LIST OF AMENDMENT
1 December 2019 i
KAN U-02 Rev.1
Table of Content
1. Introduction..................................................................................................... 1
2. Findings Category ......................................................................................... 1
2.1 Nonconformities Category 1 ........................................................................... 1
2.2 Nonconformities Category 2 ........................................................................... 2
2.3 Opportunity for Improvement .......................................................................... 2
3 Response to Findings according to Conformity Assessment Report .............. 3
1 December 2019 i
KAN U-02 Rev.1
Findings Category
1. Introduction
2. Findings Category
Assessment team may recommend to stop the accreditation process for whole
or some part of the proposed scope, or to suspend some part or whole scope
or recommending carry out ons site verification assessment.
2.1.1 All CAB personnel are not competent to carry out conformity
assessment activities in accordance with requirements in their scope;
1 December 2019 1 of 3
KAN U-02 Rev.1
1 December 2019 2 of 3
KAN U-02 Rev.1
3 Response to Findings
CAB shall respond on any findings according to which accreditation process is being
undertaken, for initial accreditation, corrective actions and verification of corrective
actions shall be completed within 3 (three) months. For surveillance, renewal and
extending scope, corrective actions and verification of corrective actions shall be
completed within 2 (two) months.
In the event that assessment team issues a nonconformities category 1 and CAB
would like to continue the accreditation process for that related scope, a follow-up on
site assessment (if needed) must be carried out within the deadline for corrective
action.
Follow-up on-site assessment to verify the corrective actions submitted by CAB can
only be done once, and there is no more correction after follow-up on site
assessment being conducted.
1 December 2019 3 of 3