CPM125 - Project Management Principles:

QA/QC - Testing and Inspection


Checklist
Purpose: Your Objective for this assignment is as follows:
1. Create a QA/QC and Testing and Inspection Checklist for our Pump House Project

Instructions: Using Point Presentation and class discussions, provide a QA/QC And T&I checklist for
our Pump House Project that provides all the requirements listed on the evaluation
sheet (Page 2)

Grading: Noted on page 2 – Evaluation Sheet.

Due: Due: Ilearn Portal Dropbox Due May 27, 2021 by 9:30PM. Late submissions will be
graded with a 25% penalty. There will be no further submission dates for this
assignment.
Notes: Be careful, all copying and “copying and pasting” will be graded with a “0” for this entire
assignment and the assignment will be submitted to the Dean for review. I am
interested in your work and having you succeed as a Construction project Manager, not
simply what you can copy and paste from the internet.
Student Name:_______________

CPM125 Project Management Principles


Breakdown of Marks for this Submission

Pump House Project (QA/QC and T&I Checklist)

Content: Mark Out of a Notes:


possible
mark of:
Provide at least 3 /6
Quality Assurance
criteria for the
project and 3 Quality
Control criteria for
the project
Identify a minimum /10
of 10 Testing and
Inspections required
for our project.

Neat and organized, /4


easy to follow and
read:
(Title Page)(Header
/ Footer)

Clear, concise /2
language: Spelling
and Grammar.

Effort: /3
Late Assignment 25% Reduction in Overall
Grade
Total /25