RINGKASAN HARGA SATUAN BAHAN/MATERIAL

HARGA PAJAK BIAYA JARAK BIAYA BIAYA JUMLAH


NO JENIS MATERIAL SAT. QUARY PEMDA 25% GALI ANGKUT ANGKUT PEKERJA HARGA
(Rp) (Rp) (Km) (Rp) (Rp) (Rp)

1 PASIR M3 83,333.33 - 37,302.60 48.00 314,563.27 0 435,199.21

3 PASIR TAILING M3 40,000.00 10,000.00 - 20.00 212,313.13 262,313.13

4 PASIR URUG - - 10.00 123,984.85 123,984.85

5 PASIR BETON M3 83,333.33 - 37,302.60 12.00 124,476.17 11,275.74 256,387.84

4 BATU KALI M3 300,000.00 75,000.00 31,085.50 48.00 278,733.28 684,818.79

5 GRAVEL M3 83,333.33 20,833.33 - 48.00 330,856.27 435,022.94

5 SIRTU M3 50,000.00 12,500.00 37,302.60 51.00 330,726.86 430,529.46

7 URPIL M3 - - - 51.00 323,479.53 323,479.53

7 TOP SOIL M3 - - - 10.00 102,565.39 102,565.39

6 ASPAL BITUMEN KG 14,940.76 27.00 270.52 15,211.28

7 SEMEN PC ZAK 87,000.00 40.00 21,885.75 108,885.75

8 BESI BETON (POLOS) KG 19,000.00 5.00 183.24 19,183.24

9 BESI BETON (ULIR) KG 29,000.00 5.00 183.24 29,183.24

10 KAWAT BENDRAT KG 25,450.00 5.00 383.93 25,833.93

11 KAWAT BRONJONG KG 18,673.10

12 KAYU BEKISTING BALOK M3 2,200,000.00

13 KAYU BEKISTING PAPAN M3 2,200,000.00

14 PAKU KG 25,973.10

15 PIPA PVC Ø 5" M'

16 PIPA GALVANIS Ø 3" M' 208,333.33

17 MINYAK SOLAR LTR 5,200 40.00 421.17 5,621.17

18 MINYAK BENSIN LTR 6,000 40.00 429.17 6,429.17

19 MINYAK PELUMAS / OLI LTR 35,000 40.00 719.17 35,719.17

20 MINYAK KEROSINE LTR 173.33

21 CAT MARKA KG 45,000 40.00 673.10 45,673.10

Ringkasan
22 THINNER LTR 27,500 40.00 543.10 28,043.10

23 GLASS BIT KG 24,000.00

24 GEOTEKSTIL M2 10,000.00

MATERIAL OLAHAN

AGREGAT KASAR (BT.Pecah) 605,535 10.00 73,607.97 31,085.50 710,228.60

26 AGREGAT HALUS M3 622,273 37,302.60 12.00 124,476.17 11,275.74 795,327.83

Ringkasan
A SATUAN BAHAN/MATERIAL

KET.

Proyek

Proyek

Proyek

Proyek

Proyek

Proyek

Proyek

Proyek

Proyek

Base camp

Proyek

Proyek

Proyek

Proyek

Proyek

Proyek

Proyek

Proyek

Proyek

Proyek

Proyek

Proyek

Proyek

Proyek

Ringkasan
Proyek

Proyek

Ringkasan
ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M01 - Pasir


Lokasi : Quarry
Tujuan Lokasi pekerjaan

NO. URAIAN KODE KOEF. SATUAN

I ASUMSI
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak Quarry ke proyek L 20.00 Km
4 Harga satuan di Quarry Rp. M01 1.00 M3
5 Harga Satuan Dasar Excavator Rp. E10 1.00 jam
6 Harga Satuan Dasar Dump Truck Rp. E08 1.00 jam

II URUTAN KERJA
1 Pasir digali dengan excavator
2 Excavator sekaligus memuat hasil galian
ke dalam Dump truck
3 Dump Truck mengangkut pasir ke lokasi
Base Camp

III PERHITUNGAN
1 Excavator
Kapasitas bucket V 0.80 M3
Faktor bucket Fb 0.83 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus: Ts1
- Menggali / memuat T1 1.50 menit
- Lain-lain T2 1.00 menit
Ts1 2.50 menit
Kap. Produksi/jam = V x Fb x Fa x 60 Q1 13.23 M3/jam
Fk x Ts1
Biaya excavator /M3 = (1/Q1) x Rp E10 Rp1 40,318.70 Rupiah

2 Dump Truck (E 08)


Kapasitas bak V 3.00 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 25.00 Km/jam
Kecepatan rata-rata kosong v2 35.00 Km/jam
Waktu siklus Ts2
- Waktu tempuh isi = (L : v1) x 60 menit T1 48.00 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T2 34.29 menit
- Muat = (V/Q1)/60 T3 13.61 menit
- Lain-lain termasuk menurunkan material T4 3.00 menit
Ts2 98.89 menit
Kap. Produksi/jam = V x Fa x 60 Q2 1.51 M3
Fk x Ts2
Biaya Dump Truck/M3 = (1/Q2) x Rp E08 Rp2 212,313.13 Rupiah

IV HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP
Harga Sat. Dasar Pasir =
(Rp M01+Rp 1+Rp 2) M 01 292,631.83

397197062.xlsx Pasir Tailing PYK


NO. URAIAN KODE KOEF. SATUAN

Dibulatkan M01 292,632 Rupiah

397197062.xlsx Pasir Tailing PYK


AHAN

HARGA SATUAN
(Rp)

40,000.00
533,290.63
320,742.05

397197062.xlsx Pasir Tailing PYK


HARGA SATUAN
(Rp)

397197062.xlsx Pasir Tailing PYK


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M01 - Pasir


Lokasi : Quarry
Tujuan : Base Camp

HARGA SATUAN
NO. URAIAN KODE KOEF. SATUAN
(Rp)

I ASUMSI
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak Quarry ke proyek L 48.00 Km
4 Harga satuan di Quarry Rp. M01 1.00 M3 83,333.33
5 Harga Satuan Dasar Excavator Rp. E10 1.00 jam 411,164.21
6 Harga Satuan Dasar Dump Truck Rp. E08 1.00 jam 225,573.14

II URUTAN KERJA
1 Pasir digali dengan excavator
2 Excavator sekaligus memuat hasil galian
ke dalam Dump truck
3 Dump Truck mengangkut pasir ke lokasi
Base Camp

III PERHITUNGAN
1 Excavator
Kapasitas bucket V 0.80 M3
Faktor bucket Fb 0.83 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus: Ts1
- Menggali / memuat T1 1.50 menit
- Lain-lain T2 1.00 menit
Ts1 2.50 menit
Kap. Produksi/jam = V x Fb x Fa x 60 Q1 11.02 M3/jam
Fk x Ts1
Biaya excavator /M3 = (1/Q1) x Rp E10 Rp1 37,302.60 Rupiah

2 Dump Truck (E 08)


Kapasitas bak V 3.00 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 35.00 Km/jam
Kecepatan rata-rata kosong v2 40.00 Km/jam
Waktu siklus Ts2
- Waktu tempuh isi = (L : v1) x 60 menit T1 82.29 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T2 72.00 menit
- Muat = (V/Q1)/60 T3 16.33 menit
- Lain-lain termasuk menurunkan material T4 3.00 menit
Ts2 173.62 menit
Kap. Produksi/jam = V x Fa x 60 Q2 0.72 M3
Fk x Ts2
Biaya Dump Truck/M3 = (1/Q2) x Rp E08 Rp2 314,563.27 Rupiah

IV HARGA SATUAN DASAR BAHAN


DI LOKASI PROYEK
Harga Sat. Dasar Pasir =
(Rp M01+Rp 1+Rp 2) M 01 435,199.21

Dibulatkan M01 435,199 Rupiah

Pasir
ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M01 - Pasir


Lokasi : Quarry
Tujuan : Base Camp

HARGA SATUAN
NO. URAIAN KODE KOEF. SATUAN
(Rp)

I ASUMSI
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak Quarry ke proyek L 24.00 Km
4 Harga satuan di Quarry Rp. M01 1.00 M3 83,333.33
5 Harga Satuan Dasar Excavator Rp. E10 1.00 jam 411,164.21
6 Harga Satuan Dasar Dump Truck Rp. E08 1.00 jam 320,742.05

II URUTAN KERJA
1 Pasir digali dengan excavator
2 Excavator sekaligus memuat hasil galian
ke dalam Dump truck
3 Dump Truck mengangkut pasir ke lokasi
Base Camp

III PERHITUNGAN
1 Excavator
Kapasitas bucket V 0.80 M3
Faktor bucket Fb 0.83 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus: Ts1
- Menggali / memuat T1 1.50 menit
- Lain-lain T2 1.00 menit
Ts1 2.50 menit
Kap. Produksi/jam = V x Fb x Fa x 60 Q1 11.02 M3/jam
Fk x Ts1
Biaya excavator /M3 = (1/Q1) x Rp E10 Rp1 Rupiah

2 Dump Truck (E 08)


Kapasitas bak V 3.00 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 25.00 Km/jam
Kecepatan rata-rata kosong v2 35.00 Km/jam
Waktu siklus Ts2
- Waktu tempuh isi = (L : v1) x 60 menit T1 57.60 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T2 41.14 menit
- Muat = (V/Q1)/60 T3 16.33 menit
- Lain-lain termasuk menurunkan material T4 3.00 menit
Ts2 118.07 menit
Kap. Produksi/jam = V x Fa x 60 Q2 1.05 M3
Fk x Ts2
Biaya Dump Truck/M3 = (1/Q2) x Rp E08 Rp2 304,185.16 Rupiah

IV HARGA SATUAN DASAR BAHAN


DI LOKASI PROYEK
Harga Sat. Dasar Pasir =
(Rp M01+Rp 1+Rp 2) M 01 387,518.49

Dibulatkan M01 387,518 Rupiah

397197062.xlsx Pasir base camp


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M01a - Pasir Beton


Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

HARGA SATUAN
NO. URAIAN KODE KOEF. SATUAN
(Rp)

I ASUMSI
1 Menggunakan alat berat
2 Kondisi jalan : sedang
3 Jarak Quarry ke Lokasi Pekerjaan L 12.00 Km
4 Harga satuan di Quarry Rp. M01 1.00 M3 83,333.33
5 Harga Satuan Dasar Excavator Rp. E10 1.00 jam 411,164.21
6 Harga Satuan Dasar Dump Truck Rp. E08 1.00 jam 225,573.14
7 Harga satuan upah pekerja Rp. L01 1.00 jam 20,714.29

II URUTAN KERJA
1 Pasir digali dengan excavator
2 Excavator sekaligus memuat hasil galian
ke dalam Dump truck
3 Dump Truck mengangkut pasir ke lokasi
Pekerjaan

III PERHITUNGAN
1 Excavator
Kapasitas bucket V 0.80 M3
Faktor bucket Fb 0.83 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus: Ts1
- Menggali / memuat T1 1.50 menit
- Lain-lain T2 1.00 menit
Ts1 2.50 menit
Kap. Produksi/jam = V x Fb x Fa x 60 Q1 11.02 M3/jam
Fk x Ts1
Biaya excavator /M3 = (1/Q1) x Rp E10 Rp1 37,302.60 Rupiah

2 Dump Truck (E 08)


Kapasitas bak V 3.00 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 25.00 Km/Jam
Kecepatan rata-rata kosong v2 35.00 Km/Jam
Waktu siklus Ts2
- Waktu tempuh isi = (L : v1) x 60 menit T1 28.80 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T2 20.57 menit
- Muat = (V/Q1)/60 T3 16.33 menit
- lain-lain termasuk menurunkan material T4 3.00 menit
Ts2 68.70 menit
Kap. Produksi/jam = V x Fa x 60 Q2 1.81 M3
Fk x Ts2
Biaya Dump Truck/M3 = (1/Q2) x Rp E08 Rp2 124,476.17 Rupiah

3 Pekerja
Produksi menentukan : Excavator Q1 11.02 M3/jam
Hasil galian batu/hari = Q1 x 7 jam Qt 77.16 M3/7jam
Kebutuhan Pekerja u/ mencuci pasir P 6.00 orang
Biaya pekerja/M3 = {(7 jam x P) : Qt} x RpL01 Rp3 11,275.74 Rupiah

397197062.xlsx-Pasir beton Pyk


HARGA SATUAN
NO. URAIAN KODE KOEF. SATUAN
(Rp)

IV HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP
Harga Satuan Dasar Pasir =
(Rp M01 + Rp 1 +Rp 2 +Rp 3) M 01 256,387.84

Dibulatkan M01 256,388 Rupiah

397197062.xlsx-Pasir beton Pyk


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M02 - Batu Kali


Lokasi : Quarry
Tujuan : Base Camp

HARGA SATUAN
NO. URAIAN KODE KOEF. SATUAN
(Rp)

I ASUMSI
1 Menggunakan alat berat
2 Kondisi jalan : sedang/baik
3 Jarak Quarry ke proyek L 48.00 Km
4 Harga satuan Batu kali di Quarry Rp. M06 1.00 M3 300,000.00
5 Harga Satuan Dasar Excavator Rp. E10 1.00 jam 411,164.21
6 Harga Satuan Dasar Dump Truck Rp. E08 1.00 jam 225,573.14

II URUTAN KERJA
1 Batu kali digali dengan excavator
2 Excavator sekaligus memuat batu kali hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut batu kali ke
Base Camp

III PERHITUNGAN
1 Excavator (E10)
Kapasitas bucket V 0.80 M3
Faktor bucket Fb 0.83 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus: Ts1
- Menggali / memuat T1 1.50 menit
- Lain-lain T2 1.00 menit
Ts1 2.50 menit
Kap. Produksi/jam = V x Fb x Fa x 60 Q1 13.23 M3/jam
Fk x Ts1
Biaya excavator /M3 = (1/Q1) x Rp E10 Rp1 31,085.50 Rupiah

2 Dump Truck (E 08)


Kapasitas bak V 3.00 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 30.00 Km/Jam
Kecepatan rata-rata kosong v2 40.00 Km/Jam
Waktu siklus Ts2
- Waktu tempuh isi = (L : v1) x 60 menit T1 96.00 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T2 72.00 menit
- Muat = (V/Q1)/60 T3 13.61 menit
- lain-lain termasuk menurunkan material T4 3.00 menit
Ts2 184.61 menit
Kap. Produksi/jam = V x Fa x 60 Q2 0.81 M3
Fk x Ts2
Biaya Dump Truck/M3 = (1/Q2) x Rp E08 Rp2 278,733.28 Rupiah

IV HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP
Harga Satuan Dasar Pasir =
(Rp M06 + Rp 1+ Rp 2) M 06 609,818.79 Rupiah

BT Kali pyk
HARGA SATUAN
NO. URAIAN KODE KOEF. SATUAN
(Rp)
Pajak Retribusi daerah (25%)XRp.M06 75,000.00

Dibulatkan M06 684,818.79 Rupiah

BT Kali pyk
ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M02 - Batu Kali


Lokasi : Quarry
Tujuan : Base Camp

HARGA SATUAN
NO. URAIAN KODE KOEF. SATUAN
(Rp)

I ASUMSI
1 Menggunakan alat berat
2 Kondisi jalan : sedang/baik
3 Jarak Quarry ke Base Camp L 15.00 Km
4 Harga satuan Batu kali di Quarry Rp. M06 1.00 M3 300,000.00
5 Harga Satuan Dasar Excavator Rp. E10 1.00 jam 411,164.21
6 Harga Satuan Dasar Dump Truck Rp. E08 1.00 jam 225,573.14

II URUTAN KERJA
1 Batu kali digali dengan excavator
2 Excavator sekaligus memuat batu kali hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut batu kali ke
Base Camp

III PERHITUNGAN
1 Excavator (E10)
Kapasitas bucket V 0.80 M3
Faktor bucket Fb 0.83 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus: Ts1
- Menggali / memuat T1 1.50 menit
- Lain-lain T2 1.00 menit
Ts1 2.50 menit
Kap. Produksi/jam = V x Fb x Fa x 60 Q1 13.23 M3/jam
Fk x Ts1
Biaya excavator /M3 = (1/Q1) x Rp E10 Rp1 31,085.50 Rupiah

2 Dump Truck (E 08)


Kapasitas bak V 3.00 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 25.00 Km/Jam
Kecepatan rata-rata kosong v2 35.00 Km/Jam
Waktu siklus Ts2
- Waktu tempuh isi = (L : v1) x 60 menit T1 36.00 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T2 25.71 menit
- Muat = (V/Q1)/60 T3 13.61 menit
- lain-lain termasuk menurunkan material T4 3.00 menit
Ts2 78.32 menit
Kap. Produksi/jam = V x Fa x 60 Q2 1.91 M3
Fk x Ts2
Biaya Dump Truck/M3 = (1/Q2) x Rp E08 Rp2 118,256.70 Rupiah

IV HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP
Harga Satuan Dasar Pasir =
(Rp M06 + Rp 1+ Rp 2) M 06 449,342.20 Rupiah

397197062.xlsx--BT Kali-BASECAMP
HARGA SATUAN
NO. URAIAN KODE KOEF. SATUAN
(Rp)

Dibulatkan M06 449,342 Rupiah

397197062.xlsx--BT Kali-BASECAMP
ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Batu pecah 2/3


Lokasi : Quarry
Tujuan :Lokasi Proyek

HARGA SATUAN
NO. URAIAN KODE KOEF. SATUAN
(Rp)

I ASUMSI
1 Menggunakan alat berat
2 Kondisi jalan : sedang/baik
3 Jarak Quarry ke Base Camp L 10.00 Km
4 Harga satuan Batu pecah di Quarry Rp. M06 1.00 M3 605,535.13
5 Harga Satuan Dasar Excavator Rp. E10 1.00 jam 411,164.21
6 Harga Satuan Dasar Dump Truck Rp. E08 1.00 jam 225,573.14

II URUTAN KERJA
1 Batu kali digali dengan excavator
2 Excavator sekaligus memuat batu kali hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut batu kali ke
Base Camp

III PERHITUNGAN
1 Excavator (E10)
Kapasitas bucket V 0.80 M3
Faktor bucket Fb 0.83 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus: Ts1
- Menggali / memuat T1 1.50 menit
- Lain-lain T2 1.00 menit
Ts1 2.50 menit
Kap. Produksi/jam = V x Fb x Fa x 60 Q1 13.23 M3/jam
Fk x Ts1
Biaya excavator /M3 = (1/Q1) x Rp E10 Rp1 31,085.50 Rupiah

2 Dump Truck (E 08)


Kapasitas bak V 3.00 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 35.00 Km/Jam
Kecepatan rata-rata kosong v2 40.00 Km/Jam
Waktu siklus Ts2
- Waktu tempuh isi = (L : v1) x 60 menit T1 17.14 menit
- Waktu tempuh kosong = (L : v2) x 60 menit T2 15.00 menit
- Muat = (V/Q1)/60 T3 13.61 menit
- lain-lain termasuk menurunkan material T4 3.00 menit
Ts2 48.75 menit
Kap. Produksi/jam = V x Fa x 60 Q2 3.06 M3
Fk x Ts2
Biaya Dump Truck/M3 = (1/Q2) x Rp E08 Rp2 73,607.97 Rupiah

IV HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP
Harga Satuan Dasar Pasir =

397197062.xlsx-BT Pecah Pyk


HARGA SATUAN
NO. URAIAN KODE KOEF. SATUAN
(Rp)
(Rp M06 + Rp 1+ Rp 2) M 06 710,228.60 Rupiah

Dibulatkan M06 710,229 Rupiah

397197062.xlsx-BT Pecah Pyk


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M 16 - Sirtu
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

HARGA SATUAN
NO. URAIAN KODE KOEF. SATUAN
(Rp)

I ASUMSI
1 Menggunakan alat berat
2 Kondisi jalan : sedang/baik
3 Jarak Quarry ke Lokasi Pekerjaan L 51.00 Km
4 Harga satuan Sirtu di Quarry Rp. M16 1.00 M3 50,000.00
5 Harga Satuan Dasar Excavator Rp. E10 1.00 jam 411,164.21
6 Harga Satuan Dasar Dump Truck Rp. E08 1.00 jam 225,573.14

II URUTAN KERJA
1 Sirtu digali dengan excavator
2 Excavator sekaligus memuat sirtu hasil galian
ke dalam Dump Truck
3 Dump truck mengangkut sirtu ke lokasi
Pekerjaan

III PERHITUNGAN
1 Excavator (E10)
Kapasitas bucket V 0.80 M3
Faktor bucket Fb 0.83 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus: Ts1
- Menggali / memuat T1 2.00 menit
- Lain-lain T2 1.00 menit
Ts1 3.00 menit
Kap. Produksi/jam = V x Fb x Fa x 60 Q1 11.02 M3/jam
Fk x Ts1
Biaya excavator /M3 = (1/Q1) x Rp E10 Rp1 37,302.60 Rupiah

2 Dump Truck (E 08)


Kapasitas bak V 2.50 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 35.00 Km/Jam
Kecepatan rata-rata kosong v2 40.00 Km/Jam
Waktu siklus Ts2
- Waktu tempuh isi = (L : v1) x 60 menit T1 87.43 menit
- Waktu tempuh kosong = (L : v2) x 60 menit 76.50 menit
- Muat = (V/Q1)/60 T3 13.61
- lain-lain termasuk menurunkan material T4 5.00 menit
Ts2 182.54 menit
Kap. Produksi/jam = V x Fa x 60 Q2 0.68 M3
Fk x Ts2
Biaya Dump Truck/M3 = (1/Q2) x Rp E08 Rp2 330,726.86 Rupiah

IV HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP
Harga Sat. Dasar Pasir = M 06 418,029.46 Rupiah
(Rp M06+Rp 1+Rp 2)

Sirtu
HARGA SATUAN
NO. URAIAN KODE KOEF. SATUAN
(Rp)
Pajak Retribusi daerah (25%)XRp.M16 12,500.00

Dibulatkan M06 430,529 Rupiah

Sirtu
ANALISA PRODUKSI BAHAN

ITEM PEMBAYARAN : AGREGAT KASAR & HALUS


JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3

NO. URAIAN KODE KOEF. SATUAN KETERANGAN

I ASUMSI
1 Bahan dasar (Batu & Pasir) diterima di lokasi
Pemecah Batu (di base camp)
2 Kegiatan dilakukan di dalam lokasi Base Camp
3 Hasil produksi alat pemecah batu:
- Agregat halus H 10.00 %
- Agregat kasar K 80.00 %
4 Berat jenis bahan dasar: - Batu
- Batu D1 1.80 ton/M3
- Pasir D2 1.67 ton/M3
- Batu Pecah D3 1.80 ton/M3
5 Harga Satuan Bahan Dasar
- Batu Kali Rp1 449,342.20 Rp/jam
- Pasir Rp2 387,518.49 Rp/jam
6 Biaya operasi alat:
- Pemecah batu / Stone Crusher Rp3 1,049,343.47 Rp/jam
- Wheel Loader Rp4 318,445.81 Rp/jam
7 Kapasitas Alat:
- Pemecah batu / Stone Crusher Cp1 30.00 ton/M3
- Wheel Loader Cp2 1.50 ton/M3
8 Faktor efisiensi alat:
- Pemecah batu / Stone Crusher Fa1 0.70 -
- Wheel Loader Fa2 0.83 -
9 Faktor kehilangan material Fh 1.10 -
10 Harga satuan Agregat kasar diambil sama
dengan Harga Satuan Agregat produksi Stone
Crusher
11 Agregat halus masih perlu dicampur dengan
pasir

II METODE PELAKSANAAN
1 Wheel Loader mengangkut batu/gravel dari
harga satuan Agregat produksi Stone Crusher.
2 Batu / gravel dipecah dengan alat pemecah
batu (Stone Crusher) sehingga menghasilkan
agregat batu pecah.

III PERHITUNGAN
1 Harga Satuan Agregat Produksi Stone Crusher
1.a. Kerja Stone Crusher memecah gravel:
- Waktu kerja Stone Crusher Tst 1.00 Jam
- Produksi Stone Crusher 1 jam = (Fa x Cp1) : D3 Qb 11.67 M3/Jam Batu pecah
- Kebutuhan batu/gravel 1 jam = (Fa1 x Cp1) : D1 Qg 11.67 M3/Jam

1.b. Kerja Wheel Loader melayani Stone Crusher


- Kap. Angkut / rit = (Fa2 x Cp2) Ka 1.25 M3
397197062.xlsx-AG-KS-HLS
NO. URAIAN KODE KOEF. SATUAN KETERANGAN

- Waktu siklus (muat, tuang, tunggu, dll) Ts 5.00 menit


- Waktu kerja W. Loader memasok gravel :
{( Qg : Ka) x Ts} : 60 menit Tw 0.78 jam

1.c. Biaya produksi batu pecah / M3


= {(Tst x Rp3) + (Tw x Rp4)} : Qb Bp 111,258.71 Rp/M3
1.d. Harga sat. batu pecah produksi S. Crusher/M3
= {(Qg : Qb) x Fh x Rp1} + Bp Hsb 605,535.13 Rp/M3

2 Harga Satuan Agregat Kasar


Harga satuan agregat kasar diambil sama dgn
agregat batu pecah produksi Stone Crusher
Harga Satuan Agregat Kasar / M3 HSAk 605,535.13 Rupiah

397197062.xlsx-AG-KS-HLS
ANALISA HARGA SATUAN DASAR BAHAN

MINYAK SOLAR ( M. 184 )


PENIMBUNAN DI AREA TERMINAL LAUT LPMAK- POMAKO

Jarak Tempuh = 40.00 Km


Kecepatan Rata - Rata = 45.00 Km/Jam
Kapasitas Angkut = 3,000.00 Ltr
Waktu Tempuh = 2.00 x 40.00 / 45.00 = 1.78 Jam
Waktu Muat dengan Tenaga Manusia = 2.00 Orang/Hari
Waktu Bongkar = 2.00 Orang/Hari
Biaya Muat dengan Tenaga Manusia = 130,000.00 / 3,000.00 x 2.00 = Rp. 86.67 / Liter
Biaya Bongkar = 130,000.00 / 3,000.00 x 2.00 = Rp. 86.67 / Liter
Biaya Angkut = 330,477.17 / 3,000.00 x 1.78 = Rp. 195.84 / Liter
Sub Total Biaya Angkut = 195.84 + 86.67 + 86.67 = Rp. 369.17 / Liter
Penyusutan 1 % = 5,200.00 x 0.01 = Rp. 52.00 / Liter
Total Biaya Angkut = 369.17 + 52.00 = Rp. 421.17 / Liter

Harga Solar Insustri di Timika = 5,200.00 /Ltr


Harga Solar = 5,200.00 = Rp. 5,200.00 / Liter
Harga Solar di Lokasi Proyek = 5,200.00 + 421.17 = Rp. 5,621.17 / Liter

MINYAK PELUMAS ( M. 185 )


PENIMBUNAN DI AREA TERMINAL LAUT LPMAK- POMAKO

Jarak Tempuh = 40.00 Km


Kecepatan Rata - Rata = 45.00 Km/Jam
Kapasitas Angkut = 3,000.00 Ltr
Waktu Tempuh = 2.00 x 40.00 / 45.00 = 1.78 / Jam
Waktu Muat dengan Tenaga Manusia = 2.00 Orang/Hari
Waktu Bongkar = 2.00 Orang/Hari
Biaya Muat dengan Tenaga Manusia = 130,000.00 / 3,000.00 x 2.00 = Rp. 86.67 / Liter
Biaya Bongkar = 130,000.00 / 3,000.00 x 2.00 = Rp. 86.67 / Liter
Biaya Angkut = 330,477.17 / 3,000.00 x 1.78 = Rp. 195.84 / Liter
Sub Total Biaya Angkut = 86.67 + 86.67 + 195.84 = Rp. 369.17 / Liter
Penyusutan 1 % = 35,000.00 x 0.01 = Rp. 350.00 / Liter
Total Biaya Angkut = 369.17 + 350.00 = Rp. 719.17 / Liter

Harga Pelumas = 35,000.00 /Ltr


Harga Pelumas = 35,000.00 = Rp. 35,000.00 / Liter
Harga Pelumas di Lokasi Proyek = 35,000.00 + 719.17 = Rp. 35,719.17 / Liter

MINYAK PREMIUM/BENSIN ( M. 184 )


PENIMBUNAN DI AREA TERMINAL LAUT LPMAK- POMAKO

Jarak Tempuh = 40.00 Km


Kecepatan Rata - Rata = 45.00 Km/Jam
Kapasitas Angkut = 3,000.00 Ltr
Waktu Tempuh = 2.00 x 40.00 / 45.00 = 1.78 / Jam
Waktu Muat dengan Tenaga Manusia = 2.00 Orang/Hari
Waktu Bongkar = 2.00 Orang/Hari
Biaya Muat dengan Tenaga Manusia = 130,000.00 / 3,000.00 x 2.00 = Rp. 86.67 / Liter
Biaya Bongkar dengan Tenaga Manusia = 130,000.00 / 3,000.00 x 2.00 = Rp. 86.67 / Liter
Biaya Angkut = 330,477.17 / 3,000.00 x 1.78 = Rp. 195.84 / Liter
Sub Total Biaya Angkut = 86.67 + 86.67 + 195.84 = Rp. 369.17 / Liter
Penyusutan 1 % = 6,000.00 x 0.01 = Rp. 60.00 / Liter
Total Biaya Angkut = 369.17 + 60.00 = Rp. 429.17 / Liter

Harga Bensin di Base Camp = 6,000.00 /Ltr


Harga Bensin = 6,000.00 = Rp. 6,000.00 / Liter
Harga Bensin di Lokasi Proyek = 6,000.00 + 429.17 = Rp. 6,429.17 / Liter
PORTLAND CEMENT ( M.080 )
PENIMBUNAN DI AREA TERMINAL LAUT LPMAK- POMAKO

Jarak Tempuh = 40.00 Km


Kecepatan Rata - Rata = 40.00 Km/Jam
Kapasitas Angkut 1 Dump Truck = 3,000.00 Kg
Waktu Tempuh = 2.00 x 40.00 / 40.00 = 2.00 / Jam
Waktu Bongkar Muat ( tenaga 2 orang ) = 0.40 Jam
Total Waktu = 2.00 + 0.40 = 2.40 Jam
Biaya Muat dengan Tenaga Manusia = 130,000.00 / 3,000.00 x 2.00 = Rp. 86.67 / Kg
Biaya Bongkar dengan Tenaga Manusia = 130,000.00 / 3,000.00 x 2.00 = Rp. 86.67 / Kg
Biaya Angkut = 330,477.17 / 3,000.00 x 2.40 = Rp. 264.38 / Kg
Sub Total Biaya Angkut = 86.67 + 86.67 + 264.38 = Rp. 437.72 / Kg

Harga Semen Portland di Base Camp = 1,740.00 /Kg


Harga Semen Portland = 1,740.00 = Rp. 1,740.00 / Kg
Harga Semen Portland di Lokasi Proyek = 1,740.00 + 437.72 = Rp. 2,177.72 / Kg
Harga 1 Zak semen ( 50 Kg ) = 2,177.72 x 50.00 = Rp. 108,885.75 / Zak

PAKU ( M.166 )
PENIMBUNAN DI AREA TERMINAL LAUT LPMAK- POMAKO

Jarak Tempuh = 40.00 Km


Kecepatan Rata - Rata = 40.00 Km/Jam
Kapasitas Angkut 1 Dump Truck = 2,000.00 Kg
Waktu Tempuh = 2.00 x 40.00 / 40.00 = 2.00 / Jam
Waktu Bongkar Muat ( tenaga 2 orang ) = 0.50 Jam
Total Waktu = 2.00 + 0.50 = 2.50 Jam
Biaya Muat dengan Tenaga Manusia = 130,000.00 / 2,000.00 x 2.00 = Rp. 130.00 / Kg
Biaya Bongkar dengan Tenaga Manusia = 130,000.00 / 2,000.00 x 2.00 = Rp. 130.00 / Kg
Biaya Angkut = 330,477.17 / 2,000.00 x 2.50 = Rp. 413.10 / Kg
Sub Total Biaya Angkut = 130.00 + 130.00 + 413.10 = Rp. 673.10 / Kg

Harga Paku di Base Camp = 25,300.00 /Kg


Harga Paku = 25,300.00 = Rp. 25,300.00 / Kg
Harga Paku di Lokasi Proyek = 25,300.00 + 673.10 = Rp. 25,973.10 / Kg
Pasar - Ke Pomako 39

Jl. Samp. Ktr. Depag

2 2

1.2 1
Jl.Hasanudin

Kehutanan
Pasar
Jl. Bu-Ut 2.7 8
1.7
Industri
Pasar-Industri 0.3 SP.II-SP.V
Pasar
0+000 1.5
1

0.7 8 Jl. Cenderawasih

P.U

Jl. Cheatubun

Jembatan
21
15 Sta. 0 + 021, dari Quary
Dari Pasar. 0+015 Kwamki Lama
SP.VII
0.3 Gua Maria

Iwaka Quary

0.75 SP.XIII
5 6.4

6.45 Simp. Mayon

0.6 Base camp Pak anwar

52
4
SP. XII 4.3
KM 60.9

KTr.Bupati
0.7
6.9
Awal Mayon
11.5

20.7
11

0+000
Mil. 32
PEMBANGUNAN JEMBATAN BETON SPII JLR. 3 KANAN
Jarak Dari Kwari Iwaka 17.6
Base camp Pak anwar

Ke Kuala