SPlf
2000Ibs.
250 plf I
80 plf
3588lbs. 23521bs.
span = 20'
The maximum moment for this loading is 20267 lb. It. The equivalent uniform load to
produce this moment would be 405 Ibs. per It.
The maximum end reaction is 3588 Ibs. The equivalent uniform load to produce this
reaction would be 359 Ibs. per It:
The K series joist tables show a 16K3 (with a 20' span) has a total load capacity of 410 Ibs.
per It. The designer should show a 16K3SP on the drawings.
The SP indicates special requirements for the joist. The joist manufacturer will review
the designated joist for its ability to carry the special loads shown.
Joist Girders with unequal panel point loads must also be defined by showing the load
diagram on the structural drawings.
'For all standard K senes joists the maximum end reaction is 8700 Ibs. If more reaction capacity is needed,
consider using two lor more) joists to share the load. For LH and DLH joists a conservative end reaction
can be found by dividing the tabulated SAFE LOAD by two.
!NCJ!
NICHOLAS I. BOURAS, INC.
PO. BOX 662. 475 SPRI NGFIELD AV .
SUMMIT. N EW JERSEY 07902-0662 19081 277- 16 17
•
•
properties'
•
fou, steel buttress towers were added to tllis THROUGHOUT THE EAST
cmlcrete -framed structure;n order to bring it /I used to be that ottly buildittg out West tteeded to meet
lip to Cllrrellt seismic stmldards. It! addition , strict seismic codes; blltltOW building codes alottg the
th, additioll added 26,()/J() sq. ft· of usabl, Eastern seaboard have been drastically amended
space. The story be11ind this il1novatit't
reI/ova"OIl b"gills Oil page 22. Photo by Mert
Corp""ter Photography, !.os Gatos, CA (408)
370-1663.
•
Chicago, It 60601-2001 .
Use newly introduced facilities like NON-LINEAR Release 17 marks the debut of AutoSTAAD/MAX - the
analysis , TI ME HISTORY analysis, user-controlled world's first integ rated structural software system that
multiple iteration P-Delta analysis , steel design for works entirely within AutoCAD .
transmission towers (ASCE Pub. 52) etc. in addition to
14 different steel , concrete , and timber codes, to explore All these powerful capabilities coupled with the
the widest possible range of design solutions. industry's most knowledgeable and experienced support
staff, makes STM D-III/ISDS the ultimate productivity
Release 17's powerful printer plotting capabilities allow tool you've been waiting for.
you to generate the industry's sharpest and most
comprehensive run output. For the first time, you can STAAD-III/ISDS Release 17 - there are those
combine numerical output with graphical output - all in who have seen the future ... have you?
th e same run document. Yes, we support the widest
.-.Research
liliiii CC Engineers, Inc.
possible range of printers - from sophisticated lasers to
down-to-earth dot- matrix printers.
On the graphics front , Release 17 features an 1570 N. Batavia, Orange , CA. 92667.
enorm ously enhanced graphics input generator with CALL TOLL FREE (800) 367-7373
. aralleled speed and power, In addition, Tel : (714) 974-2500 FAX :(714) 974-4771
Editorial Staff
Pet Peeve #2
Scott Melnick,
Ed itor a nd Publisher
Pa trick M. Newman, P.E.,
Senior Technical Ad visor
Charlie Ca rter,
W hile computers and their ilk have simplified our daily
business activities-and cut costs-they've also added a lot
of aggrava tion.
For example, we're always trying to keep Modern Steel
Construction's ci rculation as up-to-d ate as possible. As such, we send
Technical Ad visor
readers renewa l cards every year. When a reader hasn' t responded to a
renewal card in a while, we send a "last chance" notifica tion.
Unfortunately, our instructions to our computer system were not d ear
Editorial Offices
enough, and letters went out to everyone with a stop date in February,
Modem Steel Construction
One East Wacker Dr. whether they had renewed or not. My apologies to those I harangued
Suite 3100 unnecessa ril y.
Chicago, IL 60601-2001 But I know I' m not alone in Computer-Aided Failure. I' ve already
(312) 670-5407
mentioned my disHke for poorly conceived voice mail systems. Just as
bad are Fax Abusers.
Advertising Sales The latest exa mple of fax abuse 10 cross my desk came in the form of
Pallis-3M a press release from a huge, East Coast-based corporation. To start with, •
7161 North Cicero there was no reason for the press release to be fa xed . It contained no
Lincolnwood, lL 60646 information of shocking urgency-rather, it was a run-of-the-mill new
(708) 679-11 00 product announcement. In fact, it wasn' t even a prod uct related to the
FAX (708) 679-5926
steel industry. Yet this company felt the need to tie up my fax machine
with the equi valent of junk mail. Bu t to add insult to injury, they have
AISC Officers not yet mastered the automated fa x technology they are using, and
Stephen E. Egger, ind uded with my copy was a two-page Hsting of their maillist.
Chairman Customer service is another area where technology has all-to-often
Frank B. Wylie, 1Il, proven a failure. I recently purchased a piece of mail-order software
First Vice Chairman
Robert E. Owen, that, unfortunately, came with a defective floppy disk. I called the
Second Vice Cha irman company's customer service number, but of course it was busy. I called
Robert D. Freela nd, back. It was busy. I ca lled back and got through to a voice mail system.
Treasurer
Neil W. Zundel, But when I tried to lea ve a message, I was informed that the system was
President " fulJ" and I should ca ll aga in. Which I did, with the sam e result. Finally
David Ratterman, I resorted to faxing them a note (which was not ea y in itself, since their
Secretary & General Counsel
Lewis Brunner,
fax machine was almo t continuously busy). To their cred it, however, I
Vice President, did receive a replacement disk in less than three weeks (though no other
Membership Services acknowledgement was sent).
Geerhard Haaijer, The problem seems to be that the people who implement systems
Vice President,
Technology & Research based on new technology never have to experience the frustrations of
Morris Caminer, actually using the system. The solution, which few executives seem
Vice Presid ent, willing to implement, is to put yourself in the position of your customer.
Fina nce / Administration
Not just on a theoretica l basis, but in practice. Call your company one
day and see what an outsider goes through. Place an order. And finally, •
sit down at a computer terminal and see what actually goe on with
your inventory and order input system. SM
to.
tfl
to.
DESIGN
DATA
• "First in ... software, solutions, service"
402-476-8378 or 1-&>0-443-0782
•
Steel Interchange
• -------
Stetl hlttrchangt is an open forum for Mod"n Stetd ConstrllctWtl
readers to exchange usefuJ and practical professional ideas and in·
formation on aU phases of steel building and bridge construction
Opinions and suggestions are welcome on any subJed covered in
this magazme. If you have a question or problem that your fellow
readers might help to solve, please forward it to Modrnr Steel COli ·
Answers and / or questions should be typewritten and double
spaced. Submittals that have been preparl'<i by word ·processing are
appreciated on computer diskette (either as a Wordperfect file or In
ASCII format).
The opinions expressed in Sled hrtercllaflge do not necessanly
represent an official posi tion of the American Institute of Steel Con-
struction. At the same time feel free to respond to any of the ques- struction, Inc. and have not been reviewed . It is recognized that the
tions thai you have read here. Please send them to: design of structures is within the scope and expertise of a compe-
Steel Interchange t('nllicensed structura l engineer, architect or other licensed profes-
Modem Steel Construction sional for the application of principles to a p.lrlicular structure.
1 East Witcker Dr. Information on ordering AISC publications menttoned in thiS ar-
Suite 3100 ticle can be obtained by calling AI at 312/670-24ooe'(1. 433.
Chicago, IL 60601
•
be utilized to which both the beam and bracket are
fully welded. For the same reason, it is advantageous p. '11... '11...
to weld the bottom flange of the beam to the top plate , ~~ 1
of the bracket rather than bolting them. This sub-
b
assemblage can be fabricated in a shop with relative
ease and efficiency. It can then be bolted the column
T
in the field later.
The vertical web stiffener, defining the critical V;
area of the web, will create a web panel with an aspect f)'" -.
ratio between 0.75 and 1.50. This web panel should be
able to resist moment Mo without excessive shear de- 111 c
fonnation (no yielding or buckling). Otherwise, addi-
tional diagonal stiffeners will be required to carry the
balance of flange tensile/compressive force via truss
action.
The bracket sha II be designed for vertical forces,
V m and V", applied at point A (Case I). The end plate
should be proportioned to resist the same load, i.e. Vm CASE I[
+ V", in tension. However, prying of the column con-
nection bolts may control the end plate thickness re-
quirement. In situations where the connection be-
tween the bottom flange of the beam and the bracket feners sha II be provided similar to any other bolted
top plate is rendered through bolts in bearing, the end connections.
plate shall provide resistance against a portion of the If the flange area of the gusset plate is within the
shear force acting between the two surfaces. This is in same order of magnitude of the beam flange area, it is
addition to the tensile forces mentioned earlier and preferable to use the same width for both nanges and
•
tends to complicate the end plate design. eliminate the bracket top plate (Case II).
The column connection bolts shall resist the fixed- Abbas POllrbohloll1
end moment of the beam, Mf' and its end shear, VI' for Consolidated Rail Corporation
the clear span between columns. Column flange stif- Philadelphia, PA
Steel Interchange
Is it permissible to weld nuts to bolts to prevent
then from backing off? Are any special welding pro-
How can you connect wide-flange beams to tube
columns?
•
ceduIes requued? Is bolt or nut slIength affected?
•
. ..- This was ac-
complished by
tack welding
retainer bars to
the column '1I, I -"
_ CfJQlin
i 1.
f,;,. Ii ,- r.! 8)
base plate adja-
, II '
~
cent to each of I" CDII",·,:f/ ~' 0 I,/~
the two achor bolts as shown in the figm e. This was Il.t
done because the anchor bolts did not have sufficient
projection for a second (locking) nut. 1 : \ " ..". JM! tl ·
Vijay P. Kitnsal , P.E. I
Ohio Edison I
AIaon, OH
New Questions
•
editions of Steel Interchange, Also, if you have a ques- tower?
tion or problem that readers might help solve, send
these to the Steel Interchange Editor,
H ow can One take into account blast effects in
the design of steel structures?
• metrosofi
332 Palenoll ill'e
Ea,1 RLII"er!tmJ. NJ 0707J
(DXF, HPGl, IGES)
A
AISC Lecture Series : New Ideas In Structural Steel
ISC Marketing, lnc. is now
presenting a new lecture se-
ries focusing on innovations in
structural steel design. NI!W Ideas In
•
•
•
The four-part seminar covers:
Low-rise buildings.
Design of connections.
Eccentric braced frames.
registration fee are a dozen hand-
outs and publications plus a meal.
For information, contact: Colleen
Hays, AlSC, Inc., One East Wacker
•
Strllctllral Steel wiIl present practi- •Partially restrained connections. Dr., Suite 3100, Chicago, fL 60601-
cal design concepts for engineers Registration fee is $60 ($45 for 2001 (312) 670-2400.
and fabricators. AISC members). Included in the
•
structural steel. For more information, con-
Symposium on Project Management (May tact: Harold Jones, SClBS'93, 1700 Asp Ave.
13--14 in Chicago) sponsored by Association nue, Norman, OK 73037-0001 (405) 3~
for Project Managers in the Design Profes· 1947; Fax: (405) 3~7968.
1Il.' 'TI'{
U .... Zh
DI5'''<[.''' - I'I[8Rf11 i1N1.
1Al2S I j:N901..
.RM 1«11 l HIOIfiI[ SS IINl ·
2.00
2.DO
R.l2S
.50
however, by a new computer pro- STEEl rJIIU: "511· 16 . DO JlrrG.[ III ftLAT[ CK,( IINl. .00
gram from RMR Design Group, .. 80..15 - OIMTE" IINl - 1I"
Inc. called PRCO N. As its name
indicates, the program is designed lUCiTH til IIlIt1 IrYl - 32. 00
tOt:NT-fllDTATI(III ClIW£ BERM INl"'TlR liN.... ' -1&00 . 00
specifica lly for generating moment ~I ' ''' lCR) MIl-1FT). 2 . 00
rotation curves for partially re- 12'10
trained connections. ·· ..
The program, which runs on ~,
991 ·...
'
"ICfAiC C\I'IIt[ ~ '["'l
" .. 1t.7I11(°05
• ""
L
It'" ] . 56J(j( o OZ
IBM-«>mpatible personal comput- . :: flO- 1. ]J5,2[ ·03
ers with MS-DOS, offers 31 connec- i ..
~ N • 1.10
11["" lift: fl:U lSI
tion options, including: top and
seat angle; single web angle; dou-
ble web angle; header plate; single
I ... ~
.'
"~
"
.'.'
~~
01 ". 6 .
• I S. l .
o "I"'h. .,,12
o "If\e • . lj68
• "I", la . .JOe
_
N
,
I
•
welding and constant or variable Iiiiiiii
load beam lines giving beam end I•
moments and rotations. Also, it of-
fers uniform and concentrated load
options with midspan deflections.
The experimental data used for
PRCO development and verifi-
cation were obtained from tests re-
ported in archival journals, confer-
ence proceedings, and university
theses and reports.
The program "builds" a given
connection based on the strength
and force-deformation properties
of connector elements that are typi-
cally 3" in length. Connector ele-
ments are bolted or welded single
and double angles and bolts in sin-
gle or double shear. Connector
strength and force-deformation
properties in tension, compression,
and hear were obtained from lab-
oratory tests.
The output includes all inputted
material and configuration infor-
mation along with deflection and
moment-rotation curves and beam-
lines.
791-2011
Fabricators, Engineers
Aim For Consensus
•
Despite differences in views on authority and liability,
industry-wide agreement on design responsibility is
close to becoming a reality
early 300 structural engineers and fabricators The engineer of
•
more solutions than a decade, it
Leomard Ross, P.E.
instead of going came to a boil in
over the old ar- 1991 with the is-
guments," suance of the "Fernandez Memorandum." According
stated Richard to the memorandum, issued by Henry A. Fernandez,
Tomasetti, P.E., deputy commissioner of the professions for the ew
principal, York Education Department, " ... the practice of dele-
Thornton & gating design responsibility to unauthorized firms
Tomasetti Engi- constitutes unprofessional conduct under the Rules of
neers, New the Board of Regents and New York State Education
Richard Tomasetti, P.E. York City, a Law." Among these unauthorized firms are construc-
structural engi- tion contractors, such as steel fabricators. (See accom-
neer advocating panying story for more on this subject.)
shared responsibility. Tomasetti's position, in a nut- James Stori,
shell, is that if the fabricator is only doing detailing, president of
then he need not take any responsibility or liability for AISC-member
the connection design. But if the fabricator's services STS Steel, Inc.,
extend to design, then his responsibility also extends Schenectady,
to that design. Y, began Ius
"I want to change the question [from who is re- presentation by
sponsible for design] to who is responsible for the ser- reminding the
vices a given party provides," he stated. audience that
Leonard Ross, president, L. . Ross Engineering the Fernandez
Co., Atlanta, and former president of the ational In- Memorandum
stitute of Detailing, countered Tomasetti's argument did not change
by citing O.B. Steinman's remarks that there must be a the rules; rather,
clear-cut demarcation between engineers and non-en- its purpose was
to remind engi-
•
gineers. "Let's be wise enough to prevent some of the
future mishaps by rejecting attempts to improperly neers of the a 1-
James Stori
and unlawfully shift responsibility from the design ready estab-
professional to another party," Ross added. "A P.E. is lished ru les.
licensed to perform and protect the public from harm. Unfortunately, there has been increasing pressure
•
Among the reasons for the desire to shift re-
sponsibility are: pressure from lawyers and in-
surance companies; increased project complex-
Memorandum
ts st,)ted subject, "Unlawful Delegation Of DI.'Sign Rl'Spon~i
ity; a reduction in the quality of structural
drawings produced by fabricators; and tighter
I bility By Design Professionals," says it all. In August of
1991, Ilenry A. Fernandez, a deputy commissioner for the
budgets and time frames for project comple- ew York State Education Department, sent shock waves
tion. As a result, Stori explained, many engi- through the design and construction community.
neers have deleted the word "approved" from The memo states, unequivocally, that ultimate design re-
their review of shop draWings. Also, engineers sponsibility rests with the engineer of record. "In rl'Cent yeaT';,
are increasingly requiring fabricators to submit however, there has been a trend to shift responsibility for final
calculations on drawings and to have a P.E. approval of the "shop drawing" to persons other than the
among their fabrication staff. principal design professionals," Fernandez wrote. "Frequently,
"I like to think of engineers and fabricators general construction contracts for buildings contain language
as partners," Stori stated. The fabricators know pertaining to written specifications that have been interpreted
what it takes to put a building together in the to require unlicensed persons, such as subcontractors to pro-
field- what is safe and practical, while the en- vide professional design services. In other cases these contracts
gineer of record has more theoretical knowl- require the work to be performed by a licensee, as either an
edge. The fabricator has seen a wide range of employee or consultant to the subcontractor. The end result is
details from a variety of engineers, while the that the completed structure has parts designed by several par-
EOR only has access to his firm's work. How- ties, with an absence of
ever, the fabricator does not have access to all responsibility on the
of the design information for a given project. In part of the principal
the long run, it is the engineer of record who design firm or firms to
has his name and reputation on the line, ac- ensure that the entire
cording to Stori. structure will function
Rather than delegating responSibility, Stori properly and safely as
believes the EOR must insist on quality. "lIe an integrated system.
•
can require submission of details ahead of The purpose of this
time," Stori opined . "He can require a P.E. in memorandum is to in-
supervision of the detailing and connection se- form and remind allli-
lection process. He can stipulate drawing turn- censed design profes-
over times so that he's not rushed and he can sionals that the
also stipulate AlSC certification [for the fabrica- practice of delegating
torI or its equivalent." design responsibility
However, not all fabricators agree that the to unauthorized firms
constitutes unprofes- Robert Rubin, P.E
sole responsibility for design rests with the en-
sional conduct under
gineer of record.
the Rules of the oo.1rd of Regents and ew York State Educa-
"The present code requires the engineer to tion Law."
accept responsibility for hundreds, sometimes
thousands of connections that he sees for the Robert A. Rubin, counsel for the American Society of ivil
first time one day and then, two weeks later, he Engineers and a licensed engineer himself, brought suit to d
must return them approved or approved a clare the memorandum null and void. Rubin's argument, es-
noted," according to Sophus Thompson, presi- sentially, is that Fernandez miSinterpreted New York law and
was not merely reminding the engineering profession of an ex-
dent, AISC-membcr Austin Steel Co., Inc., Dal-
isting regulation but instead was creating a new rule.
las. "These are drawings that we as a fabricator
have worked on for weeks and weeks. We've The lawsuit was recently dismissed in part because "Since
designed them, we've drawn them, and we've the Memorandum is neither a rule or a regulation, It has no
checked them. It is our feeling it is impractical legal effec!." Also, since no attempt has been made to enforce
for the engineer to be fully respon ible for all of the Memorandum, there is no legal dispute on which to base a
the connections shown on the shop drawings lawsuit.
given the time pressure that is associated with However, the battle is not over. Rubin has appealed the de-
the approval project on every project." He fa- cision to the Appellate level and expects a ruling 1111994 'The
vors a clear division of responsibility, where problem is that the piece of paper is still there," Rubin stated
the fabricator would be responSible for three
~
uring the Design ResponSibility session at thIS year's a-
•
types of connections: tiona I Steel Construction Conferen e. By appealing, Rubll1
• Where the shear, axial load, and moments are
shown on the design drawings;
hopes to force the State Education Department to deal With the
issue directly and issue niles that will supersede the memo. J
M odem Sh.o.el onstru lion I M a,· 1 ~1 / 1S
• For shear con- PA and a repre-
nections of sen ta ti ve from
•
beams, where the Coalition of
the shear American Struc-
force is not tural Engineers
shown on the (CASE), the fab-
design draw- ricator may be
ings, but choosing a con-
where the re- nection from an
action can be A1SC source but
calculated is not actually
from AISC ta- designing it.
bles. "We retain re-
• For moment sponsibility," he
connections stated .
Sophus Thompson where full D . Kirk Harman, P.E.
Abraham J.
moment ca- Rokach, P.E.,
pacity of the member is indicated on the design A1SC senior staff engineer, spent several minutes
drawings. naming various A1SC sources, and the list was im-
The engineer would be responsible for all other con- pressive. The list included: Volume II Connections;
nections. LRFD and ASD Manuals of Steel Construction; LRFD
"Allow the fabricator to design connections that fit and ASD Design of Simple Shear Connections; ASD
his expertise," Thompson stated . "Put the work with and LRFD Specification for Structural Joints using
the corresponding responSibility or liability where it ASTM A 325 or A490 Bolts; A1SC Design Guides; the
fits naturally." CONXPRT computer program; and Engineering Jour-
Not everyone agrees with Thompson's interpreta- nal. "It's wrong for professional people to try to re-
tion, however. According to D. Kirk Harman, P. E., a duce their responSibility," Rokach stated . He then
principal with Cagley and Harman, King of Prussia, compared the medical and engineering professions,
•
rising insurance add, however,
costs. "There that most engi-
are the same neering in ur-
problems, but ance policies
doctors take ad- contain an ex-
ditional, not clusion where
less, responsi- the engineer
bility." manufactures a
Added Har- building com-
man, "Over th ponent. Mike
years, we have Holcomb, with
found that there C A lnsurance,
is still a signifi- a leading in-
Richard Homer cant amount of surer of fabrica- Mike Holcomb
risk for the tors, stated that
structural engineer even if we delegate the connection most fabricators carry a general liability policy that
responsibility. If there's a connection failure, we all does not cover professional liability. What that means
will be sitting at the table-the architect, the structural is that most fabricators are not covered for preparing
engineer, the contractor, the fabricator, and probably designs or plans. However, he added, at least one in-
anybody else who walked by the site during construc- surance company is currently working on a new pr<>-
tion. Why don't we just solve the problem now and gram that would offer professional liability coverage
avoid all of that time and effort." to fabricators.
Part of the question revolves around insurance. Building owners add another dimension to the
Richard Homer, with the Victor O. Schinnerer & Co., question and some have specific guidelines. As with
Inc., a leading insurer of architects and engineers, the New York Education Department, the military
noted that his firm has not pushed the shop drawing clearly states that the EOR has the ultimate design re-
• Production Control
Get unrivaled control over I ~'I . . c...t.N1 '''-'''' ......
every piece in your shop,
every step of the way
How would you like to be able to punch a fow keys on your
comput8t and get instant, detailed tracking reports on the status
of Individual pieces or entire jobs In your shop? Thafs exactly
what Sfructural Software's new Production Control Tracking
System can do for you. Shipping tickets, loading reports and
olhe< status reports show what shop stations a piece passed
through on what date. who did the work, how many manhours
the work took and whaf still needs to be done to that piece. Bar
graphs. like the one shown, give the number and percentage 01 comP'etion on any piece mark. sequence or job. The new traclOng system
gIVes you the POW8f to see exactly what shopwork remains to finish a given piece marl<, sequence or job. Sorted fists show individual piece
weights, assembly weights, even weighf of an steel on a drawing. Production Control interfaces with our Purchase Orders program to
gefl8fate cutting Hsts that give you the addled capability of tracking material from the time ~'s ordered to the time it's cut The cutt>ng ists
show shop employees exactiywhich pieces to pull, which pieces k> cut from themand which pieces to scraporretum k> Inventory. ProdUC1ion
Control also works with our new Combining program to optimize your material cutting for evon more savings .
.,-.- .- .-..----.
1. Are you aware of the issue of "shared design re- with the U.s.
sponsibility" with regard to the design of struc- Army Corps of
tural steel connections? Engineers. "De-
Dilly 20% of the respo"de"ts were aware of the isslle sign responsibil-
IJy lIame. 46% of buildillg officials were aware of the ity remains wIth
practice of shared respollsibility, the Corp of En-
gineer designer.
2. Under the current code in Y OUI jurisdiction, do Transfer is not
you require steel connections to be designed on permitted." Sim-
the construction documents p rior to your ap- ple connec-
prova l? tions-- those Abraham Rokach, P.E.
50% of participallts do require cOllllectioll desigll found in the
prior to approval. Of this 50%, 22% illdicated that COII- AlSC Manual of Steel Construction-are not required
ditional permits, partial releases, or complete waivers are to be on drawings. Also, all fabricators working on
sometimes applied. 17% of the participallts illdicated that Corp projects must be AlSC certified .
no structural rel.1iew is performed at all. In contrast, Peter Schultz, a vice president with
3. Does the current code addIess the issue of
Lehrer McG-
shared re- overn Bovis N.j.
in Princeton, NJ,
sponsibility
specifically? believes that
12% of ti,e "fabricators
participants be- must be respon-
lieved that their sible for theiI
work." How-
code directly
ever, he a [so
addressed
shared respon- stated that both •
sibility. engineers and
fabricators need
4. Are there to be more com-
any revisions plete in their
regarding drawings. One
shared re- problem he Charles Gutberlet, Jr.
sponsibility noted is the lack
Rebecca Burleson being PUI- of experience of the engineers doing the actual review
sued at the of shop drawings. Typically, he explained, they are
present time in your area? less experienced engineers. "There's a need for addi-
100% responded "no". tional training programs in this industry," he con-
eluded.
5. Does your code now allow the engineer of re- There's also a
cord to delegate the responsibility for steel con- need for a na-
nection design to the fabricator or contractor? tiona l consen-
60% respollded "Yes." (Many of these-36%-added sus, accord ing
"but the "'gilleer is IIltimately responsible for the work to Harman. En-
dOlle on his/her design.) gineers who do
not assign de-
6. If the EOR requires the contractor (or fabrica- sign responsi-
tor) to employ a licensed professional to prepare bility to their
and stamp shop drawings for later review by the fabricators are
EOR, has the EOR shifted any of his/her responsi- at a disad\an-
bility to the contractor's engineer? tage since their
26%-Yes , responsibility rests with the seal all the de- costs will be
sigll . higher. "There
•
50%-No, IIltimately the "'gineer of record mllst be needs to be a
respo"sible for the acceptability of the elltire system. level playing
field," he ex- Peter Schu ltz
24%- The courts wil/have to decide.
•
Currently, there is little
agreement on where de-
sign responsibility rests.
Rebecca Burleson, a profes-
sor at Auburn University,
recently conducted a sur-
vey of building offidals
and their reaction to the
question of design respon-
Sibility. While 60% of the
respondents indicated that
the engineer of record Pictured at the podium: David Ratterman
could delegate connection Top row: D. Kirk Harman; Richard Homer; Richard Tomasetti; Robert Rubin;
design responsibility, Charles Gutberlet, Jr.; Abraham Rokach
nearly a third of those offi-
cials indicated that "ulti- Bottom Row: Mike Holcomb; Peter Schultz; Rebecca Burleson; James Stori;
mately the engineer is re- Sophus Thompson; Leonard Ross
sponsible for the work
done on his / her design." Interestingly, while all of the sues In Design Liability: Emerging Risks And Liability
138 surveyed building code officials were invited to In The Shop Drawing And Submittal Process" will be
the design responsibility session at the NSCC, none held by the Georgia Institute of Technology in Atlanta
showed up. "The codes do not deal with this topiC on September 30 and October 1. For more informa-
[design responsibility!:' Burleson explained. "It's tion, contact: Saeid Sadri, College of Architecture,
open to the interpretation of the code official." But ul- Georgia 30332-0155 (404) 894-4875.
timately, she hoped, the solution would come from (To pure/lase a copy of a complete transcipt of tile
within the design and fabrication industry. four-hour session, contact: AISC at (312) 670-2400.)
Towards this end, a two-day session, "Critica l Is-
....
CDS
Slrll clll"I/ Sle ('/lJel(lIflllg ,\)'sle/ll
~
Computer Detailing Systems , Inc .• 7280 Pepperdam Avenue· Charleston , South Carolino 29418 • (803)552-7055
"Down the road, weathering ste~ .
The Pennsylvania ' Iurnpike is considered onc of For example, its high strength permits longer
the safest and beSt maintained roads in the nation. spans, thus reducing the number of picn. required. And
But improvemcnts were badly needed ncar that leads to foundation COSt savings.
Pittsburgh to provide bener access to the city's OTIIER STRONG REASONS.
airport and 1-80.
For anothcr, it can be ea.ily inspected, measured
The ~ lahoning River Bridge, the largest of and evaluated. If nccc"a,)', it can Ix: readily repaired.
the 21 bridges being built on the new Beaver It's also highly adaptable to redecking, widening and
Valley Expressway, is a dual-lane, conrinuous- performing other structural modification,.
span, welded plate structure. The five interior
Weathering steel also eliminate, the nced for
spans are 258 ft with end spans of 182 ft and
both initial and maintenance painting. What's more,
228 ft for an overall length of 1,700 ft.
it's as attractive as it's environmenmlly sound.
WilY \\,EATIIERING STEEL? Kempf comments, "Thc PTe', principal crite-
The bridge is built" ith -l,600 tons of ria for selecting material~ for bridges and other •
Bethlehem's AST~I A588 weathering steel. Turnpikc applications aren't based on price alone
According to Kempf, the PTe finds but also include long-tcrm serviceability and dura-
weathcring steel a very cost-effective bridge bility. And with environmental restrictions being
material for a number of reasons. what they are today, it's only prudent to '''e
•
save us more than money." Frank J. Kempf. Jr.. P.E. Bridge Engineer. Pennsylvania 'Turnpike Commission.
W
hen Sun Microsystems,
Inc., decided to purchase And finally, the company's spa- crete, forming the beam sections of
a non-ductile concrete tial needs requiIed an extensive the frame. The typical columns arc
frame building in California dating reconfiguration of the existing 20" x 20" (SO.8cm x SO.8cm) and the
back to the early 196Os, they knew space, including the demolition building is clad with glass and pre-
going in it would require substan- and replacement of partition walls. cast concrete.
tial renovation. The Palo Alto Haz- A structural ana lysis of the
ardous Building Ordinance had al- Structural Concerns building's capability to survive an
ready identified the structure as The 120' x 384' (36.5m x 117m) earthquake revealed two major
hazardous and in need of upgrad- structure has a poured-in-place re- concerns: a lack of ductility and a
ing. inforced concrete frame with 8V4"- lack of strength in the columns.
In addition, the company was (21cm) thick waffle slabs for floor About 15 retrofit schemes were
planning on locating both adminis- and roof diaphragms. The columns developed by the project's struc-
trative and research functions in for the five-story, 233,OOO-sq.-ft. tural engineer, Dasse Design Inc.,
the five-story building and the ex- (21646m2 ) building are set in a grid San Francisco. Most of the retrofit •
isting mechanical and electrical fashion, spaced 24' (7.3m) in both options involved the addition of
systems needed to be upgraded to the north-south and east-west di- interior concrete shear walls. These
hand le the increased use of elec- rections. The waffle coffers at the methods were rejected for three
•
I
>~
struction time; and an overall nega-
tive impact on building functional-
ity.
~~:I ;F~'
'V~ r - ~~.• I
~ I r - -,I
The alternate to interior shear
~l"_&-'..-...\
~1'"
'.1' 1 I
walls was to reinforce the structure
using exterior buttresses. Various <9
®+--- ~
-;
schemes-using both steel and 1I ~>I_~,........ _""" .. - i'- _
. . _ "'.ot "@,...''''''' l1
concrete and either four or eight
I I I I I
towers-were considered before
the decision was made to add four ~
•
.: It
%,1
oil}.
'" Il\" . ·i.
" '" I
L--. ~ ,, -,
braced steel towers.
~~I E!YC ~ y ~ ./- -"-® 1 I
\. <
'"
~
~ ..
council accepted the proposed de-
Sign. The computer analYSis was 1.0:1 "'" 1 u '· ,,· t
performed using the ET ABS pro-
gram from Computers & Struc- r .~ + u + " l
tures/ Inc.
Steel braced frames were chosen
over concrete systems because of
their light weight, ease of erection, W I ". ~ /
rigidity, ductility, and flexibility for
window placement.
Architects on the project were
Matarazzi Associates and Williams
/
& Tanaka, both of San Francisco.
General contractor was Koll Con-
struction, San Jose, CA. The steel /
/
detailer and erector was A1SC-
member Reno Iron Works Co., Inc.
Tieing It All Together
Sub tantial ties, or collectors,
were provided to connect the exist-
ing structure to the new buttress
towers. Steel plates, welded to the
buttresses, were anchor-bolted to
the concrete floor and roof beams,
/
reaching into the center of the
•
entire project was approximately
$14 million.
"PROTECT YOUR
BOID6ESTORE
BUILDING FROM ENGINEERED PRODUCTS Co.
Seismic Protection
EARTIIQUAKE DAMAGE , ,
.
,, ,, ''r
WITH BOID6ESTORE I
; ~ I I
,
I
t ! ::::
MULTI-RUBBER , I
BEARINGS (MRB)"
Nashville: P.O. Box 140993-T, Nashville, TN 37214-0993
Los Angeles: P.O. Box 6147-T, Huntington Beach, CA 92615-6147
• CONSTRUCTION CONFERENCE
David L. Lawrence Convention Center
Pittsburgh - May 18-20 , 1994
Title Of Paper:
Positionrritle:
Place Of Employment:
Address:
Home Address :
Co-Author(s) :
1. Name :
•
(First) (Middle Initial) (Last) (Professional Suffix-Degree)
2. Name :
(First) (Middle Initial) (Last) (Professional Suffix-Degree)
Invitation/Call For Papers : practice ; must then submit their final manu-
The 1994 National Steel Construc- Quality assurance and control; scripts, in a form suitable for publica-
Innovative management techniques; tion in the 1994 Conference Proceed-
tion Conference will be held at the
David L. Lawrence Convention Center Case studies of unique projects; ings, by February I, 1994.
Computer-aided design and
in Pi"sburgh from May 18 Ihrough May
20, 1994. Participanls include struclural detailing; Preparation of paper:
engineers, fabricators, erectors, educa- Material considerations;
Final manuscripts for publication in
tors, and researchers_POlenlial aulhors Fire protection;
the official 1994 Conference Proceed-
may sub mil abslracls of papers on de- Coatings and material preparation ;
ings are expected to be aproximately
sign, fabrication and erection of sleel- Innovative structural systems.
20 pages in length . Copy (including
framed buitdings and bridges. photographs and drawings) must be
Guidelines for camera-ready_ Complete instructions
Topics of interest include: abstract submittals: will be forwarded to authors upon ac-
Practical application of research: Abstracts for papers must be sub- ceptance of Abstract Proposals.
Advances in steel bridge design mitted before July IS, 1993. They
and construction; should be approximately 250 words in Poster Session:
Composite members and frames ; length and should be submi"ed on a Papers not accepted for presentation
Heavy framing connections; separate sheet of 8v.." x II" white at the Conference may, at the author's
Steel-framed housing ; paper a"ached to this form. expense, be presented at the Confer-
Partially restrained connections; Authors will be informed of the Or- ence Poster Session . Guidelines for
Eccentrically braced frames; ganizing Commi"ee's decisions by Oc- the Poster Session Will be provided
tober I , 1993. The selected authors upon request.
Economical fabrication and erection
Return your abstract with th is submission form before July 15, 1993 to:
•
American Institute of Steel Construction , Inc_, One East Wacker Dr_, Suite 3100,
Chicago, IL 60601 -2001 Attention: 1994 NSCC Abstracts
Phone: 312/670-2400; Fax: 3121670-5403
AFEFROM S
IESTHE
That was essential because the building, which was constructed for Evans
& Sutherland Computer Corporation, is located within a mile of the Wasatch
Fault in Salt Lake City.What's more, Evans & Sutherland is a leading de igner
of special-purpose digital computers, software systems and display devices -
products extremely vulnerable to damage from seismic tremors.
To plan for maximum protection, Vulcraft was asked to join
with the architects and engineers at the design stage of the project.
Already, they'd decided to use a "base isolation" system, the most
advanced buffering method available. But using our steel joists
and joist girders was also an important decision. The joists and
joist girders are much hghter in weight than wide flange beams,
so the entire building required less steel, hghter columns and less
foundation. And this not only hghtened the load for the base is0-
lators, it saved appreciably on building costs.
Throughout construction, Vulcraft remained constantly
involved, tailoring our dehvery of materials to the exact erection
schedule and meeting deadhnes with-
out fail. What's more, our joists and
joist girders helped the steel erectors
meet their deadhnes. That's because
our products are fast and easy to erect
- a fact that saves time and money on
virtually any job where they're used.
So whether you need Vulcraft's Thr~ ... mdw.ta ·lxu.ooIaoon-l)IImI"aax.m'
'
he1p to protect your butidmg om fr moJar"""", Iakk Thryalso!/>JOkd \lJcmIi IIr<I """
and .... R'TJ.rsPrrN~
Active Bracing •
Systems
lender structures, such as tall
A recent full-scale mockup
showed the practicality of
S buildings and long-span brid-
ges, are prone to excessive lat-
eral sways that can lead to struc-
tural and non-structural damage
"smart" bracing systems for and even to collapse during earth-
quakes and windstorms.
seismic design Traditionally, structural engi-
neers have dealt with vibration by
increasing the strength and stiff-
By Andrei M. Reinhom ness of the structure. During the
and T.T. Soong last few years, some engineers
have begun using passive energy
dissipation systems such as base
isolation systems where structural
members rest on a device designed
to dissipate energy. Other protec-
tive systems dissipate energy via
plastic deformation, viscous fluids •
or heat transfer.
Researchers are now working on
a new generation of protective sys-
tems. These active systems possess
some kind of intelligence that
allow it to direct the energy dissi-
pation in an efficient way. The idea
behind the "smart" system is that it
x can sense what the building is ex-
'~I i +Y
periencing and, through electronic
and hydraulic feedback, activate
< ""'if braces to counteract the vibrations.
~ ~ -9-....."*~~ . S[NIOR Tests have recently been con-
ducted on a six-story building in
TI {ic_~_-&l downtown Tokyo that was
•
its structural muscles" to adapt to
excessive vibrations. The Usmart"
bracing system reacts with enough
speed and accuracy to prevent ex-
cessive vibration in a tall building,
making 300 complete cycles of cor-
rection on one second (see Figure
Figure 2 (LefO: A schematic of the bracillg
2).
cOf/trol meduwism shows tile process
The active control system uses
involved ill the system's reactiml to
structural braces and tendons. It
v ibratioll ,
consists of a set of diagonal braces
or prestressed tendons connected Figure 3 (BeI",ul: The details of a typical
to a structure, with electrohydrau- bay are exposed in this diagram. Tlte active
lic servomechanisms controlling protective system is composed of solid
their tensions. Such mechanisms diagol1al tube braces, wh;ch were attached
also have applicability for retrofit, at the bllilding's first story after the mai1l
since tendons and bracings are al- sfrucf,lre was built.
ready existing members of many
structures.
The preliminary evaluation of
this active bracing system demon- ,-----------------,
strated several key advantages:
• A full-scale efficient active struc-
tural control system can be devel-
oped within the limits of current
technology using off-the-shelf
components.
• It can be used on buildings of
•
any height.
• It can be used on both new build-
ings or retrofit projects.
• The bracing system improves the
response of active mass dampers, J,:,L
which were also evaluated on the
structure.
• It allows more architectural flexi- ~~~~~~====~~ NIIIlo .u,......, ",.\C.oIj. rOIl ta'lO
-~
able.
The accumulators ca n supply
UHHIHH enough power to allow the hy-
draulic pump to reach full pressure
operation, and can drive the actua-
tors for approXimately one min-
ute-longer than most earth-
·O~~.~~,,~-,7.--~~~~~~~~ quakes- in the event of a power
t),o£ (I.co"1CSJ
failure.
(~
Control System
I~O'II(' _ l':C>os
il An analogi digital controller
~'8"./l-J .. ~V .
that the analogy controller must be
compatible with the hydraulic ser-
~ ,I : ~
vice manifold and with the
. --- T -- ~ .:- • •- - - . - . - - ~ servova lves, and be capable of si-
~. - - - i --'\yos~o --_.- multaneously controlling the two
sets of servova lves. Moreover, the
.~--~--~--~~~~~~.
5 10 25 0 5 --~:~~~-=~-=--~
10 15 2tI 25 :D controller has a series of fail-safe
TM£ (SKere', l':V€ (SIC:TOCS)
circuits designed to properly shut
down the entire system if any
'XJ I
("
OOJmIQU.lO.OfIC[O ........ TlQNI
II • El " I problems are detected . As built, the
• controller was designed to a llow a
~ ~ 'i\Mm~1
digital computer to monitor the •
I !~~~~~~N~--~:·~
N ~.
information up to plus/ minus 1000
cm / sec2 (394"/sec2) . AddHional
transducers are mounted at each
noor to monitor building behavior.
Each actuator is equipped with a
displacement transducer (LVOn
... ,-
(see Figure 4) and each has a range Figure 5: Strllctllre disp'actme"ts dllrlllg April 14, 1992 earthqllalcL
of plus/ minus 12 mrn (0.47"),
whkh is used to adjust the length
of the brace via a servovalve loop.
System Performance
The building structure was sub-
jected to a series of excitations to
I
bolted andJor welded connections -:. Cansl""l
and YOriabIe load beam lines giving beam end
..
moments and rotations .:. Uniform and concen-
trated load options wllh midspan deflec-
tions .:. Basad upon research published in . RISA-2D
archival joumals. confelence ",occedings. and
University reports .. Your complete solution for
For fre manual, call or write to:
/ [""- ~. fromes, trusses, beams,
shear walls and much morel
IUtUt Df~J(~V GnolJl', b e.
4421 E. oronado Drive
Tucson, AZ 85718 26212 DimenSion Olive, Suite 200
(602) 577-2191
HN
RISA l [
Lake Foresl, CA 92630
1-800-332-7472
w.5l£ACAAO
7~====== II'
em
I'HON(
OIEOVUOI _ _ _ __
substantial reduction of the reso-
nant amplitude. Control results
from non-resonant forced vibra-
tions also indicated good ampli-
I
I
-~~~========~~~~~.~;;~~ I
,...ONCWI{I'fIIffl
""""'"
tude reductions in all affected •
modes.
The main tests were done while
Steel~k J the control system was automati-
Institute
P.O. BOX 9506, CANTON, OHfO 44711 • TELEPHONE/FAX: 216/493-7886
_--_.\
......S
32 1 Mod ern Steel Construction I May 1993
tZ)
,.
.t.
,1'
cally activated during the afore-
•
mentioned ea rthquake episodes.
The ground motion was simulta-
neously recorded and is used with
an analytical model to estimate the
probable response of the structure
in the uncontrolled mode. The ana-
lytical model was carefully cali-
brated prior to its use for earth-
quake response estimates by
comparing the structural response
in various tests with the one com-
puted . A typical response is shown
in Figure 5. More detailed results
are available in "Active Bracing
System-A Full Scale Implementa-
tion of Active Control," Technical
Report # CEER-92-OO20, ational
Center for Earthquake Engineering
Research, SUNY I Buffalo, August
1992.
Future Applications
The active bracing system is
based on commonly used braces
that provide increased stiffness
and strengthening to lateral force
resisting systems. The active sys-
tem is therefore an extension of a
•
well understood function. The
"smart" technology provides, in
addition to strengthening, addi-
tional damping that dissipates the SORB'i'EX structural bearin\1 pad
vibratory effects of lateral loading Expansion Bearings which meet today's
such as earthquakes, wind gusts, hi\1her load requirements
and waves. Therefore, wide appli- • Hi~hLoad while remainin\1 cost
cations of this system may be con- • Seismic and Thennal
sidered for such structures as brid- effective.
movement control
ges, buildings, towers, and
off-shore platforms. The system • Low friction
Voss SOde Bearings
also can be used to retrofit existing Steel ba Red PTFE
structures. • L w Deflection accomodates stru tu ra l
Steel structures naturally pos- • Rotation Capabilities movements due to
sess low damping. as in the system
tested in Tokyo. For such struc- • AASHTO Approved thennal expansi ns - can
tures excessive lateral sways can be also be bonded to oth r
easily controlled using active sys- FiBERLAST Voss Bearil1\1S t allow for
tems, thus reducing the necessity A new choi e in a misal~nment or r tation.
for lateral strengthening using
heavy structural members and NEW CRITICAL BEARING PAD DATA!
therefore opening the way to taller
construction at a reduced cost. Write lor your free DL....'" Manual ,md
soilWBrc Ocsi\l'l dk i\h<,,""'ildI.>ic
1-ib..:rt..1!!( Ct:..-wL'IlUlW"" m.. ,n wl.lb..
Andrei M. Rein/rom is a professor
of structurat fIlgineering in the de-
partment of civil engineering at
•
SUNY/Buffalo. T.T. Soong is the Sam-
uel P. Capen Professor of Engineering
in the civil engineering department at
SUNY/Buffalo.
&?&YJ;
voss ENGINEBllNG. L"iC.
N II~lmlill Are.
UrlLolnlJ1{Xx.t.I L0CX>45
ph 708 bn 8'lOO
1,1.11 7086n 1408
E A R
T H Q A K E E I G N
u o s
•
protection of the public through
the advancement of current tech-
nologies. In addition to structural
specifications, requirements for the
lateral stability of certain architec-
tural, mechanical, plumbing and
electrical building components
were also included.
Changing Codes Poses
Problems
Since then, the building codes
have changed their design require-
ments annually. These constant
amendments have made it difficult
for design and construction profes-
sionals to incorporate the appropri-
ate code provisions when
designing buildings that will un-
dergo future expansion.
While these revisions to the
building codes are important and
necessary, the process of change is
confusing and costly. An owner
designing for current needs and
anticipating future growth by al-
lowing for vertical expansion must 1'- 5 lI T
now predict space functions and
design load requirements for the !l6fNO
10 wr CClUMt
future . During design, an engineer
• can accommodate future vertical or
horizontal expansion by incorpo-
"""" ",...,•••:e,,,,
""""
PlAt[S (TOP " BOT.)
rating gravity and lateral loads into
the design of the foundations,
building columns and bracing sys-
tems. Older buildings that were
planned for vertical expansion will
I 0,.
most likely require extensive resto-
ration work to satisfy newer and ."
•
of Iheexislillg bllilding.
panded to four) new hospital
building are under construction.
During the master planning phase
for these additions, Deborah was
--t0HE~~.~1~'~I~34~E~IJ"
DESCON
DESIGNS AND DETAILS
STEEL CONNECTIONS
•
for
STRUCTURAL STEEL & MlSCELLANEOUS METAL
with AutoCAO@
•
OMNITECH ASSOCIATES
215-355-6003
P.O. BOX 7581
4 lROS • 11 - 3'-8 BERKELEY, CA 94707
(510) 658·8328
•
5 I "'"
m> At snrr ill'S
~ 6 (SHOP fIQ.D)
PLAN \lEW
them more ductile. build ing were categorized as criti- for the new loads and detailed sim-
The structural steel, three-story cal by seismic importance factors. ilar to those of the existing struc-
hospital addition will house an ex- Therefore, the new facility was at- ture.
pansion of mechanical and electri- tached directly to the adjacent ex-
cal services on the ground floor, ra- isting steel-frame structure, and the Planning For Future
diology on the first fl oor and lateral loads were accommodated Expansion
critical care support functions on by the structural frame of the entire The new two-story hospital
the second floor. The present ser- new and existing building. The building with future vertical ex-
vices and functions of this new ad- beam-to-column connections for pansion to four stories is to be con-
d ition and the adjacent existing the new addition were designed structed over an existing ground-
•
the full system' s operato,', manual!
A va ilable Exclusively Thru:
E.J .E. INDUST RIES. IN C.
OPTI-MATE, INC. CO MP UTE R SOFT WAR E FOR STEEL PROFESSIONALS
P.o . Bo. 9097, Dept. A, Bethlehem, PA 18018
287 Dewey Avenue Washington, PA 15301 (800) 321 -3955
_ (215) 867-4077
•
of the new building will house out-
Engineering Software on the market today according patient services; the first Aoor of
to the 1992 Modern Steel Construction Magazine user the existing facility which also
houses similar services will be ren-
software survey. ovated. The second Aoor will con-
sist of critical care/ intensive care
"RAMSTEEL allowed us to meet units and other surgery-related
functions. The future third Aoor
a very tight schedule with a will contain patient rooms or medi-
smaller, more efficient design cal/surgical units. The future
team. The savings in man hours fourth floor will accommodate pa-
quickly paid for the cost of the tient rooms or the expansion of
program." high-technology catheterization
NIbih YOIISMf, S.E., _ I, laboratories.
NIbih YOIISMf" AssociII..,Inc. los Angtlts, CA
RMfSTEEL provides user inleradiOl1Iike The present and future critical
, you've never tren behre! functions place this building in the
~_~A.JJ highest seismic importance cate-
.
---.......-...--_.............--..-- -"...
--=====-r ~
S
-'.
',
..
- E E L
-.I - " " : : . ;,: _ _ ••
... ' --
gory because of its need to be func-
tional during and after an earth-
'
..M_- .... .-
ItmGRA TED ANALYSIS, DESIGN addition will be constructed with a
AND DRAFTING OF STEEL BWWINGS
For more information or an in·house
demonstration, call 800-726-7789
Ram AnaJysis
_._-
*'"
*'-
- -.
. __
-
"".
..
.......
,•
-
.
r
'
I
seismic expansion joint between
the two buildings which will per-
mit horizontal, vertical and rota-
tional building movement.
The new addition will be con-
5315 Avenida Encinas, Suite M
Carlsbad, CA 92008
• structed of structural steel framing
Fax: 619/431-5214 Break into the LRrn rom]>'titiv. odS" with full and lightweight concrete slabs. By
ASD vs. LRflJ romparisons., the dick of. button.
•
BOOf726-7789 using these materials to decrease
the weight of the building, the
foundations and the lateral seismic
forces will also be reduced. Be-
cause of the loading dock at the
ground floor level, a lateral bracing
STEEL BRIDGE DESIGN on your PC system consisting of cross bracing
will be used. Semi-rigid beam-to-
MOX's steel bridge girder design program is licensed by many of column connections of top and bot-
the largest ENR Top 500 Design Firms, as well as smaller firms and tom plates will be utilized to de-
state DOTs. Now this program interacts with a grid analysis module velop the lateral forces and
that loads user·defined lanes with standard or custom trucks. ductility needed to resist the seis-
mic loads of current building
codes.
Integrated Grid Analysis & Bridge Girder Design Hopefully, when the future ad-
• Non·prismatlc I girders and box girders. rolled shapes dition is designed, the in-place
• Up to 12 continuous spans, horizontal curvature. skewed supports building codes will not have
• Gener8tes geometry for girders and bracing changed significantly. That way,
• Generates influence surfaces. loads lanes for live load forces the facility will be able to be built
• User may specify ranges for (or fixJ any of the design variables without incurring considerable re-
• Designs girders with 8 powerful optimization method (one that works/)
design and costs.
• Generated designs satisfy the 1992 AASHTO Specification
• Allowable Stress and Load Factor versions
• Excellent for analyzing existing structures for specification compliance Richard A. Esslinger, P.E. , is direc-
• Full control of composite action tor of stmctural engineering at the
• Either free form or menu driven input. comprehensive output Philadelphia-based architectural, engi-
• Graphical output of stresses and deflections on screen or printer neering, interior design and plmll1ing
And many morel firm of Ewing Cole Cherry. Ewing
Cole Cherry services commercial, in-
•
For more information, or to request 8 free trial. contact: dustrial and institutional clients na-
tionwide.
MDX software
Phone (314) 446-3221
Fax (314) 446-3278
• What's in
a name?
CNA
For AIt the Commitments You Make
1M CHA InalnnoI ComPMIM undefWrttIng IhIs program will Wiry ac:c:otdIng to""
CCMl"Itge IwIIllabte In h Conttne"'aI US. only The.. coml*»H ~1.dI
TransportabOn Inaurtnct Company, valley Forge InlOfanoe ComPMY; ConTInental c.lMJally c:omo.ny. Nalional Flr.lnStnnCe ComPllf\"f (It HeTrtord
nnlQOntMWItai ,"lOrane. Comoany Of AmericIn cuuahy of ANdInG.~,... CN... PI&zaICNc:ago, L 60685
Rules
Long Span One or more spans more than 400 fl. in length. 3. Description: Explanation of design concept. problems
and solutions. aesthetic studies, project economics and any
Medium Span, High Clearance Venical clearance of 35 unique or innovative aspect of the projecl. Include no larger
ft. or more with longest span between 125 and 400 n. than II x 17 drawings showing elevation, framing system
and tYPical details.
Medium Span, Low Clearance Venical clearonce less
than 35 fl. with longest span between 125 and 400 fl.
Method of Presentation
Short Span No single span greater than 125 n. in length. Each entry should be submilled in an SII.!" x II" binder.
containing transparent window sleeves for displaying
Grade Separation Basic purpose is grade separation. insens back to back. The entry form included in the
brochure must be easily removable. so that the
Elevated Highway or Viaduct Five or more spans. identification of the entry can be concealed during judging.
crossing one or more traffic lanes.
• Entry Form
Entry Date'_ _ _ _ _ _ _ _ __
InnovativeConccpts,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Address: _ _--:::--:-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Street
=--:-=________--:;:::-______
Phone
• Name:: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Finn:_ _ _ __ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _
Address: _ _--::-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Ph"'"
SlTeCl
==-_________________
~~-------
Tille
-::-_=________--:;-,--______
ellY and Slaic
•
been extremely difficult," said Project construction professionals, ask for
Engineer Jack Petersen of Martini
Martin Consulting Engineers of Wheat
Ridge , Colorado. "The versatility of
Hilti's DX750 made it an ideal choice
- ........
Hilti's "Deck Tech" at 1-800-879-8000 .
'
<e ~. ®
Unlike welding , the DX750 system
worked well despite cold and wet
weather. Using a self-contained B9
FARGODOME Engineers Specify the DX750
•
•
.
'-'
,
F A S TEN E R PRO 0 U C T S
•
Kenneth Walsh, Manager of Mar- tapes, one describing commonly
Masonry-To- keting Communications, Hilti Inc., encountered problems and when
5400 South 122nd East Avenue, installing bolts to the tensions re-
Steel Tulsa, OK 74146 (BOO) 727-3427 ext. quired in the Specification for Struc-
6726. tural /oillts Using ASTM A325 or
Connections A490 Bolts ("The Reliable Witness")
and the other exploring the rela-
T he MTD System 1 is a third-
party software system that
Lock Pin & tionship between torque and ten-
sion in situations normally en OUll~
eliminates the need to assemble
masonry and structural steel com-
Collar tered on construction problems
("Questioning Torque").
ponent details from scratch. Sixty
complete state-of-the-art details are
provided in plan, section, and is0-
H uck International has intro-
duced a high-strength alter-
native to ordinary nuts and bolts:
For more information or a free
copy of a videotape, contact: J&M
metric form. All details have been The Huck Lock Pin and Collar fas- Turner, 1310 Industrial Blvd.,
carefully researched and formu- tening system. It exceeds ASTM Southamton, PA 18966 (BOO) 525-
lated to meet current standards A325 and A490 requirements and 7193; fax (215) 953-1125.
and code requirements. Engineers meets AASHTO, ICBO, AISC, and
and fabricators can use the details ASME requirements. The system is
as shown or make modifications to U.s. made, and the fasteners are
meet specific project requirements. completely traceable and factory
This system is ideal for architects mill certified. Unlike standard
and engineers involved in high-strength bolts, Lock Pin and
designing low-rise steel structures Collars require no torque for instal-
clad with masonry. The MTD Sys- lation. Instead, a Huck tool applies
tem operates on DOS version of direct, linear tension to a grooved
AutoCAD Release 11 and 12. All lock pin, while imultaneously
details are derived from the techni- pushing on the collar portion. The
•
cal publication "Masonry and Steel tool forces the collar to mold itself
Detailing Handbook." Cost is $225. into the grooves on the pin, a pro-
For more information or to re- cess known as swaging. The swag- Type I And
ceive a free demonstration disk, ing action precisely elongates the
contact: Masonry Technologies coUar and pin, and the result is an Type III Bolts
[nc., 2000 Aldrich Place, Downers installed bolt with extremely high,
Grove, lL 60516 (708) 852-9122. consistent clamp-up. Also, the fas-
teners can be visually inspected.
S t.Louis Screw & Bolt operates
the only facility in North
America offering a full range of
The system is available in nominal
High Shear Nail diameters ranging from ¥I6" to
Heavy Head High Strength Bolts,
including A325 Structural Bolts
n\l". Metric sizes and A307 blind
H ilti has recently introduced
the High Shear ail (HSN)
for the attachment of metal roof
bolts also
For
are available.
more information, contact:
from 1;2" through 11;2" diameter in
aU lengths. Everything is produced
from steel melted and made in the
and floor deck to bar joist and light Mark Brenner, Huck Fastening
U.S. to fulfill both Type I and Type
structural steel beams. Designed to Systems, 6 Thomas, Irvine, CA
[]] (weathering steel) requirements
be equivalent in allowable shear 92718(714)855-9000.
and feature an "SL" trademark on
capacity to a ~" puddle weld, the its heads. All bolts produced are
nail is compatible with Hilti's DX
36M Powder Actuated Fastening
Direct Tension traceable to mill heat lots of steel
and are tested in our in-house labo-
System, which is designed to im-
prove fastening consistency and
Indicators ratory. In addition to structural
bolts, the company also produces
minimize damage to coatings on
the deck and supporting steel. The D irect tension indicators (DTI)
produced by J&M Turner are
HSN features a unique washer and now identified with a new trade-
A307 A and A307B fasteners, and
can offer all products as plain, hot
dip galvanized, or mechanical gal-
bell-shaped top hat assembly that mark symbol as well as a lot identi- vanized. The company makes an
combine to provide high dia- fication number for complete prod- extensive line of off-standard parts,
phragm shear capacity. HSN fas- uct traceability. In addition, a full such as countersunk bolts, slotted
tening quality is verifiable through range of metric DTls are now avail- countersunk and square heads.
•
a simple visual method and is able that meet the provisions of Also offered are large anchor bolts,
faster than screw fastening as there ASTM A325M and A490M. The hot forged specials including U-
are no holes to drill. company has recently produced bolts, forged & drilled eye bolts,
For more information, contact: two half-hour educational video- and head made to customer's blue
FASTENER PRODUCTS
prints.
For more information, contact:
St. Louis Screw & Bolt, 6900 N . •
your copy now! Broadway, St. Louis, MO 63147
(BOO) 237-7059; fax (314) 389-7510.
Inslructlon Manual
Connections
tor Installing
HIGH-STRENGTH
Manual
BOLTS
""'"
OtRECT TEH5K)N INDICATORS
A ISC has issued Volllllle /I Con-
nections Manllal of Steel Con-
struction ASD/LRFD. This 702 page
(ASTM ....)
EHGUSH UNfT'S EDmON
volume covers bolted and welded
shear, moment and bracing con-
nections in applications not specif-
ically treated by the general infor-
mation in the MamlQl of Steel
~ eons/rlletion, ASO or LRFO. lt also
~ Jl M 1II..-1nc.
provides examples that follow both
ASO (9th Edition) and LRFD (lst
Edition) solutions for all applicable
topics. Cost is $60 plus shipping
and handling.
J&M Turner Inc. For more information, contact:
InlemalonatHeadquaners Phone 215-953-1118 Fax 215·953·1125 Publications, American lnstitute of
1310 InduS'n81 80uIevard 800·525·7193 Telex 288965 Steel Construction, Inc., One East
SOllihampton. PA 18966
iiiiiiiiiiiiiiiiiiiii~~~~~~~~~~~~~~~~~~iiiiii~~~~ Wacker Dr.,(312)
Suite670-2400
3100, Chicago, IL
•
60601 -2001 ext. 433;
Fax (312) 670-5403.
Grating
Installation
ANCHOR BOLTS, PLATE & SLEEVE
ASSEMBLIES, TIE RODS, STUDS, SWEDGE o H istorically, the installation of
grating was always a last
minute event. Often, a temporary
BOLTS, U-BOlTS, HEX BOLTS & EYE BOLTS planking was installed during con-
Custom fabricated to exact specHications from certified domestic struction, and then removed prior
steel up to 4-inch diameter and 4O-foot lengths in steel & alloy. to the installation of the permanent
deck or grating. This scenario has
STRUCTURAL BOLTS, NUTS & WASHERS In A325, A490 & TENSION been changing dramatically of late.
CONTROL BOLTS, WELD STUDS, CONCRETE ANCHORS, B· 7 STUDS, The major design/build firms have
CLEVISES, TURNBUCKLES and all types offasteners in various grades begun moving towards modular
and materials; piain, plated and galvanized. construction wherever possible. In
Stocked for immediate shipment this case, a whole floor is assem-
*
SAME DAY SHIPPING
OVERNIGHT TO MOST U.S. CITIES
* bled on the ground, including the
flooring or grating. Then the whole
unit is picked up and put in place.
Grate-Fast has proven ideal for this
MID·SOUTH BOLT &SCREW application because it installs from
central States Ellt Coast one side and is removable without
499 ca,. Road 59 Uberty Road a trace. In addition, there is no
Nas/Mlle. TN 37210 E"""""" VA 23847 welding. hole drilling. penetration
61WS9-8341 ~40
FAX' 61WSs-6542 FAX ;~1
of coatings, or studs sticking up.
II
1_251·3520 1_J66.BOLT Because Grate-Fast is removable, •
even thought the modules are con-
BOLTS
demeath after installation is still
NG
Struct-Fast, Inc., 20 Walnut St.,
Suite 101, Wellesley Hills, MA
02181 (617) 235-6734; Fax (617) 431-
7940.
Steel-To-
Concrete
Connections
H ALFEN Anchoring Systems
offers an extensive line of ad-
justable anchors suitable for the an-
choring of structural steel to con-
crete. The system provides the
installer with the necessary adjust-
ment to make quick and accurate
connections and to substantially re-
duce labor costs. 0 welding or
drilling is required, eliminating the
need for special tools or power on
the job site. Offered are 10 profiles
of cast in channel, providing safe
working loads of 650 Ibs. to 15,700
• Ibs. per 12" section.
For more information, contact:
HALFE Inc., P.o. Box 410203,
Charlotte, C 28241 (BOO) 323-6896;
Fax (704) 588-2144.
Roll Threading
F absco Corp. has expanded its
roll threading capacity to 3" di-
ameter so there's no need to upset
large diameter rods to achieve full
WEUNE SMART BOIlS KNOW "PROPER TENSIO III
size thread engagement. Time and A-325 or A-490 high strength bolts.
money can be saved by roll thread- Factory mill certification-traceable to each keg.
ing sag rods and tie rods. Also
stocked are $8", :¥4", and 1" diame- Black or mechanically galvanized.
ter roll thread anchor bolts as well Full domestic or open stock.
as a large range of plastic anchor
bolts sleeves up to 3" diameter. The "THE LOWEST COST SYSTEM FOR PROPERLY
company also carries hot dip gal- INSTALLED HIGH STRENGTH BOLTS!"
vanized bridge bearing studs up to
1 W' diameter. All steel inventory is
mill certifiable and made in the
U.s. Certification is provided u pon
request. Also, Fabsco features cold
is provided. Module I: Shear Con- engaged on the threaded end of the crete anchors, weld studs, threaded
nections (ASD or LRFD) costs $300 bolt and finger tightened. An in- studs, plastic sleeves, clevises,
each or $550 for both versions. stallation tool engages the splined turnbuckles and all types of nuts,
Module 1I: Moment Connections end of the fastener and the nut. The screws, bolts and washers. Three
(ASD only) costs $400. plenetary gear drive of the tool locations offer next- or second-day
Contact: AISC Software Sales turns the nut and preloads the fas- delivery to two-thirds of the U.S.
(312) 670-2400. tener assembly. When the assem- Contact: Mid South Bolt &
bly has been fully installed, the Screw Co., Inc., 499 Cave Road,
spine drive end shears at the break- Nashville, TN 37210 (BOO) 251-3520.
Tension neck groove, resulting in a prop-
erly installed and torqued fastener
Control assembly. Torque Control
Contact: Bristol Machine Com-
Indicator pany, 19844 Quiroz Court, Walnut,
N ova-Hex Torque Controlling
Nuts from the Fairchild Fas-
CA 91789 (800) 798-9321.
T he TS Fastening System is a
high-strength tension control
tener Group allow users to apply
precise torque control to nut and
indicating system and is designed
for the installation of high-strength Rapid Delivery bolt assemblies using the ov-Hex
ball socket and ordinary driving
A325 and A490 bolts. The bolt de-
sign incorporates a button head
configuration for an increased load
S pecializing in meeting the
needs of structural steel fabri-
cators, Mjd-South Bolt & Screw Co.
tools. Torque is controlled by the
ball socket, not the driving tool. A
visible, permanent installation sig-
bearing area under the head of the provides a wide range of products nature clearly and quickly identi-
bolt. The threaded end of the bolt including anchor bolts, tie rods, fies to inspectors that assemblies
incorporates a spline drive with a studs, cra ne rail bolts, U-bolts, J- ha ve the proper torque. Paint, dirt
break-neck groove adjacent to the bolts, swedge bolts, eye bolts, or grime will not obscure the iden-
spline. In service, the tension set structural hex bolts, tension control tification. From the outside, the as-
bolt is installed through the struc- bolts, load indicator washers, con- semblies appear as ordinary hex
ture, a mating washer and nut are
©'" ffi
'l-
A-325
Type 1
'" A325
A-325
Type 3
COUNTERSUNK
D
SQUARE BUTTON
HEAD
MACHINE
A-307-A A-449 A-307-B
•
sockets. But inside, there is a circu- anchors; high-strength A325 and
lar internal wall in which six car- A490 bolts; studs; crane rail an- Shear
bide balls are arranged in a uni- chors; hook anchors; sleeve an-
form, hexagonal pattern. chors; hook anchors; tie rods; Connections
Continued application of torque square and round bend U's;double
causes the socket balls to first
brinell, then penetrate deeper into
expansion shields; bent he-rods;
eye bolts; drift pins; washers; turn-
T wo 120-page books from A1SC
contain design aids for shear
connections. Presented in easy-to-
the lobes of the nut. Finally, the buckle and clevis assemblies; use tabular form, the books include
socket balls break through the re- wedge type anchors; and arc weld- designs for double-angle web
sistance of the lobes to achieve a ments. A variety of coating and bolted connections, structural tee
uniform, high level of torque con- heat treatments are available. single shear connections and sin-
trol while leaving distinctive signa- Contact: TC Bolt Supply Co., gle-angIe connections welded to
ture grooves. Inc., P.O. Box 197, Forest Road, the support. The books are avail-
Contact: Fairchild Fastener Greenfield, NH 02047 (603) 547- able in both ASD and LRFD for-
Group, One Civic Plaza, Suite 500, 6371. mats.
Carson, CA 90745 (310) 522-D700. For more information, contact:
Fastener Publications Dept., A1SC, One East
Proper Tension Wacker Dr., Suite 3100, Chicago, [L
Coating 60601 (312) 670-2400 ext. 433.
Installation
T he Lejeune Tension Control
Bolting System provides a cal-
D orrlmate, an inherently black,
zinc-rich coating is now
available from Magni Industries. A
Threaded
ibrated bolt, nut and washer as- dry-to-the-touch finish, the coating Fasteners
sembly that installs at the proper is ideal for all construction fasten-
tension for that particular size and
grade of bolt. A non-impacting
ers requiring corrosion resis tance,
consistent torque tension, and bi-
P ortland Bolt is a domestic man-
ufacturer of headed and
threaded fastening hardware up to
electric wrench drives the nut metallic protection. The coating is
•
51;2" diameter and 40' in length.
against the bolt tip. This contains applied over a zinc phosphate and The material is produced and certi-
the counter forces within the sealed with an epoxy topcoat and fied to the latest AsTM and AlsC
wrench and tightens each bolt to is cost-effective compared with tra- specifications. The company spe-
the required tension and then auto- ditional electroplating. cializes in carbon, alloy, non-fer-
matically causes the tip to shear- Contact: Magni Industries, Inc., rous fasteners and hot-dipped gal-
off, indicating proper installation. 255 South Woodward, Suite 300, vanized coatings. An expansion
A-325 Type I and 1lI, as well as A- Birmingham, Ml 48009 (313) 647- has increased production and re-
490, Grades are available in :¥4", 4500. duced lead times and costs.
718", and 1W' diameters. For more information contact:
Contact: Lejeune Bolt Co., 8330
West 220th st., Lakeville, MN Steel Deck Portland Bolt & Manufacturing
Co., Inc., P.O . Box 2866, Portland,
55044 (800) 872-2658.
Fastener OR 97208 (800) 547-6758.
•
For more information, contact:
For more information, contact:
Lewis Bolt & Nut Co., 604 Twelve
ITW Buildex, 1349 West Bryn
A wide range of products are
available from TC
Bolt Supply, including: swaged
Mawr Ave., Itasca, IL 60143 (708)
595-3549.
Oaks Center, Suite 235, 15500 Way-
zata, Wayzata, MN 55391 (BOO)
328-3480.
AISC ANNOUNCES
VOLUME II CONNECTIONS MANUAL
ASD/LRFD
lII.p.
J
Siructural SleellWelding. Commentary and outline of AISC Prize Bridge Competilion ..................... 40-41
sections 10 stUdy In the UBC. UBC STDS, AISC & AWS
Codes. Report writing, l.A. City Code, AJSC Software .................................................... Cill
elemenls of plan reading . 140 pages. A ISC Volume II·Connections.............................. 49
Send $49 check or money order to:
Belhlehem 51eel Corp ...................................... 20·21
A.Shernll
P.O. Box 371 Bridgestone ............................................................ 24
Placentia, CA 92670 icholas J. Bouras, Inc ........................................ CII
CDS ......................................................................... 19
20 Software C A Insurance ...................................................... 39
RISA·2D prOVides a fas\' Iruly inleractlve environment for Ihe ChaparraI5tecl ........................................................ 8
solution of a Wide range of structural design problems. Computer; & Structures, Inc ............................ C1V
Use RISA·2D for frames, Irusses, shear walls, conlinuous
beams and much more. Com puler Detailing Corporation ....................... 36
Sialics and dynamics are included, wilh full sleel design . Oesign Oalo .............. ................................................ 7
For a free demo, contact : EJE Industries ........................................................ 37
RISA Technologies, 26212 Dimension Dr., Suite 200,
•
Lake Forest, CA 92630 (800) 332·7472 Hilil ......................................................................... 42
J&M Turner ............................... ............................. 44
• SOFTWARE
FROM AISC
112
F.ctom:l Moment Envelope:
CONXPRT ELRFD
A knowledge·based, menu-dri· A new sophisticated program
ven PC software system lor 10< interactively checking
the design of connections in structural steel building
steellramed buildings. All components lor compliance
strength limit states are with AISC specification.
checked and expert advice Checks whether member
Irom long·time lablicator engi· satisfies all limit states and
neers is used to augment the limitabon requirements set by
design rules. the LRFD Specilication and
• Generates cope sizes, allows reports which sections are
bolt stagger and perrnlts sabsfied or violated.
different bolt diameters 10< • Review in deta~ the formulas
shop and field use and rules used in the
• Designs can be sto<ed on evaluation and interactively
disk, allowing electronic WEBOPEN assess any mathematical
communication between Designed to enable engineers expression on the screen.
design parues.
• Generates complete reports
showing details and strength
to quickly and economically
design beam web openings.
Uses state 01 the art criteria
'IOeD • Fully interactive MS Windows·
based user interlace.
• Disk includes ELRFD
• IIIOffi
10< each limit state checked. and features a clear and logi· CheckfBrowser, AISC
3· 112" or 5· 114" disk cal data entry system with Structural Shapes Database
MODULE I:
SHEAR CONNECTIONS
easy·to·use color coded input
windows. Wnnen by pracbcing
engineers lor engineers, incor-
8 lOrn and sample problems
• User GUide and Relerence
1SI edition LRFD
Version 1.02
9th edition ASD
Version 2.0
$300 porating expert design checks
and waming messages which
enhance the application 01 the
HPIOCD Manual .
3· 112" disk only $495
MODULE II:
MOMENTCONNECnONS
$400
AISC Design Guida-Steel
and Composite Beams wilh
c[DO AISC
ASD lormal only $400 Web Openin~to specific
design problems.
3·112" or 5· 114" disk. Includes
IIc[DD DATABASE
Contains the properoos and
STEMFIRE AISC Design Guide $495.00 dimensions 01 structural steel
Determines sale and economi· shapes, co<responding to data
cal fire protection lor steel
beams, columns and trusses. AISC FOR published in the most recent
LRFD and ASD Manuals of
~_r\'/.f
Based on rational procedures
1-/ ""
/
~
AUTOCAD Steel Construction. Presented
-
developed by AISI which ex· in the ASClllormat for W, S,
tend the published UL fire Saves time doing detail draw·
M, HP and other common
resistive designs to other
possible rolled structural
-j- - _.n ings 01 structural steel shapes
in AutoCAD. Lists properues shapes and channels.
Available in U.S. customary
shapes and common protec· corresponding to data in the
tion material requirements.
Two 5·114" disks
Irl ~ 1'/' ""~ most recent LRFD and ASD
manuals. Parametrically draws
to scale the end, elevation and
units or metric units. May be
converted to Lotus 1·2·3 PRN
Io<mat.
& users manual $96 3·112" or 5·114- disk $60
plan views 01 common shapes.
(sorry. no 3· 112"
3· 112-or5· 114-disk $120