JOIST DESIGN DATA SHEET

NEW COLUMBIA JOIST CO. No.1


P.O. Box 31- New Columbia, PA 17856·0031
717· 568· 6761- 717·568·1001 (FAX)

HOW TO SPECIFY SPECIAL JOISTS


To obtain correct and competitive bids the specifying professional must show any special
loading on the structural drawings. Special loadings could include concentrated loads
and any non-uniform load distribution such as:

2' 2' J 5' 3' I 8'

SPlf
2000Ibs.

250 plf I
80 plf

3588lbs. 23521bs.

span = 20'

The maximum moment for this loading is 20267 lb. It. The equivalent uniform load to
produce this moment would be 405 Ibs. per It.

The maximum end reaction is 3588 Ibs. The equivalent uniform load to produce this
reaction would be 359 Ibs. per It:

The K series joist tables show a 16K3 (with a 20' span) has a total load capacity of 410 Ibs.
per It. The designer should show a 16K3SP on the drawings.

The SP indicates special requirements for the joist. The joist manufacturer will review
the designated joist for its ability to carry the special loads shown.

Joist Girders with unequal panel point loads must also be defined by showing the load
diagram on the structural drawings.

'For all standard K senes joists the maximum end reaction is 8700 Ibs. If more reaction capacity is needed,
consider using two lor more) joists to share the load. For LH and DLH joists a conservative end reaction
can be found by dividing the tabulated SAFE LOAD by two.

!NCJ!
NICHOLAS I. BOURAS, INC.
PO. BOX 662. 475 SPRI NGFIELD AV .
SUMMIT. N EW JERSEY 07902-0662 19081 277- 16 17

• • HIGH YIELD STRENGTHS (up 10


65 KSI) even for ultra-heavy
section.
• OUTSTANDING TOUGHNESS
PROPERTIES
• EXTREMELY LOW CARBON
eOUIVALENT - ensures elleel·
lenl weidablllt)'

A NEW PAOCESS.~ OST.


The secret is In AABED's (8volu·
tlonary new In-Une OST process

OTHER RECENT AlI.ED


INNOVATIONS:

HISTAR® ARBED· ROlLEO .ao -, '4 -, and


·'TAILOR·MADE'· (WTM) " ,le$ -
famous 'or high tec:Uon moduli.
gr•• , 'alera' buckling resistance,
A new generation and big savlngl In fabrication
costs and we6ghts. These products
of rolled beams are allo available In the new
HISTAR Quality as Is our standard
and column shapes WF ••rl •• and H SEARING PILES

for economical NEW LITERATURE AVAILABLE


Send now for complet. data on , II
steel construction. ttlase AABED products, contact
Trade "ABED, INC ., 825 Third
Ave., New York , NY 10022 (212)
Once aga in, AABEO leads the 486-9890, FAX 212-355-215912421
Industry by featUri ng a trendsetting In Canada TradeARBEO Can.da
combination of mechanical, Inc ., 33<lO Malnway, Burli ngton,
chemical and technolog ical Ontario, Canada L7M 1A7
(416) 335-5710, FAX 41&.J35.1292


properties'

DlIIIOVJd'ORI or ITDL CCWiiRUCTION PRODUCTI.


MODERN STEEL
Volume 33, Number 5
CONSTRUCTION May 1993 •
FEATURES
14 FABRICATORS, ENGINEERS
AIM FOR CONSENSUS
Despite differences in views on allthority attd liability,
ittdustry-wide agreement Ott desigtt responsibility is close
to becomittg a reality

22 SEISMIC UPGRADE FOR A CONCRETE FRAME


Four steel buttress towers were added to a
concrete-framed building to bring it up to current
seismic standard s

28 ACTIVE BRACING SYSTEMS


A recent filII-scale mockllp showed tlte practicality of
"smart" bracillg systems for seismic desigtt

34 WEST COST QUAKES SEND TREMORS


fou, steel buttress towers were added to tllis THROUGHOUT THE EAST
cmlcrete -framed structure;n order to bring it /I used to be that ottly buildittg out West tteeded to meet
lip to Cllrrellt seismic stmldards. It! addition , strict seismic codes; blltltOW building codes alottg the
th, additioll added 26,()/J() sq. ft· of usabl, Eastern seaboard have been drastically amended
space. The story be11ind this il1novatit't
reI/ova"OIl b"gills Oil page 22. Photo by Mert
Corp""ter Photography, !.os Gatos, CA (408)
370-1663.

NEWS AND DEPARTM ENTS


Modem Steel Construction (Volume 33, 6 EDlTORlAL 12 STEEL NEWS
Number 5). ISSN 0026-8445 Published • Steel Calendar
monthly by the Amencan Institute of Steel
Construction, Inc. (AISC). One East 9 STEEL • New Computer
Wacker Dr., Suite 3100, Chicago, IL INTERCHANGE Program For Moment
60601 -2001 .
• Design of a bracket Rotation Curve
AdvertISIng office: PaUis/3M, 7161 North connection carrying
CICero. Lincolnwood. It 60646.
moment 43 FASTE ERPRODUCTS
Subscnpllon pnce: • Welding nuts to bolts to
Within the U.S.-5lngle issues $3; 1 year
$30; 3 years $85 prevent backing off 50 STEEL MARKETPLACE
Oulsode the U.S.-smgle ISSueS $5; 1 • Connecting wide-flange
year $36; 3 years $100.
beams to tube columns
Postmaster: Please send address
changes to Modern Steel Construction,
One East Wacker Or., Sulle 3100,


Chicago, It 60601-2001 .

Second-class postage paid at Chicago, It


and at additonal mailing offices.

4 1 Modern Steel Construction I May 1993


There are those
who have seen the future.

Announcing the arrival of STAAD-III/ISDS - Release 17. Once again,


Research Eng ineers, has made the technology of tomorrow available to you today.

Use newly introduced facilities like NON-LINEAR Release 17 marks the debut of AutoSTAAD/MAX - the
analysis , TI ME HISTORY analysis, user-controlled world's first integ rated structural software system that
multiple iteration P-Delta analysis , steel design for works entirely within AutoCAD .
transmission towers (ASCE Pub. 52) etc. in addition to
14 different steel , concrete , and timber codes, to explore All these powerful capabilities coupled with the
the widest possible range of design solutions. industry's most knowledgeable and experienced support
staff, makes STM D-III/ISDS the ultimate productivity
Release 17's powerful printer plotting capabilities allow tool you've been waiting for.
you to generate the industry's sharpest and most
comprehensive run output. For the first time, you can STAAD-III/ISDS Release 17 - there are those
combine numerical output with graphical output - all in who have seen the future ... have you?
th e same run document. Yes, we support the widest
.-.Research
liliiii CC Engineers, Inc.
possible range of printers - from sophisticated lasers to
down-to-earth dot- matrix printers.

On the graphics front , Release 17 features an 1570 N. Batavia, Orange , CA. 92667.
enorm ously enhanced graphics input generator with CALL TOLL FREE (800) 367-7373
. aralleled speed and power, In addition, Tel : (714) 974-2500 FAX :(714) 974-4771

Research Engineers Worldwide


U.S.A. • U.K. • JAPAN . GERMAN Y . FRANCE . NORWAY . CANADA . IN DI A

E o T o R A L

Editorial Staff
Pet Peeve #2
Scott Melnick,
Ed itor a nd Publisher
Pa trick M. Newman, P.E.,
Senior Technical Ad visor
Charlie Ca rter,
W hile computers and their ilk have simplified our daily
business activities-and cut costs-they've also added a lot
of aggrava tion.
For example, we're always trying to keep Modern Steel
Construction's ci rculation as up-to-d ate as possible. As such, we send
Technical Ad visor
readers renewa l cards every year. When a reader hasn' t responded to a
renewal card in a while, we send a "last chance" notifica tion.
Unfortunately, our instructions to our computer system were not d ear
Editorial Offices
enough, and letters went out to everyone with a stop date in February,
Modem Steel Construction
One East Wacker Dr. whether they had renewed or not. My apologies to those I harangued
Suite 3100 unnecessa ril y.
Chicago, IL 60601-2001 But I know I' m not alone in Computer-Aided Failure. I' ve already
(312) 670-5407
mentioned my disHke for poorly conceived voice mail systems. Just as
bad are Fax Abusers.
Advertising Sales The latest exa mple of fax abuse 10 cross my desk came in the form of
Pallis-3M a press release from a huge, East Coast-based corporation. To start with, •
7161 North Cicero there was no reason for the press release to be fa xed . It contained no
Lincolnwood, lL 60646 information of shocking urgency-rather, it was a run-of-the-mill new
(708) 679-11 00 product announcement. In fact, it wasn' t even a prod uct related to the
FAX (708) 679-5926
steel industry. Yet this company felt the need to tie up my fax machine
with the equi valent of junk mail. Bu t to add insult to injury, they have
AISC Officers not yet mastered the automated fa x technology they are using, and
Stephen E. Egger, ind uded with my copy was a two-page Hsting of their maillist.
Chairman Customer service is another area where technology has all-to-often
Frank B. Wylie, 1Il, proven a failure. I recently purchased a piece of mail-order software
First Vice Chairman
Robert E. Owen, that, unfortunately, came with a defective floppy disk. I called the
Second Vice Cha irman company's customer service number, but of course it was busy. I called
Robert D. Freela nd, back. It was busy. I ca lled back and got through to a voice mail system.
Treasurer
Neil W. Zundel, But when I tried to lea ve a message, I was informed that the system was
President " fulJ" and I should ca ll aga in. Which I did, with the sam e result. Finally
David Ratterman, I resorted to faxing them a note (which was not ea y in itself, since their
Secretary & General Counsel
Lewis Brunner,
fax machine was almo t continuously busy). To their cred it, however, I
Vice President, did receive a replacement disk in less than three weeks (though no other
Membership Services acknowledgement was sent).
Geerhard Haaijer, The problem seems to be that the people who implement systems
Vice President,
Technology & Research based on new technology never have to experience the frustrations of
Morris Caminer, actually using the system. The solution, which few executives seem
Vice Presid ent, willing to implement, is to put yourself in the position of your customer.
Fina nce / Administration
Not just on a theoretica l basis, but in practice. Call your company one
day and see what an outsider goes through. Place an order. And finally, •
sit down at a computer terminal and see what actually goe on with
your inventory and order input system. SM

6 / Mod ern Sttocl Construction I May 1993


D

to.
tfl
to.

• Our breakthrough 3-D


technology can't De shown
in a 2-D ad.

Call for your first hand


demonstration of the SDS/2
Detailing System.
• Break through time-{;onsuming 2-D, line-by-Iine graphics with the 3-D
technology of the SOS/ 2 Version 5.4 gives you the ability to automatically
produce shop draWings and other information about a structure never before
possible. The benefits are invaluable to design engineers, steel fabricators and
detailers ... or anyone who is involved in the conception and production of steel.
The SDS/ 2 Software Solutions are the ultimate steel fabrication tool. All
information created in SOS/ 2 or transferred through DesignLlNK from third-party
design software, can be used throughout all phases of design and fabrication.
The SDS/ 2 Software Solutions include:
• Engineering Analysis and Design Module • Detailing Module
• Production Control Module • CNC Interface
• F.mmating Module • DesignLINK
Call Design Data to arrange your personal demonstration or to request
additional information.

DESIGN
DATA
• "First in ... software, solutions, service"
402-476-8378 or 1-&>0-443-0782

Steel Interchange
• -------
Stetl hlttrchangt is an open forum for Mod"n Stetd ConstrllctWtl
readers to exchange usefuJ and practical professional ideas and in·
formation on aU phases of steel building and bridge construction
Opinions and suggestions are welcome on any subJed covered in
this magazme. If you have a question or problem that your fellow
readers might help to solve, please forward it to Modrnr Steel COli ·
Answers and / or questions should be typewritten and double
spaced. Submittals that have been preparl'<i by word ·processing are
appreciated on computer diskette (either as a Wordperfect file or In
ASCII format).
The opinions expressed in Sled hrtercllaflge do not necessanly
represent an official posi tion of the American Institute of Steel Con-
struction. At the same time feel free to respond to any of the ques- struction, Inc. and have not been reviewed . It is recognized that the
tions thai you have read here. Please send them to: design of structures is within the scope and expertise of a compe-
Steel Interchange t('nllicensed structura l engineer, architect or other licensed profes-
Modem Steel Construction sional for the application of principles to a p.lrlicular structure.
1 East Witcker Dr. Information on ordering AISC publications menttoned in thiS ar-
Suite 3100 ticle can be obtained by calling AI at 312/670-24ooe'(1. 433.
Chicago, IL 60601

T he following responses to questions from previ-


ous Steel Interchange columns have been re-
ceived:
b

Can you show a design of a bracket connection T

carrying moment (February 1993)?

O ne solution can be arrived at by visualizing that


the beam and bracket act together as a single
unit. The problem now is similar to a haunched beam-
(
c
to-column connection which is a more familiar mo- "'I
P
ment type connection. In order to design a rigid con- J .h_lc/ T • .!1L_ C
nection using the above assumption, an end plate can
V"'~
"


be utilized to which both the beam and bracket are
fully welded. For the same reason, it is advantageous p. '11... '11...
to weld the bottom flange of the beam to the top plate , ~~ 1
of the bracket rather than bolting them. This sub-
b
assemblage can be fabricated in a shop with relative
ease and efficiency. It can then be bolted the column
T
in the field later.
The vertical web stiffener, defining the critical V;

area of the web, will create a web panel with an aspect f)'" -.
ratio between 0.75 and 1.50. This web panel should be
able to resist moment Mo without excessive shear de- 111 c
fonnation (no yielding or buckling). Otherwise, addi-
tional diagonal stiffeners will be required to carry the
balance of flange tensile/compressive force via truss
action.
The bracket sha II be designed for vertical forces,
V m and V", applied at point A (Case I). The end plate
should be proportioned to resist the same load, i.e. Vm CASE I[
+ V", in tension. However, prying of the column con-
nection bolts may control the end plate thickness re-
quirement. In situations where the connection be-
tween the bottom flange of the beam and the bracket feners sha II be provided similar to any other bolted
top plate is rendered through bolts in bearing, the end connections.
plate shall provide resistance against a portion of the If the flange area of the gusset plate is within the
shear force acting between the two surfaces. This is in same order of magnitude of the beam flange area, it is
addition to the tensile forces mentioned earlier and preferable to use the same width for both nanges and


tends to complicate the end plate design. eliminate the bracket top plate (Case II).
The column connection bolts shall resist the fixed- Abbas POllrbohloll1
end moment of the beam, Mf' and its end shear, VI' for Consolidated Rail Corporation
the clear span between columns. Column flange stif- Philadelphia, PA

Modern Steel onstruction 1 May 1993/9


---- -- -------------------------------------------------------------

Steel Interchange
Is it permissible to weld nuts to bolts to prevent
then from backing off? Are any special welding pro-
How can you connect wide-flange beams to tube
columns?

ceduIes requued? Is bolt or nut slIength affected?

W hile it is not considered desirable to weld a


nut to a bolt, it is not uncommon to encounter
T he figure below shows a different concept of con-
necting wide-flange beams to all fom faces of a
slIuctural tube column to transfer moment and shear
situations where loosening of nut could pose a real than has previously been offered in Steeiintercitallge.
threat for slIuctural failure. In a recent case involving The end stiffener plates, connection plates and other
the base of a connection material can be shop welded and the
tall tower, the beam can then be bolted to the column in the field.
undersigned George Chiang, P.E.
was faced with The Port Authority of NY and NJ
a similar situa- New York
tion where the
columns were _~,J d.ff ~ (Tft.)
su bjected to
mild but con- CDnNtf,.;, rl ( T ..I ~ )

... tinuous vibra-


tions and loos-
.
--~~~
- ening of the
nuts had to be
prevented .
-
=.--- ---~ .:;.


. ..- This was ac-
complished by
tack welding
retainer bars to
the column '1I, I -"
_ CfJQlin
i 1.
f,;,. Ii ,- r.! 8)
base plate adja-
, II '

~
cent to each of I" CDII",·,:f/ ~' 0 I,/~
the two achor bolts as shown in the figm e. This was Il.t
done because the anchor bolts did not have sufficient
projection for a second (locking) nut. 1 : \ " ..". JM! tl ·
Vijay P. Kitnsal , P.E. I

Ohio Edison I

AIaon, OH

New Questions

L isted at right are questions that we would like the


readers to answer or discuss.
If you have an answer or suggestion please send U nder what circumstances does the designer
have to consider torsion in the design of a
it to the Steel Interchange Editor, Modem Steel Con- beam?
struction, One East Wacker Dr" Suite 3100, Chicago,
1L 60601-200l.
Questions and responses will be printed in future A re there any design aids that will help an engi-
neer design a steel a_rch or a communications


editions of Steel Interchange, Also, if you have a ques- tower?
tion or problem that readers might help solve, send
these to the Steel Interchange Editor,
H ow can One take into account blast effects in
the design of steel structures?

10 I Modern Steel Constru ction I May 1993


• TOOLS FOR STRUCTURAL ANALYSIS AND DESIGN
• EASE OF USE • SIMPLE DESIGN PROCESS • SPEED AND ACCURACY • UNIFIED WORK ENVIRONMENT.

TEST DRIVE SOFTWARE THAT WORKS AS GOOD AS" LOOKS!


TO SEE WHAT THE EXCITEMENT IS ALL ABOUT,
VIS" OUR BOOTH AT THE A/E/C SYSTEM '93 IN ANAHEIM.

FAST AND POWERFUL UNEQUALLED INTEGRATION COMPREHENSIVE AND INTUITIVE


• easy modeling of simple fromes and • in linear stotic, dynamic, seismic, non • easy to use even for the new or
powerfvl tools for large and complex linear, buckling occasional user
structures • for beams, plates, shells, cables • user friendly: menu driven, gUIded logic,
• high speed, leaves competi~an behind: • in 20 and 3D instent eccess to all resources, rapid
3D roof, 735 nocIes, 4 load cases, • for steel and concrete clesign Hyper1ext help system, integrated macros
2901 beams, 4296 DOf, computed in • all input data and results can be processed
2'27" on a notebook Toshiba T 4400 • on PC compo~bIe computers
in text or In Ivllgraphic mocIe (loading,
• universol network solution (NetWare, boundary cortditions, materials,..)
lontos~c and all NetBlOS compo~bles)
• interfoces with most CAD softwcre

• metrosofi
332 Palenoll ill'e
Ea,1 RLII"er!tmJ. NJ 0707J
(DXF, HPGl, IGES)

DEMO AVAILABLE (LIMITED VERSION OF PROGRAM WITH SELF-RUNNING EXAMPLES)


OVER 1200 USERS WORLDWIOE. fOR MORE INFORMATION CAll 201-438-4915 OR FAX TO 201-438-7058
S T E E L C A L E N D A R

A
AISC Lecture Series : New Ideas In Structural Steel
ISC Marketing, lnc. is now
presenting a new lecture se-
ries focusing on innovations in
structural steel design. NI!W Ideas In



The four-part seminar covers:
Low-rise buildings.
Design of connections.
Eccentric braced frames.
registration fee are a dozen hand-
outs and publications plus a meal.
For information, contact: Colleen
Hays, AlSC, Inc., One East Wacker

Strllctllral Steel wiIl present practi- •Partially restrained connections. Dr., Suite 3100, Chicago, fL 60601-
cal design concepts for engineers Registration fee is $60 ($45 for 2001 (312) 670-2400.
and fabricators. AISC members). Included in the

WEST Date MIDWEST Dote NORTHEAST Date


Los Angeles 514 Detroit 5111 Newark 6/22
Irvine 6/10 Indianapolis 5113 Rochestor 9122
Sacramento 6122 Minneapolis 5125 Albany 9123
San Francisco 6/24 Mitwaukee 5127
Chicago 6/3

SOUTHWEST Date SOUTH Dote MID-ATLANTIC Dote


Dallas 516 Birmingham 9/9 Baltimore 5118
San Antonio 6/1 Miami 9/14 Washington 5120
Houston 6/8 Orlando 9/16 Philadelphia 6/23
Atlanta 928 Cleveland 10/19
Richmond 9130 Cincinnati 10121

11th Annual Construction Law Seminar


(May 7 in Chicago) sponsored jointly by
Chicago-Kent College of Law and the Con·
structian Law Institute. Workshop high-
lights include: "Shifting from the Private
sions . Topics indude: sta te of the art proj«:t
management techniques; the e me rging con·
rept of partnering; creating a Total Quality
Ma nagemen t component to each design
project; making effective project decisioruo;
Structural Engineers Associa tion of South·
em California Computer Show aune 7·10
in Anaheim, CA) held in conju nction with
A{ E/ C Systems '93. Semi nar series tar·
geted at practicing structu ral e ngineers. Ses-

Sector to Public Sector Projects" (the session new project management directions for the sions include: practical aspects of dynamic
wiJI focus on the new Capital Development economy of the '90s; and case studies in· analysis using standard finite ele ment anal·
Board Service Agreement and Construction eludi ng managing quality on the new Inte r· ysis software; benefits of marketing an a ut<r
Agreement); .. Are Your Lawyers Making national Complex at O'Hare Airport. Con· mated structural engineering office; and
Vou Crazy" (a panel discussion o f ways to lact: APM 01 (312) 472-1777; Fax (312) spreadsheet softwa re. For more infonna·
control lcga l costs while also improving the 525-0444. tion, contact: SEAOSC, 2550 Beverly Blvd.,
quality of legal service); "Project by Project Los Angeles, CA 90057 (213) 385-4424; (ax
Insurance" (workshop will offer practical (213) 389-7514.
guidelines to help construction profession. Lasers in Fabricating Conference (May 18·
als identify the kind of coverage they need, 20 in Schaumburg, fL) sponsored by the
such as owner· funded project insurance, Fabricators &: Manufacturers Association . 1993 Symposium on Computer Integrated
wrap--ups. OCP policy, and coverage for TopiCS include: equipment selection and Building Sciences Oune 1()"11 in Anaheim,
pollution or hazardous materials); "The cost justifica tio n; precision laser cutting CA) sponsored by the Interna tional Cou ncil
Mentor {Protege Program" (offering infor· techniques; VAG, fiber..<felivered process- for Building Research and Documentation.
mation on affinnative action requirements); ing; laser/ punch combination machines. Topics will include: automated construc·
and "The Americans with Disabilities Act" . high..ene rgy thermal processing; program· tion (using no people); automa ted fabrica-
For more information.. conta ct: Bruce J. ming laser cutting systems; COl multiaxis tion; robotic tools fo r construction; and 3D
Sch ulte. C hicag<rKent College of Law, 565 processing; material handling equipment; modeling. An additional session will fea·
Wesl Adams 51., Chicago, lL 60661-3691 equipment specifications; maintenance; and tore the new Disney Concert Hall Project,
(312) 906-5250; (ax (312) 906-5363. safety. For more information, call (815) 227· w hich has been designed on 3D CAD and
8202. has used NC for the cutting of stone and


structural steel. For more information, con-
Symposium on Project Management (May tact: Harold Jones, SClBS'93, 1700 Asp Ave.
13--14 in Chicago) sponsored by Association nue, Norman, OK 73037-0001 (405) 3~
for Project Managers in the Design Profes· 1947; Fax: (405) 3~7968.

12 1 Modern Steel Construction I May 1993


STEEL NEWS
----

Finding Moment Rotation Curves


• O ne drawback to designing
partially restrained connec-
tions has been finding a reliable
source of moment rotation curves.
That problem has been relieved,
"-ICl.. I: CCW'05ITE. 5Uc.lE I"lRT( CIH£CT ION
(1:'"'1" 17 MAP'! WfJ'
MFfII 'fIELD STI'I(~TH "511 .
Sl Mlft'RO...l.6TOT
j:N).[I I'lRl£ THICIU€SS liN! ..
liN)_
18.00
50.00
. 00
. le
,.,. . - 5((1 ff'l(R

1Il.' 'TI'{
U .... Zh
DI5'''<[.''' - I'I[8Rf11 i1N1.
1Al2S I j:N901..
.RM 1«11 l HIOIfiI[ SS IINl ·
2.00
2.DO
R.l2S
.50
however, by a new computer pro- STEEl rJIIU: "511· 16 . DO JlrrG.[ III ftLAT[ CK,( IINl. .00
gram from RMR Design Group, .. 80..15 - OIMTE" IINl - 1I"
Inc. called PRCO N. As its name
indicates, the program is designed lUCiTH til IIlIt1 IrYl - 32. 00
tOt:NT-fllDTATI(III ClIW£ BERM INl"'TlR liN.... ' -1&00 . 00
specifica lly for generating moment ~I ' ''' lCR) MIl-1FT). 2 . 00
rotation curves for partially re- 12'10
trained connections. ·· ..
The program, which runs on ~,
991 ·...
'
"ICfAiC C\I'IIt[ ~ '["'l
" .. 1t.7I11(°05

• ""
L
It'" ] . 56J(j( o OZ
IBM-«>mpatible personal comput- . :: flO- 1. ]J5,2[ ·03
ers with MS-DOS, offers 31 connec- i ..
~ N • 1.10
11["" lift: fl:U lSI
tion options, including: top and
seat angle; single web angle; dou-
ble web angle; header plate; single
I ... ~
.'
"~
"

.'.'
~~
01 ". 6 .
• I S. l .
o "I"'h. .,,12
o "If\e • . lj68
• "I", la . .JOe
_
N
,
I

plate; and welded double web


angle. All of the former also can be
"'. .'
.~
,
• "1"- . . 692
"10-,.,., DEFlECI I""" IIIG. .6'13
eE ~ Y"t:W I l60 II HI • 1. 061
specified with top and seat connec- 10
tions. The program also allows the
use of any of the connection op-
tions in a composite connection.
The connection library also in-
cludes the option of bolting or


welding and constant or variable Iiiiiiii
load beam lines giving beam end I•
moments and rotations. Also, it of-
fers uniform and concentrated load
options with midspan deflections.
The experimental data used for
PRCO development and verifi-
cation were obtained from tests re-
ported in archival journals, confer-
ence proceedings, and university
theses and reports.
The program "builds" a given
connection based on the strength
and force-deformation properties
of connector elements that are typi-
cally 3" in length. Connector ele-
ments are bolted or welded single
and double angles and bolts in sin-
gle or double shear. Connector
strength and force-deformation
properties in tension, compression,
and hear were obtained from lab-
oratory tests.
The output includes all inputted
material and configuration infor-
mation along with deflection and
moment-rotation curves and beam-
lines.

• For more information or a free


manual, contact: RMR Design
Group, Inc., 4421 E. Coronado Dr.,
Tucson, AZ 85718 (602) 621-8251.

791-2011
Fabricators, Engineers
Aim For Consensus

Despite differences in views on authority and liability,
industry-wide agreement on design responsibility is
close to becoming a reality
early 300 structural engineers and fabricators The engineer of

N listened raptly to arguments over who has the


ultimate responsibility-and liability-for de-
signs at a special session immediately preceding the
record is the
captain of the
ship and cannot
and must not
start of this year's ational Steel Construction Confer-
ence on March 17. Although few-if any-minds abrogate any re-
were completely swayed even after 12 speakers and sponsibility for
nearly four hours, participants did appear to be mov- the safety of his
ing closer together. ship."
""ve been While the
fighting this question of de-
battle since sign responsi-
1984. I want to bility has sim-
try to look for mered for more


more solutions than a decade, it
Leomard Ross, P.E.
instead of going came to a boil in
over the old ar- 1991 with the is-
guments," suance of the "Fernandez Memorandum." According
stated Richard to the memorandum, issued by Henry A. Fernandez,
Tomasetti, P.E., deputy commissioner of the professions for the ew
principal, York Education Department, " ... the practice of dele-
Thornton & gating design responsibility to unauthorized firms
Tomasetti Engi- constitutes unprofessional conduct under the Rules of
neers, New the Board of Regents and New York State Education
Richard Tomasetti, P.E. York City, a Law." Among these unauthorized firms are construc-
structural engi- tion contractors, such as steel fabricators. (See accom-
neer advocating panying story for more on this subject.)
shared responsibility. Tomasetti's position, in a nut- James Stori,
shell, is that if the fabricator is only doing detailing, president of
then he need not take any responsibility or liability for AISC-member
the connection design. But if the fabricator's services STS Steel, Inc.,
extend to design, then his responsibility also extends Schenectady,
to that design. Y, began Ius
"I want to change the question [from who is re- presentation by
sponsible for design] to who is responsible for the ser- reminding the
vices a given party provides," he stated. audience that
Leonard Ross, president, L. . Ross Engineering the Fernandez
Co., Atlanta, and former president of the ational In- Memorandum
stitute of Detailing, countered Tomasetti's argument did not change
by citing O.B. Steinman's remarks that there must be a the rules; rather,
clear-cut demarcation between engineers and non-en- its purpose was
to remind engi-


gineers. "Let's be wise enough to prevent some of the
future mishaps by rejecting attempts to improperly neers of the a 1-
James Stori
and unlawfully shift responsibility from the design ready estab-
professional to another party," Ross added. "A P.E. is lished ru les.
licensed to perform and protect the public from harm. Unfortunately, there has been increasing pressure

14 1 Modern Steel Construction I May 1993


from the design community to alter these rules.
The Fernandez


Among the reasons for the desire to shift re-
sponsibility are: pressure from lawyers and in-
surance companies; increased project complex-
Memorandum
ts st,)ted subject, "Unlawful Delegation Of DI.'Sign Rl'Spon~i­
ity; a reduction in the quality of structural
drawings produced by fabricators; and tighter
I bility By Design Professionals," says it all. In August of
1991, Ilenry A. Fernandez, a deputy commissioner for the
budgets and time frames for project comple- ew York State Education Department, sent shock waves
tion. As a result, Stori explained, many engi- through the design and construction community.
neers have deleted the word "approved" from The memo states, unequivocally, that ultimate design re-
their review of shop draWings. Also, engineers sponsibility rests with the engineer of record. "In rl'Cent yeaT';,
are increasingly requiring fabricators to submit however, there has been a trend to shift responsibility for final
calculations on drawings and to have a P.E. approval of the "shop drawing" to persons other than the
among their fabrication staff. principal design professionals," Fernandez wrote. "Frequently,
"I like to think of engineers and fabricators general construction contracts for buildings contain language
as partners," Stori stated. The fabricators know pertaining to written specifications that have been interpreted
what it takes to put a building together in the to require unlicensed persons, such as subcontractors to pro-
field- what is safe and practical, while the en- vide professional design services. In other cases these contracts
gineer of record has more theoretical knowl- require the work to be performed by a licensee, as either an
edge. The fabricator has seen a wide range of employee or consultant to the subcontractor. The end result is
details from a variety of engineers, while the that the completed structure has parts designed by several par-
EOR only has access to his firm's work. How- ties, with an absence of
ever, the fabricator does not have access to all responsibility on the
of the design information for a given project. In part of the principal
the long run, it is the engineer of record who design firm or firms to
has his name and reputation on the line, ac- ensure that the entire
cording to Stori. structure will function
Rather than delegating responSibility, Stori properly and safely as
believes the EOR must insist on quality. "lIe an integrated system.


can require submission of details ahead of The purpose of this
time," Stori opined . "He can require a P.E. in memorandum is to in-
supervision of the detailing and connection se- form and remind allli-
lection process. He can stipulate drawing turn- censed design profes-
over times so that he's not rushed and he can sionals that the
also stipulate AlSC certification [for the fabrica- practice of delegating
torI or its equivalent." design responsibility
However, not all fabricators agree that the to unauthorized firms
constitutes unprofes- Robert Rubin, P.E
sole responsibility for design rests with the en-
sional conduct under
gineer of record.
the Rules of the oo.1rd of Regents and ew York State Educa-
"The present code requires the engineer to tion Law."
accept responsibility for hundreds, sometimes
thousands of connections that he sees for the Robert A. Rubin, counsel for the American Society of ivil
first time one day and then, two weeks later, he Engineers and a licensed engineer himself, brought suit to d
must return them approved or approved a clare the memorandum null and void. Rubin's argument, es-
noted," according to Sophus Thompson, presi- sentially, is that Fernandez miSinterpreted New York law and
was not merely reminding the engineering profession of an ex-
dent, AISC-membcr Austin Steel Co., Inc., Dal-
isting regulation but instead was creating a new rule.
las. "These are drawings that we as a fabricator
have worked on for weeks and weeks. We've The lawsuit was recently dismissed in part because "Since
designed them, we've drawn them, and we've the Memorandum is neither a rule or a regulation, It has no
checked them. It is our feeling it is impractical legal effec!." Also, since no attempt has been made to enforce
for the engineer to be fully respon ible for all of the Memorandum, there is no legal dispute on which to base a
the connections shown on the shop drawings lawsuit.
given the time pressure that is associated with However, the battle is not over. Rubin has appealed the de-
the approval project on every project." He fa- cision to the Appellate level and expects a ruling 1111994 'The
vors a clear division of responsibility, where problem is that the piece of paper is still there," Rubin stated
the fabricator would be responSible for three

~
uring the Design ResponSibility session at thIS year's a-


types of connections: tiona I Steel Construction Conferen e. By appealing, Rubll1
• Where the shear, axial load, and moments are
shown on the design drawings;
hopes to force the State Education Department to deal With the
issue directly and issue niles that will supersede the memo. J
M odem Sh.o.el onstru lion I M a,· 1 ~1 / 1S
• For shear con- PA and a repre-
nections of sen ta ti ve from


beams, where the Coalition of
the shear American Struc-
force is not tural Engineers
shown on the (CASE), the fab-
design draw- ricator may be
ings, but choosing a con-
where the re- nection from an
action can be A1SC source but
calculated is not actually
from AISC ta- designing it.
bles. "We retain re-
• For moment sponsibility," he
connections stated .
Sophus Thompson where full D . Kirk Harman, P.E.
Abraham J.
moment ca- Rokach, P.E.,
pacity of the member is indicated on the design A1SC senior staff engineer, spent several minutes
drawings. naming various A1SC sources, and the list was im-
The engineer would be responsible for all other con- pressive. The list included: Volume II Connections;
nections. LRFD and ASD Manuals of Steel Construction; LRFD
"Allow the fabricator to design connections that fit and ASD Design of Simple Shear Connections; ASD
his expertise," Thompson stated . "Put the work with and LRFD Specification for Structural Joints using
the corresponding responSibility or liability where it ASTM A 325 or A490 Bolts; A1SC Design Guides; the
fits naturally." CONXPRT computer program; and Engineering Jour-
Not everyone agrees with Thompson's interpreta- nal. "It's wrong for professional people to try to re-
tion, however. According to D. Kirk Harman, P. E., a duce their responSibility," Rokach stated . He then
principal with Cagley and Harman, King of Prussia, compared the medical and engineering professions,

Celebrating Our 2nd The state-of-the-art


Decade of Seroice!
SCADA Structural Engineering System
The SCA DA "itr uctu ra! e ngineering soft wa re Ca/>abiliti es:
syste m rcprc~c n" an integrated design·anal).., is . S t a t ic ..
'\ _ _ _ _..;\ e nvironm ent. It includes comp lete re inforced
. D)n a m ic- ... T i mc Hi~ hl q
concre te a nd Mcc l design capabili ties. Th e Dl nami c:,· Rc .. r o n .. e Spcc trum
desig n procedures arc close ly co upled to the
SCAD A analysis "," ' hods. SCADA includes • P. Dcl l li
an efficient J· D fini te c leme nt structural . Uuckin j.:
analys i.., module with a large c leme nt library . No nlin ea r Stali n .lnd O ) n;ll11i c!t
a nd a wide range of a nalysis capabi liti es. Geo metri c and Mat e ri a l No nlin earity
It o ffe rs th e cho ice o f three preprocess ing
. Co m plctc E lcmt' nt Libraq
,~_ _---~~ mod el definiti o n procedures· spreadshee t Tru ss, Beam , Kirc hllll H Plat e , S h ear
!<I t) Ie. draftin g M) Ie and ad va nced geo me tric and
Pl a te, Plane S trcs~ , PLan e t rai n .
\olid mod eling style . A .. is)mm c lri c, he ll. Solid
The SCADA display ca pabili'ics a rc powe rful and
- - -_ _ _ _ cfficicnt. in cl uding ..,haded im age. continuo us . 5'1'('1 and Co ncrete D C!t iJ: "
~_ _ _ _ _ _ _-, colo r contour . C AD T ran sl.ll o r ..
and line . Cco me tri c a nd Solid Mo del in g
con to ur
. M c!t h Gc n l' r.lIi u n
plotting.
. SQL Re lati o nal Dat llba sl' Hc po rtin g

For m/umullfon l"onUk l


SCADA -;oftwJ rl Corporation
1202 1 W.I .. h,rc RI\'~I .. Suite 676
L:.... Angdc ... CA QOOli
Tel (lI OI176· II<\O F." , (l 10) 176.1141 ~~CL_ _ _ _ _ _...J
cO
which both are issue with their
experiencing clients. He did


rising insurance add, however,
costs. "There that most engi-
are the same neering in ur-
problems, but ance policies
doctors take ad- contain an ex-
ditional, not clusion where
less, responsi- the engineer
bility." manufactures a
Added Har- building com-
man, "Over th ponent. Mike
years, we have Holcomb, with
found that there C A lnsurance,
is still a signifi- a leading in-
Richard Homer cant amount of surer of fabrica- Mike Holcomb
risk for the tors, stated that
structural engineer even if we delegate the connection most fabricators carry a general liability policy that
responsibility. If there's a connection failure, we all does not cover professional liability. What that means
will be sitting at the table-the architect, the structural is that most fabricators are not covered for preparing
engineer, the contractor, the fabricator, and probably designs or plans. However, he added, at least one in-
anybody else who walked by the site during construc- surance company is currently working on a new pr<>-
tion. Why don't we just solve the problem now and gram that would offer professional liability coverage
avoid all of that time and effort." to fabricators.
Part of the question revolves around insurance. Building owners add another dimension to the
Richard Homer, with the Victor O. Schinnerer & Co., question and some have specific guidelines. As with
Inc., a leading insurer of architects and engineers, the New York Education Department, the military
noted that his firm has not pushed the shop drawing clearly states that the EOR has the ultimate design re-

• Production Control
Get unrivaled control over I ~'I . . c...t.N1 '''-'''' ......
every piece in your shop,
every step of the way
How would you like to be able to punch a fow keys on your
comput8t and get instant, detailed tracking reports on the status
of Individual pieces or entire jobs In your shop? Thafs exactly
what Sfructural Software's new Production Control Tracking
System can do for you. Shipping tickets, loading reports and
olhe< status reports show what shop stations a piece passed
through on what date. who did the work, how many manhours
the work took and whaf still needs to be done to that piece. Bar
graphs. like the one shown, give the number and percentage 01 comP'etion on any piece mark. sequence or job. The new traclOng system
gIVes you the POW8f to see exactly what shopwork remains to finish a given piece marl<, sequence or job. Sorted fists show individual piece
weights, assembly weights, even weighf of an steel on a drawing. Production Control interfaces with our Purchase Orders program to
gefl8fate cutting Hsts that give you the addled capability of tracking material from the time ~'s ordered to the time it's cut The cutt>ng ists
show shop employees exactiywhich pieces to pull, which pieces k> cut from themand which pieces to scraporretum k> Inventory. ProdUC1ion
Control also works with our new Combining program to optimize your material cutting for evon more savings .
.,-.- .- .-..----.

• For a free demo disk, call Structural Software


today at (800) 776-9118 I
PO 80K 1i220.~I"dI... Vd401i

Modern t('t.'1 onstructlon I May lC)q3/ 17


sponsibility, ac-
Survey of Building cording
Charles Gutber-
to

Code Officials let, Jr., a stnlC-


tural engineer

1. Are you aware of the issue of "shared design re- with the U.s.
sponsibility" with regard to the design of struc- Army Corps of
tural steel connections? Engineers. "De-
Dilly 20% of the respo"de"ts were aware of the isslle sign responsibil-
IJy lIame. 46% of buildillg officials were aware of the ity remains wIth
practice of shared respollsibility, the Corp of En-
gineer designer.
2. Under the current code in Y OUI jurisdiction, do Transfer is not
you require steel connections to be designed on permitted." Sim-
the construction documents p rior to your ap- ple connec-
prova l? tions-- those Abraham Rokach, P.E.
50% of participallts do require cOllllectioll desigll found in the
prior to approval. Of this 50%, 22% illdicated that COII- AlSC Manual of Steel Construction-are not required
ditional permits, partial releases, or complete waivers are to be on drawings. Also, all fabricators working on
sometimes applied. 17% of the participallts illdicated that Corp projects must be AlSC certified .
no structural rel.1iew is performed at all. In contrast, Peter Schultz, a vice president with
3. Does the current code addIess the issue of
Lehrer McG-
shared re- overn Bovis N.j.
in Princeton, NJ,
sponsibility
specifically? believes that
12% of ti,e "fabricators
participants be- must be respon-
lieved that their sible for theiI
work." How-
code directly
ever, he a [so
addressed
shared respon- stated that both •
sibility. engineers and
fabricators need
4. Are there to be more com-
any revisions plete in their
regarding drawings. One
shared re- problem he Charles Gutberlet, Jr.
sponsibility noted is the lack
Rebecca Burleson being PUI- of experience of the engineers doing the actual review
sued at the of shop drawings. Typically, he explained, they are
present time in your area? less experienced engineers. "There's a need for addi-
100% responded "no". tional training programs in this industry," he con-
eluded.
5. Does your code now allow the engineer of re- There's also a
cord to delegate the responsibility for steel con- need for a na-
nection design to the fabricator or contractor? tiona l consen-
60% respollded "Yes." (Many of these-36%-added sus, accord ing
"but the "'gilleer is IIltimately responsible for the work to Harman. En-
dOlle on his/her design.) gineers who do
not assign de-
6. If the EOR requires the contractor (or fabrica- sign responsi-
tor) to employ a licensed professional to prepare bility to their
and stamp shop drawings for later review by the fabricators are
EOR, has the EOR shifted any of his/her responsi- at a disad\an-
bility to the contractor's engineer? tage since their
26%-Yes , responsibility rests with the seal all the de- costs will be
sigll . higher. "There


50%-No, IIltimately the "'gineer of record mllst be needs to be a
respo"sible for the acceptability of the elltire system. level playing
field," he ex- Peter Schu ltz
24%- The courts wil/have to decide.

18 1 Mod ern Stet'l Construction I May 1993


plained.


Currently, there is little
agreement on where de-
sign responsibility rests.
Rebecca Burleson, a profes-
sor at Auburn University,
recently conducted a sur-
vey of building offidals
and their reaction to the
question of design respon-
Sibility. While 60% of the
respondents indicated that
the engineer of record Pictured at the podium: David Ratterman
could delegate connection Top row: D. Kirk Harman; Richard Homer; Richard Tomasetti; Robert Rubin;
design responsibility, Charles Gutberlet, Jr.; Abraham Rokach
nearly a third of those offi-
cials indicated that "ulti- Bottom Row: Mike Holcomb; Peter Schultz; Rebecca Burleson; James Stori;
mately the engineer is re- Sophus Thompson; Leonard Ross
sponsible for the work
done on his / her design." Interestingly, while all of the sues In Design Liability: Emerging Risks And Liability
138 surveyed building code officials were invited to In The Shop Drawing And Submittal Process" will be
the design responsibility session at the NSCC, none held by the Georgia Institute of Technology in Atlanta
showed up. "The codes do not deal with this topiC on September 30 and October 1. For more informa-
[design responsibility!:' Burleson explained. "It's tion, contact: Saeid Sadri, College of Architecture,
open to the interpretation of the code official." But ul- Georgia 30332-0155 (404) 894-4875.
timately, she hoped, the solution would come from (To pure/lase a copy of a complete transcipt of tile
within the design and fabrication industry. four-hour session, contact: AISC at (312) 670-2400.)
Towards this end, a two-day session, "Critica l Is-

TO DETAIL Computer Detailing Systems, Inc. introduces


a state or the art structural steel detailing
system II hich allows rabricators and detailers
10 meet the demands or the ruture with the
ability 10 generate connection calculations,
download to C:'lC equipment and interrace lIith
major design firms through the Steel Detailing
Neutral File.
A practlcal. flexible system requiring minimal
training, COS is capable or producing illlclligcllI
3D models. Ooor plans and e1elations as lIell
as shop drawings or unsurpassed qualit) using
)'our standards and paper.
COS is cUITent11" used by Fabricators and det:ulers
throughout the ~S 'lild in Canada.
( 3 0NTACT COMPUTER DETAILING SYSTEMS
/oday fOR A FREE INfORMATION PACK .

....
CDS
Slrll clll"I/ Sle ('/lJel(lIflllg ,\)'sle/ll
~

Computer Detailing Systems , Inc .• 7280 Pepperdam Avenue· Charleston , South Carolino 29418 • (803)552-7055
"Down the road, weathering ste~ .

The Pennsylvania ' Iurnpike is considered onc of For example, its high strength permits longer
the safest and beSt maintained roads in the nation. spans, thus reducing the number of picn. required. And
But improvemcnts were badly needed ncar that leads to foundation COSt savings.
Pittsburgh to provide bener access to the city's OTIIER STRONG REASONS.
airport and 1-80.
For anothcr, it can be ea.ily inspected, measured
The ~ lahoning River Bridge, the largest of and evaluated. If nccc"a,)', it can Ix: readily repaired.
the 21 bridges being built on the new Beaver It's also highly adaptable to redecking, widening and
Valley Expressway, is a dual-lane, conrinuous- performing other structural modification,.
span, welded plate structure. The five interior
Weathering steel also eliminate, the nced for
spans are 258 ft with end spans of 182 ft and
both initial and maintenance painting. What's more,
228 ft for an overall length of 1,700 ft.
it's as attractive as it's environmenmlly sound.
WilY \\,EATIIERING STEEL? Kempf comments, "Thc PTe', principal crite-
The bridge is built" ith -l,600 tons of ria for selecting material~ for bridges and other •
Bethlehem's AST~I A588 weathering steel. Turnpikc applications aren't based on price alone
According to Kempf, the PTe finds but also include long-tcrm serviceability and dura-
weathcring steel a very cost-effective bridge bility. And with environmental restrictions being
material for a number of reasons. what they are today, it's only prudent to '''e

save us more than money." Frank J. Kempf. Jr.. P.E. Bridge Engineer. Pennsylvania 'Turnpike Commission.

weathering steci wherever possible."


Quite simply, weathering steel is a natural for a
broad variety of bridge applications.
Including yours. Especially if you want to
save more than money.
TECIINICAL LITERATURE AVAILABLE.
We would like to tell you more about weath·
ering steel for bridge applications. For a copy of
our Product Booklet 0io.3790, and our latest
lcchnical Bulletin, TB·307 on "Uncoated
\Vcadlcring [CeJ SCfUCWfCS," get in touch with
your nearest Bethlehem sales office. Or call:
Bethlehem 00
Brian Walker at (2 15)694·5906. Bethlehem Steel
e corporarion, Construction t\1arkccing Division,
Bethlehem,PA 18016·7699.
Owner: Pcnns)huniB Tumpil.;c Commission, Ilurnsburg, I)A
Fllbricutor. Il igh Steel SlruCtun.«e, Inc .. LanclIstcr. rA
Wcuthcrirtg Steel Supplier: Bethlehem Steel Corpon.I .... m. Ikthlehclll, I'A
E A R T H Q A K E E I G
N
u D s

Seismic Upgrade For A •


Concrete Frame
Four steel
buttress towers
were added
to a
concrete-framed
building to
bring it
Tire four sleel lowers
up to current were skillfully
desI81led meet tile
seismic project's seismic 1Ieeds
while IIot disturbi"g

standards Ih, bui/dillg's


aeslhelics. Tal' pholo
by Merl Carpellier
By AndIew T. Merovich, S.E. Pholography, Los
Galos,CA
(408/370-1663)

tronic equipment. grid lines were filled in with con-

W
hen Sun Microsystems,
Inc., decided to purchase And finally, the company's spa- crete, forming the beam sections of
a non-ductile concrete tial needs requiIed an extensive the frame. The typical columns arc
frame building in California dating reconfiguration of the existing 20" x 20" (SO.8cm x SO.8cm) and the
back to the early 196Os, they knew space, including the demolition building is clad with glass and pre-
going in it would require substan- and replacement of partition walls. cast concrete.
tial renovation. The Palo Alto Haz- A structural ana lysis of the
ardous Building Ordinance had al- Structural Concerns building's capability to survive an
ready identified the structure as The 120' x 384' (36.5m x 117m) earthquake revealed two major
hazardous and in need of upgrad- structure has a poured-in-place re- concerns: a lack of ductility and a
ing. inforced concrete frame with 8V4"- lack of strength in the columns.
In addition, the company was (21cm) thick waffle slabs for floor About 15 retrofit schemes were
planning on locating both adminis- and roof diaphragms. The columns developed by the project's struc-
trative and research functions in for the five-story, 233,OOO-sq.-ft. tural engineer, Dasse Design Inc.,
the five-story building and the ex- (21646m2 ) building are set in a grid San Francisco. Most of the retrofit •
isting mechanical and electrical fashion, spaced 24' (7.3m) in both options involved the addition of
systems needed to be upgraded to the north-south and east-west di- interior concrete shear walls. These
hand le the increased use of elec- rections. The waffle coffers at the methods were rejected for three

22 1 Modern Steel Construction I May 1993


reasons: high co t; lengthy con-
-
®e®@iS ® 0 ®
-
®~,® (!) Gl CD ® Gl <D 0


I

>~
struction time; and an overall nega-
tive impact on building functional-
ity.
~~:I ;F~'
'V~ r - ~~.• I
~ I r - -,I
The alternate to interior shear
~l"_&-'..-...\
~1'"
'.1' 1 I
walls was to reinforce the structure
using exterior buttresses. Various <9
®+--- ~
-;
schemes-using both steel and 1I ~>I_~,........ _""" .. - i'- _
. . _ "'.ot "@,...''''''' l1
concrete and either four or eight
I I I I I
towers-were considered before
the decision was made to add four ~

.: It
%,1
oil}.
'" Il\" . ·i.
" '" I

L--. ~ ,, -,
braced steel towers.
~~I E!YC ~ y ~ ./- -"-® 1 I
\. <
'"
~

10% Increase In Usable Space •


Analysis showed that four tow- KEY PLAN
ers were the minimum number re- - ------ -- J
qui red to brace the existing build-
ings. But more importantly,
grouping the exterior braces into
just four towers allowed the space
within the towers to be useable,
which added approximately 26,000
sq. ft. (2415m 2) to the building. Un-
fortunately, this addition violated
Palo Alto's recently established SO'
(15.2m) height limit for occupiable
space. However, since it fell within
the allowable O.SO allowable
floor /a rea ratio (FAR) and would TOWER PLAN
J

substantially increase the seismic
safety of the structure, the city

~ ..
council accepted the proposed de-
Sign. The computer analYSis was 1.0:1 "'" 1 u '· ,,· t
performed using the ET ABS pro-
gram from Computers & Struc- r .~ + u + " l
tures/ Inc.
Steel braced frames were chosen
over concrete systems because of
their light weight, ease of erection, W I ". ~ /
rigidity, ductility, and flexibility for
window placement.
Architects on the project were
Matarazzi Associates and Williams
/
& Tanaka, both of San Francisco.
General contractor was Koll Con-
struction, San Jose, CA. The steel /
/
detailer and erector was A1SC-
member Reno Iron Works Co., Inc.
Tieing It All Together
Sub tantial ties, or collectors,
were provided to connect the exist-
ing structure to the new buttress
towers. Steel plates, welded to the
buttresses, were anchor-bolted to
the concrete floor and roof beams,
/
reaching into the center of the

• building. In addition, steel plates


were added to strengthen the exist-
ing diaphragms at the roof and di-
agonal steel bracings were added

Modern St<''el Construction I Mal 1993 / 23


columns were W14x193 to
W14x233. The diagonal bracing
ranged in size from W14x74 to •
W14x193 and utilized fully welded
moment connections.
New foundations were needed
to support the buttress towers. Be-
cause of the large uplift forces, pil-
ings and caisson footings were
used to prevent tower rotation or
rocking. An additional problem-a
stream of contaminated ground
water 10' (3m) under the struc-
ture-necessitated the use of steel
piles because they are less apt than
Tile addition of tile fOllr /lew concrete piles or caissons to mix
steel towers 1101 Dil ly added water from groundwater streams
26/)OO-sq.-ft. to tile bllildi/lg's and thus cross-contaminate them.
usable area , bllt brougllt it up Paying For Success
to curreut seismic sta"dards.
The seismk portion of the 14-
month renovation project required
six months and cost $3 million, or
approximately $13/sq. ft.
($140/m 2). Approximately 70% of
this cost was for the buttress tow-
ers, 10% was for the collectors and
penthouse bracings, and 20% was
for the new footing. The cost of the


entire project was approximately
$14 million.

A. T. Merouich, S.E., is a pril/cipal


at the mechanica l penthouse and grade beams and pile caps were with Dasse Desigl/ /I/c., a structural
tied to the buttress towers. To constructed. el/gil/eerillg firm headquartered in Sail
transfer the loads from the buttress Typical beam sizes ranged from Francisco.
towers to the pilings, large concrete W14x61 to W14x14S, and typical

"PROTECT YOUR
BOID6ESTORE
BUILDING FROM ENGINEERED PRODUCTS Co.
Seismic Protection
EARTIIQUAKE DAMAGE , ,
.
,, ,, ''r
WITH BOID6ESTORE I
; ~ I I
,
I
t ! ::::
MULTI-RUBBER , I

BEARINGS (MRB)"
Nashville: P.O. Box 140993-T, Nashville, TN 37214-0993
Los Angeles: P.O. Box 6147-T, Huntington Beach, CA 92615-6147

24 1 Modern Steel Construction I May 1993


Tel: (6151872-1425, Fax: (6151872-1437
Tel: (1141962-1666, Fax: (1141968-3441

Call For Papers
1994 NATIONAL STEEL

• CONSTRUCTION CONFERENCE
David L. Lawrence Convention Center
Pittsburgh - May 18-20 , 1994

Title Of Paper:

Primary Author's Name:


(First) (Middle Initial) (Last) (Professional Suffix-Degree)

Positionrritle:

Place Of Employment:

Address:

City :_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ State :. _ _ _ _ _ _ _ _ Zip:_ _ _ _ _ _ _ _ _ __

Business Phone:_ _ _ _ _ _ _ _ _ _ _ _ Ext. : Fax#:_ _ _ _ _ _ _ _ _ __

Home Address :

City:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ State :._ _ _ _ _ _ _ _ Zip:_ _ _ _ _ _ _ _ _ _ __

Home Phone:_ _ _ _ _ _ _ _ _ _ _ Preferred Mailing Address: ()Business ( )Home

Co-Author(s) :
1. Name :


(First) (Middle Initial) (Last) (Professional Suffix-Degree)

2. Name :
(First) (Middle Initial) (Last) (Professional Suffix-Degree)

Invitation/Call For Papers : practice ; must then submit their final manu-
The 1994 National Steel Construc- Quality assurance and control; scripts, in a form suitable for publica-
Innovative management techniques; tion in the 1994 Conference Proceed-
tion Conference will be held at the
David L. Lawrence Convention Center Case studies of unique projects; ings, by February I, 1994.
Computer-aided design and
in Pi"sburgh from May 18 Ihrough May
20, 1994. Participanls include struclural detailing; Preparation of paper:
engineers, fabricators, erectors, educa- Material considerations;
Final manuscripts for publication in
tors, and researchers_POlenlial aulhors Fire protection;
the official 1994 Conference Proceed-
may sub mil abslracls of papers on de- Coatings and material preparation ;
ings are expected to be aproximately
sign, fabrication and erection of sleel- Innovative structural systems.
20 pages in length . Copy (including
framed buitdings and bridges. photographs and drawings) must be
Guidelines for camera-ready_ Complete instructions
Topics of interest include: abstract submittals: will be forwarded to authors upon ac-
Practical application of research: Abstracts for papers must be sub- ceptance of Abstract Proposals.
Advances in steel bridge design mitted before July IS, 1993. They
and construction; should be approximately 250 words in Poster Session:
Composite members and frames ; length and should be submi"ed on a Papers not accepted for presentation
Heavy framing connections; separate sheet of 8v.." x II" white at the Conference may, at the author's
Steel-framed housing ; paper a"ached to this form. expense, be presented at the Confer-
Partially restrained connections; Authors will be informed of the Or- ence Poster Session . Guidelines for
Eccentrically braced frames; ganizing Commi"ee's decisions by Oc- the Poster Session Will be provided
tober I , 1993. The selected authors upon request.
Economical fabrication and erection

Return your abstract with th is submission form before July 15, 1993 to:


American Institute of Steel Construction , Inc_, One East Wacker Dr_, Suite 3100,
Chicago, IL 60601 -2001 Attention: 1994 NSCC Abstracts
Phone: 312/670-2400; Fax: 3121670-5403

ModNn Steel Constructio n I May 1993 / 25


I
THIS BUILDING ~
GNEMOSTaJ
But not Vulcraft. We saw it as one of our greatest challenges ever. Because
we not only supplied steel joists and joist girders for the project, we also helped
design the framing system so that only limited structural damage could be ex--
pected from an earthquake measuring up to 7.5 on the Richter scale.
~

AFEFROM S
IESTHE
That was essential because the building, which was constructed for Evans
& Sutherland Computer Corporation, is located within a mile of the Wasatch
Fault in Salt Lake City.What's more, Evans & Sutherland is a leading de igner
of special-purpose digital computers, software systems and display devices -
products extremely vulnerable to damage from seismic tremors.
To plan for maximum protection, Vulcraft was asked to join
with the architects and engineers at the design stage of the project.
Already, they'd decided to use a "base isolation" system, the most
advanced buffering method available. But using our steel joists
and joist girders was also an important decision. The joists and
joist girders are much hghter in weight than wide flange beams,
so the entire building required less steel, hghter columns and less
foundation. And this not only hghtened the load for the base is0-
lators, it saved appreciably on building costs.
Throughout construction, Vulcraft remained constantly
involved, tailoring our dehvery of materials to the exact erection
schedule and meeting deadhnes with-
out fail. What's more, our joists and
joist girders helped the steel erectors
meet their deadhnes. That's because
our products are fast and easy to erect
- a fact that saves time and money on
virtually any job where they're used.
So whether you need Vulcraft's Thr~ ... mdw.ta ·lxu.ooIaoon-l)IImI"aax.m'
'
he1p to protect your butidmg om fr moJar"""", Iakk Thryalso!/>JOkd \lJcmIi IIr<I """
and .... R'TJ.rsPrrN~

earthquakes or you want to stay out of the hole when it comes to


construction costs, contact any of the plants WLCRAFT
listed below. Or see Sweet's 05100NUL. Aa.._~"..... a"1''''''.
PO Box63Z BnghamCIIJ. 1Jf84.m/IJlI7J4-~33. PC Box 1'-2. Florma.SC29502 .>'662-0.381 ;PO Box 1(fI. filrtfhyn<.AU 7
J:lV8.I'-24<A), PO Box 186, Grope/and. 1')( ~m687-4665. PO Box59, Nor#k. NE68i01402I644-85CQ PO Box ImJ.Sl IN
Rea,'"
4078-' 2191337-.5411 Arclum Erbdt-R"'m"IP ArcIu_ AlA,Sn-uauml Eng"''''' E"IIJ''''''' & ~ Inc a.".,.aI o..m.:...
Thr Il<m/yon Cmporaam. Sod fubnamr D&H Sod s.pp" Inc;Sod Enmr Sod Dtrk E....... III<
A R T H Q A K
E E I G N
E u D s

Active Bracing •
Systems
lender structures, such as tall
A recent full-scale mockup
showed the practicality of
S buildings and long-span brid-
ges, are prone to excessive lat-
eral sways that can lead to struc-
tural and non-structural damage
"smart" bracing systems for and even to collapse during earth-
quakes and windstorms.
seismic design Traditionally, structural engi-
neers have dealt with vibration by
increasing the strength and stiff-
By Andrei M. Reinhom ness of the structure. During the
and T.T. Soong last few years, some engineers
have begun using passive energy
dissipation systems such as base
isolation systems where structural
members rest on a device designed
to dissipate energy. Other protec-
tive systems dissipate energy via
plastic deformation, viscous fluids •
or heat transfer.
Researchers are now working on
a new generation of protective sys-
tems. These active systems possess
some kind of intelligence that
allow it to direct the energy dissi-
pation in an efficient way. The idea
behind the "smart" system is that it
x can sense what the building is ex-

'~I i +Y
periencing and, through electronic
and hydraulic feedback, activate
< ""'if braces to counteract the vibrations.
~ ~ -9-....."*~~ . S[NIOR Tests have recently been con-
ducted on a six-story building in
TI {ic_~_-&l downtown Tokyo that was

Figure 1: ">:perinlental test building in


Tokyo featuring "smart"· braces
t
5 00
IW
~OOO
equipped with "smart" braces to
control vibrations. The tested sys-
tem was designed and developed
at the State University of ew
York at Buffalo and transferred, as-
sembled and tested in an experi-
mental building of Takenak Con-
struction Co. (see Figure 1). While
several active mass dampers have
been implemented in full-scale
structures during the past few
years, the Tokyo test is the first to
be tested under actual ground mo- •
tions. During the test period,
Tokyo experienced three moder-
ately strong earthquakes.

28 / Modern Steel Construction ' May 1993


The system is designed to "flex


its structural muscles" to adapt to
excessive vibrations. The Usmart"
bracing system reacts with enough
speed and accuracy to prevent ex-
cessive vibration in a tall building,
making 300 complete cycles of cor-
rection on one second (see Figure
Figure 2 (LefO: A schematic of the bracillg
2).
cOf/trol meduwism shows tile process
The active control system uses
involved ill the system's reactiml to
structural braces and tendons. It
v ibratioll ,
consists of a set of diagonal braces
or prestressed tendons connected Figure 3 (BeI",ul: The details of a typical
to a structure, with electrohydrau- bay are exposed in this diagram. Tlte active
lic servomechanisms controlling protective system is composed of solid
their tensions. Such mechanisms diagol1al tube braces, wh;ch were attached
also have applicability for retrofit, at the bllilding's first story after the mai1l
since tendons and bracings are al- sfrucf,lre was built.
ready existing members of many
structures.
The preliminary evaluation of
this active bracing system demon- ,-----------------,
strated several key advantages:
• A full-scale efficient active struc-
tural control system can be devel-
oped within the limits of current
technology using off-the-shelf
components.
• It can be used on buildings of


any height.
• It can be used on both new build-
ings or retrofit projects.
• The bracing system improves the
response of active mass dampers, J,:,L
which were also evaluated on the
structure.
• It allows more architectural flexi- ~~~~~~====~~ NIIIlo .u,......, ",.\C.oIj. rOIl ta'lO

bility. LT.J !: Lm..l


III,CI""

Full-Scale Experimental L~----L'.-.~J


Implementation
The active bracing system was
tested in an unclad, symmetric, six-
story building (see Figure 1). It was Side access stairs were built with- ments and formed an interna l part
constructed of rigid ly connected out connection to the main struc- of the bracing system.
steel frames made of A36 rectangu- ture to preserve the symmetry of Braces were designed for the
lar tube columns and W-shaped the system. Because there was no maximum control force and the an-
beams with reinforced concrete cladding and because of the simple ticipated stiffness to assure that
slabs at each floor. The details of a connections, the structure had a buckling would not occur under
typical bay construction are shown very low damping in the dominant actuator actions. Circular steel
in Figure 3. In order to simulate a modes (less than 1 %). tubes were used as bracing mem-
typical high-rise building, the 600- The active protective system is bers with the following specifica-
metric-ton (6oo-ton) structure was composed of solid diagona l tube tions:
designed as a relatively flexible braces, which were attached at the
structure with a fundamen tal pe- building's first story after the main Lellgth .........360.5 CI/I (11.8')
riod of 1.1 seconds in the strong di- structure was built (see Figure 3). Dia //J eter..... 165.2 1/11/1 (6.5")
rection and 1.5 seconds in the weak The control system enables longi- TI,icklless ....4.5 //J//J (.18")

• direction. It was constructed with-


out cladding except for the top
story (sixth floor), which housed
an experimental mass damper.
tudinal expansion and contraction
of the braces via hydraulic
servocontrolled actuators, which
were inserted along the brace ele-
Strerrgth ..... 564 kN (127 kips) .

A hydraulic power supply, an


analog and digital controller, and

Modern 51'eel Construction I May 1993 / 29


valve), and are kept fully charged
by the hydraulic pump. This stored
~I
.....::comoc:u.D ........... 1IOH1I
power is used when the active con- •
trol is first started so that full hy-
, draulic pressure is instantly avail-

-~
able.
The accumulators ca n supply
UHHIHH enough power to allow the hy-
draulic pump to reach full pressure
operation, and can drive the actua-
tors for approXimately one min-
ute-longer than most earth-
·O~~.~~,,~-,7.--~~~~~~~~ quakes- in the event of a power
t),o£ (I.co"1CSJ
failure.
(~
Control System
I~O'II(' _ l':C>os
il An analogi digital controller

!:-\~!titl~jij1~ 1+fl \/VWj\·.


was chosen to drive the hydraulic
system based on the requirement

~'8"./l-J .. ~V .
that the analogy controller must be
compatible with the hydraulic ser-
~ ,I : ~
vice manifold and with the
. --- T -- ~ .:- • •- - - . - . - - ~ servova lves, and be capable of si-
~. - - - i --'\yos~o --_.- multaneously controlling the two
sets of servova lves. Moreover, the
.~--~--~--~~~~~~.
5 10 25 0 5 --~:~~~-=~-=--~
10 15 2tI 25 :D controller has a series of fail-safe
TM£ (SKere', l':V€ (SIC:TOCS)
circuits designed to properly shut
down the entire system if any
'XJ I
("
OOJmIQU.lO.OfIC[O ........ TlQNI
II • El " I problems are detected . As built, the
• controller was designed to a llow a

~ ~ 'i\Mm~1
digital computer to monitor the •

:,~~~1\IMI~MI I status of the controller and the hy-


\11 draulic system linked to the con-

. ~ .~~ ~ W~iji troller, and to adjust some operat-


ing parameters of the system,
. including triggering the fail·safe
circuits.
I A microcomputer executes the
:n 0 10 15 aI 25 3J
control algorithm, monitors the
'::ME ~HCcnc:sl
status of operation of various hy-
draulic components through the
analogi digital controller, and
Figure 4: Response during free a"d forced vibratiolls. monitors the status of the struc-
tural system via sensors connected
to the structure. The software algo-
an analog sensor also were utilized reduced further by increasing the rithm is designed to start operation
in the system. working pressure of the hydraulic upon detection of an event or shut-
Four units of Parker, heavy·duty oiL down in case of malfunctions. The
hydraulic cylinder series 2H·style system consists of a 80386-based 25
TC (NFPA style Mx2) were se- Maintaining Full MHz IBM-compatible computer
lected as actuators with an average Power Reserves equipped with conversion boards
capacity of 344 kN (77 kipsJ. Al- The final design of the system to provide interface for up to 16
though the expected movement in allows the active system to remain channels of differential input from
the actuators was only pluslminus ready for full power controlled op- sensors and four channels of ana·
12 rnrn (O.47'J, larger stroke actua- eration, while requiring a hydrau· log output to the controllers. In ad-
tors were chosen for the experi- lic pump to operate for only a few dition, 16 LSTTL, digital logic
ment to enable length corrections seconds each hour to keep the sys· channels are available on the com-
during construction . In future ap- tern fully charged. For this pur· puter boards. The analog channels
plications, a much shorter stroke pose, hydraulic accumulators are are used to interface with the sen- •
actuator would be sufficient. The placed between the pump and a sors (conditioners) and with the
physical size of the actuator can be hydraulic manifold (a complex analog servoloop. The digital logic

30 I Modern Steel Construction J May 1993


channels are used to monitor the
state-of-the-controller and adjust ... "'- 1
• its operations.
The sensors are an integral part
of the "smart" system. This control
system has four servovelocity seis-
mometers of type Tokyo Sokushjn
VSE11 for each prinCipal direction
of the building with an output
:I'
"
I '
.,
,
V l'
i

range of plus/ mjnus 100 ern / sec


(39" / sec). The velocity sensors are
located on the ground at the first,
third and sixth noors. The same "
sensors can provide acceleration I '

I !~~~~~~N~--~:·~
N ~.
information up to plus/ minus 1000
cm / sec2 (394"/sec2) . AddHional
transducers are mounted at each
noor to monitor building behavior.
Each actuator is equipped with a
displacement transducer (LVOn
... ,-
(see Figure 4) and each has a range Figure 5: Strllctllre disp'actme"ts dllrlllg April 14, 1992 earthqllalcL
of plus/ minus 12 mrn (0.47"),
whkh is used to adjust the length
of the brace via a servovalve loop.
System Performance
The building structure was sub-
jected to a series of excitations to

• MOMENT ROTATION CURVES


POl<
A Quick Quiz
For Structural Engineers
PARTIM-LY REsTRiUl\'ED The more 0 computer progrom costs, the TRUE FALSE
CoNNECTION better it is.
USING A progrom thot solves complex. difficult TRUE FALSE
problems must be complex and difficult
PRCONN to use.
Runs on IBM co~ble PCs wlih wide choke of Siructurol engineering softwore con never TRUE FALSE
prinler and/or planer graphics .:. Connection li- be fun 10 use.
brary Includes 31 IVPOS' single angle. double If you answered TRUE loony of the obove, or you would like 10 know more
angles. single plates. end shear plales. lop and obout a truly Innovative software progrom, coli us!
seal ongles, and combinations of these
-:- Composite and non-composlle beams wlih

I
bolted andJor welded connections -:. Cansl""l
and YOriabIe load beam lines giving beam end
..
moments and rotations .:. Uniform and concen-
trated load options wllh midspan deflec-
tions .:. Basad upon research published in . RISA-2D
archival joumals. confelence ",occedings. and
University reports .. Your complete solution for
For fre manual, call or write to:
/ [""- ~. fromes, trusses, beams,
shear walls and much morel
IUtUt Df~J(~V GnolJl', b e.
4421 E. oronado Drive
Tucson, AZ 85718 26212 DimenSion Olive, Suite 200
(602) 577-2191
HN
RISA l [
Lake Foresl, CA 92630
1-800-332-7472

Modern Steel onstrucbon I May 1993 / 31


identify its dynamiC properties and
to verify the performance of indi-
vidual components as well as of •
the overall system.
Mass Damper Simulates
Seismic Conditions
For the identification studies,
the structure was monitored dur-
ing ambient vibrations created by
heavy traffic and during self excita-
tion tests. Free vibrations and
forced vibrations were generated
using the 6 metric ton (6.6 ton) ac-
tive mass damper (AMD) located
at the top of the test structure oper-
ated in reverse action of its usual
function.
ote that the presence of the
AMD in the same test structure
also allows a performance compar-
ison of active mass dampers with
the active bracing system.
Find out why some of the top fabricators in the United States Seismic Activity
and Canada have choosen Steel 2000. Call60t-932-2760. In addition, the system was
tested during three strong ground
TEEL SOLunONS INC. po 80,1128. J.,k..n. MS 39215 motions that occurred on April 10,
April 14, and May 11, 1992. The
three earthquakes of magnitude
4.9, 5.0, and 5.6 respectively had •
STEEL DECK INSTITUTE peak accelera tions of aPRroxi-
mately 10 cm/ sec2 (3.9" / sec ) (ap-
FLOOR DESIGN proximately 1% of gravity).
For free and forced vibration
studies the AMD was activated in
SOFTWARE both directions using harmonic (si-
nusoidal) excitations that produced
NEW UNIQUE vibrations in the building. Free vi-
bration observations were obtained
and REUABLE from measurements of the struc-
tural response made after abruptly
• OPERATES ON IBM OR COMPAT- stopping the mass damper move-
Aknowle<lge-base<l syslem IBLE WITH 640 KBYTES OF RAM ment. The responses of the sixth
for designing Composile and Non-Composite • SAVES HOURS IN DESIGN TIME floor (see Figure 4) indicate large
beams and girders WIth Steel Deck using
~ocumenled AISC rules • PRODUCES A COMPLETE increases in damping, more pro-
Design a Comple" Bay. Incorporate the use DESIGN WITH ALL NECESSARY nounced in the decay in the y-di-
of aU grades of steel or concrele. Specify live CALCULATIONS rection, and a successful brake in
loads. dead loads. line loads. tributart area • DEVelOPED BY STRUCTURAL
loading and concentrated loads Set denection the build-up in the resonate re-
limits Specify cOOe area re<luctlons. Obtain
ENGINEERS, INC. sponse (Figures 4c. and f.)
VlbratlOO analysis for final deSIgn Pnnt com- • SPONSORED BY SOl and AISC The performance of the struc-
plete design calculabOns Pnnt deSIgn tables. COOPERATING WITH AISI ture shows a substantial increase in
r----- -------------------1 the equivalent damping ratio and a
I
I
I
I
NO. UNITS
ORDERED _
..
_51
STAl(
M£O(I) Of ~1'IoUT
VISA
lI'

w.5l£ACAAO
7~====== II'
em
I'HON(

OIEOVUOI _ _ _ __
substantial reduction of the reso-
nant amplitude. Control results
from non-resonant forced vibra-
tions also indicated good ampli-
I
I
-~~~========~~~~~.~;;~~ I
,...ONCWI{I'fIIffl

""""'"
tude reductions in all affected •
modes.
The main tests were done while
Steel~k J the control system was automati-
Institute
P.O. BOX 9506, CANTON, OHfO 44711 • TELEPHONE/FAX: 216/493-7886
_--_.\
......S
32 1 Mod ern Steel Construction I May 1993
tZ)
,.
.t.
,1'
cally activated during the afore-


mentioned ea rthquake episodes.
The ground motion was simulta-
neously recorded and is used with
an analytical model to estimate the
probable response of the structure
in the uncontrolled mode. The ana-
lytical model was carefully cali-
brated prior to its use for earth-
quake response estimates by
comparing the structural response
in various tests with the one com-
puted . A typical response is shown
in Figure 5. More detailed results
are available in "Active Bracing
System-A Full Scale Implementa-
tion of Active Control," Technical
Report # CEER-92-OO20, ational
Center for Earthquake Engineering
Research, SUNY I Buffalo, August
1992.
Future Applications
The active bracing system is
based on commonly used braces
that provide increased stiffness
and strengthening to lateral force
resisting systems. The active sys-
tem is therefore an extension of a


well understood function. The
"smart" technology provides, in
addition to strengthening, addi-
tional damping that dissipates the SORB'i'EX structural bearin\1 pad
vibratory effects of lateral loading Expansion Bearings which meet today's
such as earthquakes, wind gusts, hi\1her load requirements
and waves. Therefore, wide appli- • Hi~hLoad while remainin\1 cost
cations of this system may be con- • Seismic and Thennal
sidered for such structures as brid- effective.
movement control
ges, buildings, towers, and
off-shore platforms. The system • Low friction
Voss SOde Bearings
also can be used to retrofit existing Steel ba Red PTFE
structures. • L w Deflection accomodates stru tu ra l
Steel structures naturally pos- • Rotation Capabilities movements due to
sess low damping. as in the system
tested in Tokyo. For such struc- • AASHTO Approved thennal expansi ns - can
tures excessive lateral sways can be also be bonded to oth r
easily controlled using active sys- FiBERLAST Voss Bearil1\1S t allow for
tems, thus reducing the necessity A new choi e in a misal~nment or r tation.
for lateral strengthening using
heavy structural members and NEW CRITICAL BEARING PAD DATA!
therefore opening the way to taller
construction at a reduced cost. Write lor your free DL....'" Manual ,md
soilWBrc Ocsi\l'l dk i\h<,,""'ildI.>ic
1-ib..:rt..1!!( Ct:..-wL'IlUlW"" m.. ,n wl.lb..
Andrei M. Rein/rom is a professor
of structurat fIlgineering in the de-
partment of civil engineering at


SUNY/Buffalo. T.T. Soong is the Sam-
uel P. Capen Professor of Engineering
in the civil engineering department at
SUNY/Buffalo.
&?&YJ;
voss ENGINEBllNG. L"iC.
N II~lmlill Are.
UrlLolnlJ1{Xx.t.I L0CX>45
ph 708 bn 8'lOO
1,1.11 7086n 1408
E A R
T H Q A K E E I G N
u o s

West Coast Quakes •


Send Tremors
Throughout The East
n many parts of the United curred more recently and caused
It used to be
that only
I States-especially the Eastern
seaboard-building codes had
long ignored the severity of earth-
extensive damage and loss of life,
these design parameters have long
been incorporated into structural
quakes and the damage they can design. Elsewhere, though, the
buildings out cause. Yet, research has revealed
that earthquakes and earth tremors
building codes are just beginning
to reflect the potential damage of
West needed to are a threat in a far greater percent-
age of the country than most peo-
devastating seismic activity.

ple commonly believe. Recent Changes


meet strict While documentation shows Up until quite recently, the gen-
that earthquakes have not resulted eral practice amongst Eastern de-
seismic codes; in loss of life or costly damage sign professionals has been to ig-
along the East Coast, cataloguing nore or conduct a minimal check of
but now of this kind of information- in- design loads for seismic resistance.
eluding where earthquakes have This practice continued until 1987, •
building codes occurred, when, what size and the two years after the disastrous
extent of damage--has been spo- quake which shook Mexico in 1985.
along the radic and inconsistent. It was not
until 1900 that instruments were
At that time, building codes were
updated and seismic requirements
Eastern used to record and locate this activ-
ity. Ever since then, information
were redefined. The codes were
also expanded to inelude a ranking
has been gathered and more uni- of building types required to be de-
seaboard have formly recorded by such organiza- signed to withstand the lateral
tions as the International Seismo- loads of an earthquake.
been drastically logical Center in England, the U.s. Nevertheless, it was not until
National Earthquake Wormation October 17, 1989-the earthquake
amended Service, the National Ocean Survey in San Francisco that shocked the
and the U.s. Geological Survey. nation-that code officials
embarked on a major effort to en-
By Richard A. Esslinger, P.E. Minimum ReqUirements force seismic regulations nation-
Designers of building codes na- wide. The disaster was real, live on
tionwide have used this catalogue television during the World Series
information to define the mini- and very explicit with all of its
mum structural design require- media coverage. People across the
ments for withstanding the lateral country saw first-hand the cata-
forces of earthquakes. These forces strophiC loss of life, tragedy and
are generated from the movement extensive damage. This made lay-
of the ground due to seismic activ- men and design professionals alike
ity and converted into horizontal aware of the need to further pre-
and vertical loads. BUilding frames, vent this type of disaster.
architectural components and me- As a result, local and national
chanical and other equipment must building code officials scrambled •
be designed to withstand thes to review their current building
forces. codes. They immediately incorpo-
In areas where quakes have oc- rated requirements increasing the

34 I Modern Sleel Construction I May 1993


.D
'.J>,

design criteria necessary for the


protection of the public through
the advancement of current tech-
nologies. In addition to structural
specifications, requirements for the
lateral stability of certain architec-
tural, mechanical, plumbing and
electrical building components
were also included.
Changing Codes Poses
Problems
Since then, the building codes
have changed their design require-
ments annually. These constant
amendments have made it difficult
for design and construction profes-
sionals to incorporate the appropri-
ate code provisions when
designing buildings that will un-
dergo future expansion.
While these revisions to the
building codes are important and
necessary, the process of change is
confusing and costly. An owner
designing for current needs and
anticipating future growth by al-
lowing for vertical expansion must 1'- 5 lI T
now predict space functions and
design load requirements for the !l6fNO
10 wr CClUMt
future . During design, an engineer
• can accommodate future vertical or
horizontal expansion by incorpo-
"""" ",...,•••:e,,,,
""""
PlAt[S (TOP " BOT.)
rating gravity and lateral loads into
the design of the foundations,
building columns and bracing sys-
tems. Older buildings that were
planned for vertical expansion will
I 0,.
most likely require extensive resto-
ration work to satisfy newer and ."

future building codes. I """"


IKO
'-+-- STO 0CUIl! .w::u: SKNI
Specialty Hospital Faces
Code Challenges
t CONN£COON 'Iffi4 tOIIZON'f....
SlOT1ID HIlLS
'--+- NO!/V.SIIC WOWOIl COtH:tmII

Deborah Heart and Lung Cen-


,.. 1I(tl/4 (Wi)
<nP
ter, a specialty hospital in Browns
'fi' loP " 8OTTOIII)

Mills, N], has been facing this di-


lemma during its current expan- ( [ ) DETAIL - NEW BE AM TO EXISTING COLUMN WE§...
sion project . The original hospital
buildings were constructed in the
1940s and 1960s. Two major addi-
tions were completed in the late A five,slory addilioll al Ihe Deborah Hearl alld Lllllg Celller (top) ill BrowlIs Mills, N/,
1970s. was desiglled 10 resisl seismic loads. The laleral loads slightly exceeded code-reqllired
Currently, additions of a five- wind loads because of the Uglll structural steel framing . Pictured abot't ;s tlte com,eclim,
story office building, one-story between a lIew three-story addition m,d an existing hospital buildi"8. The
parking deck, three-story hospital beam-Ia-colu"", com,ectiotls were designed for the new loads arId detailed similar 10 those
annex and two-story (to be ex-


of Iheexislillg bllilding.
panded to four) new hospital
building are under construction.
During the master planning phase
for these additions, Deborah was

Modern Steel Construction I May 1993 / 35


able to determine the capability of
each major structure to meet seis-
mic building codes. This informa-
tion helped administrators and de- •
signers zone each building
-i!xisting, new and future-for
their space functions and ability to
withstand an earthquake.
Light-Weight Steel Framing
The office building and parking
deck were designed in accordance
with current building codes with-
out provisions for future expan-
sion. Lateral loads due to earth-
quakes have been incorporated
into the design. For the office
building, the lateral loads slightly
exceeded code-required wind
loads because of the building's
light structural steel-frame con-
struction. The precast concrete
parking deck- because of its con-
crete weight- also was governed
by seismic lateral loads. They, too,
Semi-rigid beam-to-column connections, such as those shown above and opposite, were were minimal and easily accom-
used 0 11 Ihe lIew two-story hospilal addilioll al tire Deborah Hearl alld LUlIg Cellifr. modated. The detailing of member
connections was enhanced to make

SHOP DET AILS


9 9

--t0HE~~.~1~'~I~34~E~IJ"
DESCON
DESIGNS AND DETAILS
STEEL CONNECTIONS

for
STRUCTURAL STEEL & MlSCELLANEOUS METAL
with AutoCAO@

Beams, Columns, Plans, Elevations, Stairs,


Handrail, Graling Layouls, Ladders, Linlels,
Bracine" Bins, Base Plates, Roof Frames, Grillage, Gu ssets,
Floor Frames, Kickers, Hangers, Relieving Angles, Stack Framine" I I-.r+l~····· ...•.••
Access Platforms, Tubes, Trusses, Towers •
or anylhing else you can fabricale. •

~ams and Columns, Plans and Elevations· Version 5


English or Melric

COMPUTER DETAJLING CORPORATION


A .~i.t. t • . , . . , . / . , #~d f_rk• .n _tI tkt.u,.,
FOR A FREE DEMO DISK
1310 Industrial Blvd. CAll OR WRITE TO
Southampton, PA 18966


OMNITECH ASSOCIATES
215-355-6003
P.O. BOX 7581
4 lROS • 11 - 3'-8 BERKELEY, CA 94707
(510) 658·8328

36 1 Modern Steel Construction 1 May 1993


. " ..
• II' 1.5
~ ..
x.
" ' ' '"".
"""'
. .';


5 I "'"
m> At snrr ill'S
~ 6 (SHOP fIQ.D)

PLAN \lEW

them more ductile. build ing were categorized as criti- for the new loads and detailed sim-
The structural steel, three-story cal by seismic importance factors. ilar to those of the existing struc-
hospital addition will house an ex- Therefore, the new facility was at- ture.
pansion of mechanical and electri- tached directly to the adjacent ex-
cal services on the ground floor, ra- isting steel-frame structure, and the Planning For Future
diology on the first fl oor and lateral loads were accommodated Expansion
critical care support functions on by the structural frame of the entire The new two-story hospital
the second floor. The present ser- new and existing building. The building with future vertical ex-
vices and functions of this new ad- beam-to-column connections for pansion to four stories is to be con-
d ition and the adjacent existing the new addition were designed structed over an existing ground-

• For the BEST in Bridge


Software.•.

Design of Cwved Girder Bridges


Structural Material Sorter Ver. 4.2
A series of programs
NEW FEATURES: designed to help
,j Live Load Distribution - Automatic
(Longitudinal & Transverse) steel fabricators
,j Mesh Generation - Au tomatic
,j Rating - Auto Rating Factors manage material.
,j Influence Line Output
(From Influence Surfaces)
,j Metric Conversion • Reduces labor - Increase s accura cy.
,j Uses AASHTO 15th Edition • Automatically computes weights, surface
areas, bolt counts and lineal tolals.
,j Lease or License
• Quickly sorts lists into proper order.
.J Timesharing • Produces optimum length-cutting li st. from
in-house stock, vendor's stock or the best
MERLIN DASH combination of each.
Design & Analysis of • Provides shipping lists based on piece-
5,"i Glrd,r Bridgls - .. .. .. mark sequence.
--~
.J AASHTO - UWI New ISCh Ed. .J D.rivtd from Original • Tallies material costl. shop hours and field
.J FHWA - EMQfMd 1M U. d by BARS Prog ram --~
... . ' -, hours for easy estimating .
.J DOT's · Uted by 15 Sm .,t :J Compatible with DOT's • Uses simplif ied terms so non -tech person-
.J o.sign . eo" OpIIlIIllIId Structural DltabulS
nel can operate with ease .
.J Friendly . Menu- ~I'fen r.pul
.J Graphics Display 01 Output
~ RaIlS AU ConVlnlion.1
Member Types
--= • External Data Interface can import existing
..J OvlpUl Ripon $flection :.J Considers All computer-based material lists.
.J Quality and P,rlormanci Construct ion Mat' flolls • Call today for a FREE demo kit, inc luding


the full system' s operato,', manual!
A va ilable Exclusively Thru:
E.J .E. INDUST RIES. IN C.
OPTI-MATE, INC. CO MP UTE R SOFT WAR E FOR STEEL PROFESSIONALS
P.o . Bo. 9097, Dept. A, Bethlehem, PA 18018
287 Dewey Avenue Washington, PA 15301 (800) 321 -3955
_ (215) 867-4077

Mode rn Steel Construction I May 1993/ 37


FA C T:
RAMSTEEL was the highest rated of all Structural level loading dock. The first Aoor


of the new building will house out-
Engineering Software on the market today according patient services; the first Aoor of
to the 1992 Modern Steel Construction Magazine user the existing facility which also
houses similar services will be ren-
software survey. ovated. The second Aoor will con-
sist of critical care/ intensive care
"RAMSTEEL allowed us to meet units and other surgery-related
functions. The future third Aoor
a very tight schedule with a will contain patient rooms or medi-
smaller, more efficient design cal/surgical units. The future
team. The savings in man hours fourth floor will accommodate pa-
quickly paid for the cost of the tient rooms or the expansion of
program." high-technology catheterization
NIbih YOIISMf, S.E., _ I, laboratories.
NIbih YOIISMf" AssociII..,Inc. los Angtlts, CA
RMfSTEEL provides user inleradiOl1Iike The present and future critical
, you've never tren behre! functions place this building in the
~_~A.JJ highest seismic importance cate-
.
---.......-...--_.............--..-- -"...
--=====-r ~
S
-'.
',
..
- E E L
-.I - " " : : . ;,: _ _ ••

... ' --
gory because of its need to be func-
tional during and after an earth-
'

, ... quake disaster. Hence, the new

..M_- .... .-
ItmGRA TED ANALYSIS, DESIGN addition will be constructed with a
AND DRAFTING OF STEEL BWWINGS
For more information or an in·house
demonstration, call 800-726-7789
Ram AnaJysis
_._-
*'"
*'-

- -.
. __
-
"".
..

.......
,•

-
.
r
'

I
seismic expansion joint between
the two buildings which will per-
mit horizontal, vertical and rota-
tional building movement.
The new addition will be con-
5315 Avenida Encinas, Suite M
Carlsbad, CA 92008
• structed of structural steel framing
Fax: 619/431-5214 Break into the LRrn rom]>'titiv. odS" with full and lightweight concrete slabs. By
ASD vs. LRflJ romparisons., the dick of. button.


BOOf726-7789 using these materials to decrease
the weight of the building, the
foundations and the lateral seismic
forces will also be reduced. Be-
cause of the loading dock at the
ground floor level, a lateral bracing
STEEL BRIDGE DESIGN on your PC system consisting of cross bracing
will be used. Semi-rigid beam-to-
MOX's steel bridge girder design program is licensed by many of column connections of top and bot-
the largest ENR Top 500 Design Firms, as well as smaller firms and tom plates will be utilized to de-
state DOTs. Now this program interacts with a grid analysis module velop the lateral forces and
that loads user·defined lanes with standard or custom trucks. ductility needed to resist the seis-
mic loads of current building
codes.
Integrated Grid Analysis & Bridge Girder Design Hopefully, when the future ad-
• Non·prismatlc I girders and box girders. rolled shapes dition is designed, the in-place
• Up to 12 continuous spans, horizontal curvature. skewed supports building codes will not have
• Gener8tes geometry for girders and bracing changed significantly. That way,
• Generates influence surfaces. loads lanes for live load forces the facility will be able to be built
• User may specify ranges for (or fixJ any of the design variables without incurring considerable re-
• Designs girders with 8 powerful optimization method (one that works/)
design and costs.
• Generated designs satisfy the 1992 AASHTO Specification
• Allowable Stress and Load Factor versions
• Excellent for analyzing existing structures for specification compliance Richard A. Esslinger, P.E. , is direc-
• Full control of composite action tor of stmctural engineering at the
• Either free form or menu driven input. comprehensive output Philadelphia-based architectural, engi-
• Graphical output of stresses and deflections on screen or printer neering, interior design and plmll1ing
And many morel firm of Ewing Cole Cherry. Ewing
Cole Cherry services commercial, in-


For more information, or to request 8 free trial. contact: dustrial and institutional clients na-
tionwide.
MDX software
Phone (314) 446-3221
Fax (314) 446-3278
• What's in
a name?

• A comprehensive business insurance program


designed especially for AISC.
When you look closely at what a name Plus optional coverages such as inland marin ,
like CNA offers the Ameri an Institute of Ste I business interruption and commercial umbrella.
Construction, you'll find everything you need in Even eligibility for a safety group dividend7
a comprehensive business insurance program And regardless of how much or how little
for your business. coverage you need, CNA deliver the kind of per-
This coverage is offered by the CNA Insurance sonalized los control servi es and responsive
Companies. CNA offers you experience, stability, claims handling that no structural st el fabricator
financial strength, and benefits that associations should be without.
just like A1SC have been taking advantage of for C A, a multi-line insurance group, has nearly
over 20 yea rs. 100 years' experience, over $11 billion in revenue,
In fact, CNA is the one name that offers you over $35 billion in assets, $5 billi n in st kholders'
a business insurance program endorsed with the equity and consistently high ratings~'
AISC " Seal of Approval:' It's a comprehensive pro- Find out more about this custom business
gram that includes commercial property, commercial insurance program de igned especially f r AlSC.
liability, commercial auto and workers' compensation. Call 1- OO-CNA-6241.
"BeMel on ..fident conltol eM Iouea SaJety dMdInda. • .....a.bIe WI II'IOM atale&, &AI ~ bV CNA" 9o«d of Dnctorw and cannot bit o~
-AM But. St.IIndatd , PIoor"s. Moody'a, DuH , Phelps

CNA
For AIt the Commitments You Make
1M CHA InalnnoI ComPMIM undefWrttIng IhIs program will Wiry ac:c:otdIng to""
CCMl"Itge IwIIllabte In h Conttne"'aI US. only The.. coml*»H ~1.dI
TransportabOn Inaurtnct Company, valley Forge InlOfanoe ComPMY; ConTInental c.lMJally c:omo.ny. Nalional Flr.lnStnnCe ComPllf\"f (It HeTrtord
nnlQOntMWItai ,"lOrane. Comoany Of AmericIn cuuahy of ANdInG.~,... CN... PI&zaICNc:ago, L 60685
Rules

Eligibility Entry Requirements


To be eligible. a bridge must be buill of fabricated All entries must contain an entry form. photographs and a
structural steel. must be located within the United States wrillen description of the project. A separate binder must be
(defined as the 50 states. the District of Columbia. and all submilled for each entry. No entry free is required;
U.S. territories). and must have been completed and opened submission materials will not be returned. The use of any
to traffic between May I. 1988 and Apri/30. 1993. entry's submilled data. detail and/or photographs by AISC
shall be unrestricted. Note: Projects not receiving an award
still may be used in Modem Steel ConstructIOn magazine or
other AISC marketing materials.
Judging Criteria
Judging will be ba!.Cd upon aesthetics. economics. design I. Elllry/orm The complete and accurate entry form and
and engineering solutions. Quality of presentations. though one copy must be enclosed.
not a criterion, i!. Important.
2. Photographs: A minimum of four professional quality
Sx 10 color prints of various views showing the entire
Award Categories bridge. including abutments as well as selected details. are
required. 35 mm slides are strongly recommended.
Entries may be judged in one or more categories. but can
receive only one award. Photographs will not be returned.

Long Span One or more spans more than 400 fl. in length. 3. Description: Explanation of design concept. problems
and solutions. aesthetic studies, project economics and any
Medium Span, High Clearance Venical clearance of 35 unique or innovative aspect of the projecl. Include no larger
ft. or more with longest span between 125 and 400 n. than II x 17 drawings showing elevation, framing system
and tYPical details.
Medium Span, Low Clearance Venical clearonce less
than 35 fl. with longest span between 125 and 400 fl.
Method of Presentation
Short Span No single span greater than 125 n. in length. Each entry should be submilled in an SII.!" x II" binder.
containing transparent window sleeves for displaying
Grade Separation Basic purpose is grade separation. insens back to back. The entry form included in the
brochure must be easily removable. so that the
Elevated Highway or Viaduct Five or more spans. identification of the entry can be concealed during judging.
crossing one or more traffic lanes.

Movable Span Having a movable span. Awards


The winners will be notified shonly aner the mid-August
Railroad Principal purpose of carrying a railroad. may be
judging. Public announcements of the winners will be made
combination. but non·movable.
in the ovember issue of Modern Steel Construction
magazine. Award presentations will be made to the winning
Special Purpose Bridge not identifiable in one of the
designers at the National Symposium on Steel Bridge
above categories. including pedestrian. pipeline and
Construction, November II. 1993. in Atlanta. GA.
airplane.

Reconstructed Having undergone major rebuilding.


Deadline for Submission
Entries must be postmarked on or before June 18, 1993.
and addressed to: American Institute of Steel Construction.
Inc .. Attn: Awards Commillee. One East Wacker Drive.
Suite 3100, Chicago. IL 60601-2001. For further
informallon, call 312/670-5432.

AISC 1993 Prize Bridge Competition

• Entry Form
Entry Date'_ _ _ _ _ _ _ _ __

Name or Bndge_ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ Complellon Date_ _ _ _ _ _ _ _ _ _ _ __

Locatioo_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Dale opened to traffic _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Category in which entered _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Approx. tOlal COSI_ _ _ _ _ _ _ _ _ _ _ _ __

Span lengths_ _ _ _ _ _ _ _ _ Roadway widths _ _ _ _ _ _ _ _ _ Steel wt./sq. n. or deck._ _ _ _ _ _ _ _ _ __

Vertical clearance_ _ _ _ _ _ _ _ _ _ Stccl tonn:tge,_ _ _ _ _ _ _ _ Painted: yes _ _ _ _ _ _ _ No,_ _ _ _ _ __

Structural system(s) (describe brieny here)'_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

InnovativeConccpts,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Descriptive data: Attach separate sheets (see entry requirements)

No. or photographs enclosed: Color prints 35 mm slides

O'Sig nFirm: _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _~~------------------

Address: _ _--:::--:-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Street
=--:-=________--:;:::-______
Phone

City and Stile lJp


Person tocontact: _________________________________ = _______
Title
ConSUltin g F irm (ir any): _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _----;Phone=,,-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Address: _ _~------------------~~~~---------~~-------
S~I ellyand Slate Zip
Pe~nto co ntact :. _________________________________ =-----__
Tuk
General Contracting Firm :_ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _--;:;_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Address: _ _--;:::::-::-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Sb'eC1
===::-______----;;: -______
Phone

City and Stal~ ZIp


Persontocontact::_________________________________ ~~---- __
Title
S teel Fa bricatin g Firm :: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _--;:;=_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Phone
Address: _ _--::-_ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ -::-_=________--:;-,--______
SlrttI: ellyand State ZIp
Pe~ontocontact :. _________________________________ ~::---- _ __
TIlle
S teel E recting Firm :_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _--;:,,--,---_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Address: _ _--::-_ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ -::-_=________--:;-,--______


Sirttl
Persontocontacl:._________________________________ ~::------ __
O wner:: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~-------------------
Address:_ _--:::--:-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ===:::-_______--:;:::-______
s""'"
Persontocontacl::_________________________________=::-______

This entry submitted by:

• Name:: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Finn:_ _ _ __ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _
Address: _ _--::-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Ph"'"
SlTeCl
==-_________________
~~-------

Tille

-::-_=________--:;-,--______
ellY and Slaic

(ADDITIOSAL ENTRIES MA Y BE SUBM ITTED ON COPIES OF TIllS FORM)


ZIp
Deck Fastening
Anytime, Anywhere.

Incorporating new innovative power source and a magazine clip 01 reputation in the industry , I knew we
technology, Hilti's DX750 Powder ten fasteners . the DX750 produced would rece ive the technical
Actuated Fastening System is fastenings superior to those of a 5/8 assistance necessary to complete
designed to fasten metal deck to inch puddle weld . It eliminated the the job. I believe using the DX750
structural steel and bar joist on just problem of burn through and was has improved the productivity of our
abcut any type of project...large or used on coated deck with no decking crew by at least 50 percent
small , complex or rout ine. retouching needed -- thus reduc ing on this project. I'd like to see more
labor costs. structural engineers specify powder-
Engineers for North Dakota 's actuated fastenings . It's definitely
FARGODOME were faced with Jim Minkkinen, Project Manager the best option when installing
design and installation challenges for the steel erection and roof deck decking:
due to severe weather conditions subcontractor Danny's Construction
when specifying its deck fastening Company Inc . of Shakopee If the DX750 can tackle the unique
system. Planned as a multi-purpose Minnesota said , "Given Hilti 's challenges of the FARGODOME, just
entertainment and convention facility , think what it could do on your next
the $50 million, 470 ,000 square foot project. It will fasten virtually any
building stands 125 feet tall with deck, anytime, anywhere .
nearly 220,000 square feet of roofing.
For your copy of the DX750
"Because the dome's architectural Specification Kit, including approval,
design involves a long, sloping roof design and technical data , plus
of metal decking, welding would have success stor ies from other


been extremely difficult," said Project construction professionals, ask for
Engineer Jack Petersen of Martini
Martin Consulting Engineers of Wheat
Ridge , Colorado. "The versatility of
Hilti's DX750 made it an ideal choice
- ........
Hilti's "Deck Tech" at 1-800-879-8000 .
'

for the decking application ."


P.O. Box21148
Tulsa,Oklahoma74121 -1148

<e ~. ®
Unlike welding , the DX750 system
worked well despite cold and wet
weather. Using a self-contained B9
FARGODOME Engineers Specify the DX750



.
'-'
,

F A S TEN E R PRO 0 U C T S


Kenneth Walsh, Manager of Mar- tapes, one describing commonly
Masonry-To- keting Communications, Hilti Inc., encountered problems and when
5400 South 122nd East Avenue, installing bolts to the tensions re-
Steel Tulsa, OK 74146 (BOO) 727-3427 ext. quired in the Specification for Struc-
6726. tural /oillts Using ASTM A325 or
Connections A490 Bolts ("The Reliable Witness")
and the other exploring the rela-
T he MTD System 1 is a third-
party software system that
Lock Pin & tionship between torque and ten-
sion in situations normally en OUll~
eliminates the need to assemble
masonry and structural steel com-
Collar tered on construction problems
("Questioning Torque").
ponent details from scratch. Sixty
complete state-of-the-art details are
provided in plan, section, and is0-
H uck International has intro-
duced a high-strength alter-
native to ordinary nuts and bolts:
For more information or a free
copy of a videotape, contact: J&M
metric form. All details have been The Huck Lock Pin and Collar fas- Turner, 1310 Industrial Blvd.,
carefully researched and formu- tening system. It exceeds ASTM Southamton, PA 18966 (BOO) 525-
lated to meet current standards A325 and A490 requirements and 7193; fax (215) 953-1125.
and code requirements. Engineers meets AASHTO, ICBO, AISC, and
and fabricators can use the details ASME requirements. The system is
as shown or make modifications to U.s. made, and the fasteners are
meet specific project requirements. completely traceable and factory
This system is ideal for architects mill certified. Unlike standard
and engineers involved in high-strength bolts, Lock Pin and
designing low-rise steel structures Collars require no torque for instal-
clad with masonry. The MTD Sys- lation. Instead, a Huck tool applies
tem operates on DOS version of direct, linear tension to a grooved
AutoCAD Release 11 and 12. All lock pin, while imultaneously
details are derived from the techni- pushing on the collar portion. The


cal publication "Masonry and Steel tool forces the collar to mold itself
Detailing Handbook." Cost is $225. into the grooves on the pin, a pro-
For more information or to re- cess known as swaging. The swag- Type I And
ceive a free demonstration disk, ing action precisely elongates the
contact: Masonry Technologies coUar and pin, and the result is an Type III Bolts
[nc., 2000 Aldrich Place, Downers installed bolt with extremely high,
Grove, lL 60516 (708) 852-9122. consistent clamp-up. Also, the fas-
teners can be visually inspected.
S t.Louis Screw & Bolt operates
the only facility in North
America offering a full range of
The system is available in nominal
High Shear Nail diameters ranging from ¥I6" to
Heavy Head High Strength Bolts,
including A325 Structural Bolts
n\l". Metric sizes and A307 blind
H ilti has recently introduced
the High Shear ail (HSN)
for the attachment of metal roof
bolts also
For
are available.
more information, contact:
from 1;2" through 11;2" diameter in
aU lengths. Everything is produced
from steel melted and made in the
and floor deck to bar joist and light Mark Brenner, Huck Fastening
U.S. to fulfill both Type I and Type
structural steel beams. Designed to Systems, 6 Thomas, Irvine, CA
[]] (weathering steel) requirements
be equivalent in allowable shear 92718(714)855-9000.
and feature an "SL" trademark on
capacity to a ~" puddle weld, the its heads. All bolts produced are
nail is compatible with Hilti's DX
36M Powder Actuated Fastening
Direct Tension traceable to mill heat lots of steel
and are tested in our in-house labo-
System, which is designed to im-
prove fastening consistency and
Indicators ratory. In addition to structural
bolts, the company also produces
minimize damage to coatings on
the deck and supporting steel. The D irect tension indicators (DTI)
produced by J&M Turner are
HSN features a unique washer and now identified with a new trade-
A307 A and A307B fasteners, and
can offer all products as plain, hot
dip galvanized, or mechanical gal-
bell-shaped top hat assembly that mark symbol as well as a lot identi- vanized. The company makes an
combine to provide high dia- fication number for complete prod- extensive line of off-standard parts,
phragm shear capacity. HSN fas- uct traceability. In addition, a full such as countersunk bolts, slotted
tening quality is verifiable through range of metric DTls are now avail- countersunk and square heads.


a simple visual method and is able that meet the provisions of Also offered are large anchor bolts,
faster than screw fastening as there ASTM A325M and A490M. The hot forged specials including U-
are no holes to drill. company has recently produced bolts, forged & drilled eye bolts,
For more information, contact: two half-hour educational video- and head made to customer's blue

Modern Steel Construction I May 1993/ 43


FASTENER PRODUCTS
prints.
For more information, contact:
St. Louis Screw & Bolt, 6900 N . •
your copy now! Broadway, St. Louis, MO 63147
(BOO) 237-7059; fax (314) 389-7510.

Inslructlon Manual
Connections
tor Installing
HIGH-STRENGTH
Manual
BOLTS

""'"
OtRECT TEH5K)N INDICATORS
A ISC has issued Volllllle /I Con-
nections Manllal of Steel Con-
struction ASD/LRFD. This 702 page
(ASTM ....)
EHGUSH UNfT'S EDmON
volume covers bolted and welded
shear, moment and bracing con-
nections in applications not specif-
ically treated by the general infor-
mation in the MamlQl of Steel
~ eons/rlletion, ASO or LRFO. lt also
~ Jl M 1II..-1nc.
provides examples that follow both
ASO (9th Edition) and LRFD (lst
Edition) solutions for all applicable
topics. Cost is $60 plus shipping
and handling.
J&M Turner Inc. For more information, contact:
InlemalonatHeadquaners Phone 215-953-1118 Fax 215·953·1125 Publications, American lnstitute of
1310 InduS'n81 80uIevard 800·525·7193 Telex 288965 Steel Construction, Inc., One East
SOllihampton. PA 18966
iiiiiiiiiiiiiiiiiiiii~~~~~~~~~~~~~~~~~~iiiiii~~~~ Wacker Dr.,(312)
Suite670-2400
3100, Chicago, IL


60601 -2001 ext. 433;
Fax (312) 670-5403.

Grating
Installation
ANCHOR BOLTS, PLATE & SLEEVE
ASSEMBLIES, TIE RODS, STUDS, SWEDGE o H istorically, the installation of
grating was always a last
minute event. Often, a temporary
BOLTS, U-BOlTS, HEX BOLTS & EYE BOLTS planking was installed during con-
Custom fabricated to exact specHications from certified domestic struction, and then removed prior
steel up to 4-inch diameter and 4O-foot lengths in steel & alloy. to the installation of the permanent
deck or grating. This scenario has
STRUCTURAL BOLTS, NUTS & WASHERS In A325, A490 & TENSION been changing dramatically of late.
CONTROL BOLTS, WELD STUDS, CONCRETE ANCHORS, B· 7 STUDS, The major design/build firms have
CLEVISES, TURNBUCKLES and all types offasteners in various grades begun moving towards modular
and materials; piain, plated and galvanized. construction wherever possible. In
Stocked for immediate shipment this case, a whole floor is assem-

*
SAME DAY SHIPPING
OVERNIGHT TO MOST U.S. CITIES
* bled on the ground, including the
flooring or grating. Then the whole
unit is picked up and put in place.
Grate-Fast has proven ideal for this
MID·SOUTH BOLT &SCREW application because it installs from
central States Ellt Coast one side and is removable without
499 ca,. Road 59 Uberty Road a trace. In addition, there is no
Nas/Mlle. TN 37210 E"""""" VA 23847 welding. hole drilling. penetration
61WS9-8341 ~40
FAX' 61WSs-6542 FAX ;~1
of coatings, or studs sticking up.

II
1_251·3520 1_J66.BOLT Because Grate-Fast is removable, •
even thought the modules are con-

~ 0 t -tJ ~ -- ~.....-:a: structed on the ground, access un-

44 I Modern Steel Construction I May 1993


BOLTS
demeath after installation is still

• maintained . And since it does not


require holes for fastening, it is
easy to re-install.
For more information, contact:

NG
Struct-Fast, Inc., 20 Walnut St.,
Suite 101, Wellesley Hills, MA
02181 (617) 235-6734; Fax (617) 431-
7940.

Steel-To-
Concrete
Connections
H ALFEN Anchoring Systems
offers an extensive line of ad-
justable anchors suitable for the an-
choring of structural steel to con-
crete. The system provides the
installer with the necessary adjust-
ment to make quick and accurate
connections and to substantially re-
duce labor costs. 0 welding or
drilling is required, eliminating the
need for special tools or power on
the job site. Offered are 10 profiles
of cast in channel, providing safe
working loads of 650 Ibs. to 15,700
• Ibs. per 12" section.
For more information, contact:
HALFE Inc., P.o. Box 410203,
Charlotte, C 28241 (BOO) 323-6896;
Fax (704) 588-2144.

Roll Threading
F absco Corp. has expanded its
roll threading capacity to 3" di-
ameter so there's no need to upset
large diameter rods to achieve full
WEUNE SMART BOIlS KNOW "PROPER TENSIO III
size thread engagement. Time and A-325 or A-490 high strength bolts.
money can be saved by roll thread- Factory mill certification-traceable to each keg.
ing sag rods and tie rods. Also
stocked are $8", :¥4", and 1" diame- Black or mechanically galvanized.
ter roll thread anchor bolts as well Full domestic or open stock.
as a large range of plastic anchor
bolts sleeves up to 3" diameter. The "THE LOWEST COST SYSTEM FOR PROPERLY
company also carries hot dip gal- INSTALLED HIGH STRENGTH BOLTS!"
vanized bridge bearing studs up to
1 W' diameter. All steel inventory is
mill certifiable and made in the
U.s. Certification is provided u pon
request. Also, Fabsco features cold

• forming capacity up to ~" diame-


ter in lengths up to 3".
For more information, contact:

Mod e rn Steel Construction I May 1993 / 45


F A S T E _N
~~E~R~~P--.:R
~~O~D=---.::.
U---==C=----T=----S
=-- _ __
Fabsco Corp., 1745 West 124th St., the bolt easy to install, easy to re- 1 \4". Electroplating and zinc phos-
Calumet Park, IL 60643 (708) 371- move, and easy to check its instal- phating are available. •
7500; Fax (708) 371-7524. lation with a torque wrench. Using For more information, contact:
a quiet, hand-held tool, the Tru- lnfasco, division of Ivaco Inc., 700
Tension system provides the cor- Ouellette, Marieville, Quebec, J3M
Extended rect tension every time. It also 1 P6, CANADA (514) 658-8741; Fax
(514) 447-0114.
eliminates operator error during
End-Plate assembly, and lowers installation
costs. All ucor Tru-Tension bolts
Moment and nuts are fully traceable to Tension Control
Nucor's domestic steel sources.
Connections They are fully tested and certified, R apid Tension Bolts from SS
Industries are a type of struc-
including full compliance with
T he fourth in AlSC's fascinating
Design Guide series, "Ex-
tended End-Plate Moment Connec-
FHWA, DOT and AASHTO speci-
fications for bridge construction.
tural bolt-nut-washer assembly
where the proper tension is indi-
cated when the spline has been
tions" covers the design, fabrica- For more information, contact: separated from the bolt. Installa-
tion and erection of this type of Nucor Fastener, P.O. Box 6100, St. tion is achieved by first assembling
connection. Extended end-plate Joe, 1 46785 (800) 955-6826; (219) the bolt, washer & nut into the con-
moment connections are increas- 337-5394. nection hole and tightening by
ingly being used in steel construc- hand until snug. ext, the 12-point
tion and this 43 page guide gives
recommendations and background
Metal-To-Wood socket of the installation tool is en-
gaged. Rapid tension is achieved
for four-bolt as well as eight-bolt
end-plate connections. The Guide
Fasteners by simply pres ing the trigger of
the installation tool; while the
costs $16 plus shipping and han-
dling.
For more information, contact:
T he Atlas family of fasteners for
wood applications
builders four proven methods to
offers
outer socket rotates clockwise, the
inner socket rotates counterclock-
wise, ensuring a snug fit .
Publications, American Institute of achieve metal-ta-wood construc- Contact: NSS Industries, 9075
Steel Construction, Inc., One East tion. These fasteners are available General Dr., Plymouth, MI 48170 •
Wacker Dr., Suite 3100, Chicago, IL in five lengths and feature high, (800) 221-5126.
60601-2001 (312) 670-2400 ext. 433; sharp cornered head for fast, posi-
Fax (312) 670-5403. tive driving. WoodFast features a
plated steel #9-16 washer head and Connection
provides a cost-effective method to
Anchor Bolts & upgrade from conventional nail- Software
ing. WoodTite features a #10 shank
Tie Rods with shard, type 17 milled point C O XPRT is a knowledge-
based PC software system for
and dual thread for quicker pene-
H aydon Bolts manufacturers
anchor bolts and tie rods up
to 4" in diameter. The products are
tration and holding power.
For more information, contact:
the design of connections in steel-
framed buildings. All strength
limit state are checked and expert
offered in ASTM A36, A449, A325, Atlas, 1628 Troy Road, Ashland, advice from long-time fabricator
and A588. A complete line of stan- OH 44085 (800) 321-6846. engineers is used to augment the
dard and special sizes of ASTM design rules. The program incorpo-
A325 and A490 are available in
hexagon heads as well as button Cold Forged rates privsions to set dimensional
and material defaults for a particu-
head shear bolts.
For more information, contact:
Bolts lar project or general shop needs.
Additionally, CONXPRT is menu-
Haydon Bolts, Inc., Adams Avenue
& Unity Street, Philadelphia, PA
19124-3196 (215) 537-8700; Fax
I nfasco offers a wide range of
cold forged bolt products in-
cluding: diameters of \4" and $li6"
driven and incorporates help
screens designed for easy use. The
program will generate cope sizes,
(215) 537-5569. up to 8" in length; diameters of:>8" allows bolt stagger, and permits
through :¥4" up to 15" in length; different bolt diameters for shop
and diameters 7;8" through 1 \4" up and field use. Tightening clear-
to 10" in length. Also available is a ances are automatically checked . If
Twist-Off Bolt wide range of metric sizes. The a design cannot be accomplished,
company also manufactures a van- CONXPRT provides an explana-
N ucor Fastener has developed
a twist-off bolt with a major
difference from competitive prod-
ety of nuts-<:old formed in diame-
ters of \4" through 0/16" and hot
tion, including necessary refer- •
ences. Additionally, expert advice
ucts: a hex head. This head makes forged in diameters of !it" through on how to improve the connections

46 / Modern Steel onstruction I May 1993


is provided. Module I: Shear Con- engaged on the threaded end of the crete anchors, weld studs, threaded
nections (ASD or LRFD) costs $300 bolt and finger tightened. An in- studs, plastic sleeves, clevises,
each or $550 for both versions. stallation tool engages the splined turnbuckles and all types of nuts,
Module 1I: Moment Connections end of the fastener and the nut. The screws, bolts and washers. Three
(ASD only) costs $400. plenetary gear drive of the tool locations offer next- or second-day
Contact: AISC Software Sales turns the nut and preloads the fas- delivery to two-thirds of the U.S.
(312) 670-2400. tener assembly. When the assem- Contact: Mid South Bolt &
bly has been fully installed, the Screw Co., Inc., 499 Cave Road,
spine drive end shears at the break- Nashville, TN 37210 (BOO) 251-3520.
Tension neck groove, resulting in a prop-
erly installed and torqued fastener
Control assembly. Torque Control
Contact: Bristol Machine Com-
Indicator pany, 19844 Quiroz Court, Walnut,
N ova-Hex Torque Controlling
Nuts from the Fairchild Fas-
CA 91789 (800) 798-9321.
T he TS Fastening System is a
high-strength tension control
tener Group allow users to apply
precise torque control to nut and
indicating system and is designed
for the installation of high-strength Rapid Delivery bolt assemblies using the ov-Hex
ball socket and ordinary driving
A325 and A490 bolts. The bolt de-
sign incorporates a button head
configuration for an increased load
S pecializing in meeting the
needs of structural steel fabri-
cators, Mjd-South Bolt & Screw Co.
tools. Torque is controlled by the
ball socket, not the driving tool. A
visible, permanent installation sig-
bearing area under the head of the provides a wide range of products nature clearly and quickly identi-
bolt. The threaded end of the bolt including anchor bolts, tie rods, fies to inspectors that assemblies
incorporates a spline drive with a studs, cra ne rail bolts, U-bolts, J- ha ve the proper torque. Paint, dirt
break-neck groove adjacent to the bolts, swedge bolts, eye bolts, or grime will not obscure the iden-
spline. In service, the tension set structural hex bolts, tension control tification. From the outside, the as-
bolt is installed through the struc- bolts, load indicator washers, con- semblies appear as ordinary hex
ture, a mating washer and nut are

WHEN YOU BUY ST. LOUIS,


YOU BUY AMERICAN!
AND YOU GET: • FULL TRACEABILITY
• LOT CONTROL
• CERTIFICATIONS

Registered Head Markings on all Products from '12"-3" diameter include:


structural and machine bolts:

©'" ffi
'l-
A-325
Type 1
'" A325

A-325
Type 3
COUNTERSUNK

D
SQUARE BUTTON
HEAD
MACHINE
A-307-A A-449 A-307-B

ST. LOUIS SCREW & BOLT COMPANY


6900 N. Broadway • St. Louis, MO 63147
(314) 389-7500 • 1-800-237-7059 • Fax (314) 389-7510
Modern Steel Construction I May 1993 / 47


F A S TEN E R PRO 0 U C T S


sockets. But inside, there is a circu- anchors; high-strength A325 and
lar internal wall in which six car- A490 bolts; studs; crane rail an- Shear
bide balls are arranged in a uni- chors; hook anchors; sleeve an-
form, hexagonal pattern. chors; hook anchors; tie rods; Connections
Continued application of torque square and round bend U's;double
causes the socket balls to first
brinell, then penetrate deeper into
expansion shields; bent he-rods;
eye bolts; drift pins; washers; turn-
T wo 120-page books from A1SC
contain design aids for shear
connections. Presented in easy-to-
the lobes of the nut. Finally, the buckle and clevis assemblies; use tabular form, the books include
socket balls break through the re- wedge type anchors; and arc weld- designs for double-angle web
sistance of the lobes to achieve a ments. A variety of coating and bolted connections, structural tee
uniform, high level of torque con- heat treatments are available. single shear connections and sin-
trol while leaving distinctive signa- Contact: TC Bolt Supply Co., gle-angIe connections welded to
ture grooves. Inc., P.O. Box 197, Forest Road, the support. The books are avail-
Contact: Fairchild Fastener Greenfield, NH 02047 (603) 547- able in both ASD and LRFD for-
Group, One Civic Plaza, Suite 500, 6371. mats.
Carson, CA 90745 (310) 522-D700. For more information, contact:
Fastener Publications Dept., A1SC, One East
Proper Tension Wacker Dr., Suite 3100, Chicago, [L
Coating 60601 (312) 670-2400 ext. 433.
Installation
T he Lejeune Tension Control
Bolting System provides a cal-
D orrlmate, an inherently black,
zinc-rich coating is now
available from Magni Industries. A
Threaded
ibrated bolt, nut and washer as- dry-to-the-touch finish, the coating Fasteners
sembly that installs at the proper is ideal for all construction fasten-
tension for that particular size and
grade of bolt. A non-impacting
ers requiring corrosion resis tance,
consistent torque tension, and bi-
P ortland Bolt is a domestic man-
ufacturer of headed and
threaded fastening hardware up to
electric wrench drives the nut metallic protection. The coating is


51;2" diameter and 40' in length.
against the bolt tip. This contains applied over a zinc phosphate and The material is produced and certi-
the counter forces within the sealed with an epoxy topcoat and fied to the latest AsTM and AlsC
wrench and tightens each bolt to is cost-effective compared with tra- specifications. The company spe-
the required tension and then auto- ditional electroplating. cializes in carbon, alloy, non-fer-
matically causes the tip to shear- Contact: Magni Industries, Inc., rous fasteners and hot-dipped gal-
off, indicating proper installation. 255 South Woodward, Suite 300, vanized coatings. An expansion
A-325 Type I and 1lI, as well as A- Birmingham, Ml 48009 (313) 647- has increased production and re-
490, Grades are available in :¥4", 4500. duced lead times and costs.
718", and 1W' diameters. For more information contact:
Contact: Lejeune Bolt Co., 8330
West 220th st., Lakeville, MN Steel Deck Portland Bolt & Manufacturing
Co., Inc., P.O . Box 2866, Portland,
55044 (800) 872-2658.
Fastener OR 97208 (800) 547-6758.

Domestic Bolts T he Autotraxx ICH Deck Fas-


tening System from ITW Bolts
L ohr Structural Fasteners offers
a wide range of domestic bolts.
The product line is mill certified,
Buildex is used to attach steel deck
in a stitch or structural steel appli-
cation. The system has two compo-
L ewis Bolt & Nut Co. has been
manufacturing bolts in 1927
and specializes in A-449 and A-325
fully assembled and tested, and of nents: a stand-up tool that includes
fasteners in diameters of \1" or
the highest quality available. a screwgun, special fastener guid-
greater and lengths of 6" and
Contact: Lohr Structural Fasten- ance system, depth sensitive nose-
longer. Products are made to order
ers, Inc., P.O. Box 1387, Humble, piece and unique drive socket; and
and rush orders are welcome. Cer-
TX 77347 (BOO) 782-4544. Traxx fasteners with an ICH (Inter-
tification and lot tracking are of-
nal Cone Head) design. The fasten-
fered on all orders and all bolts are
ers have either a Traxx / 1 point for
Construction stitch applications or a Traxx/5
manufactured in the U.S. with do-
mestic materials.
point for structural attachments,
Fasteners


For more information, contact:
For more information, contact:
Lewis Bolt & Nut Co., 604 Twelve
ITW Buildex, 1349 West Bryn
A wide range of products are
available from TC
Bolt Supply, including: swaged
Mawr Ave., Itasca, IL 60143 (708)
595-3549.
Oaks Center, Suite 235, 15500 Way-
zata, Wayzata, MN 55391 (BOO)
328-3480.

48 / Modern Steel Construchon I May 1993


AISC ANNOUNCES
VOLUME II CONNECTIONS MANUAL
ASD/LRFD

lII.p.

.... Volume /I Connections


is a companion and
extension to the AISC
Manual of Steel
Construction (both LRFD ,
1st Edition, and ASD , 9th .... Covers bolted
Edition). and welded
shear, moment ,
.... Contains examples and bracing
and information on steel connections In
connections not published applications not
anywhere else. treated in either
the ASD o r LRFD
.... Has practical and Manual of Steel
economical examples of Construction.
complex connection
designs in both LRFD .... FREE BONUSI
and ASD . An updated copy
of the AISC Code
.... Based on the latest of Standard
AISC LRFD and ASD Practice will be
specifications. sent with each
book.

704 PAGES - ONLY $60.00 - ORDER YOUR COPY TODAY!


" " iESi"I'~~~; '~'~'~~' ~~;~~~' ;;'~~~'~~~~;~~'~~ """···· ············ · · ··~~;~·r~;~·· ···················· · ·· ·
Send me _ _ copies at only $60 each. AISC Connections Offer
PO Box 806276
Name/Title Chlcago , IL 60680-4124
Company __________________________________________
Addre~ ___________________________________________ Phone Orders
312/670-2400 X433
City/State/Zip _______________________________________ FAX Orders
Phone ____________________________________________ 312/670-5403
o Check enclosed o Charge my 0 Visa 0 MasterCard
Please enclose remittanc e.
Accl# _____________________Explres _ _ No COD orders. Add S5 for UPS
25 % DISCOUNT
FOR AISC MEMBERS Signature charge. Foreign orders: S10
mlnlnum for shipping.
STEEL MARKETPLACE

HeJp Wanted Structural Steel Detailing
General Manager Structural Engineer Experienced. AutoCAD CR121 based structural steel detailing
We fabricate short and long Registration and experience in office. Familiar Yo ith nil aspects of slt.'el construction 15 years
span Joists, as well as girders structural steel engineermg re- detailing With ml'lnc units of measurement. Past proJect.s up to
and metal decking. Experience quired. Must be able to manage 6,000 tons. References/referrals available upon request.
with steel fabrication manda- engineering standards in oceor· (Competitive prices & timely delivery.)
tory. Total PIL responsibility. dance with Sw('1 Joist Institute. Ram Drafting (SI. Catharines) Ltd USA address:
Theil(" poMllions aN! ror Valley JOISt., A DIVision orEOSCO Indutitne •• 172JA Niagara 81. Main Post Office Box 2629
nnd are located In Ft. Payne. AL Sl. Catharines. ON L2R4L4 Niagara Fall, NY 14302
Send resume to: Leon Sizemore, cio EBSCQ Induslric", PO. Box 1943, Tel: 1·416·685·1835 USA
Birmingham, AL3520 1· 1943. Fax/modem : 1-416·685·6131

STUDY GUIDE 92. 10th EDITION


For Special Inspector ICBO exam .
Advertiser's Index

J
Siructural SleellWelding. Commentary and outline of AISC Prize Bridge Competilion ..................... 40-41
sections 10 stUdy In the UBC. UBC STDS, AISC & AWS
Codes. Report writing, l.A. City Code, AJSC Software .................................................... Cill
elemenls of plan reading . 140 pages. A ISC Volume II·Connections.............................. 49
Send $49 check or money order to:
Belhlehem 51eel Corp ...................................... 20·21
A.Shernll
P.O. Box 371 Bridgestone ............................................................ 24
Placentia, CA 92670 icholas J. Bouras, Inc ........................................ CII
CDS ......................................................................... 19
20 Software C A Insurance ...................................................... 39
RISA·2D prOVides a fas\' Iruly inleractlve environment for Ihe ChaparraI5tecl ........................................................ 8
solution of a Wide range of structural design problems. Computer; & Structures, Inc ............................ C1V
Use RISA·2D for frames, Irusses, shear walls, conlinuous
beams and much more. Com puler Detailing Corporation ....................... 36
Sialics and dynamics are included, wilh full sleel design . Oesign Oalo .............. ................................................ 7
For a free demo, contact : EJE Industries ........................................................ 37
RISA Technologies, 26212 Dimension Dr., Suite 200,


Lake Forest, CA 92630 (800) 332·7472 Hilil ......................................................................... 42
J&M Turner ............................... ............................. 44

CUSTOM DECK SOLUTIONS Lejeune Bolt ........................................................... 45


We can provide custom designed deck for unusual applicalions. MOX ........................................................................ 38
Long-spans, heavy loads, or special finishes are not new to us. Call Metrosoft ................................................................ 11
us to proVIde an engmcered design for your unique needs.
Mid·South Bolt ...................................................... 44
Nicholas J. Bouras, Inc.
475 Spnngfield Ave. NSCC Can For Papers .......................................... 25
Summll, NJ 07902·0662
Omnitech ................................................................ 36
ph : 908·277·1617 fax: 908·277·6789
Optimate ................................................................. 37
RMR ........................................................................ 31
Ram Analysis Steel Design Software RAM Analysis ....................................................... 38
Now. gel SBEA'" by Ram AnalYSIS ror only $100. Full renlured Research Engineers ........................................ ,........ 5
compositeJnon-compOflLtc Illngle beam de8i~ and analYMis software I LRFO
or ASOI. EIlMY·t.o-Use With Windows graphlcul Interface. Full 90 dJly money RJ 5A Technologies ....... ................. ........................ 31
back guarantee.
Also 8v,ulablc, the RAM STEEL Integralt.'d Structural Software Sy.-tem SCAOA Software .................................................. 16
Fully Ink'Rrated anolY818. dcslgn and drafting or .teel beams, JOII~:
columnM. and baseplat(' . 51. Louis Screw & Bolt .......................................... 47
Ram AnalYSIS Steel Deck Institule ............................................... 32
5315 Avenida EnCinas, Suite M, Carlsbad, CA 92008
Phone: 8001726·7789 5IeeISOlubons ........................................................ 32
Fax orders: 619/431·5214 51ructuraiSoftware ............................................... 17
Trad eA RBEO ........................................................... 3
CLASSIFIED ADS
Voss .......................................................... ............. 33
Rcach 35.000 engineers, fabricators, architects, contractors,
bridge officials nnd building owners inexpensively wilh a Vulcraft .............................................................26-27
c1af:lsified adverti~mcnt in Modem SLeeI Construction. It's faRt Whilefab ............................................................... 13
and ('a.~y-we'll even do the typesetting for you at no charge.

For rate a nd place me nt in'onn a tio n, call:


Greg Poland at (708) 679· 11 00.
Or 'ax him 8 note at (708) 679-6926.

50 I Mod<'rn Steel Construction I May 1993



STRUCTURAL S TEE L DESIGN

• SOFTWARE
FROM AISC
112
F.ctom:l Moment Envelope:

CONXPRT ELRFD
A knowledge·based, menu-dri· A new sophisticated program
ven PC software system lor 10< interactively checking
the design of connections in structural steel building
steellramed buildings. All components lor compliance
strength limit states are with AISC specification.
checked and expert advice Checks whether member
Irom long·time lablicator engi· satisfies all limit states and
neers is used to augment the limitabon requirements set by
design rules. the LRFD Specilication and
• Generates cope sizes, allows reports which sections are
bolt stagger and perrnlts sabsfied or violated.
different bolt diameters 10< • Review in deta~ the formulas
shop and field use and rules used in the
• Designs can be sto<ed on evaluation and interactively
disk, allowing electronic WEBOPEN assess any mathematical
communication between Designed to enable engineers expression on the screen.
design parues.
• Generates complete reports
showing details and strength
to quickly and economically
design beam web openings.
Uses state 01 the art criteria
'IOeD • Fully interactive MS Windows·
based user interlace.
• Disk includes ELRFD

• IIIOffi
10< each limit state checked. and features a clear and logi· CheckfBrowser, AISC
3· 112" or 5· 114" disk cal data entry system with Structural Shapes Database
MODULE I:
SHEAR CONNECTIONS
easy·to·use color coded input
windows. Wnnen by pracbcing
engineers lor engineers, incor-
8 lOrn and sample problems
• User GUide and Relerence
1SI edition LRFD
Version 1.02
9th edition ASD
Version 2.0
$300 porating expert design checks
and waming messages which
enhance the application 01 the
HPIOCD Manual .
3· 112" disk only $495

MODULE II:
MOMENTCONNECnONS
$400
AISC Design Guida-Steel
and Composite Beams wilh
c[DO AISC
ASD lormal only $400 Web Openin~to specific
design problems.
3·112" or 5· 114" disk. Includes
IIc[DD DATABASE
Contains the properoos and
STEMFIRE AISC Design Guide $495.00 dimensions 01 structural steel
Determines sale and economi· shapes, co<responding to data
cal fire protection lor steel
beams, columns and trusses. AISC FOR published in the most recent
LRFD and ASD Manuals of
~_r\'/.f
Based on rational procedures
1-/ ""
/
~
AUTOCAD Steel Construction. Presented

-
developed by AISI which ex· in the ASClllormat for W, S,
tend the published UL fire Saves time doing detail draw·
M, HP and other common
resistive designs to other
possible rolled structural
-j- - _.n ings 01 structural steel shapes
in AutoCAD. Lists properues shapes and channels.
Available in U.S. customary
shapes and common protec· corresponding to data in the
tion material requirements.
Two 5·114" disks
Irl ~ 1'/' ""~ most recent LRFD and ASD
manuals. Parametrically draws
to scale the end, elevation and
units or metric units. May be
converted to Lotus 1·2·3 PRN
Io<mat.
& users manual $96 3·112" or 5·114- disk $60
plan views 01 common shapes.
(sorry. no 3· 112"
3· 112-or5· 114-disk $120

ORDER YOUR AISC SOFTWARE PACKAGES TODAY


VISA ~ASTERCARD
CALL (312) 670-2400

• FOR FASTER SERVICE FAX YOUR ORDER (312) 670-5403


OR SEND MAIL ORDERS TO: AISC SOFTWARE. P.O . BOX 806276, CHICAGO, IL 60680-4124.
ALLOW 2 -3 WEEKS FOR MAIL ORDERS; 7- 10 DAYS ON PHONE, FAX ORDERS.
CREDtTCARDSONLYON PHONE, FAX ORDERS

For fTIOl'(" mfdimatlon


Compute. .. SlJUclW'es. 1Dc:.
1995 Ulllv"sily Avenue
BerkallW. Califorrua 94704
TIL: (110) 845-2177
FAX: (510) 845-4096
C 1991 Comput~rs & StructuIes. Inc ETABS 15 a mg1steled trademark of CSI • SAP90 IS a trademark 01 CSI

You might also like