Professional Documents
Culture Documents
Instructions: Using Point Presentation and class discussions, provide a QA/QC And T&I checklist for
our Pump House Project that provides all the requirements listed on the evaluation
sheet (Page 2)
Due: Due: Ilearn Portal Dropbox Due May 27, 2021 by 9:30PM. Late submissions will be
graded with a 25% penalty. There will be no further submission dates for this
assignment.
Notes: Be careful, all copying and “copying and pasting” will be graded with a “0” for this entire
assignment and the assignment will be submitted to the Dean for review. I am
interested in your work and having you succeed as a Construction project Manager, not
simply what you can copy and paste from the internet.
Student Name:_______________
Clear, concise /2
language: Spelling
and Grammar.
Effort: /3
Late Assignment 25% Reduction in Overall
Grade
Total /25