Professional Documents
Culture Documents
Docking, Mooring and Transfer For LNG: Trelleborg Marine and Infrastructure - Performance People
Docking, Mooring and Transfer For LNG: Trelleborg Marine and Infrastructure - Performance People
You need to work with a partner that You need to ensure your measurement,
combines best practice expertise, gained communications and safety systems are
through worldwide experience, with a deep designed by a world leader, with in-house
understanding of local requirements and design, testing and manufacturing capabilities.
regulations. This global reach combined with
Connect with a partner that provides the
feet on the ground local presence helps to
support you need from conception to
make Trelleborg the Performance People that
completion and beyond.
continually enhance your operations.
Connect with the Performance People at
You need to ensure your LNG facility is
Trelleborg Marine Systems for a complete
protected by solutions designed around the
portfolio of LNG docking, mooring and transfer
needs of you and your customers, with an
solutions.
experienced team that understands your
demanding requirements.
It is essential your docking, mooring and
transfer systems feature the most technically
superior products, to maximize durability and
reliability whilst minimizing downtime and
whole life costs.
2
Contents
C A PA B I L I T I E S
Q u ality M anagement
r esea r c h an d d e v elopment
p r o d u cts
3
Trelleborg Marine Systems
LNG portfolio
With over 30 years’ experience in providing cutting-edge docking, mooring and
transfer technology systems all over the world; we understand the LNG market
and the demands of the modern terminal.
From offshore applications to FSRUs, we have a pedigree in all LNG applications
and can ensure you have the solution you need to optimize your operations.
4
LNG Terminals
From Quick Release Hooks (QRHs) to Ship-Shore
Links (SSLs), Trelleborg represents the benchmark
in integrated docking, mooring and transfer
packages for LNG terminals. We supply over 60%
of LNG terminal mooring and monitoring systems,
and in excess of 80% of the SSL transfer systems
for LNG terminals globally. All our systems comply
with the stringent safety requirements for berthing
at export/import terminals and SIGTTO guidelines.
5
Project management
process
Our consultative project management
process takes the pressure off you because
our dedicated in-house team are experienced
from the conceptual design stage right the
way through to aftersales care.
1
The Teekay
Typical project
case studies > “Arctic Spirit”
Customer:
Teekay
6
2 3 4
The Excelerate The “Golar Frost” Yuedong LNG
Energy “Exemplar”
Customer: Customer: Customer:
❙S
SL Regas system connected ❙ LNGC to FSRU conversion ❙ Fully integrated large-scale LNG
to jetty and companion LNGC at Livorno, Italy mooring and transfer system
❙C
ontinual provision of gas to the ❙ Ship-to-ship mooring solution ❙ QRHs, DAS, Environmental and
region whilst receiving LNG from including QRHs, load monitoring Oceanographic Monitoring, Fibre
companion LNGC to refill its tanks and GPS OMADS Optic Ship Shore Link
❙P
rocess data communicated ❙ Trelleborg SeaTechnikTM SSL ❙ Trelleborg SeaTechnikTM SSL
between FSRU and shore through system for LNG transfer for protects LNG transfer
SSL, gas and liquid processes replenishment
❙ Portable Handheld Unit (PPU)
remained independent of each
❙ Bespoke solution, ensuring for dual berth installation and a
other’s Emergency Shutdown
compliance with RINA Carry On Board (COB) laptop
Signals (ESD)
Classification Requirements system for single berth installation
❙ T he Exemplar is compatible
❙ Storage capacity of 137,000 ❙ High-quality aftercare, including
with any global regas terminal,
cubic meters of LNG and a equipment testing and
representing a flexible and
production capacity of 3.75 billion operational training
significant asset in the Excelerate
standard cubic meters per annum
Energy fleet ❙ Hazardous area compliance
(bscmpa)
7
5 6 7
Curtis Island LNG Singapore LNG Escobar LNG
Terminal
Customer: Customer:
Customer:
Antara Koh/Samsung YPF
John Holland Group
❙ T he world’s first project to turn ❙ Integrated docking and mooring, ❙ 175 million cu.m. (6,000 million
coal seam gas into LNG SSL and fender systems scf) per day Escobar LNG terminal
❙Q
RHs with load monitoring ❙ SCK Cell fenders supplied over ❙ Advanced mooring equipment to
and remote release, Laser two phases, DAS, QRHs and SSL ensure ship and terminal safety
DAS, PPU, MetOcean, SSL during critical gas discharge
❙ Stringent specifications
and environmental monitoring, operations
and testing
integrated marine monitoring
❙ QRHs with Electric Remote
systems and workstations ❙ SSLs installed on berths one
Release and SmartHook®
and two
❙ Data made available to client’s Load Monitoring Systems
DCS systems
❙ Fast track design and supply
❙C
omprehensive product range, for the mooring equipment
systems integration and support was essential
in local regulatory guidelines and
❙ Controlling critical gas output
hazardous area standards
process whilst simultaneously
❙ T relleborg SeaTechnikTM SSL controlling LNG replenishment
protects LNG transfer from LNGC to FSRU
8
8 9 10
Dubai LNG Ras Laffan Grain LNG
RasGas/QatarGas
❙O
versight and supply for both ❙ Ras Laffan, 80km north of Qatari ❙ Docking, mooring and fendering
jetty and FSRU capital Doha, aims to be the for jetty upgrades: QRHs,
world’s leading port for LNG SmartHook load monitoring,
❙ Double, triple and quadruple
SmartDock DAS, central
QRHs with load monitoring for ❙ Supplied a full suite of fender
integrated monitoring system
the jetty mooring systems, docking and mooring
and SCN super cone fenders
equipment and gas transfer
❙ T relleborg SeaTechnikTM
technology ❙ Further work with main contractor,
SSL installed
CB&I to supply monitoring
❙ The facility now boasts state-
❙ Additional work with Golar on instrumentation
of-the-art Parallel Motion
design and supply of double
Fenders, Quick Release Hooks, ❙ Trelleborg SeaTechnikTM SSL
150T Quick Release Hooks,
Smarthook®, load monitoring installed on the two berths
load monitoring, remote release
with remote release, Smartdock®
and central computer system ❙ The Isle of Grain terminal can now
Docking Aid Systems with
facilitate LNGCs with a capacity
❙ Critical integration and alignment customized central integration
of up to 266,000m³, jetty eight
of the two systems and Trelleborg SeaTechnikTM Ship
is capable of accommodating
Shore Links installed across
the world’s largest LNG ship,
various condensate and LNG
the Q-Max vessel
berths within the port
❙ A personal aftersales service,
including calibration and
commissioning of QRHs at short
notice, and operational training
at Trelleborg’s Melbourne facility
9
7
Quality
Management
Quality Management is at the core of everything we do at Trelleborg
Marine Systems. It is integral to our processes and procedures, and
controls the way we work with you to approach each engineering
challenge. Our business systems are constantly evaluated to drive
innovation and value delivery to you as our customer, reflecting
national, regional and environmental standards.
Quality Assurance
Quality Assurance is the priority across our range
of products and services for the LNG industry.
Both Trelleborg Marine Systems UK and our
Melbourne Docking & Mooring group hold
accreditation to ISO9001, certified by Lloyd’s
Register QA. In addition the Melbourne facility
holds ISO14001 accreditation.
10
11
7
Engineering
Design
Experienced engineering and rigorous testing.
12
13
7
Research and
Development
For over 30 years, we’ve been a world leader in innovation to meet the needs of ports
and harbours all over the world. We’ve remained true to the principle of innovation,
with a substantial staff of experts in research and development, ensuring we
consistently provide new ways to meet increasingly demanding specifications.
14
Versatility Compatibility
Our understanding of the intricacies of docking and We can work with you to integrate new solutions into
mooring, and the complex nature of gas loading and existing projects, as our products can be used with
unloading safety systems mean we are constantly those of other providers, and integrated seamlessly
evolving our solutions to meet and exceed the to provide full-service, bespoke solutions. Our SSLs
specifications of your project, be this a FLNG, small rationalize the various connectors and communication
scale or conventional LNG terminal. Our mission is to protocols in a single product to ensure worldwide
help you maximize the efficiencies of your operations. compatibility.
15
7
16
A portfolio of
LNG products
Trelleborg Marine Systems designs, manufactures and commissions unique mooring
hardware and monitoring software that is specifically configured and matched to your
requirements. Our solutions, which are built around the latest field-proven technologies,
will be tailored to the needs of your project by our multi-disciplined team of engineers.
1. 2. 3. 4. 5. 6.
17
1. 2. 3. 4. 5. 6.
18
Learn more about the complex systems integration
requirements for docking, mooring and transfer in FSRUs.
19
7
Trelleborg is a world leader in engineered polymer solutions
that seal, damp and protect critical applications in
demanding environments. Its innovative solutions accelerate
performance for customers in a sustainable way.
facebook: TrelleborgMarineandInfrastructure
twitter: @TrelleborgMI
youtube.com/user/TrelleborgMarineandInfrastructure
flickr.com/people/marineandinfrastructure
linkedin.com/company/trelleborg-marine-and-infrastructure
Thesmartapproachblog.trelleborg.com