LIFT

4' X 4'
UP

STUDIO FLAT STUDIO FLAT STUDIO FLAT STUDIO FLAT STUDIO FLAT STUDIO FLAT STUDIO FLAT STUDIO FLAT
10'-0" X 27'-0" 10'-0" X 20'-0" 10'-0" X 20'-0" 10'-0" X 20'-0" 10'-0" X 20'-0" 12'-6" X 20'-0" 12'-6" X 20'-0" 12'-6" X 27'-0"

12'-6" WIDE LOBBY

BATH BATH BATH BATH BATH BATH


4'-0" X 5'-0" 4'-0" X 5'-0" 4'-0" X 5'-0" 4'-0" X 5'-0" 4'-0" X 5'-0" 4'-0" X 5'-0"

7' WIDE CORRIDOR 7' WIDE CORRIDOR


BATH BATH
4'-0" X 5'-0" 4'-0" X 5'-0"

LOWER GROUND FLOOR PLAN


O.T.S O.T.S O.T.S OPEN KITCHEN
BATH BATH BATH BATH 12'-7.5" X 9'-6"
5'-0" X 5'-0" 5'-0" X 5'-0" 5'-2" X 5'-0" 5'-2" X 5'-0"

BED ROOM LIFT


BED ROOM 13'-4.5" X 10'-0" 4' X 4'
13'-8.5" X 12'-0"
LOUNGE
DN UP
24'-1.5" X 13'-10.5"
BED ROOM
10'-4.5" X 10'-6" BED ROOM
10'-8.5" X 14'-10.5"

O.T.S
LOBBY
SITTING AREA 12'-6" X 12'-0" BED ROOM
6'-10.5" X 9'-10.5" 12'-3" X 11'-0"
OPEN KITCHEN
OPEN KITCHEN 6'-6" X 6'-6"
10'-9" X 10'-0" LOUNGE
13'-8.5" X 13'-10.5"
RECEPTION BED ROOM
11'-7.5" X 12'-0" 12'-1.5" X 12'-0"

BATH BATH
5'-11.5" X 5'-0" 5'-11.5" X 5'-0"

UP

GROUND FLOOR PLAN


O.T.S O.T.S O.T.S OPEN KITCHEN
BATH BATH 12'-7.5" X 9'-6"
BATH BATH 5'-2" X 5'-0" 5'-2" X 5'-0"
6'-6" X 5'-0" 6'-6" X 5'-0"

BED ROOM LIFT


BED ROOM 13'-4.5" X 10'-0" 4' X 4'
13'-8.5" X 12'-0"
LOUNGE
DN UP
24'-1.5" X 13'-10.5"
BED ROOM
13'-4.5" X 10'-6" BED ROOM
10'-8.5" X 14'-10.5"

O.T.S
LOBBY
SITTING AREA 12'-6" X 12'-0" BED ROOM
6'-10.5" X 9'-10.5" 12'-3" X 11'-0"
OPEN KITCHEN
6'-6" X 6'-6"
OPEN KITCHEN
6'-6" X 6'-6"
LOUNGE
21'-5.5" X 16'-10.5"
STUDIO FLAT BED ROOM
11'-7.5" X 15'-0" 12'-1.5" X 15'-0"

BATH BATH
5'-11.5" X 8'-0" 5'-11.5" X 8'-0"

BATH
4'-0" X 4'-0"

MEZZANINE FLOOR PLAN


O.T.S O.T.S O.T.S OPEN KITCHEN
BATH BATH 12'-7.5" X 9'-6"
BATH BATH 5'-2" X 5'-0" 5'-2" X 5'-0"
6'-6" X 5'-0" 6'-6" X 5'-0"

BED ROOM LIFT


BED ROOM 13'-4.5" X 10'-0" 4' X 4'
13'-8.5" X 12'-0"
LOUNGE
DN UP
24'-1.5" X 13'-10.5"
BED ROOM
13'-4.5" X 10'-6" BED ROOM

O.T.S
10'-8.5" X 14'-10.5"

LOBBY
SITTING AREA 12'-6" X 12'-0" BED ROOM
6'-10.5" X 9'-10.5" 12'-3" X 11'-0"
OPEN KITCHEN
6'-6" X 6'-6"
OPEN KITCHEN
6'-6" X 6'-6"
LOUNGE
21'-5.5" X 16'-10.5"
STUDIO FLAT BED ROOM
11'-7.5" X 15'-0" 12'-1.5" X 15'-0"

BATH BATH
5'-11.5" X 8'-0" 5'-11.5" X 8'-0"

BATH
4'-0" X 4'-0"

FIRST FLOOR PLAN


O.T.S O.T.S O.T.S

BED BATH BED BED BATH BED BED BATH BED BED
13'-4.5" X 11'-3" 4'-3" X 4'-0" 10'-0" X 11'-3" 10'-0" X 11'-3" 4'-3" X 4'-0" 9'-6" X 11'-3" LIFT 10'-0" X 11'-3"
5'-0" X 4'-3"
10'-0" X 11'-3" 10'-0" X 11'-3"
4' X 4'
BATH BATH
BATH
4'-3" X 4'-0" 4'-3" X 4'-0" DN UP 5'-0" X 4'-3"

O.T.S
6' WIDE CORRIDOR 6' WIDE CORRIDOR BATH
4' X 6'

BATH BATH BATH BATH


4'-0" X 5'-5.5" 4'-0" X 5'-5.5" 4'-0" X 5'-5.5" 4'-0" X 5'-5.5"
BED
BED BED BED BED BED BED BED
8'-4.5" X 11'-3"
13'-4.5" X 11'-3" 10'-0" X 11'-3" 10'-0" X 11'-3" 10'-0" X 11'-3" 10'-0" X 11'-3" 10'-0" X 11'-3" 10'-0" X 11'-3"

BATH BATH BATH BATH


4'-0" X 5'-5.5" 4'-0" X 5'-5.5" 4'-0" X 5'-5.5" 4'-0" X 5'-5.5"

SECOND FLOOR PLAN


O.T.S O.T.S O.T.S

O.H.W.T
LIFT
11'-3" x 10'-6" x 5'-0"
BED ROOM 4' X 4'
W1 12'-9" X 13'-10.5" DN
D1

5' WIDE CORRIDOR

D1
D1 D1

O.T.S
D2
OPEN AREA

D1
52'-9" X 29'-3" V2 BATH
5'-0" X 5'-0"

LOUNGE
D1
3'-4.5" WIDE
19'-9" X 15'-0" W1

KITCHEN
W7 15'-4.5" X 6'-3"

W1 W1

TOP FLOOR PLAN 25'-1012"


Iron Grill
FRONT ELEVATION
SCALE 1'-8"
SIDE ELEVATION
SCALE 1'-8"
1½" THICK BRICK TILES
3" THICK MUD
POLYTHENE FILM
1" THICK 1m X 1m THERMOPORE SHEET
POLYTHENE FILM
2 COATS OF HOT BITUMEN
R.C.C. SLAB
TOP ROOF LEVEL 62'-6"
6"

AUTOMATIC
BRICK MASONRY DOOR

11'-0"
LIFT

TOP FLOOR LEVEL 51'-0" TOP FLOOR


6"

AUTOMATIC
CLADDING
DOOR

11'-0"
LIFT
BRICK MASONRY

R.C.C Slab
SECOND FLOOR LEVEL 39'-6" SECOND FLOOR
6"

CLADDING

AUTOMATIC
DOOR

11'-0"
LIFT

S.S. RAILING

FIRST FLOOR LEVEL 28'-0" FIRST FLOOR


6"

CLADDING

AUTOMATIC
DOOR

11'-0"
LIFT
S.S. RAILING

MEZZANINE FLOOR LEVEL 16'-6" MEZZANINE FLOOR


6"

AUTOMATIC
DOOR
11'-0"

LIFT
S.S. RAILING

GROUND FLOOR LEVEL 5'-0" GROUND FLOOR

6"
4'-6"

ROAD LEVEL 0'-0" AUTOMATIC


DOOR

LIFT
5'-6"

LOWER GROUND LEVEL -5'-6" LOWER GROUND FLOOR

SECTION A-A
SCALE 1'-8"
100'
1' 11' 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11' 1'

1'-3"

1'-3"

1'-3"
2'

2'
1'-3"
9'-1"

1'-3"
1'-3"
3'-6"

3'-6"
9'-4" 11'-6" 11'-6" 11'
1'-3"

1'-10" 1' 6'-10" 4'-4" 1' 4'-4" 6'-10" 1' 1'-10" 4"
6" 3'-6" 4" 4" 4" 3"
3'-6" 1"
12
8'-6"

8'-6"

4'
4'
13'-6"

13'-6"

13'-6"

13'-6"

12'-3"

12'-3"
UP
1"

1"

1"

1"
18'-102

18'-102

18'-102

18'-102
3'-6" 3' 3'-6"

1"

1"
1' 1'

17'-72

17'-72

1"
18'-102
21'-3"

20'
1" 1" 1" 1" 1"
4'-42 1"

12'-5"

12'-5"
4'-42 4'-42 4'-42 4'-42 4'-42

23'
27'
6'

6'

2'-6" 9"

2'-6" 9"

2'-6" 9"

2'-6" 9"

2'-6" 9"

2'-6" 9"
5'

5'

5'

5'

5'
17'
1"

1"

1"

1"

1"

1"
1"

2'-12

2'-12

2'-12

2'-12

2'-12

2'-12
4'-42

4' 4' 4' 4' 4'


12'
1" 1"
4'-42
4'-42 3' 2' 1" 2' 3' 3' 2' 1" 2' 1" 3'
8'-6"

2'-42 2'-42 1'-82 9" 3' 7" 3' 2' 1"


2'-42 2' 2'-1" 3' 3'
1'-3"
2'
2'-6" 9"

2'-6" 9"
1"
42 1" 1"
1'-42 1"1'-101
1'-42 1"
1'-12 11'-4 1 1"
1'-102 2" 1'-102 " 2" 1'-42 1" 1" 41"
1'-112 82
6'-3"

6'-3"
2
3'

3'

3'
5'

1'-10"

1'-3"
1"

1"
1'-3"

4'
2'-12

2'-12
1'-3"
2'

2'
1' 2' 1'-11" 4' 1"
2'-82 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 4' 3' 2' 1'

1"
42 1"
1'-72 1"
42

LOWER GROUND FLOOR


WORKING DRAWINGS
103'
3' 1' 11' 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11' 1'
2'-121" 4' 1" 1"
5' 9' 4'-10" 5'-2" 8'-102 9'-102 5'
2'

2'
1"
1"

1"
2'

2'

2'

2'

2'

2'

2'

2'
8'-42

1"

1"

1"
42

42

R2
1"

3'-102

3'-102

1'-72
4'

1"
4'-42

1"
1'-72

'-6
6"

6"
5'-2"

1'-72
1"
9'
1"

1'-72
5'

5'

5'

5'
22

5' 1"

1"

"
3'

42
1" 42 3' 1" 4' 3'-6" 10' 4'
13'-42
3'

2'-6"

2'-6"
72 6" 1" 6"
1" 2'-6" 2'-32
1"

9'-6"

9'-6"
102 1" 1"

R7 2
102

1"
10'
102 102

7'-102
1"
1"

1"
8'-42

8'-102
2'-10"

2'-6" 7'-6"
12'
2'-6" 7'-10"

1"

1"
1"
2'-3"

13'-102

13'-102
10'-42
1"
13'-42
1"
42 1" R7 1 5'

1"

4'
5'

11'-6"

11'-6"
1"
42

5'-42
2"

3'-32
10'-6"

1" DN UP
1"

7'
7'-12

3' 1" 42 3'-6" 1'-6"

1"
13'-82 1"

42
3' 10' 4' 1' 3' 1' 3'-6" 24'-12
1"
10'-42 1"

5"
42
6'

6'

1"
10'-42
3' 10'-4" 3' 10' 1"

1"
2'-112"
42

102
1

3'
1"

1"

3'

3'

5'-3"
14'-102

14'-102

3'

"
1"

1"
1"
'-6

42
1'-12

4'
3' 10'-4" 42 20'-9" 3'

23'
R2
3'

11'-11"
1" 1" 1'-6"
2'-3"

10'-42 1"

30'
1"
42 13'-42

9'-102
1"
1"
3'-10"

1" 8'-9" 3'


42

9"
1'-22

1"

11'
13'-82 10'-82 1"
7
R 2

3'
12'-6" 1"

1"
9'-3"

6'-6"

6'-6"

6'-6"

7'-72
10'-9" 42
1"

1"
7'-42

1"
R7 2

5'-42
4'
"

1"
'-6

13'-102

1"
1" 1"

3'-2"

10'-42
3'-82 3'-82
R2

12'-3"

12'

12'
6'

6'

5' 1"
12'-12
10'

1'

1" 1" 2'-6"


11'-72 1"
R7 2 2'-4" 6' 6'-5" 6' 4'-1" 5'-112
1"

1"

1"
1'-22

1"
1"

2'-6"

3'-42

3'-42
4'
1'-22

5'-112

5'-10"
3'

3'

1" 1"
12
1"

1"
6'

R7 2

5'
5'
1'-72

1'-72
1"

1"

1"
1'-72

1'-72

1'-72
6"
4'

5'-4"
11'-6" 5'-4"
2'

2'

2'
UP
1' 2'-7" 6' 2'-5" 1' 2'-9" 6' 2'-9" 1' 11'-6" 1' 11'-6" 1' 4'-6" 7' 1' 6' 5' 1' 2'-9" 6' 2'-9" 1' 3' 2'-8" 3' 1'

3'

3'
6" 1'-2" 1'-2"

GROUND FLOOR
WORKING DRAWINGS
103'
3' 1' 11' 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11' 1'
1"

1" 1" 6'-6" 1"


2'-22

2'-102 4' 9' 4'-10" 5'-2" 4' 1" 9'-102 5'

2'
2'-72 8'-102 1"

1"
1"

1"
2'

2'

2'

2'

2'

2'

2'

2'
8'-42

3'-102
1"

1"
42

42

R2
3'-102

1'-72
1"
1'-72

1"
5'-2"

'-6
6'-6"
6"

6"

1'-72
5'

5'

5'

5'

1"

"
1"

42
3'-42

3' 9'-4" 3' 9' 4' 3'-6" 10' 4'


3'

2'-6"

2'-6"
1"
2'-32
6" 6"

9'-6"

9'-6"
1" 1" 1"

R7 2
102 1"

1"
10'
102 102 102

7'-102
1"
1' 1'-10"

1"
8'-102
1" 1" 2'-6" 7'-10"

1"

1"
3'-72 2'-6" 7'-3" 13'-82

1"
2'-3"

13'-102

13'-102
10'-42

5'
12' 1"
13'-42
1"
42 R7 1 5'

1"

4'
11'-6"

11'-6"
1"

5'-42
42 DN UP 2"

1"
1"

1"

3'-32
7'-12

3'-62
3'-6" 1'-6"
10'-6"

1"
1" 3' 10' 1"

42
10'-82 24'-12
4' 1' 3' 1' 3'-6"
6'

6'

1" 1"

1"
10'-42

1"
13'-42

42
1"
1"

42

1"
12

42

102
3'
1"

1"

3'

3'

5'-3"
14'-102

14'-102
12'-6"

3'

3'

3'

3'
"

1"
1"
'-6

42
1'-12

4'
3' 10'-4" 20'-9" 3'

23'
R2
1"
3'

3'

13'-42
1' 1'-10" 1'

1" 1'-6"
2'-3"

30'
42

1"
9'-102
1"

1" 8'-9" 3'


42

9"
11'
13'-82 1"
9"

7
R 2

3'
1"

1"

1"
9'-3"

6'-6"

6'-6"

6'-6"

6'-102
13'-9"

7'-72
42
1"
1"

1"
1'-22

7'-42

1"
R7 2

5'-42
12'-3"

4'

20'-9"
1"

1"
3'-10"

1"
1"

10'-42
3'-82

10'-72
2'-4" 6' 2'-4" 3'-82 12'-3"
1"

1"
8'-42

16'-102
6'

4' R2'-6 1"


2'-4" 6' 6'-5" 6' 4'-1" 12'-12

7'
" 1" 2'-6"

15'
1'-6"

11'-72 1"
1"

5'-112
1'
82

1"

1"
1"

2'-6"

3'-42

3'-42
13'

4'

4'
5'-112
3'

3'

1" 1"
R7 1" 12 4'-42
1' 1'

6"
1
2'-72" 1" 5'-4"

2'

2'
7'-12
9'

2'-6" 9"

8'
8'
R7 2

11'-6" 11'-6" 5'-4"


2'

2'

2'

2'

2'
5'-10"

1"

11' 11'-6" 11'-6" 4'

1"
7'-3"
1"

4'
1"

1"

1"

1"

1"

1"

1"
1'-12
4'-82

2'-72

2'-72

2'-72

2'-72

2'-72

2'-72

2'-72
1"
3'

3'

3'

3'

3'
6'-22

5'-1" 1' 1' 6' 1' 4'-2" 1' 6' 1"


1' 2'-52 37'-4" 1' 6' 1' 3' 3'-3" 1' 6' 1' 3'-11" 3' 2'-8" 3' 2'-2"
6"

MEZZANINE FLOOR
WORKING DRAWINGS
103'
3' 1' 11' 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11' 1'
1"

1" 1" 6'-6" 1"


2'-22

2'-102 4' 9' 4'-10" 5'-2" 4' 1" 9'-102 5'

2'
2'-72 8'-102 1"

1"
1"

1"
2'

2'

2'

2'

2'

2'

2'

2'
8'-42

3'-102
1"

1"
42

42

R2
3'-102

1'-72
1"
1'-72

1"
5'-2"

'-6
6"

6"

1'-72
5'

5'

5'

5'

1"

"
1"

42
3'-42

3' 9'-4" 3' 9' 4' 3'-6" 10' 4'


3'

2'-6"

2'-6"
1"
2'-32
6" 6"

9'-6"

9'-6"
1" 1" 1"

R7 2
102 1"

1"
10'
102 102 102

7'-102
1"
1' 1'-10"

1"
8'-102
1" 1" 2'-6" 7'-10"

1"

1"
3'-72 2'-6" 7'-3" 13'-82

1"
2'-3"

13'-102

13'-102
10'-42

5'
12' 1"
13'-42
1"
42 R7 1 5'

1"

4'
11'-6"

11'-6"
1"

5'-42
42 DN UP 2"

1"
1"

1"

3'-32
7'-12

3'-62
3'-6" 1'-6"
10'-6"

1"
1" 3' 10' 1"

42
10'-82 24'-12
4' 1' 3' 1' 3'-6"
6'

6'

1" 1"

1"
10'-42

1"
13'-42

42
1"
1"

42

1"
12

42

102
3'
1"

1"

3'

3'

5'-3"
14'-102

14'-102
12'-6"

3'

3'

3'

3'
"

1"
1"
'-6

42
1'-12

4'
3' 10'-4" 20'-9" 3'

23'
R2
1"
3'

3'

13'-42
1' 1'-10" 1'

1" 1'-6"
2'-3"

30'
42

1"
9'-102
1"

1" 8'-9" 3'


42

9"
11'
13'-82 1"
9"

7
R 2

3'
1"

1"

1"
9'-3"

6'-6"

6'-6"

6'-6"

6'-102
13'-9"

7'-72
42
1"
1"

1"
1'-22

7'-42

1"
R7 2

5'-42
12'-3"

20'-9"
1"

1"
3'-10"

1"
1"

10'-42
3'-82

10'-72
2'-4" 6' 2'-4" 3'-82 12'-3"
1"

1"
8'-42

16'-102
6'

4' R2'-6 1"


2'-4" 6' 6'-5" 6' 4'-1" 12'-12

7'
" 1" 2'-6"

15'
1'-6"

11'-72 1"
1"

5'-112
1'
82

1"

1"
1"

2'-6"

3'-42

3'-42
13'

4'

4'
5'-112
3'

3'

1" 1"
R7 1" 12 4'-42
1' 1'

6"
1
2'-72" 1" 5'-4"

2'

2'
7'-12
9'

2'-6" 9"

8'
8'
R7 2

11'-6" 11'-6" 5'-4"


2'

2'

2'

2'

2'
5'-10"

1"

11' 11'-6" 11'-6" 4'

1"
7'-3"
1"

4'
1"

1"

1"

1"

1"

1"

1"
1'-12
4'-82

2'-72

2'-72

2'-72

2'-72

2'-72

2'-72

2'-72
1"
3'

3'

3'

3'

3'
6'-22

5'-1" 1' 1' 6' 1' 4'-2" 1' 6' 1"


1' 2'-52 37'-4" 1' 6' 1' 3' 3'-3" 1' 6' 1' 3'-11" 3' 2'-8" 3' 2'-2"
6"

FIRST FLOOR
WORKING DRAWINGS
103'
1"
1'-112

3' 1' 11' 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11' 1'

1"

1"
1'-72

1'-72
1"
2'-72 9'-9" 4' 4' 1" 1" 10'
9' 5'

2'
10' 8'-102 8'-42

1"
2'

2'

2'

2'

2'

2'

2'

2'

2'
3'-102
1"

1"
3'-102

1'-72
2'-7"

1"
1'-72
1'

2'-6" 9"

2'-6" 9"

2'-6" 9"
3' 3' 3'
1"
13'-42 4' 3'-6" 1"
6" 6" 6" 6" 6" 6" 72
1"
4'-3"

4'-3"

4'-3"
10'-72
1"

1"

1"
6'-42

6'-42

6'-42
11'-3"

11'-3"

11'-3"

11'-3"

11'-3"
4' 4' 4'
6'

1"

1"

1"

1"

1"
4'

9'-72

9'-72

9'-72

9'-72

9'-72
4'
10' 4' 9'-6" 4' 10'
1"

DN UP
1'-42

6'

6'

6'
1"

1"
4'-3"

4'-3"

4'-3"
1'-42

1'-42
2'-6"

2'-6"

2'-6"
1"

1"
2'-82

1" 1" 1" 42


1"

4' 1" 1"


42

1"

1"
6'-72 6'-72 6'-12 6'-72 6'-72 3' 1'-9" 2'-6" 1'-6" 1'-6"

42

42
10'
3' 1"
21'-42 3' 3' 17'-6" 3' 9" 3'-6" 1' 3' 1' 3'-6" 9" 3' 19' 3' 3' 1'

1'-6"
1"
21'-52

23'
1"
42 1"
1'-12 1"
1'-12
1'-6"

30'
3'
5'

6'

6'
1" 96' 1"

6'
1'-12 1'-12 1" 1"
10' 3' 11'-9" 3' 3' 18' 3' 3' 18' 3' 7'-42 3' 5'-12 2'-6"

1'-6"
6"

4'
1"

1"

1"
42

42

42

1"
42
10' 1" 1" 1"
6'-72 1" 1"
6'-72 1"
6'-72 2'-6" 4'-9" 1'-6"
6'-72 6'-72 3' 6'-72
2'-6"

2'-6"

2'-6"

2'-6"
1"
1"

1"

1"

1"
5'-52

5'-52
42

5'-52

5'-52
1"

1"

1"

1"
10'
6'-72

6'-72

6'-72

6'-72
1"
6'

13'-42
2'-7"

2'-7"

2'-7"

2'-7"
8'-9"

8'-9"

8'-9"

8'-9"
4'

11'-3"
4' 10' 1" 10'
4' 72 4'
11'-3"

11'-3"

11'-3"

11'-3"

11'-3"

11'-3"
10"

10"

10"
8'-9"
10"

4' 10'
1"

1"

1"

1"

1"
1'

1" 1"
52

8'-42

8'-42

8'-42

8'-42
1"
2'-72 9'-9" 102 10' 2'-42
9" 1" 10'
2'-3" 8'-102 2'-6"

2'
6"
1"
5'-52
5'-3"

8'-9"

1"
9'

5'-52
4' 4'

1"
4'
1"

2'-72
1"

1"
1"

1"

1"

1"
4'-82

5'-52

5'-52
1"
2'-6"

2'-6"

2'-6"

2'-6"
2'-72

2'-72

2'-72

2'-72
1" 1'-52 1"

3'
5'-42 6' 2' 2' 6' 2' 6' 2'-7" 2' 6' 2' 2' 6' 2' 1'-22
2' 6' 2' 2' 6' 2' 6' 1'-7"

5'-1" 1' 1' 94'-6" 1'

1"
112

SECOND FLOOR
WORKING DRAWINGS
103'

1"
3' 1' 11' 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11'-6" 1' 11' 1'

1'-72
1"

1"
1'-72

1'-72
4' 4' 1" 5'

1"

1"

2'
8'-102

2'-42

2'-42

1"
2'

2'

2'
3'-102
1"
3'-102
1" 1' 1" 3'-3"
2'-72 9'-9" 4'-9" 9' 1' 10'-42 4' 3'-6"

2'-9"
1"
1'-12
12'-9"

10'-6"
3'-6"

1"
11'-3"

8'-102
1"
13'-102
4'

5'
4'
12'-3"

1'-8"
1"

6'
DN 24'-42
3'-6" 1' 3' 1' 3'-6"
1"
39'-72

5'
25'-10"

3'

1"
1" 1"

1'-12
42 42

29'-3"
1"

23'
2'-6" 6'-6" 3'

4'-72
29'-3"

1'-6"

30'
1"

1"
26'-102

34'-102

6'
3'
1"
5'-42
2'

5'

1"
26'-102
19'-9"

1'
5'

2'-3"

1"
10'-42

1"
17'-72
1"

1"
5'-42

3'-42
3'

15'

6'
1"

36'-9"
1'-72

11'-3"
1'-6"

1"
1'-6"

3'-102
6"
3'-3" 6'-9" 11'-6"
2'

2'

2'
4'-9"
1"

1"
4'-82

1"

2'-72
2'

2'-42
1"

3'
72
6"

40'-6" 6' 1"


4'-112 6' 41'
5'-1"

TOP FLOOR PLAN


WORKING DRAWINGS
1"
31'-102

6"

2'-6"

2'-6"
8'
1"
4'-112 1"
5'-1" 3'-102

6'

6'
6' 6'
4'-6"

4'-6"

4'-6"

4'-6"

4'-6"
1'

1' 1"
112
1"
3"

4'-12 1"
2'-6" 4' 2'-9" 3'-102
2'

2'

2'

2'
2'-3"
6"

4'-3" 2'
2' 2' 1" 2' 1"
1"
4'-42 4'-112 4'-42
2'-1" 8'-9" 2'-1"
8'-9"
6'

6'

6'

6'

6'

6'

6'

6'
4'

4'

4'

4'
1"
8'-22
6' 6' 6' 6' 6' 6' 6' 6'

1'
1'

2'
1'-10" 8' 4'-2" 8' 2'-9" 36'-6"
3'-6"

3'-6"

3'-6"

3'-6"

4'-6"

4'-6"
6"
8' 3' 3'-3" 8'

2'-6"

2'-6"
6"

4'-6"

2'

2'

2'
8'-6"

38'
3'-11" 3' 2'-8" 3' 2'-2"
29'

6'

6'

6'

6'

6'

6'
6' 6' 6' 6' 6' 6'

9'-6"

9'-6"

9'-6"
3'
19'-6"

19'-6"

19'-6"
5'-6"

5'-6"

5'-6"

5'-6"
6"

2'

2'
3'

2'

2'

2'
8'

3'-11" 3' 2'-8" 3' 2'-2"


6'-9"
6'

6'

6'

6'

6'

6'
6' 6' 6' 6' 6' 6'

7'-6"

7'-6"

7'-6"
1'

1'

1'

1'

1'

1'
1' 1' 1' 1' 1'
3'
2'-6"

2'-6"

2'-6"

2'-6"
6"

3' 3'-7" 6' 6'-2" 6' 3'-9"


2'

2'

2'

2'

2'

2'

2'
8'

1'-6" 8'-9"
4'-11" 3' 2'-8" 3' 2'-2"

11'-6"
6'

6'

6'

6'

6'
6' 6' 6' 6' 6'
16'

16'
3'-6"

3'-6"

3'-6"

3'-6"
1"
3'

1'-42 1"
1'-42
1' 11'-6" 1' 11'-6" 1"
2'-72 4' 3' 2'
2' 1'-11" 4' 1"
3'-82
6"

3'-6"

3'-6"
4'-6"

4'-6"

4'-6"
1'-6"

1'

1'
Iron Grill
100'
100'
FRONT ELEVATION
WORKING DRAWINGS
30'

6"
6"

2'

2'

2'
2' 2'
1
5'-12"

2'
1
4'-72"

8'

8'

6'
6'

12'-6"
4'
6'

4'-6"

1'
1

3"
102"

6"
3'-7"
8'

6'

6'

6'
6' 6' 6'
1'

1'
3'-6"
4'-6"

1
2'-22" 3' 1'-10" 8' 1'-10" 8' 1'-7"
2'
38'

29'
6'

6'

6' 6'
62'-6"

9'-6"
2'

6'

6'

6' 6'
7'-6"

1'

1'

1'

1'

1' 1' 1'


2'-6"

2'-6"

1
2'-22" 3' 2'-10" 6' 3'-10" 6' 1
3'-22" 3'
2'
2'

6'

6'

6' 6'
16'

16'
3'-6"

6'
8'

8'

10'-6" 10'-6"
1'-6"

27'

SIDE ELEVATION
WORKING DRAWINGS
ELECTRICAL
DRAWINGS
M.E.S. ARCADE
KHASRA NO. 150/2/2, 151/2, 200, 204
MOZA# JHANGI SYEDA, TARNOL, ISLAMABAD.
1- THE WHOLE OF THE ELECTRIC WORK SHALL BE CARRIED OUT ONLY BY THE LICENSED CONTRACTOR , AUTHORIZED BY THE
GOVERNMENT TO UNDERTAKE SUCH WORK, UNDER THE PROVISION OF THE PAKISTAN ELECTRICITY RULES AND UNDER THE
DIRECT SUPERVISION OF WHOLE TIME ELECTRICAL SUPERVISOR, HAVING REQUIRED CERTIFICATE OF COMPETENCY, FOR THE
TYPE OF WORK UNDER EXECUTION.
2- THE WHOLE OF ELECTRIC WORK SHALL BE CARRIED OUT IN STRICT ACCORDANCE WITH THE " REGULATIONS OF THE ELECTRIC
EQUIPMENT OF BUILDINGS" ( LATEST EDITION ) AS ISSUED BY THE INSTITUTE OF ELECTRICAL ENGINEERS LONDON AND SHALL
ALSO COMPLY WITH PROVISIONS OF THE PAKISTAN ELECTRICITY RULES.
3- READ ALL OF THE ELECTRICAL DRAWINGS CAREFULLY AND IN 100 % BEFORE STARTING THE WORK AT SITE ( FOR PURPOSES
OF NOTINGS FOR SHOP DRAWINGS AND FOR COORDINATION WITH OTHER SERVICES etc. ).
4- THE CONDUIT SHALL BE LAID IN CEILING SLAB OF THAT FLOOR , UNLESS OTHERWISE NOTED
5- PROVIDE CONCEALED JUNCTION / PULL BOXES WHEN EVER MORE THAN TWO NINETY DEGREE BENDS / TURNS ARE MADE IN A
CONDUIT RUN . A PULL BOX SHALL ALSO BE PROVIDED FOR EVERY 75 FEET OF STRAIGHT CONDUIT RUN.
6- AVOID JUNCTION / PULL BOXES WHENEVER NOT REQUIRED AS THESE DO NOT APPEAR GOOD ARCHITECTURALLY / AESTHETICALLY.
7- THE WIRING THROUGH CONDUIT SHALL BE STARTED ONLY AFTER CONDUITING SYSTEM IS COMPLETELY INSTALLED AND ALL OF THE
OUTLETS BOXES, JUNCTION BOXES etc. ARE FIXED IN POSITION.
8- THE WIRES SHALL BE PULLED IN THE CONDUIT WITH CARE AND, TO FACILITATE PULLING, THE MANUFACTURER'S RECOMMENDED
LUBRICANT SHALL BE USED. USE OF ANY KIND OF OIL OR SOAP WILL NOT BE PERMITTED.
9- WHERE SEVERAL WIRES ARE TO BE RUN IN THE SAME CONDUIT, THOSE SHALL BE PULLED-IN TOGETHER.
10- THE WIRES / CABLES SHALL NOT BE BENT TO A RADIUS LESS THAN 10 TIMES THEIR OVER ALL DIAMETER OF THE
WIRES / CABLES , UNLESS OTHERWISE RECOMMENDED BY THE MANUFACTURER.
11- THE WIRING SHALL BE CONTINUOUS BETWEEN TERMINATIONS.
12- THE LOOPING-IN SYSTEM SHALL BE FOLLOWED THROUGHOUT . ANY JOINT IN WIRES WILL NOT BE ALLOWED . THE USE OF
CONNECTORS WILL ONLY BE ALLOWED AT LOCATIONS WHERE LOOPING-IN IS RENDERED DIFFICULT. THE CONSENT OF THE
ENGINEER- INCHARGE , IN WRITING , WILL BE REQUIRED FOR USING CONNECTORS.
13- ALL CONDUIT SHALL BE CONCEALED AND OF PVC FOR GENERAL USE.
14- PVC CONDUIT SHALL BE MADE OF M/S PAKISTAN PVC LTD. KARACHI AND NAME " SHAVYL " , UNLESS OTHERWISE NOTED.
15- MINIMUM SIZE OF CONDUIT IS 3/4 " DIA.
16- WIRES / CABLES SHALL BE OF COPPER CONDUCTOR ONLY AND MADE OF M/S PAKISTAN CABLES LTD. KARACHI , UNLESS
OTHERWISE NOTED .
17- ALL CONDUIT FOR TELEPHONE SYSTEM IS 1" DIA , UNLESS OTHERWISE NOTED.
18- CIRCUIT BREAKERS ARE MADE OF M/S MERLIN GERIN FRANCE , UNLESS OTHERWISE NOTED.
19- PROVIDE A PULL WIRE OF 12 INCHES OF SLACK AT EACH END OF THE CONDUIT RUN.
20- THE DISTANCE OF THE SWITCH BOX FROM WHERE THE SWING OF THE DOOR STARTS WILL BE 8" OR AS APPROVED BY THE
ENGINEER-INCHARGE.
21- LOCATIONS OF ALL EQUIPMENTS , FIXTURES AND ACCESSORIES WILL BE LIABLE TO CHANGE AT SITE.
22- MINIMUM SIZE OF SINGLE CORE WIRE SHALL BE 1.5 sq. mm.
23- ELECTRIC DIAGRAMS ARE DIAGRAMMATIC AND NOT TO BE SCALED.
24- ALL OF THE EQUIPMENTS TO BE INSTALLED SHALL BE FLUSH MOUNTED, UNLESS OTHERWISE NOTED.
25- FACE PLATES OF SWITCHES, SOCKETS, TELEPHONE AND OTHER OUTLETS SHALL BE FLUSH MOUNTED WITH FINISHED SURFACE.
26- THE ELECTRICAL RESISTANCE OF ECC TOGETHER WITH EARTH LEAD AND EARTH ELECTRODE SHALL NOT EXCEED ONE OHM.
IF THE RESISTANCE TO EARTH EXCEEDS ONE OHM, THEN CONTRACTOR SHALL OBTAIN INSTRUCTIONS FROM THE CONSULTANT
FOR ANY RECTIFICATION. RUN TWO SEPARATE LEADS TO EACH ELECTRODE.
27- CIRCUIT DIRECTORY SHALL BE MARKED ON DBs / PANELS AS PER DRAWING.
28- WHENEVER MORE THAN ONE CIRCUIT ( SINGLE PHASE FOR LIGHT AND SOCKETS etc . ) RUN IN ONE COMMON CONDUIT .
EACH CIRCUIT SHALL HAVE ITS OWN SEPARATE AND INDEPENDENT PHASE WIRE, NEUTRAL WIRE AND ECC.
NEUTRAL WIRE SHALL HAVE THE SIZE EQUAL TO ITS PHASE WIRE.
NEUTRAL WIRE AND ECC OF ONE CIRCUIT SHALL NOT BE MADE COMMON WITH NEUTRAL AND ECC OF THE OTHER CIRCUIT.
29- FOR SIZES OF CIRCUIT WIRING WIRES, POINTS WIRING WIRES AND ECCs, USE THE " SCHEDULE OF WIRES FOR WIRING ",
UNLESS OTHERWISE NOTED.
30- USE SEPARATE SWITCH BOX FOR EACH CIRCUIT IF THERE ARE MORE THAN ONE CIRCUIT COMING AT ONE LOCATION.
31- THE MOUNTING HEIGHT OF DIFFERENT FIXTURES ABOVE FINISHED FLOOR LEVEL SHALL BE AS FOLLOWING AS MEASURED FROM
THE BOTTOM OF THE FIXTURE ;
a. DISTRIBUTION BOARD - - - - 3'-6".
b. LIGHT AND FAN CONTROL SWITCH / DIMMER - - - - 3'-6".
c. 5 A, 15 A/20 A SWITCH SOCKETS - - - - 1'-0".
d. 15/20 A SWITCH SOCKET FOR A/C - - - AT LEVEL AS PER A/C MOUNTING POSITION.
e. WALL MOUNTING LIGHT, LIGHT BRACKETS - - - - 7'-0".
LEGEND
SNO. SYMBOLS DESCRIPTION

1 SWITCH BOX

2 LIGHT PLUG

3 POWER PLUG

4 TELEPHONE OUTLET

5 CEILING LIGHT

6 EXHAUST FAN

7 FANCY WALL LIGTH

8 TUBE LIGHT 4'-0"

9 TUBE LIGHT 2'-0"

10 LAWN LIGHT

11 CEILING FAN

12 CHANDELIER

13 VISITORS CALL BELL

14 DISTRIBUTION BOX

15 TV.JUNCTION BOX

16 TELEPHONE JUNCTION BOX

17 TV.OUT LET

18 BELL PUSH BUTTON

19 INTERNAL UNIT

20 EXTERNAL UNIT

21 SPOT LIGHT

22 BROAD BAND DSL INTERNET

23 GATE INTER COM

24 LIGHTING PROTECTION SYSTEM

25 INTER COM
SCHEDULE OF WIRES FOR WIRING
SIZE OF
USE OF WIRES PHASE NEUTRAL CPC
WIRE WIRE
POINTS WIRING WIRES FOR LIGHT, 2 2 2
FAN, 13 A SOCKET 1.5mm 1.5mm 1.5mm

2 2 2
CIRCUIT WIRES FOR LIGHT, FAN, 2.5mm 2.5mm 2.5mm
13 A SOCKET

15/20 A SOCKET FOR GENERAL USE


2 2 2
4mm 4mm 4mm

2 2 2
WIRING FOR A/C FROM DB TO CU 6mm 6mm 6mm

EARTH ELECTRODE DETAIL ( TYPE-A )

2 HEAVY DUTY C.I. COVER


2x35 mm EARTHING
LEADS FROM DB IN 750 mm
1 /14DIA
" GI PIPE
600 mm
GROUND LEVEL
100 GI SOCKET
450 mm

(1:2:4) CC

COMPACT EARTH 13 mm DIA GI PIPE FOR


WATERING ARRANGEMENT

1 1/4" DIA GI PIPE

OR AS REQUIRED TO PROVIDE 2x35 sq. mm


4000 mm MINIMUM HDBCC
ONE OHM EARTH RESISTANCE

300 600x600x3.2 mm (24"X24"X1/8")


TINNED COPPER EARTH PLATE

CHARCOAL AND LIME


300 MIXTURE PACKED HARD
IN RATIO 3:1
300
300 BRASS BOLT WITH
300 SPRING WASHERS COVERED
WITH BITUMEN
UP

LOWER GROUND FLOOR


ELECTRIC PLAN
DN UP

UP

GROUND FLOOR
ELECTRIC PLAN
DN UP

MEZZANINE & FIRST FLOOR


ELECTRIC PLAN
DN UP

SECOND FLOOR
ELECTRIC PLAN
O.T.S O.T.S O.T.S

O.H.W.T
11'-3" x 10'-6" x 5'-0"

DN

O.T.S
TOP FLOOR PLAN
ELECTRIC PLAN
SEWERAGE DETAIL
4" DIA RAIN WATER PIPE

M.H.
6" DIA SEWERAGE PIPE

LIFT
MAIN SEWERAGE LINE

4' X 4'
UP

6" DIA SEWERAGE PIPE


M.S M.S M.S M.S
U.G.W.T. M.S M.S
9'-0" X 10'-0" 5'-0"
F.T F.T F.T F.T F.T F.T

SEPTIC TANK
8'-0" X 5'-0" 5'-0"
SEPTIC TANK SEPTIC TANK

WATER LINE
SLUDGE
M.S SEWERAGE LINES PUMP
SEWERAGE LINES M.S

F.T F.T
SLUDGE PUMP

4" DIA RAIN WATER PIPE 4" DIA RAIN WATER PIPE
PIPE

BORING
6" DIA SEWERAGE PIPE POINT

M.H. M.H. M.H. M.H.


MAIN SEWERAGE LINE MAIN SEWERAGE LINE MAIN SEWERAGE LINE

LOWER GROUND FLOOR


SEWERAGE DETAIL
4"Ø P.V.C PIPE DOWN 4"Ø P.V.C PIPE DOWN
4"Ø P.V.C PIPE DOWN
4"Ø P.V.C PIPE DOWN

M.S
F.T F.T
M.S M.S M.S
F.T F.T

LIFT
F.T
4' X 4'
DN UP

F.T
4"Ø P.V.C PIPE DOWN

4"Ø P.V.C PIPE DOWN


F.T
F.T
4"Ø P.V.C PIPE DOWN

F.T

M.S M.S

4"Ø P.V.C PIPE DOWN


UP
4"Ø P.V.C PIPE DOWN 4"Ø P.V.C PIPE DOWN
4"Ø P.V.C PIPE DOWN

GROUND FLOOR PLAN


SEWERAGE DETAIL
4"Ø P.V.C PIPE DOWN 4"Ø P.V.C PIPE DOWN
4"Ø P.V.C PIPE DOWN 4"Ø P.V.C PIPE DOWN

M.S
F.T
M.S
F.T
M.S M.S
F.T F.T

LIFT
F.T
4' X 4'
DN UP

F.T
4"Ø P.V.C PIPE DOWN

4"Ø P.V.C PIPE DOWN


4"Ø P.V.C PIPE DOWN

F.T

4"Ø P.V.C PIPE DOWN

4"Ø P.V.C PIPE DOWN


F.T
4"Ø P.V.C PIPE DOWN
F.T
F.T
4"Ø P.V.C PIPE DOWN M.S M.S
M.S

MEZZANINE FLOOR PLAN


SEWERAGE DETAIL
4"Ø P.V.C PIPE DOWN 4"Ø P.V.C PIPE DOWN
4"Ø P.V.C PIPE DOWN 4"Ø P.V.C PIPE DOWN

M.S
F.T
M.S
F.T
M.S M.S
F.T F.T

LIFT
F.T
4' X 4'
DN UP

4"Ø P.V.C PIPE DOWN


CONNECT WITH SECOND FLOOR BATH
F.T
4"Ø P.V.C PIPE DOWN

4"Ø P.V.C PIPE DOWN


4"Ø P.V.C PIPE DOWN

F.T

4"Ø P.V.C PIPE DOWN

4"Ø P.V.C PIPE DOWN


F.T F.T
4"Ø P.V.C PIPE DOWN

F.T
4"Ø P.V.C PIPE DOWN M.S M.S
M.S

FIRST FLOOR PLAN


SEWERAGE DETAIL
4"Ø P.V.C PIPE DOWN 4"Ø P.V.C PIPE DOWN
4"Ø P.V.C PIPE DOWN 4"Ø P.V.C PIPE DOWN

F.T F.T F.T

M.S M.S

LIFT M.S

4' X 4'
M.S M.S M.S
F.T F.T F.T
DN UP

4"Ø P.V.C PIPE DOWN


M.S
F.T
4"Ø P.V.C PIPE DOWN

4"Ø P.V.C PIPE DOWN

4"Ø P.V.C PIPE DOWN


M.S M.S M.S M.S
F.T F.T F.T F.T
4"Ø P.V.C PIPE DOWN

4"Ø P.V.C PIPE DOWN

4"Ø P.V.C PIPE DOWN


F.T F.T M.S F.T M.S F.T
M.S M.S
4"Ø P.V.C PIPE DOWN

SECOND FLOOR PLAN


SEWERAGE DETAIL
9"X9" KHURRA

4"Ø P.V.C RAIN WATER PIPE 1


2"ØCOLD WATER PIPE FROM U.G.W.T
2"Ø GI OVER FLOW PIPE
2"Ø GI CLEAN OUT PIPE
O.H.W.T
LIFT 1"Ø COLD WATER PIPE TO LOWER GROUND FLOOR
11'-3" x 10'-6" x 5'-0"
4' X 4' 1"Ø COLD WATER PIPE TO GROUND FLOOR
SL
OP SL 1"Ø COLD WATER PIPE TO ME ANINE FLOOR
SLOP SLOP DN OP 1"Ø COLD WATER PIPE TO FIRST FLOOR
1"Ø COLD WATER PIPE TO SECOND FLOOR

4' Ø PLASTIC TANK


F.T M.S ON THE ROOF OF TOP FLOOR
1
2"ØCOLD WATER PIPE FROM U.G.W.T
SL
LOP 2"Ø GI OVER FLOW PIPE OP
S
2"Ø GI CLEAN OUT PIPE
SLOP SLOP SLOP SLOP
1"Ø COLD WATER PIPE TO TOP FLOOR
4"Ø P.V.C PIPE DOWN

4"Ø P.V.C RAIN WATER PIPE 4"Ø P.V.C RAIN WATER PIPE

F.T

9"X9" KHURRA 9"X9" KHURRA

TOP FLOOR PLAN


1 - PIPE PASSING THROUGH WALL, FLOOR OR
ROOF SHALL BE PROTECTED WITH SLEEVES
2 - CLEANOUT OR ACCESS DOOR SHALL BE O
/ DIAMETER OF PIPE

PROVIDED AT THE BASE OF ALL DRAINAGE CW or C COLD WATER PIPE


STACK AND AT EACH FLOOR LEVEL. HW or H HOT WATER PIPE
3 - DRAINAGE STACKS SHALL BE CONNECTED TO CW/HW or C/H COLD WATER & HOT WATER PIPE
HORIZONTAL FIXTURE DRAIN PIPES BY 90° SOIL PIPE
SP
SWEEP TEE OR Y AND 45° BEND.
WP WASTE PIPE
4 - DRAINAGE STACKS SHALL BE CONNECTED TO
VP VENT PIPE
UNDERGROUND DRAIN PIPE BY EITHER 90°
LARGE/LONG RADIUS BEND OR TWO 45° BENDS. S/S SOIL STACK

5 - PIPE SIZES ARE IN INCHES. W/S WASTE STACK

6 - PLUMBING SERVICES, SHALL BE CO-ORDINATED V/S VENT STACK


WITH OTHER SERVICES SUCH AS ELECTRICAL, T/A TO ABOVE
HVAC ETC. TO AVOID CONFLIT OR INTERFERENCE
T/B TO BELOW
WITH THEM.
F/A FROM ABOVE
7 - SIZE OF FLOOR DRAIN UNLESS OTHERWISE
STATED SHALL BE SAME AS THE SIZE OF F/B FROM BELOW

OUTLET DRAIN PIPE. AFC ABOVE FALSE CEILING


8 - WHEREVER FLOOR DRAIN/TRAP IS SHOWN, O/H OVER HEAD
SLOPE FLOOR TOWARDS DRAIN/TRAP.
U/G. UNDER GROUND
9 - HORIZONTAL DRAINAGE PIPING OF 3 INCH
U/F. UNDER FLOOR
DIAMETER & LESS SHALL BE INSTALLED
WITH A SLOPE OF NOT LESS THEN 1/4 INCH H/L HIGH LEVEL
PER FOOT, LARGER ONES WITH A SLPOE OF L/L LOW LEVEL
NOT LESS THEN 1/8 INCH PER FOOT.
10 - EXTENSION OF VENT PIPES THROUGH A ROOF
PLAN EWH ELECTRIC WATER HEATER

SHALL BE TERMINATED AT LEAST 6 INCHES


ABOVE FINISHED ROOF LEVEL. EACH VENT
DETAIL OF MANHOLE GWH GASE WATER HEATER

WC WATER CLOSET
TERMINAL SHALL BE MADE WATER TIGHT WITH
THE ROOF BY PROPER FLASHING RWP. RAIN WATER PIPE

WB. WASH BASIN


11 - SIZE OF ANYTHING GIVEN ON PLUMBING DRAWING
MEANS ITS CLEAR DIMENSIONS (CAPACITY), MH MANHOLE
UNLESS OTHERWISE MENTIONED. N.T.S. NOT TO SCALE

P.V.C PIPE

PLAIN YEE TEE

M.H
4"Ø PIPE PLAIN YEE TEE
PUMP

BASEMENT
P.V.C PIPE
VERTICAL PIPE SYSTEM DETAIL
DISPOSAL TANK

DET. OF MECHNICAL SYSTEM


FOR DISPOSAL TANK

PLAIN YEE PLAIN YEE

P.V.C PIPE P.V.C PIPE P.V.C PIPE


HORIZONTAL PIPE SYSTEM DETAIL

COLD WATER PIPE


G.I. PIPES MEDIUM GRADE BS-1387
& FITTINGS
HOT WATER PIPE
IIL OR JAMAL Make
SOIL PIPE
PPR PIPES DIN 8077-78
& FITTINGS
WASTE PIPE
DADEX, MARLEY, FIRAT THERM
VENT PIPE
CI PIPES BS-416 C.I. (SPUN)
& FITTINGS
GATE VALVE IN CHAMBER
ALPINE, TEEPU (SUPREME)
GV
GATE VALVE ON HORIZONTAL PIPE
ISO:3633 (TYPE 'B') or
12 - THE "VERTICAL DISTANCE" FROM FIXTURE OUTLET
uPVC PIPES
GATE VALVE ON VERTICAL PIPE
& FITTINGS BS4514/5255 (CLASS A) TO THE TRAP WEIR SHALL PREFERABLY BE NOT
DADEX, BETA, FIRAT PLASTIC
FLOAT VALVE
MORE THAN 12 INCHES. HOWEVER, THIS "VERTICAL
CO
FLOOR CLEAN OUT
VALVES KITZ JAPAN MAKE DISTANCE" FROM THE FIXTURE OUTLET TO THE
TRAP WEIR SHALL NOT EXCEED 24 INCHES.
CO CLEAN OUT IN THE FALSE CEILING

WATER TAP

FD
FLOOR DRAIN
13 - WHERE THE CHANGE OF DIRECTION IS 45° OR LESS,
FT
20mm 1/2" 40mm 1-1/2" IT IS NOT NECESSARY TO PROVIDE A CLEAN OUT.
FLOOR TRAP
25mm 3/4" 50mm 2" BUT WHEN THE CHANGE IN DIRECTION IS MORE THAN
PIPE RISER WITH BEND (FROM ABOVE)
32mm 1" 75mm 3" 45°, A CLEAN OUT SHOULD BE REQUIRED.
PIPE RISER WITH BEND (TO BELOW)
40mm 1-1/4" 110mm 4"
DIRECTION OF FLOW
50mm 160mm
DETAIL OF FLOOR CLEANOUT 14 - CLEANOUTS SHALL BE SO INSTALLED THAT THERE IS
1-1/2" 6"
MS MUSLIM SHOWER A CLEARANCE OF NOT LESS THAN 18 INCHES FOR
65mm 2"
G.T
GULLY TRAP THE PURPOSE OF RODDING.
Gr.T 1. BOTH PPR & uPVC DESIGNATE EXTERNAL DIAMETERS.
GREASE INTERCEPTOR 2. BOTH G.I. & C.I. PIPES DESIGNATE INTERNAL DIAMETERS.
15 - ALL TRAPS AND FLOOR DRAINS SHALL HAVE A WATER
SEAL NOT LESS THAN 2 INCHES.

16 - PROVIDE TEMPERATURE RELIEF VALVES OR ENERGY


SHUT OFF DEVICES FOR ALL EQUIPMENT USED FOR
THE HEATING OR STORAGE OF HOT WATER. THE
RELIEVING CAPACITY OF A TEMPERATURE-RELIEF VALVE
SHOULD NOT BE LESS THAN ONE GALLON OF WATER
HOUR FOR EACH 1250 BTU. OF HEATER CAPACITY
PER HOUR.

17 - (EXTERNAL SERVICES) THE BOTTOM OF WATER-SERVICES


PIPE , AT ALL POINTS,SHALL BE AT LEAST 12 INCHES
ABOVE THE TAP OF THE SEWER LINE AT ITS HIGHEST
DETAIL OF CAULKED JOINT
CLEANOUT INSTALLATION
DETAIL OF FLOOR TRAP IN FALSE CEILING
READ THIS DRAWING IN CONJUNCTION WITH ALL
RELEVANT DRAWINGS
STEEL
REINFORCEMENT
DETAIL
GENERAL
1- READ THESE STRUCTURAL DRAWINGS IN
CONSTRUCTION WITH ALL RELEVANT DRAWINGS.
2- PROVIDE TERMITE CONTROL TREATMENT IN THIS
BUILDING.
3- ALL LEVELS AND DIMENSIONS ARE IN FEET & INCHES
UNLESS OTHERWISE NOTED.
4- DO NOT SCALE THE DRAWINGS, DIMENSIONS GIVEN ON
THE DRAWING SHALL GOVERN.

DESIGN CODES & BUILDING ZONE


1- THE BUILDING HAS BEEN DESIGNED ON THE BASIS OF
THE PARAMETERS LAID DOWN IN THE DESIGN CODES
ACI-318 AND UBC-97.
2- THE STRUCTURE IS DESIGNED FOR SEISMIC ZONE-2B AS
PER UBC-97.

FOUNDATION
1- FOUNDATION HAS BEEN DESIGNED FOR BASEMENT,
GROUND FLOOR MEZZANINE FLOOR, FIRST FLOOR,
SECOND FLOOR, PLUS TOP FLOOR AT DESIGNATED
LOCATION AS IN ARCHITECTURE ONLY. ANY FURTHER
CONSTRUCTION ABOVE TOP FLOOR IS STRICTLY NOT
ALLOWED.
2- ALL LOOSE/SOFT PATCHES NOTICED DURING
EXCAVATION SHALL BE REPLACED WITH GRANULAR
FILL. THE FILLING SHALL BE DONE IN LAYERS OF
MAXIMUM 6" THICKNESS (EACH) AND EACH LAYER
SHALL BE COMPACTED UPTO 95% RELATIVE DENSITY.

REINFORCEMENT CONCRETE WORKS


1- ALL CONCRETE CONSTRUCTION SHALL BE CLASS "B" TYPE (1:1.5:3)
WITH MINIMUM CYLINDER CRUSHING STRENGTH OF 3000PSI AT 28
DAYS CURING.

REINFORCING STEEL WORKS


1- ALL REINFORCEMENT SHALL BE HIGHLY YIELD HOT ROLLED BILLET
DEFORMED STEEL BARS CONFORMING TO ASTM A-615 GRADE 60 WITH
SPECIFIED YIELD STRENGTH OF NOT LESS THEN 60,000 PSI NOT MORE
THAN 78000 AND RATIO OF ULTIMATE STRENGTH / YIELD STRENGTH NOT
LESS THAN 1.25.
2- 3/8" DIA BARS SHALL BE MILD STEEL DEFORMED BARS GRADE 60 WITH
A MINIMUM YIELD STRENGTH OF 60000 PSI.
3- ALL DETAILING SHALL BE DONE AS PER ACI-315 AND ACI-318.
4- USE GRADE 60 DEFORMED STEEL FOR SLABS, BEAM STRIPS & COLUMN
TIES EXCEPT MENTIONED.
5- USE GRADE 60 DEFORMED STEEL FOR RAFT, COLUMNS, BEAM MAIN
REINFORCEMENT, RETAINING WALLS, OVERHEAD & UNDERGROUND
WATER TANKS.
6- CONCRETE CLEAR COVERAGE SHOULD BE FOLLOWED AS:-
(A) SLAB 3/4" (B) BEAMS 1.5" ALL SIDES
(C) COLUMNS / WALLS 1.5" ALL SIDES
7- LAP LENGTH SHOULD BE FOLLOWED AS:-
(A) 1" DIA = 60" (B) 3/4" DIA = 45"
(C) 1/2" DIA = 30" (E) 3/8" DIA = 24"
8- ALL REINFORCEMENT STEEL SHALL BE ACCURATELY LOCATED IN THE
FORMS AND HELD FIRMLY IN PLACE BEFORE & DURING THE PLACING OF
CONCRETE BY MEANS OF WIRE AND SUPPORTS ADEQUATE TO PREVENT
DISPLACEMENT DURING THE COURSE OF CONSTRUCTION.

CONCRETE CONSTRUCTION
1- ALL STRUCTURAL SURFACES, AGAINST WHICH EARTH IS TO BE FILLED,
SHALL BE COATED WITH TWO COATS OF HOT BITUMEN OF 10 20 GRADE AT
THE RATE OF 1.0 KG/SQM EACH COAT.
2- AVOID STACKING OF CONSTRUCTION MATERIALS, BRICKS, ETC ON
SLAB PANELS DURING CONSTRUCTION.
3- BEFORE CASTING OF ANY STRUCTURAL MEMBER, IT SHALL BE
ENSURED THAT ALL EMBEDDED ITEMS OR OPENINGS FOR ELECTRICAL,
PLUMBING, STRUCTURAL STEEL AND OTHER WORKS ARE PROPERLY
LOCATED IN PLACE.
A B C D E F G H I
12'-6" 12'-6" 12'-6" 12'-6" 12'-6" 12'-6" 12'-6" 12'-6"
1 T-B T-B T-B T-B T-B T-B T-B T-B

2'
C-2 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-2
T-B

T-B

T-B

T-B

T-B

T-B

T-B

T-B

T-B
24" THICK

#6 @ 6" C/C
#6 @ 6" C/C
27'

23'
R.C.C. RAFT

#6 @ 6" C/C

#6 @ 6" C/C

C-2 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-2

2'
T-B T-B T-B T-B T-B T-B T-B T-B
B

FOOTING REINFORCEMENT PLAN


#6 @ 6" C/C

#6 @ 6" C/C
BELOW RAFT 7'-9"

#6 @ 6" C/C

#6 @ 6" C/C

A U.G.W.T.
9'-0" X 10'-0" 5'-0"
A

SEPTIC TANK
8'-0" X 5'-0" 5'-0"

C-2 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-2

#5 @ 6" C/C B/W #5 @ 6" C/C B/W


#5 @ 6" C/C B/W #5 @ 6" C/C B/W

24" THICK R.C.C. RAFT U.G.W.T. 24" THICK R.C.C. RAFT


5'-5"

SEPTIC TANK
COMPACT EARTH 4" THICK P.C.C. (1:4:8) COMPACT EARTH 4" THICK P.C.C. (1:4:8)

24" THICK R.C.C. RAFT


2'
4"

4" THICK P.C.C. (1:4:8)

FOOTING SECTION A-A


B-2 B-2 B-2 B-2 B-2 B-2 B-2 B-2
#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C
C-2 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-2
6'

6'

6'

6'

6'

6'

6'
VOID

UP
#3 @ 10" C/C

#3 @ 10" C/C

#3 @ 10" C/C

#3 @ 10" C/C

#3 @ 10" C/C

#3 @ 10" C/C

#3 @ 10" C/C
CB-2

#3 @ 10" C/C

#3 @ 8" C/C
4'
B-1

B-1

B-1

B-1

B-1

B-1

B-1

B-1

B-1
#3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C
#3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C 9' 9' 9' 9' 5'
4' 9' 9' 9'
#4 @ 8" C/C

#3 @ 8" C/C
4'
#4 @ 8" C/C #4 @ 8" C/C CB-2 #4 @ 8" C/C #4 @ 8" C/C
#4 @ 8" C/C #4 @ 8" C/C #4 @ 8" C/C
#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C
6'

6'

6'

6'

6'

6'

6'
C-2 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-2
CB-1 CB-1 CB-1 CB-1 CB-1 CB-1 CB-1 CB-1

LOWER GROUND FLOOR


SLAB REINFORCEMENT PLAN
B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1
#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C
C-2 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-2
6'

6'

6'

6'

6'

6'

6'
VOID

UP
#3 @ 10" C/C

#3 @ 10" C/C

#3 @ 10" C/C

#3 @ 10" C/C

#3 @ 10" C/C

#3 @ 10" C/C

#3 @ 10" C/C
CB-2

#3 @ 8" C/C
B-1

B-1

B-1

B-1

B-1

B-1

B-1

B-1

B-1
6'
#3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C
#3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C 9' 9' 9'
7' 9' 9' 9' #3 @ 8" C/C #3 @ 8" C/C #3 @ 8" C/C
9' 5'
#4 @ 8" C/C
#4 @ 8" C/C #4 @ 8" C/C #4 @ 8" C/C #4 @ 8" C/C
#4 @ 8" C/C #4 @ 8" C/C #4 @ 8" C/C

#3 @ 10" C/C
#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C

#3 @ 8" C/C
C-2 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-2
9'

9'

9'

9'

9'

9'

9'

9'
B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1

GROUND + MEZZANINE + FIRST + SECOND


REINFORCEMENT PLAN
B-1 B-1

#3 @ 10" C/C

#3 @ 8" C/C
#3 @ 8" C/C

C-1 C-1 C-1


6'

6'
#4 @ 8" C/C B/W
#4 @ 8" C/C B/W
#3 @ 10" C/C

#3 @ 8" C/C
R.C.C. (1:1.5:3)
5' DOWEL ALL FOOTINGS R.C.C. (1:2:4)
#3 @ 6" C/C B/W
B-1

B-1

B-1

#4 @ 8" C/C
#3 @ 8" C/C
8'
#5 @ 6" C/C B/W
#3 @ 8" C/C #3 @ 8" C/C
9'
8' WATER STOPER
#4 @ 8" C/C
24" #5 @ 6" C/C B/W

24"
2' TB-1
#5 @ 6" C/C B/W
#3 @ 8" C/C

#3 @ 8" C/C

4"

4"
P.C.C. (1:3:6) P.C.C. (1:3:6)
6'

6'

C-1 C-1 C-1 C-1


3" 8' 3" 3" 5' 3"
B-1 B-1

TOP FLOOR REINFORCEMENT PLAN TYPICAL FOOTING SECTION R.C.C. WALL


12" 12"
GRID GRID GRID
3#5
#3@8"C/C
6#5 1/2" ∅ @ 8" C/C B/W 3/8" ∅ @ 6" C/C B/W
EXTRA BARS AT SUPPORT EXTRA BARS AT SUPPORT
X EXTRA BARS AT SUPPORT #3@8"C/C
CLOSE STIRRUPS NORMAL STIRRUPS CLOSE STIRRUPS NORMAL STIRRUPS CLOSE STIRRUPS NORMAL STIRRUPS CLOSE STIRRUPS 3#4
b 4#5
TOP BARS
6" 4'-0" 6"

24"

24"
#3@8"C/C #3@8"C/C

h
3#4

6"
2h BOTTOM BARS 2h 2h 4b 2h
X SECTION
AT X-X 6#5
3#5
TYPICAL DETAIL OF BEAM RESTING ON COLUMNS.

COLUMN SECTION C-1 COLUMN SECTION C-2

LIFT

4'-0"
6-#1/2" 3-#1/2" 12"
12" 12" 4'-0" X 4'-0"
6"

6"

6"

6"

3#6

R.C.C. (1:2:4) 2-1/2"∅ 2-1/2"∅


24"

24"

#3@8"C/C #3@8"C/C
24"

4"

4"
#3@ 8"C/C #3 @ 8" C/C
#3@ 8"C/C
3#6
3#6
10-3/4"∅ 10-1/2"∅

6"
CONCIELD BEAM SECTION CB-1 CONCIELD BEAM SECTION CB-2
6-#5/8" 3-#5/8" P.C.C. (1:3:6)

12" 12" 3" 12" 3"

X-SEC. OF BEAM B-1 X-SEC. OF BEAM B-2 TIE BEAM TB-1


LIFT R.C.C. WALL
#4@6"c/c
#4@7"c/c #4@8"c/c
3" 2'-0" 3" #4@8"c/c #4@8"c/c #4@6"c/c
R.C.C RAFT LEVEL B/W

3"
B/W

4"
6''

2-#4 M.H Cover

6"
Water Level Water Level 5"THICK
4.5" Th. Brick Wall 4.5" Th. Brick Wall
2-#4 L/
4 WAIST
#4@8"c/c #4@7"c/c #6@12"c/c #4@7"c/c
(O.F) (I.F)
Cover 1 12" Cover 1 12" #4@6"c/c

4'-0"
#4@9"C/C
6'-0"
#4@9"c/c #4@9"c/c 6#5
#4@12"c/c

1'-6"
5'-0"

(O.F) (I.F)
Corner Bars
#4 @ 6" C/C
Damp Proof Coating Damp Proof Coating 6" #4@9"c/c
#4@10"c/c B/W F/L

6"

1'-6"

54"
12"

Corner Bar

6"
6" #4@9"c/c
1'-0"
6"

B/W #4@6"c/c #4@6"c/c

1'-6"
P.C.C.(1:4:8)

18"
27"
3"6"

PCC (1:4:8)
3" 6" 9" 9'-0" 9" 6"3" Slab
2'-0"

#4@7"c/c #4@7"c/c 95 % ASSHTO Compacted


Granular Soil

SECTION OF U.G.W.T DETAIL OF O.H.W.T. DETAIL OF STAIR