SCOPE OF WORK PERBAIKAN KABEL TANAH dan INSTALL BATTERY CHARGER

GENERATOR EMERGENCY PARLEMENT BUILDING - MIMIKA

I. Site Work
1. Penggalian Jalur Kabel
2. Penimbunan Kembali Pasir

II. Concrete Work


1. Concrete untuk pipa croos jalan
2. Pemasangan bagasting .

III. Electrical
1. Install Pipa Conduit / Paralon
2. Install Fish tape
3. Install Conductor 4 core X 70mm x 300 m
4. Pulling Kabel
5. Splicing Joint Conductor
6. Install Termination
7. Install power control Battery
8. Install Battery Charger Set