ROBIN ANAND PATROL INSPECTION REPORT

INDUSTRIES DRAWING NO
PRODUCT NAME INPUT SHAFT (11X22) DATE

PROCESS SPLINES CUTTING SHIFT

M/C NO SHM- OPERATOR NAME

INSPECTION ACTUAL OBSERVATION


S NO PARAMETER SPECIFICATION REMARK
METHOD
1 2 3 4
-0.0
1 MINOR DIA DVC 29.20 -0.2

-0.0
2 WIDTH SPLINE DVC 8.50 -0.1
3 SPLINE LENGTH DVC 75.0 ±0.1
4 NO.OF SPLINES VISUAL 6

5 VISUALLY OPEN EYE OK/NOTOK

CODE = RAI-PI- CYCLE TIME WT BEFORE


REV = 00 IDLE TIME WT AFTER
DATE =11 /06/20 TOTAL TIME

INPECTOR NAME & SIGN- HOD QA-


INPECTOR NAME & SIGN- HOD QA-
ROBIN ANAND INDUSTRIES-LUDHIANA
INCOMING INSPECTION REPORT
DRAWING NO

PARTY NAME DATE

CHALLAN/BILL NO ITEM NAME

QUANTITY

INSPECTION ACTUAL OBSERVATION


S NO PARAMETER SPECIFICATION REMARK
METHOD
1 2 3 4

CYCLE TIME WT BEFORE


IDLE TIME WT AFTER
TOTAL TIME

INPECTOR NAME & SIGN- HOD QA-


INPECTOR NAME & SIGN- HOD QA-
ROBIN ANAND INDUSTRIES-LUDHIANA
FINAL INSPECTION REPORT
DRAWING NO

PARTY NAME DATE

CHALLAN/BILL NO ITEM NAME

QUANTITY

INSPECTION ACTUAL OBSERVATION


S NO PARAMETER SPECIFICATION REMARK
METHOD
1 2 3 4

CYCLE TIME WT BEFORE


IDLE TIME WT AFTER
TOTAL TIME

INPECTOR NAME & SIGN- HOD QA-


INPECTOR NAME & SIGN- HOD QA-
ROBIN ANAND INDUSTRIES-LUDHIANA
CUSTOMER RETURN REPORT
DRAWING NO

PARTY NAME DATE

CHALLAN/BILL NO ITEM NAME

QUANTITY

INSPECTION ACTUAL OBSERVATION


S NO PARAMETER SPECIFICATION REMARK
METHOD
1 2 3 4

CYCLE TIME WT BEFORE


IDLE TIME WT AFTER
TOTAL TIME

INPECTOR NAME & SIGN- HOD QA-


INPECTOR NAME & SIGN- HOD QA-