SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
1
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
General All Area Technical personals. 1.All technical personals should be submit their certificate
Activities To Safety department and allow them to work in the site
based on the approval of project SAPMT.
Drivers / Operators. 2.Alshalawi Safety Department will be provide the Safety
orientation and defensive driving training before enter
the site.
3.All drivers should have valid SAG license and operators
should have SAG License and SA certification except
roller Compactor operator.
4.All drivers should be followed speed limit and traffic
signage in the site.
5.Violators will be penalized and fourth violation subjected
to permanent removal from the site.
5.Vehicle and equipment should be perfect condition and
checked it based on the check list before start the Job.
6.Check list to be submitted the Safety department office
weekly basis and Safety department will be check all
vehicle and equipment weekly basis. Defective
equipment will be removed from the site with immediate.
2
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
effect.
7. Traditional dress will not be allowed in the site.
8. Drivers make sure all safety devices of the equipment
and vehicle should be working properly.
9. Vehicles and equipment to be parked only the
designated area.
10.Major maintenance will not be allowed in the work
place.
First Aiders. 1. Shall be provided minimum one first aider have first aid
certificate from recognized hospital in a crew and it
will be increase depend up on the nature of Hazards
and location of the people assigned for the work.
2.Will provide 10 units of first aid kits up to 50 man power
and minimum 36 first aid kits above 50 man power.
Site Nurse. 1.Site nurse shall be mobilized to the site prior the
approval of SAPMT and Saudi Aramco Minimum medical
standard requirements.
Safety Rep. 1.All safety personal shall be mobilized to the site prior
Approval of SAPMT Safety department. Company will
be Ensure the availability of safety officers is 50:1.
C P R Training. 1.Company will be make sure that minimum one of the
employee who is able to give the C P R in case of the
emergency based on the training by the recognized
hospital and training certificate will be kept in the safety
departmental office.
3
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
4
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
5
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
Turnover of Equipment Ensure the area is stable for placing crane prior to
installation by site engineer.
Safety personal makes double check the area prior
to installation of crane.
Safety personal will not be allowed any placing of
crane on unstable surface.
The crane will not be place near by the excavation
unless additionally protected.
Outriggers must be fully extended and placed on
mats.
Strictly enforce to follow the lift calculation chart.
Injury/Death/Fatality. Safety department will not be allowed to operate the
crane if the wind speed is above 32 Kp/mh.
Operation will not be allowed if below 360 degree
visibility or adverse weather.
All personal allowed only work with crane is
competent and trained.
Ensure that all employees equipped with proper P P
E and additionally reflective jacket.
Area should be demarcated by the safety barrier
and will display the sign board “EXCLUSION ZONE
DO NOT ENTER”
All lifting operations shall be accepted only under
the supervision of the competent supervisor.
Do not allowed to stay any one underneath of the
suspended load.
6
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
7
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
8
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
evening)
8.Garbage will be removed from the site and dispose
based on the approval of Municipality.
9.To be keep required skids in the site and office are to
keep garbage and will be removed the garbage daily
basis.
10.Portable waste basket will be provided with cover.
11.Dust control shall be carrying out frequently and
ensure that site is not affecting the exposure of dust
through water spraying.
9
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
All activities All Area Death, 1.All fire will be reported to Saudi Aramco within 24 hours
Burn, by Project Manager or Safety supervisor.
Fatality,
Material Loss. 2. Fire rated office to be installed.
3.All employees to be trained emergency response while
mobilization.
4. Minimum 1 emergency evacuation mock drill will be
conduct in the work place by safety department and
documented.
5. Assembly sign board will be displayed near by the safe
10
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
Emergency Site Office Injuries In an emergency, or on hearing the “Stop Work Alarm”,
Evacuation & Camp Fatality every supervisor shall ensure the following: A
Death B&C
1. All works are stopped at once.
2. All equipment is shut down.
3. All men are evacuated to a pre-determined assembly
point.
4. A roll call is taken and every man is accounted for.
5. No one is permitted to return to work until notification
has been received from operations or from the
company representative that it is safe to do so.
11
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
Help in an Emergency
In the event of an emergency situation (serious personal
injury, fire, critical damage to operating equipment, etc.)
help may be obtained by contacting the nearest Saudi
Aramco Main Gate or Security Control Center. This may
be done by:
A Telephone-110
Dial emergency to
B Radio
If telephones are not available, Security Control Center
may be contacted from the Emergency Control Center on
the emergency Radio Circuit (158.96 MHZ).
12
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
MANUAL Phase-1 ERGONOMIC HAZARDS 1. Observe proper lifting techniques e.g. Back straight;
Handling (Attributed to routine Knees bent; Load close to the body; Legs apart; Firm
manual handling / lifting grip
materials or exposure to 2. Ensure the awareness of the employees by posture
repetitive and prolonged and training..
tasks) 3. Buddy system observed on handling heavy loads.
13
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
Hand and Power Installation Electric Shock. 1- Ensure generator properly grounded with 70mm
Tools. of Site Hand Injury. transparent copper cable and grounding rod A
Office. Hearing Loss. properly derived to the earth. B&C
Back Pain. 2- All employees equipped with proper P P E.
Stress and Fatigue. 3- Ear protection to be used while working with
grinder, cutter and drilling machine.
4- To be provide frequent breaks to the workers.
5- Ensure the fire extinguisher (ABC Type) Available
near the work area.
6- Use only G F C I Cable.
7- Ensure proper inlet and out let for power supply.
8- Only allowed 125 volts power tools in the site.
Preparation Site Offices Fire Emergency Evacuation plan to be
of Site Offices Facilities. prepared.
Facilities. Fire protection devices to be installed,
Slip, trip & fall Fire Extinguisher, Fire drums with Fire Buckets,
and Smoke detectors to be installed.
Electrocution Emergency Evacuation plan must be
displayed entire the facility.
All the access way, corridors stairs must
Injury be clear from any obstruction
In case of Emergency numbers list to be displayed
Sudden illness at entire facility.
14
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
15
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
a) Back strains / injuries 4-If possible use equipment to avoid manual handling.
Musculoskeletal pains 5-Ensure the physical capability prior to assign workers
b) Cumulative Trauma to the job.
Disorders (CTD's) 6-Ensure proper supervision by competent person.
c) Hernia.
16
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
17
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
slopped or benched.
Health Effects Hand excavation only will be permitted to expose
underground utilities.
Ladder will be provided in excavation for access
and egress.(each 7.5 Meters)
Noise, Vibration, A cold permit and confined space entry
Dusts, Groundwater permit will be required for all excavations over 1.2
Pollution. meters in depth.(General Requirement)
A gas test would be required Hourly basis in the
suspected areas.
Proponent shall provide plans before start work.
All the equipment and vehicle will be scheduled and
provision of maintenance will be placed.
Ear plugs, earmuffs will be provided
If necessary Plastic mesh will be used as barricade
for preventing unauthorized Entrance if needed.
Existing U/G utilities drawing will be
used to identify U/G utilities. Allowed only Manual
Excavation.
Maximum spoils height is 2 feet with in
horizontal distance away from the edge of the
excavation equal to the depth of the
excavation.
Excavation plan shall be prepared by a
degreed civil /structural engineer and
reviewed by CSD.
18
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
compaction, Phase -1 Dust, 2- Ensure the ear protection if sound exceeding the B&C
Testing, Back Vehicle reversing, limit.(85 dAb for 8 Hours)
filling, Asphalt. Vehicle overturning, 3- Flag man to be assigned for controlling traffic.
Burn, 4- Safety barriers to be erected for preventing
Heat stress, Fatigue unauthorized entrance.
5- All employees equipped with proper P P E in
additionally visible Jacket.
6- Ensure the area is stable while dumpers dumping
materials for back filling.
7- Provide proper rest shelter and frequent break to
avoid fatigue and stress.
8- Work to be closely monitored by the competent
supervisor.
9- Ensure the excavation work permit to be obtained.
10-Sufficient drinking water to be provided.
11-Traffic to be controlled by the competent person
with flag man based on the traffic flow plan.
12-Ensure there are no underground utilities disturbed
during the earth cutting.
13-All operators and drivers must be attended the
defensive driving safety training prior commence to
the work.
14-Mechanical Forman and Safety advisors ensure that
all equipment’s reverse warning alarm and all
electrical lighting system functioning properly.
Civil work of Phase -1 Falling from height, 1-To be provided proper scaffold plat form for performing
Booster station. Falling materials, Job. A
Drilling, Back pain, 2-Scaffold must be certified by the scaffold supervisor. B&C
19
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
Constructing Hand Injury, 3-Ensure the employee equipped with full body harness
Guard House, Contact with chemicals, and tied up on the stable surface while working on the
chlorination Slip trip and fall, roof.
House, Office Contact with moving parts, 4-Materials to be segregated and ensure the walk ways
building. Electric Shock, are free from obstructions.
5-Walkways must be stable and free of slipping.
6-All protruding rebars to be caped or bended.
7-Use equipment and avoid manual handling if possible.
8-Ensure the suitable and physically sound employee to
be used for manual Handling
9-Ensure the employees equipped with proper P P E.
10-Used water resistant boots and rubber gloves for
concrete job to avoid body contact with cement.
11-Ensure the portable equipment safety guards in place.
12-Damaged portable tools and equipment to be removed
from the site with immediate effect.
13-G F C Is shall be used for all portable electrical power
Tools and power supply.
14-Ensure all electrical inlet and outlet as per Saudi
Aramco Standards.
15-Portable electrical power tools shall be rated and used
at a voltage not exceeding 125 Volts.
16-All power tools to be double insulated.
17-Form works shall be designed, erected,
supported, braced and maintained in accordance with
SAES-Q-001,ACI 347.2R,ACISP-4,ANSI/ASSE
A10.9,ASCE 37.
18-Competent personals must be monitor and supervised
the activity.
19-Personel shall not be allowed under or near form work
20
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
21
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
22
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
23
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
Work in Man Hole Phase -1 Fire Must be obtained confined entry permit Procedure.
Explosion To be assigned Fire watches or 30minutes after A
work finished. B&C
Asphyxiation
Ensure the designated person for conducting
Death atmosphere check every one hour.
Fatality Ensure the calibrated fire extinguisher readily
24
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
Hydro power Phase-1 Explosion. 1-To be ensure that the skilled and competent
testing A
Uncontrolled releasing of staff involving Hydro power testing.
B&C
power 2-To be used only calibrated equipment for
Hydro Test.
3-Area should be demarcated and displayed sign
25
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
Cable Phase-1 Slip, Trip & Fall, Back pain, To be ensuring that only competent staff assigned
Pulling/lying. Muscle pain. for the work. A
Ensure that all workers are equipped with proper P B&C
P E.(Especially Hand Gloves)
Competent person to be supervised the work
activities.
To be provide sufficient man power to be worked.
Ensure the work area is clean and stable for the
activity.
Trashes and garbage’s to be removed from the
26
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
area.
To be used only physically sound employees for the
activity.
Use equipment to transfer cable drum to one place
to other place.
Ensure proper access &egress to the junction
Boxes.
Existing live power to be shut off and following the
lock out tag out system.
Dewatering Phase-1 Environmental Hazards, To be ensuring that there is no oil leakage of the
dewatering pumps. A
Hearing Loss,
To be ensure the precautions for sound control B&C
Physical Injury,
measures (Isolation, Cabinet or Saud proofing fall,
Burn, Frequent Breaks)
Slip, Trips and Fall, If possible use equipment for handling materials
Equipment collapse. Ensure proper access and egress to the work place.
Use proper refueling system for water pumps
To be used drip trays if needed.
Ensure all heat surface of the Water pumps to be
safe guarded.
To be provided valid fire extinguisher with water
pumps.
Use only authorized equipment and certified
27
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
Asphalt Paving. Phase-1 Physical Injury, Ensure the competent staff for asphalt paving.
All employees equipped with proper P P E .In A
Burn,
additionally Gum boots, Hand gloves, Face mask B&C
Collide with equipment,
and high visible reflective jacket and ear muffs.
Chemical Infection, Use flag man for controlling traffic.
Heat stress, Required sign Boards to be displayed
Environmental Hazards, Area to be demarcated to prevent unauthorized
Burn, entrance.
To be provided sufficient drinking water at site .
Hearing Loss.
Allow workers to be take frequent breaks.
Slip, Trips and fall. Handling chemical to be carefully.
Supervised by the competent supervisor.
Ensure the first aid facility available at site.
Excessive asphalt to be disposed at designated
area only.
Ensure the work area cleaned up before leaving the
site.
All equipment should have beacon lamp and
28
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
Fire Prevention Site & Injuries 1. The emergency phone # shall be posted in strategic
and Protection Camp locations around the temporary site facilities in A
Burn
clearly visible boards of approximately 40 x 60cm. B&C
Fatality
and written on it
Death 2. Emergency reporting procedures shall be posted
near each telephone set in the jobsite.
3. Firefighting equipment shall be provided as
indicated on the approved site layout plan.
4. Separate container shall be provided for the storage
of flammable materials that complies with the
requirements of the Construction Safety Manual
and applicable GI’s.
5. Materials were to be stored and protected according
to sizes, nature, perishability, flammability, etc. with
adequate access ways for easy storage & retrieval,
and for fire trucks.
6. Two five-meter gates shall be provided for easy
access to the lay down yard. Power supply shall be
tapped from existing systems so there is no need
for Generator Sets.
29
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
30
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
First-Aid/AED Site and Fatality To be provided Sufficient First aid Facilities in the
Camp site. A
Death
Trained First Aiders for each group of workers. B&C
Ensure the availability of Equipped Ambulance with
good condition.
The medical Teams to be ready for Immediate
Response
Displayed Emergency Contact Numbers in work
place and office premises
Additional training to the employees for emergency
response and evacuation procedure.
Ensured the workable AED is available in the site
clinic and this AED under the control of SAMSO
Approved site nurse.
Compressed Gas Site & Fire, Cylinders should not be used as rollers, supports,
cylinders Camp or for any purpose other than to contain and use
Explosion.
the contents, as received Minimize the number of
cylinders in use and storage in site only limited as
per the requirements.
Avoid storing cylinders in hallways, heavily traveled
31
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
32
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
33
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
area
Sanitation and Phase-1 Disease Entire jobsite and project Luger buckets / Skip
Housekeeping boxes will be provided for proper waste A
Hygiene management. B&C
Waste Disposal Trash bins with Plastic bags will be
Provided in Offices, Camps and jobsite.
Rodents, Insects
Weekly inspection will be conducted by the safety
officer &Documented.
Unhealthy Daily housekeeping will be in practice
Environment throughout the project.
Drinking water with paper cups will be provided at
site.
Pest control will be performed.
Waste disposal as per SAEPD.(Environmental
Protection Dept.
All the portables will be closed around at bottom
and sides to avoid rodent and insects rehabilitation.
Traffic circulation Phase-1 All the Drivers shall comply with SAG
along jobsite and MVA, hit, struck by License requirement. A
Road Crossing All the vehicles will be maintained as per B&C
Manufacturer recommendation.
All the Safety devices with vehicle will be in good
condition.
Injury All the Drivers will be given Safety
trainings for “defensive Drivers Training”
in each 6 months and document will be keep in site
safety office.
34
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
Office & A, Electrical Shock 1. All electrical circuits shall be protected by (GFCI) and to
Electrical system Entire B, Burns be checked at least once a week.
and Equipment Constructio C, Fatality 2. All electrical equipment shall be provided with proper
Installation. n Site. grounding. Newly installed systems either temporary or
D, Death
permanent shall be inspected, tested, and approved by
E, Material Loss Electrical Engineer
3. Prior to commencing of isolation of systems for tie-ins,
Operations shall identify isolating locations and types
of isolating device are required. If necessary, they shall
consult with third parties, such as electrical specialists.
Equipment shall then be isolated, locks, and tags
installed by Operations and Al- Shalawi Company.
A. Isolation will have been completed only when no
associated control device, such as a push button,
control interlock, or automatic start-up control
circuit, shall have the capability of energizing the
35
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
equipment.
In situations where it is not possible to lockout or
chain off an isolating device, isolation may be
accomplished by removal of fuses, disconnection
of electrical cables, installation of blind flanges, or
physical removal of a component of the system
supplying energy to the equipment. The point of
Physical interruption should be identified with a
fully completed tag.
A. When isolation has been completed (or before if
appropriate), Operations will de-energize equipment to
ensure that it contains no residual energy.
4. Other organizations or individuals working on
equipment shall also install their locks and tags at
locations identified by Operations. Multiple lockout
clips shall be used if necessary.
5. Each lock on a piece of equipment, or on a multiple
lockout clip, must be labeled to be identified. The
preferred approach is to install a tag (Aramco form 525)
on each lock indicating plant numbers or location, the
date and time of lockout, name, badge number,
organization, contact phone and signature of the
individual who installed the lock and the reason for the
lock’s installation.
6. Verification tests, in which all affected parties
participate, shall be conducted by Operations on each
isolating device and on each piece of equipment
isolated.
36
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
37
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
38
HAZARD IDENTIFICATION PLAN
SAUDI ARAMCO HOME OWNERSHIP DEVELOPMENT PROJECT INCR – II, EAST DAMMAM
BI # 28-10011
CONTRACT #
ACTIVITY LOCATION POTENTIAL HAZARDS CONTROL MEASURES HAZARD CLASS
39