Wrong type of lug used. Wrong size
Wrong Installation for
Should be heavy duty crimping tool
grounding thick gauge lug used

Cables not clamped


together correctly
Cable lugs
• All cable lugs should
be tinned copper
and thick gauge
strong material


R or RF type are not acceptable
MET connections
• Any connection to the MET (Main Earth Terminal)
must be with a double lug as shown

Stainless materials
only
Bolt
Washer
MET
Washer
Nut
RBS 6201

RBS 6201 must be connected to the Main Earth Terminal (MET) inside
the equipment room using a 35 mm² Copper or 50 mm² Aluminium
grounding cable.
The RBS 6201 earth grounding points are located on the front of the
RBS and consists of two M8 studs as shown above.
Typical RBS Site
Powering Radio’s Installation ECM
0305 26 Ah Inside RBS 6201
PDU 03 02 requires the SW to be L18Q2 or a later version
To install PDU 03 02

Step 1 Slide the PDU into the cassette until the latch
on the PDU snaps into position
Step 2 Connect the EC-bus cable
Step 3 The PDU automatically configures itself. If
additional configurations are to be made, refer
to Manage Hardware Equipment
Step 4 Perform the concluding routines
Powering Radio’s Installation ECM
0305 26 Ah Inside RBS 6201
• To install ECM 03 05:
• When installing ECM, make sure that there are no empty slots in the
cassette or the 1 U power sub-rack. To secure the airflow, all empty slots
need to be filled with dummy units
Step 1 Slide the ECM into the cassette until the latch on the ECM snaps
into position
Step 2 Connect the cables according to the previous notations
Step 3 Turn on the outputs on the ECM that are to be used by pressing
the button
Step 4 The ECM automatically configures itself. If additional
configurations are to be made, refer to Manage Hardware
Equipment.
Step 5 Ensure that there are no empty slots in the cassette or the 1 U
power sub rack. To secure the airflow, all empty slots need to be
filled with dummy units
Step 6 Perform the concluding routines
Powering Radio’s Installation ECM
0306 40 Ah for Inside RBS 6201
• PDU 03 02 requires the SW to be L18Q2 or a later version
• To install PDU 03 02

Step 1 Slide the PDU into the cassette until the latch
on the PDU snaps into position
Step 2 Connect the EC-bus cable
Step 3 The PDU automatically configures itself. If
additional configurations are to be made, refer
to Manage Hardware Equipment
Step 4 Perform the concluding routines
Powering Radio’s Installation ECM
0306 40 Ah for Inside RBS 6201
• To install ECM’s 03 06
• When installing ECMs, make sure that there are no empty slots in the
cassette or the 1 U power subrack. To secure the airflow, all empty slots
need to be filled with dummy units
Step 1 Slide the ECM into the cassette until the latch on the ECM snaps
into position
Step 2 Connect the cables according to the previous notations
Step 3 Turn on the outputs on the ECM that are to be used by pressing
the button
Step 4 The ECM automatically configures itself. If additional
configurations are to be made, refer to Manage Hardware
Equipment.
Step 5 Ensure that there are no empty slots in the cassette or the 1 U
power sub rack. To secure the airflow, all empty slots need to be
filled with dummy units
Step 6 Perform the concluding routines
Powering Radio’s SDP Details &
recommendation
• ECM0306 & SPD 40A required for Radio 44xx
Powering Radio’s SDP Details
& recommendation
Indoor kit

Product Key Description Quantity


DISTRIBUTION FRAME/DF-OVP
NBA10130/9 frame, RBS 600 1.00
OVERVOLTAGE ARRESTER/Surge
NFT30459/3 Protection Device 3.00
RPM1192371/100 CABLE WITH CONNECTOR/Power
00 Cable 3.00
Outdoor kit
Product Key Description Quantity
OVERVOLTAGE ARRESTER/Surge
NFT30459/3 Protection Device 3.00
RPM1192371/015 CABLE WITH CONNECTOR/Power
00 Cable 3.00
Powering Radio’s SDP Details &
recommendation
• ECM0305 SPD 25A required for Radio22xx
Powering Radio’s SDP Details &
recommendation
• Installation of new DF for SPD Indoor site
• The DF-OVP mechanical frame “NBA 101 30/9” has space for up to 12 OVP
standard sized OVP modules (35 mm wide) or 6 alarm OVP modules (70 mm
wide) or a combination thereof, for protection of RBS interfaces.

• The DF-OVP can also house power SPDs for protection of power supply
when feeding for instance MINI-LINK PT or Remote Radio Units
Powering Radio’s SDP Details &
recommendation
• Power ECM 0306, 40A to SPD for Outdoor RBS
Standard Installation BB6630 Inside
RBS 6000
Climate System description :

• The climate system uses fans to draw ambient air through the units in the sub-
pressurized space. Below is the airflow in an example configuration with the climate
system properly configured
Standard Installation BB6630 Inside
RBS 6000
• Placement of Cover Plates in the RBS 6201 AC Configurations

SXA 215 0422/2

SXA 215 0422/3

SXA 215 0422/4

SXA 215 1171/1


Standard Installation BB6630 Inside
RBS 6000
• 3 Installation “SXA 215 0422/3” and “SXA 215 0422/4”
Standard Installation BB6630 Inside
RBS 6000
• Installation “SXA 215 0422/2”:
Standard Installation BB6630 Inside
RBS 6000

Finally we
have this
configuration,
regarding all
air blocker

Side view
Standard Installation BB6630 Inside
RBS 6000
• Installation SXA 215 1171/1 air-restrictor plate

SXA 215 1163/1

SXA 215 1640/1

SXA 215 1171/1


Standard Installation BB6630 Inside
RBS 6000
• Standard Installation BB6630 Inside RBS 6201
Standard Installation BB6630 Inside
RBS 6000
• Standard Installation BB6630 Inside RBS 6102

You might also like