeries, gasket, seal, fitting and all necessary fixing accessories; al a
No 1452000 2904000
No 12408000 12408000
No 3168000 3168000
No 792000 792000
oncrete soffit consist with 5 mm diameter galvanized steel including wall trim, fixed with scrimped and flush joint, including forming holes
m2 0
m2 0
m2 0
n and beams; including all labour, materials and plant in fabricating, assembling and erecting with welded and bolted shop and site connec
m2 0
m 0
No 2000000 2000000
No 3960000 3960000
No 900000 6300000
No 0
No 0
No 0
TOTAL : 32964065
elded and bolted shop and site connections, complete including zinc cromate priming, as described to:-
he frames in water proofing cement mortar, protecting frames and cleaning on completion, all as described;
nt, including forming holes and additional framing for ME fitting, all as described;
olted shop and site connections, complete including zinc cromate priming, as described to:-
JAKARTA MASS RAPID TRANSIT PROJECT
WIKA-TOKYU JOINT OPERATION
STRUCTURE & ARCHITECTURAL WORKS
BILL OF QUANTITY
PRELIMINARIES
General Notes :
1 This Bill is to be rea Note
2 The words "as describ Note
3 Notwithstanding anythNote
4 Access to and egress f Note
5 The Contractor shall c Note
6 The Contractor shall s Note
7 The Contractor shall alNote
8 The Contractor shall bNote
9 The Contractor shall bNote
10 In the event of the Co Note
11 In the event of pipes, Note
12 The Contractor shall bNote
13 The Contractor shall a Note
14 The Contractor shall a Note
15 The Contractor shall a Note
16 The Contractor shall a Note
17 The Contarctor shall a Note
3b.3.(10).1Site Clearance etc.
a Allow for c 1 Item Include 1
b Allow for r 1 Item Include 1
c Well compa 319.28 m2 0 0 319.28 319.28
3b.3.(10).1Sand bedding, as described
a Sand bed la 144 m2 0 0 Please check the ref. 144
3b.3.(10).1Lean concrete, as described
a Blinding la 144 m2 0 0 144
3b.3.(10).1Vibrated Reinforced concrete fc' 24 N/mm2
a Slab, drop 129 m3 0 0 129 98.304
b Pedestal 5 6 no 0 0 6 6
3b.3.(10).1Bar reinforcement; deformed high tensile steel BJTD 40
a General rei 12814 kg 0 0 12814 12779.52
3b.3.(10).1Fair face finish formwork
a Side of sl 20 m2 0 0 20 35.1208
3b.3.(10).1Supply and install structural steel frame works, fixed to the existing concrete and/or to steel coulmn and beams; in
a Column H 2302.32 kg 0 2302.32 2476.65
b ST1 WF 40 1980.9 kg 0 0 1980.9 1980
c ST2 WF 20 0 kg 0 0 0 0
d ST3 WF 25 1650.63 kg 0 0 1650.63 1687.2
e ST4 WF 35 992 kg 0 0 992 992
f ST5 WF 30 1322 kg 0 0 1322 1321.2
g BR1 H 125 1754 kg 0 0 1754 1754.133
h Purlin CNP 804 kg 0 0 804 891
i Base plat 68 kg 0 0 68
j Plate 16m 66 kg 0 0 66
k Plate 12m 447 kg 0 0 447
l Plate 6mm 41.33 kg 0 0 41.33
m M32 Ancho 36 No 0 0 36
n M24 Bolt 128 No 0 0 128
o M22 Bolt 96 No 0 0 96
p M20 Bolt 24 No 0 0 24
q M16 Bolt 24 No 0 0 24
r M12 Bolt 180 No 0 0 180
s 30mm thick 1 m2 0 0 1
# Paint Finis 11428.18 kg 0 0 11428.18 0
# Sandblast, 228.5636 m2
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Item Include
Item Include
0 0 m2 0
-144 #DIV/0! m2 0
-30.696 -0.312256 m3 0
0 0 no 250000 1500000
-34.48 -0.002698 kg 0
15.1208 0.430537 m2 0
steel coulmn and beams; including all labour, materials and plant in fabricating, assembling and erecting with welded and bolted shop and
174.33 0.070389 kg 0
-0.9 -0.000455 kg 0 0
0 #DIV/0! kg 0 0
36.5696 0.021675 kg 0 0
0 0 kg 0 0
-0.8 -0.000606 kg 0 0
0.133333 7.601E-05 kg 0 0
87 0.097643 kg 0 0
-68 #DIV/0! kg 0 0
-66 #DIV/0! kg 0 0
-447 #DIV/0! kg 0 0
-41.33 #DIV/0! kg 0 0
-36 #DIV/0! No 125000 4500000
-128 #DIV/0! No 75000 9600000
-96 #DIV/0! No 40000 3840000
-24 #DIV/0! No 30500 732000
-24 #DIV/0! No 20100 482400
-180 #DIV/0! No 7100 1278000
-1 #DIV/0! m2 2964000 2964000
-11428.18 #DIV/0! kg 0
228.5636 m2 0
m2 0
m2 0
m2 0
m2 0
m2 0
m2 0
ling mechine and rolling box, fitting and all necessary fixing accessories; all as described:
No 90450000 1.81E+08
n and beams; including all labour, materials and plant in fabricating, assembling and erecting with welded and bolted shop and site connec
m2 0
m 0
m 0
TOTAL : 2.06E+08
elded and bolted shop and site connections, complete including zinc cromate priming, as described to:-
olted shop and site connections, complete including zinc cromate priming, as described to:-
JAKARTA MASS RAPID TRANSIT PROJECT
WIKA-TOKYU JOINT OPERATION
STRUCTURE & ARCHITECTURAL WORKS
BILL OF QUANTITY
PRELIMINARIES
General Notes :
1 This Bill is to be rea Note
2 The words "as describ Note
3 Notwithstanding anythNote
4 Access to and egress f Note
5 The Contractor shall c Note
6 The Contractor shall s Note
7 The Contractor shall alNote
8 The Contractor shall bNote
9 The Contractor shall bNote
10 In the event of the Co Note
11 In the event of pipes, Note
12 The Contractor shall bNote
13 The Contractor shall a Note
14 The Contractor shall a Note
15 The Contractor shall a Note
16 The Contractor shall a Note
17 The Contarctor shall a Note
3b.3.(11).1Site Clearance etc.
a Allow for c 1 Item Include 1
b Allow for r 1 Item Include 1
3b.3.(11).1Stripping heads of precast reinforced concrete piles to the required cut off level including disposal of debris and fo
a Spun piles 8 No. 0 0 8 12
3b.3.(11).1Sand bedding, as described
a Sand bed la 149 m2 0 0 149 149.04
3b.3.(11).1Lean concrete, as described
a Blinding la 149 m2 0 0 149 149.04
3b.3.(11).1Vibrated Reinforced concrete fc' 24 N/mm2
a Slab, drop 72.4025 m3 0 0 72.4025 75.816
3b.3.(11).1Bar reinforcement; deformed high tensile steel BJTD 40
a General rei 8505 kg 0 0 8505 3726
3b.3.(11).1Fair face finish formwork
a Side of sl 78.4 m2 0 0 78.4
3b.3.(11).1Supply and install structural steel frame works, fixed to the existing concrete and/or to steel coulmn and beams; in
a SC1 - HB2 2756.992 kg 0 2756.992
b ST1 - WF3 596 kg 0 0 596
c ST2- WF30 441 kg 0 0 441
d ST3 - WF2 888 kg 0 0 888
e Purlin CNP 447 kg 0 0 447
f Base Palte 91 kg 0 0 91
g Plate 16mm 76 kg 0 0 76
h Plate 12mm 23 kg 0 0 23
i M32 Anchor 32 No 0 0 32
j M22 Bolts 84 No 0 0 84
k M12 Bolts 96 No 0 0 96
l 30mm thick 1 m2 0 0 1
m Pedestal 8 No 0 0 8
n Metal roof 100 m2 0 0 100
o Metal Gutt 32 m 0 0 32
p Roof Vent 2 No 0 0 2
# Paint Finis 5318.992 kg 0 0 5318.992 0
# Sandblast, 106.3798 m2
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Item Include
Item Include
ng disposal of debris and for any cleaning, straightening and bending of projecting reinforcement
4 0.333333 No. 150000 1200000
0.04 0.000268 m2 0
0.04 0.000268 m2 0
3.4135 0.045023 m3 0
-4779 -1.282609 kg 0
-78.4 #DIV/0! m2 0
steel coulmn and beams; including all labour, materials and plant in fabricating, assembling and erecting with welded and bolted shop and
kg 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
No 0
No 0
No 0
m2 0
No 0
m2 0
m 0
No 0
-5318.992 #DIV/0! kg 0
106.3798 m2 0
m2 0
m2 0
m2 0
m2 0
m2 0
mes and all necessary fixing accessories as described to:-
m2 0
m2 0
ling mechine and rolling box, fitting and all necessary fixing accessories; all as described:
No 38535000 38535000
luding ironmongery and all fixing accessories, all the exposed frame to primed with approved primer, grouting the frames in water proofin
No 0
truded frame in powder coating finish, installed complete with ironmongeries, gasket, seal, fitting and all necessary fixing accessories; al a
No 33000000 66000000
TOTAL : 1.06E+08
elded and bolted shop and site connections, complete including zinc cromate priming, as described to:-
he frames in water proofing cement mortar, protecting frames and cleaning on completion, all as described;
sary fixing accessories; al as described:
JAKARTA MASS RAPID TRANSIT PROJECT
WIKA-TOKYU JOINT OPERATION
STRUCTURE & ARCHITECTURAL WORKS
BILL OF QUANTITY
PRELIMINARIES
General Notes :
1 This Bill is to be rea Note
2 The words "as describ Note
3 Notwithstanding anythNote
4 Access to and egress f Note
5 The Contractor shall c Note
6 The Contractor shall s Note
7 The Contractor shall alNote
8 The Contractor shall bNote
9 The Contractor shall bNote
10 In the event of the Co Note
11 In the event of pipes, Note
12 The Contractor shall bNote
13 The Contractor shall a Note
14 The Contractor shall a Note
15 The Contractor shall a Note
16 The Contractor shall a Note
17 The Contarctor shall a Note
3b.3.(15).1Site Clearance etc.
a Allow for c 1 Item Include 1
b Allow for r 1 Item Include 1
3b.3.(15).1Excavation commencing from existing level including dispose excavated soil off-site work
a Excavate f 90 m3 0 0 90
3b.3.(15).1Backfill with selected imported materials,consolidated, spread, levelled and well compacted (mechanically), as de
a Side of fo 54 m3 0 0 54
3b.3.(15).1Compacted Subgrade, as described
a Well compa 86 m2 0 0 86
3b.3.(15).1Lean concrete, as described
a Blinding la 86 m2 0 0 86
3b.3.(15).1Vibrated Reinforced concrete fc' 24 N/mm2
a Foot plate 35 m3 0 0 35
3b.3.(15).1Bar reinforcement; deformed high tensile steel BJTD 40
a General rei 9450 kg 0 0 9450
3b.3.(15).1Formwork
a Side of fo 306 m2 0 0 306
3b.3.(15).1Supply and install structural steel frame works, fixed to the existing concrete and/or to steel coulmn and beams; in
a SC-1 H-125 1250 kg 0 1250
b B1 WF-250 4050 kg 0 0 4050
c B2 UNP-20 483 kg 0 0 483
d Floor Jois 5752 kg 0 0 5752
e Floor supp 56 kg 0 0 56
f Base plat 590 kg 0 0 590
g End Plate 402 kg 0 0 402
h Plate 6mm 140 kg 0 0 140
i Anchor Bol 328 No 0 0 328
j M16 Bolts 304 No 0 0 304
k M12 Bolts 912 No 0 0 912
l 30mm thick 5 m2 0 0 5
m Railling 1 266 No 0 0 266
n Deck 536 m2 0 0 536
# Paint Finis 12723 kg 0 0 12723 0
# Sandblast, 254.46 m2
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Item Include
Item Include
m3 0
cted (mechanically), as described:
m3 0
m2 0
m2 0
m3 0
kg 0
m2 0
steel coulmn and beams; including all labour, materials and plant in fabricating, assembling and erecting with welded and bolted shop and
kg 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
No 0
No 0
No 0
m2 0
No 500000 1.33E+08
m2 1500000 8.04E+08
-12723 #DIV/0! kg 0
254.46 m2 0
m2 0
m2 0
m2 0
m2 0
TOTAL : 9.37E+08
elded and bolted shop and site connections, complete including zinc cromate priming, as described to:-
JAKARTA MASS RAPID TRANSIT PROJECT
WIKA-TOKYU JOINT OPERATION
STRUCTURE & ARCHITECTURAL WORKS
BILL OF QUANTITY
PRELIMINARIES
General Notes :
1 This Bill is to be rea Note
2 The words "as describ Note
3 Notwithstanding anythNote
4 Access to and egress f Note
5 The Contractor shall c Note
6 The Contractor shall s Note
7 The Contractor shall alNote
8 The Contractor shall bNote
9 The Contractor shall bNote
10 In the event of the Co Note
11 In the event of pipes, Note
12 The Contractor shall bNote
13 The Contractor shall a Note
14 The Contractor shall a Note
15 The Contractor shall a Note
16 The Contractor shall a Note
17 The Contarctor shall a Note
3b.3.(16).1Site Clearance etc.
a Allow for c 1 Item Include 1
b Allow for r 1 Item Include 1
3b.3.(15).1Excavation commencing from existing level including dispose excavated soil off-site work
a Excavate f 5 m3 0 0 5
3b.3.(15).1Backfill with selected imported materials,consolidated, spread, levelled and well compacted (mechanically), as de
a Side of fo 3 m3 0 0 3
3b.3.(15).1Compacted Subgrade, as described
a Well compa 5 m2 0 0 5
3b.3.(15).1Lean concrete, as described
a Blinding la 5 m2 0 0 5
3b.3.(15).1Vibrated Reinforced concrete fc' 24 N/mm2
a Foot plate 1.7 m3 0 0 1.7
3b.3.(15).1Bar reinforcement; deformed high tensile steel BJTD 40
a General rei 459 kg 0 0 459
3b.3.(15).1Formwork
a Side of fo 13.2 m2 0 0 13.2
3b.3.(16).1Supply and install structural steel frame works, fixed to the existing concrete and/or to steel coulmn and beams; in
a SC-1 H-15 110 kg 0 110
b B1 WF-250 97 kg 0 0 97
c B2 UNP-20 519 kg 0 0 519
d Floor supp 42 kg 0 0 42
e Base plat 42 kg 0 0 42
f End Plate 390 kg 0 0 390
g Anchor Bol 24 kg 0 0 24
h M-12 Bolts 32 No 0 0 32
k 30mm thick 1 No 0 0 1
l Railling 1 21 m2 0 0 21
m Deck 3.6 No 0 0 3.6
# Paint Finis 1224 kg 0 0 1224 0
# Sandblast, 24.48 m2
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Item Include
Item Include
m3 0
cted (mechanically), as described:
m3 0
m2 0
m2 0
m3 0
kg 0
m2 0
steel coulmn and beams; including all labour, materials and plant in fabricating, assembling and erecting with welded and bolted shop and
kg 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0 0
kg 0
No 0
No 0
m2 0
No 0
-1224 #DIV/0! kg 0
24.48 m2 0
m2 0
m2 0
m2 0
m2 0
TOTAL : 0
TOTAL 24 DECK: 0
elded and bolted shop and site connections, complete including zinc cromate priming, as described to:-
JAKARTA MASS RAPID TRANSIT PROJECT
WIKA-TOKYU JOINT OPERATION
STRUCTURE & ARCHITECTURAL WORKS
BILL OF QUANTITY
PRELIMINARIES
General Notes :
1 This Bill is to be rea Note
2 The words "as describ Note
3 Notwithstanding anythNote
4 Access to and egress f Note
5 The Contractor shall c Note
6 The Contractor shall s Note
7 The Contractor shall alNote
8 The Contractor shall bNote
9 The Contractor shall bNote
10 In the event of the Co Note
11 In the event of pipes, Note
12 The Contractor shall bNote
13 The Contractor shall a Note
14 The Contractor shall a Note
15 The Contractor shall a Note
16 The Contractor shall a Note
17 The Contarctor shall a Note
3b.3.(17).1Site Clearance etc.
a Allow for c 1 Item Include 1
b Allow for r 1 Item Include 1
3b.3.(17).1Sand bedding, as described
a Sand bed la 145 m2 0 0 145
3b.3.(17).1Lean concrete, as described
a Blinding la 145 m2 0 0 145
3b.3.(17).1Vibrated Reinforced concrete fc' 24 N/mm2
a Slab, drop 63 m3 0 0 63
3b.3.(17).1Bar reinforcement; deformed high tensile steel BJTD 40
a General rei 6555 kg 0 0 6555
3b.3.(17).1Fair face finish formwork
a Side of sl 57 m2 0 0 57
3b.3.(17).1Supply and install structural steel frame works, fixed to the existing concrete and/or to steel coulmn and beams; in
a SB1 - WF2 282 kg 0 282
b Purlin CNP 131 kg 0 0 131
c Plate 10mm 15 kg 0 0 15
d M20 Anchor 16 No 0 0 16
e Metal roof 27 m2 0 0 27
f Metal Gutt 5 m 0 0 5
# Paint Finis 428 kg 0 0 428 0
# Sandblast, 8.56 m2
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Item Include
Item Include
m2 0
m2 0
m3 0
kg 0
m2 0
steel coulmn and beams; including all labour, materials and plant in fabricating, assembling and erecting with welded and bolted shop and
kg 0
kg 0 0
kg 0 0
No 0
m2 0
m 0
-428 #DIV/0! kg 0
8.56 m2 0
m2 0
m2 0
m2 0
m2 0
m2 0
m2 0
ling mechine and rolling box, fitting and all necessary fixing accessories; all as described:
No 33141500 33141500
with ironmongeries, gasket, seal, fitting and all necessary fixing accessories; al as described:
No 1302000 5208000
TOTAL : 38349500
elded and bolted shop and site connections, complete including zinc cromate priming, as described to:-
JAKARTA MASS RAPID TRANSIT PROJECT
WIKA-TOKYU JOINT OPERATION
STRUCTURE & ARCHITECTURAL WORKS
BILL OF QUANTITY
PRELIMINARIES
General Notes :
1 This Bill is to be rea Note
2 The words "as describ Note
3 Notwithstanding anythNote
4 Access to and egress f Note
5 The Contractor shall c Note
6 The Contractor shall s Note
7 The Contractor shall alNote
8 The Contractor shall bNote
9 The Contractor shall bNote
10 In the event of the Co Note
11 In the event of pipes, Note
12 The Contractor shall bNote
13 The Contractor shall a Note
14 The Contractor shall a Note
15 The Contractor shall a Note
16 The Contractor shall a Note
17 The Contarctor shall a Note
3b.3.(18).1Site Clearance etc.
a Allow for c 1 Item Include 1
b Allow for r 1 Item Include 1
3b.3.(18).1Excavation commencing from existing level including dispose excavated soil off-site work
Excavate fo 45 m3 0 0 45 43.32
3b.3.(18).1Sand bedding, as described
a Sand bed la 54 m2 0 0 54 43.32
3b.3.(18).1Lean concrete, as described
a Blinding la 54 m2 0 0 54 43.32
3b.3.(18).1Vibrated Reinforced concrete fc' 24 N/mm2
a Slab, drop 26 m3 0 0 26 129.225
Pile Cap 6.81
Pedestal 2.4
3b.3.(18).1Bar reinforcement; deformed high tensile steel BJTD 40
a General rei 2571 kg 0 0 2571 13767.75
Pile Cap 1191.75
Pedestal 480
3b.3.(18).1Fair face finish formwork
a Side of sl 144 m2 0 0 144 219.218
Pile Cap 18
Pedestal 24
3b.3.(18).1Supply and install structural steel frame works, fixed to the existing concret 49066 45843.52
a Column SC1 582 kg 0 582 577.92
b Pipe 114.3 10959 kg 0 0 10959 5892.6
c Pipe 76.3x 33590 kg 0 0 33590 35260
d Pipe 60.5x 312 kg 0 0 312 310
e Pipe 48.6x 402 kg 0 0 402 320
f Purlin CNP 2920 kg 0 0 2920 3168
g Base Plate 301 kg 0 0 301 315
h Anchor Bol 96 No 0 0 96 96
i 30mm thick 5 m2 0 0 5 5
j Roof finish 583 m2 0 0 583 583
k Gutter 90 96 m 0 0 96 96
l Capping pi 96 m 0 0 96 96
# Paint Finis 49066 kg 0 0 49066 0
# Sandblast, 981.32 m2
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Note
Item Include
Item Include
-1.68 -0.038781 m3 0
-10.68 -0.246537 m2 0
-10.68 -0.246537 m2 0
103.225 0.798801 m3 0
6.81 1
2.4 1
11196.75 0.813259 kg 0
1191.75 1
480 1
75.218 0.34312 m2 0
18 1
24 1
-3222.48 -0.070293
-4.08 -0.00706 kg 0
-5066.4 -0.85979 kg 0 0
1670 0.047362 kg 0 0
-2 -0.006452 kg 0 0
-82 -0.25625 kg 0 0
248 0.078283 kg 0 0
14 0.044444 kg 0 0
0 0 No 0
0 0 m2 0
0 0 m2 0
0 0 m 0
0 0 m 150000 14400000
-49066 #DIV/0! kg 0
981.32 m2 0
m2 0
m2 0
m2 0
m2 0
-1.2 -0.001603 m2 0
0 0m 15000 11220000
TOTAL : 25620000