You are on page 1of 1

DAFTAR HARGA SATUAN UPAH,DAN BAHAN / MATERIAL

Zona Tengah (JBYN TGH, JBYN DALAM, MARGAHAYU)


A. HARGA SATUAN UPAH

NO URAIAN KODE SAT HRG. SAT KETERANGAN

1 Tukang L 01 JAM 25.000,00 175.000,00 / Hari


2 Kepala tukang L 02 JAM 28.571,43 200.000,00 / Hari
3 Operator L 03 JAM 42.857,14 300.000,00 / Hari
4 Pemb. Operator L 04 JAM 25.000,00 175.000,00 / Hari
5 Mandor L 05 JAM 32.142,86 225.000,00 / Hari
6 Pekerja L 06 JAM 21.428,57 150.000,00 / Hari

B. HARGA SATUAN BAHAN / MATERIAL dan ALAT

NO URAIAN KODE SAT HRG. SAT KETERANGAN

BAHAN / MATERIAL
1 Koral cor ( palu ) M 01 M3 739.200,00
2 Pasir cor ( lokal ) M 02 M3 254.100,00
3 Pasir pasang (Lokal) M 03 M3 254.100,00
4 Agregat klas B M 04 M3 577.500,00
5 Batu Gunung M 05 M3 462.000,00
6 Sirtu M 06 M3 138.600,00
7 Tanah Timbunan Pilihan M 07 M3 50.000,00
8 Portland cemen M 08 Kg 1.600,00
9 Portland cemen M 09 Zak 80.000,00
10 Kayu begisting M 10 M3 3.465.000,00
11 Kayu Ulin 10/10 - 4m M 11 M3 7.507.500,00
12 Kayu Ulin 5/10 - 4m M 12 M3 7.507.500,00
13 Multipleks 9 mm M 13 Lbr 190.575,00
14 Paku M 14 Kg 23.100,00
15 Besi polos U24 M 15 Kg 23.100,00
16 Kawat Bendrat M 16 Kg 23.100,00
17 Plastik Cor M 17 M2 2.310,00
18 Gorong-gorong Diameter 20 x 100 Cm M 18 Bh 420.000,00
19 Gorong-gorong Diameter 30 x 100 Cm M 19 Bh 420.000,00
20 Gorong-gorong Diameter 40 x 100 Cm M 20 Bh 420.000,00
21 Gorong-gorong Diameter 60 x 50 Cm M 21 Bh 420.000,00
22 Gorong-gorong Diameter 80 x 50 Cm M 22 Bh 420.000,00
23 Balok Kayu Meranti M 23 Bh 3.465.000,00
24 Pipa PVC 3/4 " M 24 Kg 13.860,00
ALAT / PERALATAN
1 Dump Truck 3,5 ton E 01 Jam 216.516,46
2 Concrete mixer E 03 Jam 50.200,00

1. URUKAN / M3 180.220,00 4. PARIT / TURAP


2. SEMENISASI (L = 3 M) / M3 1.914.908,00 Pemasangan Batu Gunung / M3 1.374.269,00
SEMENISASI (L = 4 M) / M3 1.881.250,00 Plesteran / M2 103.673,00
3. PENGERASAN Acian / M2 62.125,00
BATU (TELFORD) / M3 776.407,00 5. K3 1.000.000,00
AGREGAT / M3 710.931,00 6. PAPAN PROYEK 500.000,00
7. READY MIX K250 ( L = 3 m ) 2.459.229,00
READY MIX K250 ( L = 4 m ) 2.432.510,00

You might also like