Lessons I learned during installation and wiring of LV

switchboard
electrical-engineering-portal.com/lessons-installation-wiring-lv-switchboard

By Amar M February 5,
2020

Low voltage switchboard


Let’s start with some basic definitions from the United States National Electrical Code (NEC).
An LV switchboard is generally defined as a large single panel, frame, or assembly of panels
on which are mounted on the face, back, or both, switches, overcurrent and other protective
devices, buses, and usually instruments.

Lessons I learned during installation and wiring of LV switchboard

These assemblies are generally accessible from the rear as well as from the front and are
not intended to be installed in cabinets. Modern switchboards are totally enclosed to
minimize the probability of spreading fire to adjacent combustible materials and to guard
live parts.

1/15
Busbars are arranged to avoid inductive overheating of the enclosure or any nearby metal.
Service busbars are isolated by barriers from the remainder of the switchboard to avoid
inadvertent contact by personnel or tools during maintenance.

Here are some of the lessons I learned designing LV switchboards:

1. Switchboards and panelboards are different


2. Access
3. Transport
4. Housekeeping
5. Insulating mats
6. Location
7. Architecture
8. Layouts and clearances
9. Breakers, fuses or both
10. Metering
11. Preplanning
12. Coordination

1. Switchboards and panelboards are different


Switchboards are typically used for service entry, and any distribution required there
onwards. On the other side, panelboards are used primarily for branch circuits, and end of
line loads. It follows therefore that switchboards feed panelboards.

One key distinction to remember is that panelboards typically have a maximum ampacity
of 800A to 1200A and are governed by Underwriters Laboratories’ (UL) 67 – Standard for
Panelboards.

The designs of switchboards are governed by UL 891 – Standard for Switchboards.

2/15
Left: Draw-out Molded Case Switchboard (photo credit: Eaton); Right: Low voltage panelboard (credit:
Schneider Electric)

Go back to Content Table ↑

2. Access
This is always a big issue. Most codes and regulations will require two ways to enter and exit
the switchboard area, likely at each end of the switchboard lineup.

Always plan for a dedicated room for the switchboard.

A room ensures safety due to the fact that access can be limited to only qualified personnel.
If the switchboard is located within a room, which is the ideal case, the entry/exit doors
should swing out in the direction of the exit path.
Over a certain amperage, many codes and regulations have this specific exit requirement
but it is an engineering best practice to do it anyway. If you think about it, in an emergency,
the easiest way to get out of an area would be to just have to push your way out.

To further ease your way out, another key item with doors is that they should have ‘ panic
hardware’ on them.

3/15
Doors equipped with panic hardware

Go back to Content Table ↑

3. Transport
Size your entry/exit doors to create a large enough opening that the switchgear can actually
be brought into its dedicated room (or area) for installation. This seems obvious, but it is
easily missed.

Pick the largest piece that needs to be transported! The manufacturer should be able to
give you this information. Then work out an approximate path of how you believe that piece
can get into the building and then into the room.

4/15
This is worked out by the installer; however, going through it as a designer helps prevent
consternation later.

Transport of low voltage switchgear on site

5/15
Transport truck loaded with low voltage switchgear

Go back to Content Table ↑

4. Housekeeping
Equipment pads are necessary in order to ensure that the equipment is above the floor and
safe during any accidental floods or just general cleaning/housekeeping.

A minimum height of 4” is a good idea and ensuring that the pad contours around the
entire footprint of the switchboard. This will of course increase the overall height of the
installation and therefore, the pad should be taken into consideration throughout the
course of the design.

6/15
Low voltage switchgear pad

Go back to Content Table ↑

5. Insulating mats
In addition to housekeeping pads, another thing to keep in mind is maintenance. The safety
of the individuals working on the switchboard can be ensured by installing high quality
electrical insulating mats in front and/or back of the switchboard.

The mats are basically a way to ensure a zero hazard environment by preventing
unprecedented shock to personnel.
The goal is to have the mats cover all places where live parts may be accessible during
maintenance or repair by personnel.

7/15
Electrical insulating mats in front and/or back of the LV switchboards

Go back to Content Table ↑

6. Location
One of the key things that plays into this is equipment access requirements. Is your
switchboard going to require front or rear access, or both? Rear access switchboards tend to
be easier to install and maintain but they are also deeper.

The easiest way to mitigate this problem is to have front-access only switchboards. This may
not always be possible but it is definitely a step in the right direction to simplify your design.
It will make locating the switchboard design much easier.

8/15
Switchboard workspace (photo credit: mikeholt.com)

Go back to Content Table ↑

7. Architecture
This lesson relates to the location, but it is separated out due to the impact that an
unrelated external factor can have on the design – Expansion Joints. It should go without
saying that a switchboard should not be installed over an expansion joint.

However, unbelievably, I came across such an installation. As I remember seeing it, part of
the switchboard was on one side of the expansion joint while part of it was on the other
side. There were cables installed with enough slack going over the expansion joint
connecting the two sides.

This meant the whole setup was unnecessarily long and used up quite a large footprint.
The installer had to be careful on where and how the cable supports were installed because
one wrong location, and it could all come down.
Basically, you should negotiate a location for your electrical equipment that does not result
in such a complicated switchboard design and installation.

9/15
Switchboard expansion joints

Go back to Content Table ↑

8. Layouts and clearances


Clearances required vary based on overall layouts chosen. The idea always is to ensure the
best possible use of the space available. Sometimes this will result in switchboard
sections facing each other. While this may increase the clearance required resulting in a
large isle between them, it often is the most economical use of the available space.

Other popular layouts are C or U-shaped, and L-shaped switchgear.

10/15
Switchboard layout ‘L’

Typical clearances start at 3 feet in front and up to 6/8 feet, if two switchboards face each
other.

Electric switchboard clearances

Go back to Content Table ↑

11/15
9. Breakers, fuses or both
Prior to selection of whether you will have breakers or fused switches, ensure that a fault
current study is done to know the expected fault current. For main service switchboards,
the available fault at your service entry is provided by the utility company.

This will dictate what you can specify because if the fault currents are too high, fused
switches may be your only option.

Sometimes if you have large meter or transformer loads downstream, a combination of


breakers and switches can also be proposed in your switchboard to mitigate transformer
inrush, motor inrush, etc.

Position of circuit breakers and fuses in LV switchboard

Go back to Content Table ↑

12/15
10. Metering
Switchboards are versatile when it comes to metering and can combine circuit breakers,
surge protection, metering CTs and the meters themselves in a single engineered
assembly.

There are times when utility metering is done separately with bulb-type meters that are
accessible to utility personnel, while electronic meters are also specified for the owner.

Metering panel

Go back to Content Table ↑

11. Preplanning
Because switchboard installations tend to be about getting it in place and forgetting about
it, preplanning is essential. If you are going to have drawout breakers, it is important to
include racking capabilities as part of the initial installation, instead of retrofitting it in
later.
13/15
Switchboards can be expanded beyond their basic circuit distribution and protection
functions to include various other equipment based on the requirements of the design. Low
voltage distribution transformers, panelboards, even automatic transfer switches can be
made part of the switchboard layout. This helps with preplanning space in the layout by
including some spare room for future.
When mobile generators are being considered as a contingency backup, switchboards allow
for quick connect setups for fast and easy mobile generator use.

Always assume that a pull section/structure will be required to pull cables into the
switchboard prior to connection with the main breaker or disconnect switch.

Remote Racking : Eaton VCP W Circuit Breaker


Go back to Content Table ↑

12. Coordination
While this may be an obvious item, but a lack of coordination is a perennial problem.
Mechanical, plumbing, fire protection, etc. all get in the way of or in dedicated electrical
spaces with complete disregard. Therefore, ensure there is ample discussion with the other
trades/disciplines.

The NEC has specific requirements on dedicated spaces about electrical equipment and
what is explicitly allowed in those spaces. Fire protection sprinklers are allowed however it
makes sense to be wary of including water in a place/area that has electricity.

Most country codes and regulations have ways around this problem by instead allowing
electrical rooms to be two-hour rated construction. This is the case in the United States to
preclude the sprinkler requirement.
Another way to prevent water and power mixing is talking with the fire protection engineer
to consider a pre-action sprinkler system for your electrical switchboard room. This will
allow for a time lag between detection and the eventual water spray.

If the location of a plumbing or mechanical pipe is in vicinity of your switchboard, consider


drip pans or any other mitigation tactic.

14/15
Working space and dedicated electrical space according to NFPA 70 (NEC)

Go back to Content Table ↑