A.

K1 – 150 X 250 (6D13)


B. K2 – 150 X 350 (6D13)

Elem
Unique Output Station P V2 V3 T M2 M3
Story Column Case Type Element Station
Name Case
m kN kN kN kN-m kN-m kN-m m
- - -
Story1 C13 44 Comb2 Combination 2,45 0,675 0,4589 0,0043 44 2,45
185,301 0,7093 1,0481
- - -
Story1 C13 44 Comb1 Combination 2,45 0,5958 0,4202 0,0042 44 2,45
168,915 0,6485 0,9211
- - -
Story1 C13 44 Comb3 Combination 2,45 0,5283 0,3619 0,0034 44 2,45
145,977 0,5591 0,8195
- -
Story1 C13 44 Comb2 Combination 1,225 -187,12 0,675 0,4589 0,0043 44 1,225
0,1472 0,2212
- - -
Story1 C13 44 Comb1 Combination 1,225 0,5958 0,4202 0,0042 44 1,225
171,037 0,1337 0,1912
- - -
Story1 C13 44 Comb3 Combination 1,225 0,5283 0,3619 0,0034 44 1,225
147,492 0,1159 0,1724
-
Story1 C13 44 Comb3 Combination 0 0,5283 0,3619 0,0034 0,3274 0,4747 44 0
149,008
-
Story1 C13 44 Comb1 Combination 0 0,5958 0,4202 0,0042 0,3811 0,5387 44 0
173,158
-
Story1 C13 44 Comb2 Combination 0 0,675 0,4589 0,0043 0,415 0,6057 44 0
188,938
CEK BALOK A1 200X400

Dik
fy (Mpa) 420
f'c (Mpa) 19

Tulangan lentur terpasang

Tumpuan Lapangan Tumpuan

b (mm) 200
h (mm) 400
Top 6 D 13 3 D 13 6 D 13
Bot 3 D 13 6 D 13 3 D 13

As   tulxAtul

As Top (mm²) 795,99 397,995 795,99


As Bot (mm²) 397,995 795,99 397,995

Mu (Knm) 77 59 77

d  h  selimut  tulbeg 12 tul

d (mm) 364
Asxfy
a
0.85xf ' cxb
a tump (mm) 104
a lap (mm) 104
Mu
Asperlu 
0 .85 xfyx d  a
2

As perlu top (mm²) 691,860244 265,06334 691,86024


As perlu bot (mm²) 276,744098 530,12668 276,7441

Cek jika As perlu < As pasang maka Oke…

Cek As top Oke… Oke… Oke…


Cek As bot Oke… Oke… Oke…
Tulangan geser terpasang

Tump Lap Tump

Tumpuan (mm) 10 D - 150


Lapangan (mm) 10 D - 250
Tumpuan (mm) 10 D - 150

1000
Asada  xAtul
S

As ada (mm²) 523,333333 314 523,33333

V (Kn) 66 50 66
1
Vc  x f ' c xbxd
6
Vc (Kn) 53

V  Vc
Vs 
0.75

Vs (Kn) 17,579566 -3,7537674 17,579566

∑ kaki 1

1000
Asperlu   kakixAxfyx d
VsxA

As perlu (mm²) 115,147481 -24,587459 115,14748

Cek jika As perlu < As pasang maka Oke…

Cek As Oke… Oke… Oke…


PERHITUNGAN PLAT LANTAI

2800 mm

3000 mm

Dik

fy 420 Mpa
f'c 19 Mpa
h 120 mm
Qd
108 Kg/m² Finishing lantai
25 Kg/m² M/E + Hanger
150 Kg/m² Partisi Dinding bata
283 Kg/m²
Ql 192 Kg/m²
Wu 1.2 Qd + 1.6Ql 647 Kg/m²

fy
m  xf ' c

= 26,01

Tulangan terpasang

Bentang panjang ly 3000 mm

Top 10 - 200 As ada 392,5 mm²


Bot 10 - 200 As ada 392,5 mm²

Bentang pendek lx 2800 mm

Top 10 - 200 As ada 392,5 mm²


Bot 10 - 200 As ada 392,5 mm²

d  h  se lim ut  1
2  tul
95 mm
ly/lx 1,1 Untuk cari koef momen

Mu  0 . 001 xMxWu 2

Mu
Rn  xbxd 2


Mty 51 Muty 259 Kgm Rnty 0,4 Mpa
Mly 25 Muly 127 Kgm Rnly 0,2 Mpa
Mtx 51 Mutx 259 Kgm Rntx 0,4 Mpa
Mlx 25 Mulx 127 Kgm Rnlx 0,2 Mpa

1 2 xmxRn
r  x1  1
m fy

rty 9E-04
rly 4E-04
rtx 9E-04
rlx 4E-04

As  r xbxd

Tulangan perlu

Cek bila As ada > As perlu maka oke…

Bentang panjang

Top As perlu 87,5 mm² Oke…


Bot As perlu 42,6 mm² Oke…

Bentang pendek

Top As perlu 87,5 mm² Oke…


Bot As perlu 42,6 mm² Oke…