You are on page 1of 2

Date: 2021-05-14

TANK PRODUCT VOLUME TANK STATUS


SETTLING PLANT R50:50 AND MARO
19 SLOPS 3
68 CON OIL 36 to move to tank 48, got free water at the bottom
69 CON OIL 45 to move to tank 48, got free water at the bottom
71 SLOPS 70 SETTLING
72 SLOPS 34 RECEIVING
73 SLOPS 14 TO RECEIVE
74 SLOPS 0 TO RECEIVE
75 SLOPS 63 MOVING
76 SLOPS 67 SETTLING
77 SLOPS 0,5m SETTLING
78 SLOPS 73 to move to settling plant
79 SLOPS 3.5 to move to settling plant
80 SLOPS 74.6 to move to settling plant
81 SLOPS 40 moving to settling plant
40 SLOPS 25 to move to settling plant
41 SLOPS 33.7 to run through FFE
101 TK20 SLUGE 45 to move to tank 49/ and run through FFE
48 SLOPS 98 FFE feed (currently), feed is 52% water
49 SLOPS 77 to drain water
28 FFE DISCH 29
84 R50:50 5
44 PX LUBE 19 to move to tank 48
45 MARO2 24 batched
46 SLOPS 17 tank needs to be cleaned/ de sludged
47 R50:50 19
FO150
83 SLOPS 61
85 HFO 58
86 HFO 70.3
87 LOSD FEED 60.3 needs to be heated up, hole tank product is waxy
88 HFO 270
89 MFO 286 batched
90 LOSOD 131
91 BIT. BLEND 166
92 DE-BANKER 167.7 vics is = to 87.8cSt, water 0.59%
93 HFO 157 batched
EFFLUENT PLANT AND WATER SYSTEM
70 EFF WATER 200 level faulty, and tank 70 valve to separator to be fixed
57 EFF WATER 402 91,30%
25 EFF WATER 0 to de sludging the tank
OTHERS
20 PX SLUGE 3
27 WET LUBE 3.8
42 TK20 SLUGE full to move to tank 49/41 and run through FFE
43 BOILER FUEL 18
59 LIGHTENDS 36
60 LIGHTENDS 39
DELIVERIES RECEIVING
60tons mondi 1 mfo was received
18tons much asphalt pmb
25tons srf
7tons bidvest bay
27tons compass waste
SLOPS
FO150

R50:50
LOSOD
MARO2
WATER
TK20 SLUGE
PX SLUGE
LOSD FEED
TO HEAT RECEIVING
HEATING SETTLING
SETTLING HEATING
TO MOVE
MOVING MOVING
TO DRAIN EMPTY
DRAINING FFE DISCH
RECEIVING BOILER FUEL
TO RECEIVE
PX LUBE
EFF WATER
LIGHTENDS
CON OIL
HFO
MFO
BIT. BLEND
DE-BANKER
WET LUBE
BATCHED

1.65 deeping

You might also like