The ABB HAZCON process is a


systematic and formal method of
identifying and assessing the risks
which may be present during
construction, maintenance,
modification and demolition of an
asset.

The Construction (Design and Management) (CDM) The ABB methodology adopts a two stage approach,
regulations were updated in 2007 active for a significant project. The HAZCON 1 study should
involvement of the client is key to the success of the be carried out as early as possible in the project life
project and is required by the regulations, in regard cycle and be completed before significant detail
to the health and safety of those involved with the design or remediation programme commences, or
construction, operations and maintenance of the indeed any of the site contracts are let to third party
asset. Risk assessment at the early stages of a suppliers. HAZCON 2 study should take place before
project can help minimise risks during construction any significant site work commences and should
and through the life of the asset. The HAZCON include all relevant parties who can influence OHS
process helps address the ‘hidden’ risks and identify on the project.
any ‘hidden’ costs associated with health and safety.
HAZCON implementation
Our approach To be effective, the HAZCON studies need to be
HAZCON methodology attended by those who can make a significant OHS
The ABB HAZCON process is a systematic and input to the project specification. Normally this
formal method of identifying and assessing the would include the project manager, project
risks which maybe present during construction, engineer, the client, the client’s OHS specialist, CDM
maintenance modification and demolition of an coordinator, construction manager and
asset. In providing a proven process for construction OHS specialist. Ideally the study
identification of risk and the necessary actions for should be chaired by an experienced HAZCON leader
risk mitigation, it helps with the following who will facilitate the meeting, record the findings
important steps: of the study and agree action / ownership with
appropriate timescales where identified actions
-- Production of Occupational Health and Safety need to be addressed.
(OHS) management plans
-- Consideration of OHS at the layout and detailed
design stages
-- Identification of key personnel that can influence
the OHS of a project
As a proven methodology, the HAZCON study is a Benefits
robust questionnaire based approach adapted for -- Improved health and safety of workers
practical implementation and based on our in-depth -- Reductions in overall costs of ownership of asset
experience for these particular elements of the -- Reduced delays
project lifecycle. -- More reliable costs and programmes
-- Improved communications and cooperation
A skilled HAZCON leader will invariably introduce the between key parties
questions and stimulate discussion concerning -- Improved quality of finished product
potential hazards, risks and controls. This will assist -- Compliance with CDM design requirements
those responsible for project delivery to minimise
the construction or demolition / remediation risks. Why ABB?
-- The ABB process has been developed and
To be effective overall, the HAZCON study actions successfully used over a period of many years
need to be implemented within agreed timescales -- ABB have experienced HAZCON leaders who can
and should be seen as an integral part of the overall help clients effectively use the process
project Occupational Health and Safety (OHS) -- ABB can provide training on the implementation of
management procedures, plans and action tracking the process
processes. -- ABB are able to suggest potential solutions to
issues raised
-- ABB can help identify where hidden costs maybe
waiting

Projects services/PRS123a/05/18

— —
ABB Limited We reserve the right to make technical We reserve all rights in this document and
Daresbury Park, Daresbury changes or modify the contents of this in the subject matter and illustrations
Warrington, Cheshire document without prior notice. With contained therein. Any reproduction,
WA4 4BT United Kingdom regard to purchase orders, the agreed disclosure to third parties or utilisation of
Phone: +44 (0)1925 741 111 particulars shall prevail. ABB does not its contents – in whole or in parts – is
E-Mail: contact@gb.abb.com accept any responsibility whatsoever for forbidden without prior written consent of
potential errors or possible lack of ABB. Copyright© 2018 ABB
information in this document. All rights reserved
abb.com/consulting

You might also like